PROPOSED STUDENT RESIDENTIAL ACCOMMODATION PHASE 10 BILLS OF QUANTITIES QUANTITY SURVEYORS: ARCHITECT: MDP Project Services Ltd Triana Church Lane Lydiate Merseyside, L31 4HL ABW Architects Ltd 16 Cook Street Liverpool L2 9RF Tel: Fax: 0151 728 7979 0151 728 7989 Date: December 2014 Ref: 1282-003 Tel: Fax: 0151 669 1129 0844 412 8107 PROPOSED STUDENT ACCOMMODATION - PHASE 10 BILL OF QUANTITIES TABLE OF CONTENTS SECTION DESCRIPTION PAGE NR BILL NR 1 PRELIMINARIES (separate Word document) 1:1 - 1:79 BILL NR 2 MEASURED WORKS 2:1 - 2:115 MAIN SUMMARY MS/1 TENDER DRAWING LIST EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FOUNDATIONS AND SUBSTRUCTURE WORKS Total FOUNDATIONS AND SUBSTRUCTURE WORKS NOTE: The following works relate to foundation and substructure works for all blocks A - D all as per Structural Engineers drawings ref AJP 214-256/100 & 104 NOTE: Site clearance works, reduced level dig, excavations for foundations and concrete footing will be let separately as part of an Enabling Works Contract; these works will be complete in advance of the commencement of the Main Contract works. EXCAVATION AND FILLING; D20 Imported material; hard clean stone to pass through a 75mm sieve; Single sized; No fines; Hardcore to slabs Filling; depositing and compacting in maximum 150mm thick layers A to make up levels; 300mm thick; 375 m 3 1225 m 2 Surfaces of filling B levelling; blinding with sand; compacting CONCRETE WORK; GENERALLY AS SPEC REF AJP E10 INSITU CONCRETE Plain insitu concrete; prescribed mix 1:2:4; 10mm aggregate Blinding to hardcore sub-base C 50mm thick (Provisional) 59 m3 TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 1 - Total Reinforced insitu concrete; to be grade C40 concrete, 3 minimum cement content 340 kg/m ; maximum water/cement ratio 0.5; maximum aggregate size 20mm Beds; cast in bays A generally not exceeding 150mm thick; incorporating thicknessings (typical thicknessings 300mm as detailed on Engineers drawing) 185 m3 65 m m2 FORMWORK; E20 Formwork; as spec ref E20 Sides of isolated beams or beam casings B vertical; 400 - 600mm high REINFORCEMENT FOR INSITU CONCRETE; Reinforcement fabric; BS4483; hard drawn mild steel wire; welded; 200mm side and end laps C Floor Slabs;Reference A252 mesh 1173 D Floor Slabs;Reference B785 mesh 41 m 2 1173 m 2 1173 m 2 Concrete sundries Treating surfaces of unset concrete E Easy Float finish Slab insulation; laid on hardcore; Polyfoam or equal to Architects approval F 150mm thick; horizontal or sloping TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 2 - Total Damp proof membrane A visqueen dpm; 1200 gauge; welded joints; horizontal B visqueen dpm; 1200 gauge; welded joints; turned up face of masonry; approx 250mm high 2 1173 m 663 m 186 m 2 2 BRICK/BLOCK WALLING Facing bricks; 65mm Ibstock Bradgate Regal Facing Brick; laid half stretcher bond in natural mortar as section Z21, standard as specified by Structural Engineer, mix (1:1:6); semi-recessed joints; pointing as the work proceeds as spec ref F10/110 Walls C half brick thick and pointing one side Concrete blockwork; BS 6073 Part 1; solid, dense; 440 2 x 215mm; minimum compressive strength 7N/mm ; laid in cement lime mortar (1:1:6); stretcher bond; as NBS ref F10/350 Nb. Internal 215mm internal wall measured in External Walls for programming reasons as these walls will be required to support precast concrete floor units Walls D 100mm thick 186 m E 215mm thick; Sleeper walls; 2 x 100mm courses laid flat stretcher bond; as section 3 and 4 of drawing 214256/104 193 m TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 3 - Total ACCESSORIES/SUNDRY ITEMS Sundries Forming cavities in hollow walls; wall ties - Ancon, or similar approved, two part tie at 450mm centres vertically and 450mm centres horizontally (min 75mm embedment to both courses) as NBS F30/214 - 255; built in; Full fill cavity Knauf Dritherm 37 insulation as NBS F30/150, installed strictly in accordance with the manufacturers recommendations A 200mm wide 186 m 2 102 m 2 22 m 2 Damp proof courses; Hyload pitch polymer or equal approved; lapped joints with contact adhesive; installation strictly in accordance with the manufacturers recommendations Damp proof courses; spec ref F30/330 B width over 225mm; forming cavity trays (Provisional) CONCRETE WORK; GENERALLY AS SPEC REF AJP E10 INSITU CONCRETE Plain insitu concrete; prescribed mix 1:2:4; 10mm aggregate Filling to hollow walls C not exceeding 200mm thick TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 4 - Total COLLECTION Page 2:1 0.00 Page 2:2 0.00 Page 2:3 0.00 Page 2:4 0.00 To Summary 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 5 0.00 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 ROOF ROOF NOTE: The following relates to the roof works which are to be Contractor Designed, manufactured, supplied and installed complete. The Contractor is to allow for all interface connections to other elements of the building to ensure complete water and air tightness. ROOF COVERINGS NOTE: System Guarantees. The Contractor is to provide at tender stage a guarantee which covers against defective workmanship of the installing Contractor, defective materials and defective design. All items detailed in the specification are to be covered by the guarantee scheme. NOTE: Manufacturers Warranty; The manufacturer is to provide an extended warranty