Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) BD Dhaka Water Supply and Sanitation Project (P093988) SOUTH ASIA | Bangladesh | Water Global Practice | IBRD/IDA | Specific Investment Loan | FY 2009 | Seq No: 13 | ARCHIVED on 23-Nov-2014 | ISR17136 | Implementing Agencies: Dhaka Water and Sewerage Authority (DWASA) Key Dates Key Project Dates Board Approval date:02-Dec-2008 Effectiveness Date:17-Mar-2009 Planned Mid Term Review Date:31-Oct-2012 Actual Mid-Term Review Date:28-Nov-2012 Original Closing Date:30-Jun-2013 Revised Closing Date:31-Dec-2015 Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective (PDO) is to improve the sustainable delivery of stormwater drainage, wastewater and waterservicesby the Dhaka Water Supply and Sewerage Authority (DWASA) to the population of Dhaka through: (a) the installation ofselected stormwater pumping stations and the rehabilitation of selected canals to help improve drainage and minimize urbanflooding; (b) the rehabilitation, repair and expansion of priority investments in the city's sewerage network and treatment plantto help improve the urban environment; and (c) supporting DWASA's pilot expansion of water and sanitation services into selectedDhaka slums to help increase services to the urban poor. Has the Project Development Objective been changed since Board Approval of the Project Objective? Yes Board Approved Revised Project Development Objective (If project is formally restructured)PHRPDODEL The revised Project Development Objective is to improve stormwater drainage in select catchments in Dhaka and improve DWASA's planning activity. Components Name Investment Planning in Sanitation:(Cost $3.10 M) Rehabilitation and Strengthening of Storm Water Drainage System:(Cost $60.50 M) Support to the implementation of environment and social safeguards:(Cost $2.30 M) Support to Service Improvement Planning in Low Income Communities:(Cost $1.50 M) Project Management and Institutional Capacity Building:(Cost $8.60 M) Overall Ratings Name 11/23/2014 Previous Rating Public Disclosure Copy Current Rating Page 1 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating -- Substantial Implementation Status and Key Decisions The project is on track to achieve its development objectives. Major physical works to improve storm water drainage in selected catchments in Dhaka city remain on schedule. Civil works, pump installation and other mechanical and electrical installations have been completed at Rampura storm water pumping station – thus increasing the storm water pumping capacity by 25m3/s. Full commissioning of Rampura station is expected by December 31, 2014. Kamlapur storm water pumping station is also on schedule to be fully completed and commissioned by June 30, 2015. Rehabilitation works for the originally targeted eight drainage canals are progressing well, and are on schedule to be completed by the project closing date. Total capacity of rehabilitated drainage canals has increased by 150m3/s, which is about 60% of the targeted increase of 250m3/s. Total length of rehabilitated canals now stands at 18,500m, as compared to the targeted length of 20,885m. Further, key technical assistance activities to improve DWASA’s investment planning capacity remain on schedule to be completed by credit closing date. The sewerage master plan has been completed and approved by DWASA Board. The draft final report on the drainage master plan has been submitted, and is currently being reviewed by DWASA and other stakeholders. DWASA has also recently launched the process of preparing an investment plan to improve services for the low-income customer groups. Finally, significant progress has been achieved implementing DWASA’s institutional capacity development action plan. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- -- High Macroeconomic -- -- Substantial Sector Strategies and Policies -- -- Substantial Technical Design of Project or Program -- -- Moderate Institutional Capacity for Implementation and Sustainability -- -- High Fiduciary -- -- High Environment and Social -- -- Low Stakeholders -- -- Moderate Other -- -- -- Overall -- -- Substantial Results 11/23/2014 Public Disclosure Copy Page 2 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) Project Development Objective Indicators PHINDPDOTBL Direct project beneficiaries (Number, Core) Baseline Actual (Previous) Actual (Current) End Target Value 1500000.00 2000000.00 2500000.00 4000000.00 Date 05-Jun-2013 25-May-2014 26-Oct-2014 31-Dec-2015 Comments This target will be achieved on completion of the khal rehabilitation and the building of the pumping stations PHINDPDOTBL Increase in Permanent Stormwater Pumping Capacity (Cubic Meter(m3), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 25.00 40.00 Date 12-Dec-2008 25-May-2014 26-Oct-2014 31-Dec-2015 Comments Construction works on the storm water pumping stations is now underway. The civil works for Rampura have been completed and Kamlapur is on schedule. The work will be completed by the credit closing date. PHINDPDOTBL Increased Capacity of Rehabilitated Drainage Canals (Cubic Meter(m3), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 60.00 120.00 150.00 250.00 Date 12-Dec-2012 25-May-2014 26-Oct-2014 31-Dec-2015 Comments A total of four canals have been completed, and the remaining four are in final stages of completion. A few