The Stockholm Bypass Project

The Stockholm
Bypass Project
Jesper Niland
Technical Manager
Stockholm - A city on water
2
2015‐06‐04
Undersized traffic system
3
2015‐06‐04
Regional development plan
The Stockholm bypass will:
• form an outer ring road
together with Norrortsleden
and Södertörnsleden
• link north and south and many
of the regional urban cores
• create a single market for
jobs, homes and services
4
2015‐06‐04
The Stockholm Bypass
Total length:
21 km
Tunnel length: 18 km
Travel time:
15 minutes
No. of lanes:
3 in each direction
Junctions:
6
Traffic 2035:
140,000 vehicles/day
Construction: 10 years
Cost:
5
2015‐06‐04
EUR 3.1 billion
(2009 price level)
Longitudinal section
Graphics: Tomas Öhrling 2010
6
2015‐06‐04
General cross section
7
2015‐06‐04
Rock tunnels in brief
• Length of main tunnels: 2 x 18 km
• Length of ramp tunnels: 14 km
• 6 main tunnel contracts
• 7 access tunnels
• Excavated rock: 19 million tons
• 3 temporary jetties for transport of
rock masses at sea
8
2015‐06‐04
Construction method
9
2015‐06‐04
Drilling for blasting
Pre-grouting
Scaling
10
2015‐06‐04
Rock bolts and shotcrete
Logistics of rock masses
11
2015‐06‐04
The Kungens kurva Junction
12
2015‐06‐04
The Hjulsta Junction
13
2015‐06‐04
Tunnel safety concept
14
2015‐06‐04
15
2015‐06‐04
Building Information Modelling
BIM – a natural part of
• the design work
• the tender documents
• the co-operation with contractors
• the as-built documentation
16
2015‐06‐04
Procurement
Main contracts
Civil contracts:
6 Nos
Main tunnel contracts:
6 Nos
Access tunnel contracts:
2 Nos
Installation contracts:
5 Nos
The size of the main contracts varies
between 50-350 million Euro
A total of about 50 different contracts
International marketing of the project
17
2015‐06‐04
Betongbeläggning i Förbifart Stockholm
K1
K2
K3
Påfart
Avfart
Betong
Asfalt
18
2015‐06‐04
K3
K2
K1
Betongbeläggning i Förbifart Stockholm
• Tjocklek beläggning 250 mm
• Längs‐ och tvärgående fogar
• Förankringsstänger i fogarna
• Utformning och material i princip enligt AMA 13
• Strukturbehandling av färdig vägyta
19
2015‐06‐04
Betongbeläggning i Förbifart Stockholm
• Betongläggare av typen glidformsläggare
• Utförandeentreprenader
• Betongbeläggningar på broar enligt TRVK Bro
20
2015‐06‐04