for the full roof system for a minimum of 25 years. Copy of the draft warranty to be provided at tender stage. Also the full roofing system should have received BBA accreditation with a life expectancy of a minimum of 40 years Contractor Designed Roofing system; Snaplock Seam system; including 18mm WBP exterior plywood substrate; installed complete all as NBS Specification H72 and installation strictly in accordance with the manufacturers recommendations; work deemed inclusive of all labour and materials and all detailing required at boundaries (including raking cutting), abutments, parapets, ridges, valleys, hips, openings and penetrations; including flashings and to include all products, fixings, closer pieces, sealants and interface components necessary to complete the fabrication and installation and provide a watertight and airtight enclosure (including vapour barrier, thermal insulation, movement joints and air seals at all junctions with other elements); as Architects Roof Plan Drawing 3739-505 and sample details provided with the Architects drawing 3739515 Insulated roof system; fixing to timber purlins/supports at spacings as shown on drawings; including all integral and perimeter gutters and flashings. A Roofs; Blocks A - D Item B Vertical Roof Cladding at stairwells; to sides of stairs B & C; as section B-B on drawing 3739/516 Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:6 0.00 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 ROOF Cappings; Powder Coated Aluminium; to external masonry walls; as section D-D on drawing 3739/518 A Item Blocks A - D Contractor Designed Roofing system; Sarnafil Single Ply membrane roofing system or other similar approved; to kitchen bay projections; including class 4 WBP ply substrate; all as NBS Specification J42 and installation strictly in accordance with the manufacturers recommendations; work deemed inclusive of all labour and materials and all detailing required at boundaries (including raking cutting), abutments, parapets, ridges, valleys, hips, openings and penetrations; including flashings and to include all products, fixings, closer pieces, sealants and interface components necessary to complete the fabrication and installation and provide a watertight and airtight enclosure (including vapour barrier, thermal insulation, movement joints and air seals at all junctions with other elements); as Architects Roof Plan Drawing 3739-505 and sample details provided with the Architects drawing 3739515 & 518 Insulated roof system; fixing to timber purlins/supports at spacings as shown on drawings; including all integral and perimeter gutters and flashings. B Item To kitchen bay projections ROOF STRUCTURE; CONTRACTOR DESIGNED Design, supply and install composite roof structure comprising; roof carcass and all associated trussed rafters, wallplates, straps, bracing members; concrete padstones and structural steel members measured elsewhere; as shown on the Structural Engineers Drawings 214-256/101, 102, 103, 105 and 106 and NBS G20 Roof structure C Blocks A - D Item D Extra; include framing to take vertical cladding; cladding as shown on section B-B drawing 3739/516 (to stairs B & C both sides) Item DRAINAGE Contractor Designed rainwater drainage systems; to include gutters and downpipes as shown on Architects Drawing 3739-505; as NBS R10 Composite system including pipework and rainwater outlets; including rainwater stack to ground floor drainage system; rainwater outlet positions as shown D Item Blocks A - D TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:7 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 ROOF Insulation Insulation laid between ceiling joists; Rockwool Roll wool insulation; laid in position over MF ceiling system; as P10/125 A 300mm overall thickness; 100mm laid between joists and 200mm over to achieve minimum u-value of 0.15W/m2K 1173 m2 TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:8 ‐ 0.00 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 ROOF COLLECTION Page 2:6 0.00 Page 2:7 0.00 Page 2:8 0.00 TO SUMMARY 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:9 0.00 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 METALWORK QUANT UNIT RATE £ TOTAL £ METALWORK Metalwork to lintels or supports; Supply and fix; Deliver to site to working level height; composite item; unfabricated steelwork; BS EN 10025 in beams, in single members cut to length, primed with one coat of red oxide primer at works; As Structural Engineers Drawings 214-256-100A, 101,102,103 and Details 104 & 105 RHS ; 200x100x10 kg/m; including 275mm wide BTM plate welded on, as section 4-4 and 4A-4A of drawing 214256,105 A 3800 long; fixing at 2500 above ground level (Ground Fl ) 15 Nr - B 3800 long; fixing at 5000 above ground level (First Floor) 15 Nr - RHS ; 150x100x10 kg/m and 100 x 100 x 10kg/m; Welded to SHS post at each end; as section 7-7 of drawing 214256,105 C 3300 long; fixing at 2500 above ground level (Ground Fl ) 2 Nr - D 3300 long; fixing at 5000 above ground level (First Floor) 2 Nr - PFC ; 2 nr x 250x90; welded; including 250mm wide BTM plate welded on, as section 8-8 of drawing 214-256,105 E 3800 long; fixing at 2500 above ground level (Ground Fl ) 3 Nr - F 3800 long; fixing at 5000 above ground level (First Floor) 3 Nr - 3 Nr - RHS ; 200x100x12.5 kg/m; as section 9-9 of drawing 214256,105 G 4100 long; fixing