Validata Connectivity (V-Conn) Achieve full control of the migration process, reducing risk on go-live Agenda 1 Challenges with T24 Migration 2 Validata Approach 3 Validata Methodology 4 V-Conn Overview 5 ABN AMRO Bank Migration Project 6 Benefits Challenges with T24 Migration Implementation is extremely complex and business critical Data migration is not agile based and doesn't support Business-IT collaboration Mapping multiple core banking legacy systems into a single platform system Challenges data profiling, data quality & data governance impacting go-live timelines No formal migration methodology or methodology integrated with the implementation & delivery methodology of T24 Financial loss in the accounting book due to inaccurate data mapping and extract specification Maintenance of delta logs (data) while conducting multiple mocks Unscheduled downtime to Legacy Services and semiautomated procedures Engagement from Legacy & T24, Business & IT subject matter experts (SMEs), impact time & cost to engage related resources Migration is usually seen as one-off activity leading to a scripted approach with limited reusability, high risks, longer implementation plans Validata Approach Big Bang Approach o V-Conn will migrate all records (bulk import) from the legacy to the T24 tables or to the DWH o Validata DB will be used as staging area for the static data o When doing the import, V-Conn can do the cleansing and validation of the imported data o Validata will generate a reconciliation report after the migration Phased Approach o Special adapters will be used to extract the new and modified records and mitigate them to DWH on a daily basis o This incremental migration will happen automatically through scheduled jobs o Following to the migration, a reconciliation of the migrated data in all ETL processes can be achieved Sample ETL Steps methodology Automatic validation of data mapping prerequisite worksheet Extraction Source 1 Task Validata Adapter Validata Engine Stage 1 Extracted data and Validation Log Data migration risks and mitigation plan Transformation Task Data mapping templates and tables Transformation Engine Reporting Adapter Stage 2 Transformation Data and Transformation Log Data migration risks and mitigation plan Load in T24 Task Validata Adapter Stage 3 Transformation Data and Transformation Log Load Data Data migration risks and mitigation plan Target System V-Conn Features Data Extraction & Loading Online & offline data extraction and loading from multiple applications within the same framework Data Transformation Validata Mapping Schemas define the mapping and transformation rules. Data Profiling Key item for archiving is to identify and understand all relationships in data Creates and replicates tables from the legacy systems, storing the data information accordingly and providing reporting on top of them. Data Archiving Prebuilt Migration Mappings forT24 Validation Scheduling & Job Sequencing Pre built business mapping knowledge for T24 Field and Data Validation for completeness, proper context, rules validation and attributes value validation The migration jobs can be scheduled for single or a repetitive execution at specified date and time. Synchronization Service Real time synchronization of data between two systems Process Control & Audit Full audit trail and control over the migration process Consolidation Reporting Data import and consolidation from heterogeneous data sources and from many different applications and platforms Reconciliation Reporting Generation of automated reconciliation reports T24 Reporting Testing CRF reporting testing and Balance sheet revaluation testing Validata ETL Migration Process Control and Audit Mechanism Validata Adapter Validation and Data Cleansing Engine Mapping Schemas Validata Adapter Mapping Schemas Validata Staging Area & Data Warehouse Report , Warnings, Rejections Legacy Mapping Schemas Reconciliation Engine Business Model Report , Warnings, Rejections T24 Reconciliation Engine Mapping Schemas V-Conn Prebuilt Adapters A cornerstone of V-Conn architecture is its system integration and interoperability features. V-Conn design is based upon the concept of a generic core that can communicate freely and flexibly with other systems using components called adapters. Transaction Monitor Adapter 80% reduction in current time to test T24 Adapter 50% faster time to market 80% reduction in current spend on testing 30% increase in productivity Data Base Adapters Generic Adapters T24 Java API Adapter (CSV, xml, flat files) Validata Migration Project Steps Analysis (scoping) Activities Review TAABS Identify T24 modules Scoping Workshop Volume Analysis Migration Approach Reconciliation Approach ETL