e tenneguedfsure Tennessee Gas Pipeline Weekly System Update November 13, 2014 Ten n e ss ee Ga s Pip e lin e I 1 00 1 Lo u is i an a Str eet I Hou s ton , T X 7 7 00 2 I w ww. ten n e s see ad v an t ag e.com INSIDE THIS UPDATE TGP Calendar Reminders Tip of the Week Storage Update Operations Update Outages Update Helpful Links DART Training (Videos) TGP CALENDAR REMINDERS Weekend Contacts and After-hours number: 713-420-4999 Nov 15th Nicole Lang Mandey Allen Debbie Tweedy Work 713-420-5992 713-369-9369 713-420-5289 IM tgpnicolel Craftyone07 tgpdtweedy Nov 16th Nicole Lang Mandey Allen Debbie Tweedy Work 713-420-5992 713-369-9369 713-420-5289 IM Tgpnicolel Craftyone07 tgptweedy TIP OF THE WEEK DART Training (Documents) Presentations Chart After Hours: 713-420-4999 Please send all suggestions and comments on our weekly update to: [email protected] Thank you for your business! Kinder Morgan has the following holidays for the remainder of 2014: Thursday, November 27 Thanksgiving Day Friday, November 28 Thanksgiving Day KM designated Holiday Thursday, December 25 Christmas Day Friday, December 26 Christmas Day KM designated Holiday Page 2 TIP OF THE WEEK (Continue) DART Customer Activities New Login Link – Update As previously posted on June 27, 2014 Kinder Morgan is in the process of upgrading and adding new servers. This Saturday night November 15, 2014 access to the old Dart servers will be going away. Please be aware that if you are using “Dart Login (Old)” or from Mobile Dart “Houston IDart” or “Lakewood IDart”, these connections will no longer be available. If you are currently using “Dart Login” or from Mobile Dart “HOU IDart –New” you will not see a change. The IP addresses are located on the "DART Access/Firewall Rules" page under the "Help & Information" section of our site at http://pipeline.kindermorgan.com/StaticContentManager.aspx?control=firewallRules. Access to the public areas of http://pipeline.kindermorgan.com does not require these firewall rules. If you have not already done so please forward these IP addresses to your IT department as soon as possible in order to reduce a potential interruption of access. For questions concerning firewall configuration please contact Skip Stallings at 713-3699067, [email protected]. For general questions concerning this change, please contact Wade Callen at 713-369-9366, [email protected]. Note: Technical Staff is limited over the weekend and may not be available to assist if experience any technical issues accessing Dart. STORAGE UPDATE As a reminder November 30, 2014 is a Sunday and part of the Thanksgiving holiday weekend. All December 1 online storage transfers need to be input and confirmed on or before the end of day November 30. If you or your back-up need assistance, please contact your scheduler in the coming week for training. If your storage transfer is not completed on terminated or recalled contracts online, your storage contract will be charged for being over MSQ on your invoice, and the balance will not be automatically moved to the new contract. All storage customers that do storage transfers need to set up a contact with an email in DART for notification of storage transfers. Go to Business Preference, New, Select the “IMBAL TRD/STOR TRANS” category and input the contact information including the phone number and email. NOTE: IF THE EMAIL IS NOT SET UP FOR THE GID, THE TRANSFER WILL BE IN ERROR AND THIS MUST BE FIXED BEFORE THE TRANSFER CAN PROCEED. 3 Page 3 Imbalance Trades The imbalance trade period for October, 2014 trades is November 13-November 25, 2014 OPERATIONS UPDATE The OFO Action Alert in Zone 4 downstream of Station 315 and Upstream of Station 321 on the 300 Line remains in place. Matching physical flows to scheduled volumes in these areas remain extremely important. The reversal project at Sta. 860 continues. This project will limit throughput through Station 847 (segment 847 FH) by approximately 195,000 Dths and Station 860 (segment 548 BH) by approximately 221,000 Dths. The maintenance continues at on the 500 line. This project will limit throughput through the station by approximately 415,000 Dths (Segment 542 BH). These projects could result in restrictions through a pro rata portion of secondary out of the path (SOP) nominations. Anomaly remediation at MLV 101-1 to 106-1 and and the bi-directional/filter work at Sta. 200 continues. This project limits throughput through Sta. 110 by approximately 587,000 Dths (Segment 187 BH). These projects could result in restrictions through a pro rata portion of secondary out of the path (SOP) nominations. Unit maintenance continues at Sta. 245. Work will limit throughput through the station by approximately 30,000 Dths. This work could result in restrictions through a pro rata portion of secondary out of the path (SOP) nominations. OUTAGES UPDATE For a full list of outages, please refer to the 2014 Maintenance & Outage Update Posting
© Copyright 2024