at 2500 above ground level (Ground Fl ) TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 10 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 METALWORK QUANT UNIT RATE £ TOTAL £ RHS ; 200x100x12.5 kg/m; welded at one end to CHS post and one end to RHS post; as section 11-11 of drawing 214256,105 A 1750 long; fixing at 5000 above ground level (First Floor) 3 Nr - 3 Nr - 2 Nr - 2 Nr - 4500 long; fixing at 7500 above ground level (Second Floor) 3 Nr - 1750 long; fixing at 7500 above ground level (Second Floor) 3 Nr - RHS ; 200x100x12.5 kg/m; welded at one end to CHS post and one end to RHS post; as section 12-12 of drawing 214256,105 B 4500 long; fixing at 5000 above ground level (First Floor) RHS ; 120x800x5 kg/m; welded to end to SHS post; as section R1-R1 of drawing 214-256,105 C 3300 long; fixing at 7500 above ground level (Second Floor) RHS ; 150x100x10 kg/m; cantilvered; welded to end to SHS post; as section R1-R1 of drawing 214-256,105 D 1000 long; fixing at 7500 above ground level (Second Floor) RHS ; 200x100x12.5 kg/m; welded at one end to CHS post and one end to RHS post; as section R2-R2 of drawing 214256,105 E F TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 11 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 METALWORK QUANT UNIT RATE £ TOTAL £ RHS ; 200x100x15 kg/m; welded at one end to CHS post and one end to RHS post; as section R2-R2 of drawing 214256,105 A B 4500 long; fixing at 7500 above ground level (Second Floor) 3 Nr - 1750 long; fixing at 7500 above ground level (Second Floor) 3 Nr - 6 Nr - 4 Nr - 3 Nr - 10 Nr - 10 Nr - 10 Nr - RHS ; 200x100x12.5 kg/m; as section R3-R3 of drawing 214256,105 C 5000 long; fixing at 7500 above ground level (Second Floor) RHS ; 200x100x12.5 kg/m; as section R4-R4 of drawing 214256,105 D 3300 long; fixing at 7500 above ground level (Second Floor) RSA ; 200x100x15 kg/m; as section 9-9 of drawing 214256,105 E 4100 long; fixing at 2500 above ground level (Ground Fl ) PFC Tie; 2 Nr x 250x90x23 kg/m and RSA Tie;welded back to back F G G 3500 long; fixing at 2500 above ground level (Ground Floor) (PROVISIONAL) 3500 long; fixing at 5000 above ground level (First Floor) (PROVISIONAL) 3500 long; fixing at 7500 above ground level (Second Floor) (PROVISIONAL) TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 12 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 METALWORK QUANT UNIT RATE £ TOTAL £ Metalwork to posts; Supply and fix; Deliver to site to working level height; composite item; unfabricated steelwork; BS EN 10025 in beams, in single members cut to length, primed with one coat of red oxide primer at works; galvanised; finished on site with 2 coats RIW Corner Restraint Posts; composite items; 100 x 60 x 6 RHS; 250 x 250 x 10 end plates fixed with and including 3 Nr 16 diameter Hilti HIT resin anchors to concrete or precast concrete - 2 Nr; Bolts through PC plank as Elevation on Detail 1; including Ancon ref PPB wall ties with debonding sleeves shot-fired to steel at 225mm centres with neoprene washers; all built into walls; as Typical Detail 1 and Elevation of Detail 1 of Engineers drawings 214-256/105 Restraints A B C Approx 2875 long; vertical; fixing at 2500 above ground level (Ground Floor) Approx 2875 long; vertical; fixing at 5000 above ground level (First Floor) Approx 2875 long; vertical; fixing at 7500 above ground level (Second Floor) 8 Nr - 8 Nr - 9 Nr - 4 Nr - Corner Restraint Posts; composite items; 120 x 120 x 10 SHS; 250 x 200 x 10 end plates fixed with and including 3 Nr 16 diameter Hilti HIT resin anchors to concrete or precast concrete - 2 Nr; including 2 Nr Ancon ref PPB wall ties with debonding sleeves shot-fired to steel at 225mm centres with neoprene washers; all built into walls; as Typical Detail 2 of Engineers drawings 214-256/105 Restraints D Approx 2875 long; vertical; fixing at 2500 above ground level (Ground Floor) TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 13 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 METALWORK QUANT UNIT RATE £ A Approx 2875 long; vertical; fixing at 5000 above ground level (First Floor) TOTAL £ 4 Nr - 2 Nr - 24 Nr - Approx 2875 long; vertical; fixing at 2500 above ground level (Ground Floor) 3 Nr - Approx 2875 long; vertical; fixing at 5000 above ground level (First Floor) 1 Nr - Approx 2875 long; vertical; fixing at 7500 above ground level (Second Floor) 3 Nr - Roof Restraint Posts; composite items; 100x100x5 SHS; 150 x 100 x 6 plates welded to post at 750mm centres and fixed with and including 2 Nr 12 diameter Hilti HIT resin anchors to blockwork - 1 Nr B Approx 2900 long; vertical; fixing at 7500 above ground level (Second Floor) Roof Restraint Posts; composite items; 80x80x5 SHS; 150 x 100 x 6 plates welded to post at 750mm centres and fixed with and including 2 Nr 12 diameter Hilti HIT resin anchors to blockwork - 1 Nr C Approx 2900 long; vertical; fixing at 7500 above ground level (Second Floor) Metalwork to posts; Supply and fix; Deliver to site to working level height; composite item; unfabricated steelwork; in single members cut to length; Galvanised at works Corner Posts; composite items; 139 diameter x 10 CHC; 250 x 250 x 10 end plate welded on - 1Nr fixed to concrete bases with 3Nr 16 diameter holes Posts D E F TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 14 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 