activities agreed Issues & challenges identified. Tracker with open issues to be addressed prior to design workshops Design Activities Review BRDs, FSDs & T24 Build Design Workshop ETL Design Migration Versions Design Migration Strategy Reconciliation Strategy Tracker with open issues & challenges Reconciliation Design Deliverables Project Plan Detailed Mapping Tracker Deliverables Identify T24 Gaps Detailed Migration Requirements Document & Data Migration Sheets (DMSs) Detailed Reconciliation Requirements Document Migration Versions Requirements Document Tracker with T24 Gaps Testing Strategy Updated Project Plan (optional, if necessary) Build Activities Testing Activities Go Live Activities Development Functional Testing. Perform Data Migration Migration testing UAT. ETL Support Functional Testing scoping and test cases preparation. Dress Rehearsals Auto Reconciliation Recovery Plan preparation Go Live Plan preparation Business Reconciliation Support. Deliverables Deliverables Deliverables Updated DMSs ETL scripts Functional Test Logs Reconciliation scripts UAT Logs Migration Versions Dress Rehearsals Summary Reports Unit test cases and Test Logs Defect Logs Recovery & Go Live Plans Test cases for Functional Testing. Auto reconciled T24 system • Define the source • Define the filtering criteria • Select the extraction process • Select the pre-created mapping rules • Execute the extraction process • Review and reject or accept the results Benefits • Continuous and online extraction from multiple sources through Online High Performance Staging Area • On line extraction: connecting directly on the source using the pre-built adapters • Off line extraction: using extracted file formats • The delta migration is extracting only the changed and new records from the source system • Live synchronization process for data extraction Process Multi Level Data Extraction Data Extraction Engine • Fully automated extraction process, results in reducing the total effort of the extraction process • The pre-built Validata integration with the legacy systems reduces the total cost of investment of the whole migration project • Through the synchronization and incremental update processes the extraction of accurate data during are ensured • Business Rules setup at File level and Field level • Mandatory/Optional setup • Critical/Non Critical Rules setup • Field/File Format restrictions setup • Threshold setup for warning and rejection mechanism • Reject records populated into Audit Tables with justifications • Reject records fixed and Partial File can be reprocessed Benefits • File validation • Check for Availability of required files by Modules • Check for Source data file format In expected Standard format • Check for Total record count as Specified in Controller • Check for Duplicate records • Field validation • Check for mandatory and Optional Data • Check for source Field correctness based on Available business rules • Populate Default Values wherever not available and Possible based on Business Rules • Dependency validation • Check for Source data referential Integrity across Files Process Multi Level Data Validation Data Validation Engine • Configurable Thru Control Tables and Files • Customization based on required Legacy Source system and target T24 Version • Framework for Automated Import of Associated Data Objects • Target Format definitions setup at File level and Field level • Load data to the T24 in validate mode for migration testing • Load data to T24 using T24 migration versions • Reconciliation reporting of the data transformation and load phases Benefits • Field level reformat as required by T24 • Minimum and Maximum Field lengths • Regeneration of required T24 IDs • Multi-value Field Setups • Check for Duplicate records • File level Formats • Structure files as required by T24 Data Migration Tool • Breakup into Multiple files wherever required • File Split and parallel files for performance • Support for Data Migration Tool (optional) • Pre-created Data Mapping definitions for standard file formats as required by DMT Process T24 Specific Re-Formatting Data Transformation and Load Engine • Configurable Thru Control Tables and Files • Customization based on required Legacy Source system and target T24 Version • Customize Existing T24 Data Migration tool definitions • Predefined formats of reconciliation Files by module • Comparison utility to reconcile Source and T24 Data • Predefined Reconciliation reports by Module • Internal T24 Audit log reports to additionally validate correctness of loaded information Benefits • Nature of reconciliation • Qualitative reconciliation • Quantitative reconciliation • Reconciliation Data Extraction Process • Identified set