additional canals works are advancing well. PHINDPDOTBL Number of Plans Prepared and Approved by DWASA's Board of Directors (Number, Custom) Baseline 11/23/2014 Actual (Previous) Public Disclosure Copy Actual (Current) End Target Page 3 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) Value 1.00 0.00 1.00 4.00 Date 12-Dec-2012 21-Nov-2013 26-Oct-2014 31-Dec-2015 Comments The waste water management master plan is has been approved by the DWASA Board approval. It is expected that the preparation of all remaining plans will be completed, and the plans approved DWASA Board by the closing date. PHINDPDOTBL Female beneficiaries (Percentage, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 50.00 50.00 50.00 50.00 Date 05-Jun-2013 25-May-2014 26-Oct-2014 31-Dec-2015 Comments Overall Comments Intermediate Results Indicators PHINDIRITBL A New Sewerage Plan for Dhaka City is Approved by DWASA's Board of Directors (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value N N Y Y Date 12-Dec-2012 25-May-2014 26-Oct-2014 31-Dec-2015 Comments The plan has been approved by DWASA's Board. 11/23/2014 Public Disclosure Copy Page 4 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) PHINDIRITBL Diagnostic Study on Septage Management Practices in Dhaka (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 12-Dec-2012 25-May-2014 26-Oct-2014 31-Dec-2015 Comments The consultancy for the study is in the final stages of procurement. It is expected to be completed by Project closing date. PHINDIRITBL Length of stormwater canals developed / rehabilitated (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value -- 18.00 18.50 20.89 Date -- 25-May-2014 26-Oct-2014 31-Dec-2015 Comments The khals are progressing well and the target is expected to be achieved by the closing date. PHINDIRITBL A New Drainage Master Plan for Dhaka City is Approved by DWASA's Board of Directors (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 12-Dec-2012 25-May-2014 26-Oct-2014 31-Dec-2015 Comments Work on the plan in ongoing, and is expected to be completed, approved and disseminated by project closing. PHINDIRITBL Drainage Modeling Undertaken of the Impacts of the Project's: i) Khal Rebilitation and ii). Stormwater Pumping Station Rehabilitation (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 12-Dec-2012 25-May-2014 26-Oct-2014 31-Dec-2015 Comments 11/23/2014 Public Disclosure Copy Page 5 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) Work will be completed by project closing. PHINDIRITBL Number of project affected households (PAHs) successfully compensated (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value -- 435 435 500 Date 02-Dec-2008 25-May-2014 26-Oct-2014 31-Dec-2015 Comments All PAHs have been compensated as per the RAP. PHINDIRITBL Service Improvement Plan for LIC is Prepared (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 12-Dec-2012 25-May-2014 26-Oct-2014 -- Comments The consultant has started the work and it is expected that the plan will be completed and approved by DWASA's Board before Project closing date. PHINDIRITBL Annual statutory audits for DWASA demonstrating transparent and accountable financial management (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value -- 2 3 4 Date 02-Dec-2008 25-May-2014 26-Oct-2014 24-Dec-2015 Comments DWASA is currently audited annually and so this target is likely to be achieved 11/23/2014 Public Disclosure Copy Page 6 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) PHINDIRITBL Number of water utilities that the project is supporting (Number, Core) Baseline Actual (Previous) Actual (Current) End Target Value 1.00 1.00 1.00 1.00 Date 02-Dec-2008 -- 26-Oct-2014 31-Dec-2015 Comments PHINDIRITBL Development of an Institutional Structure for DWASA Decentralization and an Action Plan for its Implementation (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 12-Dec-2012 25-May-2014 26-Oct-2014 31-Dec-2015 Comments The procurement is in final stages and the consultant should be on-board by December 2014 PHINDIRITBL A New Decentralized Zonal Management Structure and An Action Plan for its Implementation are Approved by DWASA's Board of Directors (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value -- N N Y Date -- 25-May-2014 26-Oct-2014 -- Comments The procurement is in final stages and the consultant should be on-board by December 2014 PHINDIRITBL DWASA Zonal Office Equipped and Refurbished (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1.00 Date 12-Dec-2012 25-May-2014 26-Oct-2014 31-Dec-2015 Comments DWASA has hired an architect to complete this work. The work will be completed by project closing 11/23/2014 Public Disclosure Copy Page 7 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency P093988 IDA-45060 Effective XDR Original Revised Cancelled Disbursed Undisbursed Disbursed 94.80 50.97 43.83 26.28 24.70 52% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P093988 IDA-45060 Effective 02-Dec-2008 17-Dec-2008 17-Mar-2009 30-Jun-2013 31-Dec-2015 Cumulative Disbursements 11/23/2014 Public Disclosure Copy Page 8 of 9 Public Disclosure Copy The World Bank Implementation Status & Results Report BD Dhaka Water Supply and Sanitation Project (P093988) Restructuring History Level Approved on Related Project(s) There are no related projects. 11/23/2014 Public Disclosure Copy Page 9 of 9
© Copyright 2024