METALWORK QUANT UNIT RATE £ TOTAL £ Corner Posts; composite items; 168 diameter x 10 CHC; 250 x 250 x 10 end plate welded on - 1Nr fixed to concrete bases with 3Nr 16 diameter holes Posts A Approx 2875 long; vertical; fixing at 5000 above ground level (First Floor) 2 Nr - 75 m2 - Steelwork Sundries Prepare and supply 2 coats bitumen paint B Steelwork surfaces; To restraint posts; over 300mm girth (PROVISIONAL) TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 15 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 METALWORK QUANT UNIT RATE £ TOTAL £ COLLECTION Page 2:10 0.00 Page 2:11 0.00 Page 2:12 0.00 Page 2:13 0.00 Page 2:14 0.00 Page 2:15 0.00 TO SUMMARY 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 16 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 UPPER FLOORS AND STAIRS PRECAST/COMPOSITE LANDINGS FLOORS, STAIRS AND Contractor designed precast concrete suspended floors; design, manufacturing workmanship, supply and erection in accordance with BS 8110 and the precast concrete plank specification; design criteria and layout/spans of flooring on Structural Engineers drawing noted below and supporting specifications; combined Dead Load and Combined Live load as specified on drawings noted below; including all in-situ concrete make up strips and infills including filling ends of planks; complete with associated reinforcement and formwork; beading at bearings, grouting between joints, as NBS ref E60/130 and section E60 generally Suspended floors; contractor designed hollow pre-stressed planks; 200mm thick; as Structural Engineers drawings 214256/101 & 102 First Floor; including main bedroom areas, corridors, kitchens and staircase landing areas. A Block A Item B Block B (double block) Item A Block C (double block) Item B Block D Item Second Floor; including main bedroom areas, corridors, kitchens and staircase landing areas. E Block A Item F Block B (double block) Item G Block C (double block) Item H Block D Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 17 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 UPPER FLOORS AND STAIRS Contractor designed precast concrete stairs and landings; to layouts/spans as shown on the Structural Engineers drawings; including all insitu concrete make up strips and infills including infilling ends of stairs/landings; complete with associated reinforcement and formwork; all surfaces to be smooth finish; soffit and strings to be smooth finish to receive paint finish; to span between floor to half landing or to span between half landing to floor (refer Architects and Engineers sections/drawings); as NBS ref E60/180 and section E60 generally and L30/270 Contractor designed precast concrete stairs; including associated landings and half landings; as Structural Engineers Drawing 214-256/101 & 102 Ground to Second Floors K Stair A Item L Stair B Item M Stair C Item N Stair D Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 18 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 UPPER FLOORS AND STAIRS COLLECTION - Page 2:17 " - 2:18 TO SUMMARY 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 19 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 HANDRAILS, BALUSTRADES AND CANOPIES Total HANDRAILS, BALUSTRADES AND CANOPIES Contractor design All the following work is subject to Contractor Design and the Contractor shall submit to the Architect all designs, drawings, specification and the like for approval prior to works being carried out on site; the works shall generally be in accordance with the Indicative Specification referred to within this section HANDRAILS Handrails; Contractor designed; all in accordance with NBS L30/570 and in strict accordance with the manufacturer's recommendations Handrails; contractor designed; composite item; 50mm tubular bespoke Brushed Stainless Steel Grade 304; including all associated wall mounted pillar brackets fixed to blockwork plugged and screwed; including plate angle brackets and plain flat end caps; including posts as shown at half landings in front of glazed screens; as Architects Drawing 3739-516 & 517 Staircase Balustrade A B To outside string and landing; per staircase area comprising 4 Nr flights 4 Nr - To staircase spine walls; per staircase area comprising 4 Nr flights 4 Nr - 2 Nr - CANOPIES Canopies; Contractor designed Canopies; composite steel and glazed item; comprising SHS steel subframe as per Structural Engineers details, fixed to foundation bases and wall to details as shown ; including PPC aluminium flashing to steel penetration through cladding (cladding by others) to matching colour; Toughed glass canopy fixed to steel subframe with stainless steel connections as Architects Drawing 3739-516 Glass/steel Entrance Canopy C To entrance lobby areas TO SUMMARY 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) £ 2: 20 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 EXTERNAL WALLS QUANT UNIT RATE £ TOTAL £ BRICK/BLOCK WALLING Facing bricks; Ibstock Staffordshire Blue Brindle (standard brick size); as NBS F10/110; laid half stretcher bond in natural mortar as section Z21, standard BS EN 998-2, mix (1:1:6); semi recessed joints; pointing as the work proceeds; as spec ref F10/111 Walls A half brick thick and pointing one side 96 m2 - Facing bricks; 65mm Ibstock Bradgate Regal Facing Brick; laid half stretcher bond in natural mortar as section Z21, standard