of reconciliation data needs by Module. • Generation of Standard reconciliation files from Legacy Source and Target Temenos T24 • Reconciliation Reports • Predefined Set of recon reports by Module to validate success of Migration • File comparison Utility to reconcile Source extracted data with T24 Loaded Data. • T24 Audit log reports Process Reconciliation Reconciliation Engine • Provides a portfolio of predefined reconciliation reports for every migration step • Multistage (Extraction, transformation etc) Reconciliation, for both technical and business level. • It is bundled with a number of financial reconciliation reports that could be used for financial reconciliation as well (e.g Contingent/Non Contingent entries, Total debit/Total credit). • A reconciliation engine and reconciliation report writer enables business and IT to define new reports without coding Reconciliation Reports View details for task Extract and Validate Customers View details clicked for task Transform Customers Case 1 – details when there is no error • Priority definition of Various Modules • Defining dependencies in the Migration execution process • Multiphase Implementation definitions • Dependencies • Audit Information • Threshold definitions controls • Start – Stop mechanisms, Hard and Soft Restart • Monitoring Start and Stop times • Notification to concerned Groups depending on success or failures • Controls at granularity of Module level as well as Individual File level • Setup done in files or tables to define the entire sequence and mandatory dependencies • Notification process setup based on need • Scheduled migration tasks are created to follow the migration process automatically. Benefits • End to end Process Sequence Process Control Mechanisms Process Control Engine • Customizable based on Implementation needs • Configurable for Big bang or Phased implementations V-Conn IT Audit Support Key Issues Data misfeeds Lack of data / transaction integrity Loss of critical data Unencrypted sensitive information Data variances between sources and target system Invalid, incompleteness and inadequate interfaces and their related controls Lack of Business / IT alignment Non compliance to regulatory requirements Data Validation & Integrity Application Security Configuration Review IT General Controls Post Data Conversation Review Transaction Integrity Review Reporting Accuracy Interface Control Testing V-Conn IT Audit Support Methodology Identification of the upgrades and changes through the change management capability Alignment of the business requirements and system design documentation to achieve effective and timely upgrade Risk assessment and mitigation planning Check the availability and appropriateness of business and technical operating procedures and standards Disaster recovery and business continuity arrangements Logical access controls Configuration Management Interfaces adapters Compliance with technical security standards for T24 platform and database Adequacy and effectiveness of the testing strategy and environment Service level agreements Monitoring Legal and regulatory aspects Benefits Proper use of IT applications and supporting systems Increased business process efficiency and controls alignment Check the effectiveness of business and IT risks Check on inappropriate access granted to sensitive transactions, data and configurations Verification of incorrect data mapping results in inaccurate processing of data or misclassification of data /accounts Reduction of the number of manual controls and enhance reliance on automated controls Key Differentiators Data Validation and Integrity Transaction Integrity Data Flow Validation Interface Controls Data Conversation Review Benefits Save up to 60% of the time for all migration stages Time reduction of the migration setup and preparation by 70% Avoid costs for additional archiving storage and software 90% reduction of time and cost for establishing the connectivity to the legacy system 50% faster time to Market 30% increase in productivity 20% increase in project success Save up to 50% time for the reports preparation Up to 5 times faster creation of mappings Automatic Vs Semi -Automatic Migration 0% Reusability 67% Cut Down Cost due to Reusability Roll Out Reconciliation Test Development Analysis Engagement C O S T $$$ Roll Out -50% Reconciliation -60% Test -75% Development -70% Analysis -65% Engagement -65% Semi- Automatic Migration Automatic Migration C O S T $$ Data source – Transaction data Extracted data Load data Target System Validata adapters Transformed data Validata Staging Area Validata adapters Reconcile data Data source – Static data Reconcile data Reconciliation Diagram Data source – Transaction data