as specified by Structural Engineer, mix (1:1:6); semi-recessed joints; pointing as the work proceeds as spec ref F10/110 Walls B half brick thick and pointing one side 1443 m2 - C half brick thick and pointing one side 100 m2 - 922 m - Close cavity with facing brickwork D 100mm wide; vertical (Provisional) Concrete blockwork; BS 6073 Part 1; solid, dense; 440 x 215mm; minimum compressive strength 7N/mm 2; laid in cement lime mortar (1:1:6); stretcher bond; as NBS ref F10/350 Nb. Internal 215mm internal wall measured in External Walls for programming reasons as these walls will be required to support precast concrete floor units Walls E 100mm thick (External walls) 2773 m2 - F 100mm thick (External walls) (Provisional) 150 m2 - G 100mm wide (Internal Walls) (Provisional) 343 m - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 21 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 EXTERNAL WALLS QUANT UNIT RATE £ TOTAL £ A 215mm thick (Internal Walls) 1364 m2 - B 215mm thick (Internal Wall - Stairs Spine Wall) 106 m2 - 200 m - 120 m - Closing cavities with 100mm thick concrete blockwork C 100mm wide (Provisional) Sandstone; Red Sandstone, Hardscape Products Ltd, dressed and worked in accordance with shop drawings to be prepared by the supplier, sawn finish, 440 x 225 x 100mm in gauged cement mortar, stretcher bond, flush pointing as the work proceeds; tied to concrete blockwork (measured elsewhere) - Supplier: Hardscape Products Ltd, Ashworth House, Deakins Business Park, Egerton, Bolton BL7 9RP; Contact: Anthony Collins (tel: 01204 590666); as NBS F30/721 D 100 thick x 225mm high band; pointing one side E Extra for external angles 12 Nr - F Extra for vertical ends 12 Nr - G Extra for forming vertical expansion joint; 10 wide; with Aerofil joint filler, mastic sealant one side 5 m - 2167 m2 - ACCESSORIES/SUNDRY ITEMS Sundries Forming cavities in hollow walls; Ancon Two Part or other equal and approved stainless steel wall ties at 450mm horizontal centres and 450mm vertical centres and additional ties as NBS F30/214-255; minimum 75mm embedment to both leaves; as NBS F30/214 and 228; built in; Knauf Dritherm 37 full fill cavity insulation, installed strictly in accordance with the manufacturers recommendations; as spec ref F30/150 H 200mm wide cavity TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 22 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 EXTERNAL WALLS QUANT UNIT RATE £ TOTAL £ Cavity closers with integral damp proofing and insulation; Thermabate cavity closer; as spec ref F30/180; 2Nr 100mm wide with connecting clips A B C to suit 200mm wide cavity; horizontal; to window and door openings (heads and cills) 388 m - to suit 200mm wide cavity; vertical; to window and door openings 922 m - to suit 200mm wide cavity; horizontal; to underside of timber roof plate 282 m - 168 m2 - 40 Nr - over 225mm wide; stepped over cavity to 600mm overall width, above windows 162 m2 - over 225mm wide; stepped to 600mm overall width, to underside of roof plate 168 m2 - 40 Nr - 400 Nr - 70 m - Damp proof courses; Caviroll or equal or approved DPC's or Cavity Trays by Cavity trays Ltd; polyethelene site formed flexible sheet cavity tray; lapped end sealed joints; installation strictly in accordance with the manufacturers recommendations; as spec F30/320 - 560 On horizontal surfaces; forming cavities in hollow walls D E F G H I over 225mm wide; stepped over cavity to 600mm overall width, laid on DPC Extra; external corners Extra; external corners Extra; seal cavity tray at ends to form sealed air barrier; approximate dimensions 150mm wide x 300mm high Proprietary items Supply and install compressible filler; compriband with mastic sealant or equal approved J 140mm thickness; to seal head of glazing to underside of timber roof plate (Provisional) TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 23 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 EXTERNAL WALLS QUANT UNIT RATE £ TOTAL £ Weep vents; proprietary plastic vents; as NBS ref F30/132 A to 75mm high perpendicular joints in brickwork; at centres as noted in NBS 1092 m - 223 m - 794 m - Bricktore, Stainless steel B C Supply & Install 75mm wide Stainless Steel Bricktore Reinforcement at junctions between masonry finishes, min 450mm long, horizontal, laid every block course Supply & Install 150mm Stainless Steel Bricktore Reinforcement at Junctions where internal 215mm block walls abut external 100mm blockwork walls, min 450mm long, horizontal, laid every external block vertical course LINTELS Supply and install lintels Lintels; composite item; Catnic ref ANG (brick leaf)-1Nr; Bertly Lintel Ref SB100 (block leaf)-1Nr; As Structural Engineers Drawing 214-256/101,102,103 (Lintel Ref 1) 1 D 1000mm long; to window openings 6 Nr - E 1500mm long; to window openings 2 Nr - F 2200mm long; to window openings 101 Nr - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 24 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 EXTERNAL WALLS QUANT UNIT RATE £ TOTAL £ Lintels; composite item; Catnic ref ANG (brick leaf)-1Nr; Naylor ref R6 (block leaf)-1Nr; As Structural Engineers Drawing 214-256/101,102,103 Lintel Detail 3 A 1300mm long; to window openings 11 Nr - B 1500mm long; to window openings 4 Nr - C 2100mm long; to window openings 52 Nr - D 3300mm long; to window openings 2 Nr - E 3800mm long; to window openings 3 Nr - 36 Nr - Lintels; Naylor lintel ref R6 (to block leaf); ref 3 - As Structural Engineers Drawing 214-256/101, 102, 103 and 105 (section 4-4 and 4A-4A) F 1300mm long; to head over internal door openings TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 25 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 EXTERNAL WALLS QUANT UNIT RATE £ TOTAL £ PADSTONES Padstones; ordinary Portland cement 30 N/mm2; bedding in cement mortar; As Structural Engineers Drawing 214-256/101,102,103 Padstones A B C 440 x 100 x 215mm; strapped to block wall with 30 x 2.5mm mild steel straps; Type P1 16 Nr - 440 x 400 x 400 x 215mm; strapped to block wall with 30 x 2.5mm mild steel straps; Type P2 3 Nr - 3 Nr - 440 x 215 x 215mm; strapped to block wall with 30 x 2.5mm mild steel straps; Type P3 ACCESSORIES/SUNDRY ITMES FOR BRICK/BLOCK WALLING Design joints in masonry Form vertical joint in external walls; filled with Adshead Ratcliffe Arbo Polyethylene foam; 10mm thick joint with mastic sealant both sides; including 2 Nr wall ties at 225mm vertical centres; as NBS Ref F30/610 D vertical joint; in 102.5mm thick facing brick walls 253 m - D vertical joint; in 100mm thick blockwork walls 253 m - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 26 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 EXTERNAL WALLS QUANT UNIT RATE £ TOTAL £ EXTERNAL CLADDING/RAINSCREEN Contractor designed external rainscreen cladding; VMZINC interlocking panel system or equal approved; as NBS Ref H92/110 - 985 Wall cladding/rainscreen A over 300mm wide 650 m2 - B Extra; top edge 125 m - C Extra; bottom edge 125 m - D Extra; side edges 165 m - E Extra; Corners 185 m - F Extra; Penetrations for Air Ducts / Vents and the like; including cutting and flashing around opening and the supply & fix of matching Ventilation Grill (Provisional) 72 Nr - Item - F Extra; to window openings within areas of cladding TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 27 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 EXTERNAL WALLS QUANT UNIT RATE £ TOTAL £ COLLECTION - Page 2:21 " 2:22 - " 2:23 - " 2:24 - " 2:25 - " 2:26 - " 2:27 - TO SUMMARY 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 28 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 WINDOWS, SCREENS AND EXTERNAL DOORS Total WINDOWS, SCREENS AND EXTERNAL DOORS Contractor design All the following work is subject to Contractor Design and the Contractor shall submit to the Architect all designs, drawings, specification and the like for approval prior to works being carried out on site; the works shall be carried out in accordance with the NBS Specifications referred to within this section WINDOWS Windows; Contractor designed; to be Velfac as manufactured by VELFAC LTD, The Old Livery, Hildersham, Cambridge, CB21 6DR (Telephone: 01223 897100); windows to be all in accordance with NBS L10/110 - 510 and are to include all ironmongery; doors to be in accordance with L20/280 and are to include all ironmongery included in that section; all in strict accordance with the manufacturer's recommendations Windows; punch hole windows; Velfac Ref Velfac V200 System ; as Architects Drawing 3739-522 Window Schedule; include for a groove to take internal window lining providing line of air tightness; to include opening lights, intake panels and infill panels as shown on drawings; (dimensions are approximate) A B C D E 1790 wide x 2100 high; to bedroom; opening light - 1; Typical window W-Type-A 144 Nr - 1790 wide x 2100 high; to stairs A & D; opening light 0;typical window W-Type-K 6 Nr - 1115 wide x 5560 high; to stairs A & D; to include solid infill panels as shown on drawings; typical window W-TypeL 2 Nr - 890 wide x 1050 high; to kitchen; opening light - 1; typical window W-Type-M 9 Nr - 3610 wide x 2240 high; to kitchen; opening light - 2; typical window W-Type-N 2 Nr - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 29 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 WINDOWS, SCREENS AND EXTERNAL DOORS Total A B 1790 wide x 2100 high; to kitchen; opening light - 0; typical window W-Type-P 2 Nr - 12 Nr - 2710 wide x 9010mm high; to stair B & C; opening light 2; single door - 1; to include solid infill panels as shown; Typical window W-Type-B 2 Nr - 2710 wide x 7500mm high; to stair B & C; opening light 2; to include solid infill panels as shown; Typical window W-Type-C 2 Nr - 2610 wide x 8410mm high; to stair A; opening light - 2; single door - 1; to include solid infill panels as shown; Typical window W-Type-D 1 Nr - 3375 wide x 8100mm high; to kitchen; opening light - 3; intakes - 3; to include solid infill panels as shown; Typical window W-Type-E 3 Nr - 1440 wide x 5015mm high; to kitchen; opening light - 0; intakes - 2; to include solid infill panels as shown; Typical window W-Type-F 2 Nr - 3240 wide x 5015mm high; to kitchen; opening light - 2; intakes - 2; to include solid infill panels as shown; Typical window W-Type-G 2 Nr - 1440 wide x 5015mm high; to kitchen; opening light - 0; intakes - 2; to include solid infill panels as shown; Typical window W-Type-H 1 Nr - 3240 wide x 5015mm high; to kitchen; opening light - 2; intakes - 2; to include solid infill panels as shown; Typical window W-Type-J 1 Nr - 2610 wide x 8410mm high; to stair D; opening light - 2; single door - 1; to include solid infill panels as shown; Typical window W-Type-R 1 Nr - 665 wide x 