Stage1 – Extraction Reconciliation Validata adapters Target System Stage2-Transformation Reconciliation Load data Transformed data Extracted data Validata Staging Area Validata adapters Data source – Static data Reconciliation Framework Stage3 – Load Reconciliation Reconciliation for this stage is populating report based on comparison between extracted Legacy data. Also all mismatches as per business validation rules. Reconciliation for this stage is populating report based on extracted transformed data. The process is using the defined business transformation rules. Reconciliation for this stage is populating report based on data that should be loaded against data actually loaded in T24. Stage4 - Reconcile Reconciliation for this stage is populating report based extracted data from T24 against data that should have been loaded. Direct Migration Extract Transform Load Reconciliation Diagram Reconciliation Framework static Data Stage1 – Extraction Reconciliation 500.000 Customers Stage2-Transformation Reconciliation 500.000 Customer Stage3 – Load Reconciliation 500.000 Customer Stage4 - Reconcile 500.000 Customer Reconciliation for this stage will be based Data cleansing rules on Sector(Integer and in between specific range), Address( Specific Length). Reconciliation for this stage is populating report based on >100 business transformation rules . Reconciliation for this stage is populating report based on Transformed data to be loaded in Target System against actual volume of data loaded. Reconciliation for this stage is populating report based on Extraction of all Customer in T24 against the Customers that should have been loaded. •Failover policy , the process can be done unattended. •Validation Rules easy to be maintained. •Extraction requires approximately 3 minutes. •Generation of the report plus excel export takes 10 minutes •Failover policy , the process can be done unattended. •Transformation business rules easy to be defined and maintained. •Transformation requires approximately 2 minutes •Generation of the report plus excel export takes 10 minutes •Failover policy , the process can be done unattended. •The expect number of loaded data is a result of previous stage outcome. •Loading requires approximately 12 minutes •Generation of the report plus excel export takes 10 minutes •Failover policy , the process can be done unattended. •Comparison ruler(field level) are easy to be created and maintained. •Extraction of the Data takes approximately 8 minutes. •Generation of the report plus excel export takes 10 minutes •Overall time is 18 minutes fully automated process. Reconciliation Diagram Reconciliation Framework Dynamic Data Stage1 – Extraction Reconciliation 750.000 FUNDS.TRANSFER Stage2-Transformation Reconciliation 750.000 FUNDS TRANSFER Stage3 – Load Reconciliation 750.000 FUNDS.TRANSFER Stage4 - Reconcile 750.000 FUNDS.TRANSFER Reconciliation for this stage will be based Data cleansing rules on AMMOUNT( to be above 0),ACCOUNT ( belongs in the list of migrated acc) Reconciliation for this stage is populating report based on >30 business transformation rules . Reconciliation for this stage is populating report based on Transformed data to be loaded in Target System against actual volume of data loaded. Reconciliation for this stage is populating report based on Extraction of all Funds transfer in T24 against the Funds transfer that should have been loaded. •Failover policy , the process can be done unattended. •Validation Rules easy to be maintained. •Extraction requires approximately 3 minutes. •Generation of the report plus excel export takes 10 minutes •Failover policy , the process can be done unattended. •Transformation business rules easy to be defined and maintained. •Transformation requires approximately 2 minutes •Generation of the report plus excel export takes 10 minutes •Failover policy , the process can be done unattended. •The expect number of loaded data is a result of previous stage outcome. •Loading requires approximately 15 minutes •Generation of the report plus excel export takes 10 minutes •Failover policy , the process can be done unattended. •Comparison ruler(field level) are easy to be created and maintained. •Extraction of the Data takes approximately 15 minutes. •Generation of the report plus excel export takes 10 minutes •Overall time is 25 minutes fully automated process. ROI based on Reusability for Migration Projects 78% Cut Down cost 0% Reusability Roll Out Reconciliation Test Development Analysis Engagement Migration Phase 1 Roll Out -60% Reconciliation -80% Test -85% Development -75% Analysis -80% Engagement -85% Migration Phase 2 *Scenario where the same legacy system across locations is used
© Copyright 2024