1050 high; to kitchen; opening light - 1; typical window W-Type-Q Windows; window walling; Velfac Ref Velfac V200 System ; as Architects Drawing 3739-522 Window Schedule; include for a groove to take internal window lining providing line of air tightness; to include opening lights, intake panels and infill panels as shown on drawings; to include doors including ironmongery as L20/280; (dimensions are approximate) C D E F G H I J K TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 30 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 WINDOWS, SCREENS AND EXTERNAL DOORS Total ASSOCIATED ITEMS IN CONNECTION WITH WINDOWS, SCREENS AND EXTERNAL DOORS PACKAGES A External sealant; as NBS L10/400 1700 m - B Internal sealant; as NBS L10/400 1700 m - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 31 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 WINDOWS, SCREENS AND EXTERNAL DOORS Total COLLECTION - Page 2:29 " 2:30 - " 2:31 - TO SUMMARY 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 32 £ 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE SUMMARY JOINERY PACKAGE - SUMMARY BEDROOM JOINERY PACKAGE FOR 144 NR BEDROOMS Page 2:36 - JOINERY PACKAGE FOR COMMON AREAS Page 2:40 - JOINERY PACKAGE FOR STAIR AREAS Page 2:44 - IRONMONGERY Page 2:45 - JOINERY PACKAGE TOTAL - TO SUMMARY 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) £ - 2:33 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE PER BEDROOM JOINERY - BEDROOM JOINERY PACKAGE INTERNAL DOORS L20 DOORS/SHUTTERS/HATCHES; REFER TO DOOR SCHEDULE (DRAWING NR 3665/623) Flush doors; ash veneered factory finish; solid ash lipping to 4 Nr sides; solid core door; Enduracore core to achieve half hour resistance + 30Dba acoustic rating; as L20 generally Doors A Door Type - F; bedroom door; size 926 x 2040mm 1 Nr - 1 Nr - 7 m - 22 m - 1 Nr - Softwood door frames; plugged, screwed and countersunk to metal stud partitions or masonry; including Adshead Ratcliffe Excel 1075 30/60 minute fire and smoke perimeter sealant joints all round; as NBS L20/330; Door frames; as drawing 3739-525 A for bedroom door type -F; 60 x 135mm frame (finished sizes); rebated - 2; ; door frame set; grooved for intumescent strip; overall frame size 1010mm wide x 2100mm high; as frame detail 01 on drawing 3739-525 P20 UNFRAMED ISOLATED TRIMS/SKIRTINGS/ SUNDRY ITEMS Sawn softwood; grounds for bedroom desk pin board and associated shelving (pinboard and shelving by others) Grounds C 25 x 38mm, plugged and screwed to masonry MDF; plugged, screwed and countersunk to metal stud partitions or masonry Architraves D 20 x 50mm (to both sides of bedroom door, one side of pod door and around jambs and head and under cill of window) Batten for fixing blinds; as detail on drawing 3739-532 E 100 x 20mm; 2000mm long (approx) Plywood ; MR Bonding, grade B/BB, internal quality Pattresses; to bedrooms F 300 x 300 x 12mm; screwed to and including timber noggins; for TV support 1 Nr F 300 x 300 x 12mm; screwed to and including timber noggins; for radiators 1 Nr TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:34 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE Medium density fibreboard; plugged, screwed and countersunk to metal stud partitions or masonry Skirtings A 100 x 18mm 12 m - CILLS AND REVEALS TO WINDOWS Cills and reveals to windows; MDF moisture resistant; plugged, screwed and countersunk to metal stud partitions or masonry Window boards; as detailed on 3739-532 B 22 x 270mm wide; grooved; bullnosed; radiused ends (2 Nr) 2 m - C 75 x 22mm wide; grooved (below window board) 2 m - Lining to window reveal and head; as detailed on 3739-532 C 22 x 260mm wide; grooved 6 m - C 75 x 22mm wide; grooved 6 m - 12 m - 1 Nr 1 Nr Sawn softwood; grounds for cill and reveal boards Grounds D 25 x 25mm, plugged and screwed to masonry (Provisional) SUNDRY Fix only tv bracket (tv bracket supplied by others) A TV bracket; 4 Nr screws to plywood; pre drill laminate faced pinboard Supply and fix plastic grommit to take cable throgh pinboard; colour to match pinboard B 50mm diameter Forming holes; through laminate faced pinboard C 50mm diameter; to take plastic grommit (taken elswhewere) 1 Nr D 90mm x 90mm; to take single pattress box 2 Nr TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:35 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE COLLECTION - Page 2:34 " - 2:35 SUB-TOTAL JOINERY PACKAGE FOR 1 NR BEDROOM MULTIPLY X 144 FOR 144 NR BEDROOMS - CARRIED TO JOINERY PACKAGE SUMMARY - X 144 - To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:36 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE JOINERY PACKAGE FOR FLAT COMMON AREAS (CORRIDORS AND KITCHENS) INTERNAL DOORS L20 DOORS/SHUTTERS/HATCHES; REFER TO DOOR SCHEDULE (DRAWING NR 3739/524 & 525) Flush doors; ash veneered factory finish; solid ash lipping to 4 Nr sides; solid core door; Enduracore core to achieve half hour resistance = 30Dba acoustic rating; as L20 generally Doors A Door Type -B; cluster entrance door - single; size 926 x 2040mm; 30 minute fire rating; having opening for vision panel size 200 x 1450mm; as L20/230 18 Nr - B Door Type -D; service riser doors - double; pair doors each size 726 x 2040mm; 30 min fire rating 36 Prs - C Door Type -E; riser doors - single; size 626 x 2040mm; 30 min fire rating 72 Nr - D Door Type -G; kitchen door - single; size 926 x 2040mm; fully glazed vision panel size 614 x 1606mm 18 Nr - 18 Nr - 36 Nr - 72 Nr - 18 Nr - Softwood door frames; plugged, screwed and countersunk to metal stud partitions or masonry; including Adshead Ratcliffe Excel 1075 30/60 minute fire and smoke perimeter sealant joints all round; as NBS L20/330; Door frames; as drawing 3739-525 E for cluster entrance door type -B; 60 x 135mm frame (finished sizes); rebated - 2; ; door frame set; grooved for intumescent strip; overall frame size 1010mm wide x 2100mm high; as frame detail 04 on drawing 3739-525 F for riser door type -D; double; 60 x 135mm frame (finished sizes); rebated - 2; door frame set; grooved for intumescent strip; overall frame size 1528mm wide x 2100mm high; as frame detail 03 on drawing 3739-525 G for riser door type -E; single; 60 x 135mm frame (finished sizes); rebated - 2; door frame set; grooved for intumescent strip; overall frame size 710mm wide x 2100mm high; as frame detail 02 on drawing 3739-525 H for kitchen door type -G; 60 x 135mm frame (finished sizes); rebated - 2; ; door frame set; grooved for intumescent strip; overall frame size 1010mm wide x 2100mm high; as frame detail 04 on drawing 3739-525 TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:37 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE L20 GENERAL GLAZING Glazing to doors and side screens; Pilkington Pyrodur Plus 7mm to achieve class B safety standards to BS6206 to achieve half hour fire integrity resistance; glazing set in 20 x 2 Dufaylite Interdens intumescent sea glazing gasket To timber beads and channels A size 200 x 1450mm (to cluster entrance door) 18 Nr - B size 614 x 1606mm (to kitchen door) 18 Nr - 972 m - 117 m - 935 m - 18 Nr P20 UNFRAMED ISOLATED TRIMS/SKIRTINGS/ SUNDRY ITEMS MDF; plugged, screwed and countersunk to metal stud partitions or masonry Architraves C 20 x 50mm (to one side of single and double riser doors, both sides of flat entrance door and kitchen door and around jambs and head of window) (note - architraves to corridor-side of bedroom door included with Bedroom Joinery package) Batten for fixing blinds; as detail on drawing 3739-532 D 100 x 20mm Medium density fibreboard; plugged, screwed and countersunk to metal stud partitions or masonry Skirtings E 100 x 18mm Pattresses; to corridors F 300 x 300 x 12mm; screwed to and including timber noggins; for extinguishers supports TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:38 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE CILLS AND REVEALS TO WINDOWS Cills and reveals to windows; MDF moisture resistant; plugged, screwed and countersunk to metal stud partitions or masonry Window boards A 22 x 270mm wide; grooved; bullnosed; radiused ends (2 Nr) 111 m - 298.5 m - 597 m - Lining to window reveal and head B 22 x 260mm wide; grooved Sawn softwood; grounds for cill and reveal boards Grounds C 25 x 25mm, plugged and screwed to masonry (Provisional) SUNDRY Forming holes; through laminate faced kitchen unit carcass D 25mm diameter; for cable route 36 Nr - F 90mm x 90mm; to take single pattress box 36 Nr - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:39 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 JOINERY PACKAGE COLLECTION - Page 2:37 " 2:38 - " 2:39 - Common Areas Total - carried to Joinery Package Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:40 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE COMMON AREAS JOINERY PACKAGE (STAIR INTERNAL DOORS L20 DOORS/SHUTTERS/HATCHES; REFER TO DOOR SCHEDULE (DRAWING NR 3739/524 & 525) Flush doors; ash veneered factory finish; solid ash lipping to 4 Nr sides; solid core door; Enduracore core to achieve one hour resistance = 30Dba acoustic rating; as L20 generally Doors; 54mm thick A Door Type - C; IT store door - single; size 826 x 2040mm; FD60S to meet one hour fire resistance 4 Nr - Flush doors; Formica factory finish; solid ash lipping to 4 Nr sides; solid core door; Enduracore core to achieve one hour resistance = 30Dba acoustic rating; as L20 generally Doors; 54mm thick B Door Type - I; mechanical riser door - single; size 726 x 2040mm; FD60S to meet one hour fire resistance 12 Nr - C Door Type - J; electrical riser door - single; size 726 x 2040mm; FD60S to meet one hour fire resistance 12 Nr - 3 Nr - 4 Nr - Doors; solid ash door incorporating glass panel; to achieve half hour fire resistance FD30 Doors; 40mm thick; FD30S D Door Type - K; lobby door / screen - single; size 926 x 2040mm; having opening for vision panel size 614 x 1606mm Hardwood door frames; plugged, screwed and countersunk to metal stud partitions or masonry; including Adshead Ratcliffe Excel 1075 60 minute fire and smoke perimeter sealant joints all round; as NBS L20/330 E for IT store door - single; 50 x 135mm frame with 25mm x 54mm rebate (finished sizes); door frame set; grooved for rebated intumescent strip; overall frame size 9100mm wide x 2100mm high; as frame detail 05 on drawing 3739-525 TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:41 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE A for mechanical and electrical riser door - single; 50 x 135mm frame with 25mm x 54mm rebate (finished sizes); door frame set; grooved for rebated intumescent strip; overall frame size 810mm wide x 2100mm high; as frame detail 05 on drawing 3739-525 24 Nr - 4 Nr - Solid ash door frames; plugged, screwed and countersunk to metal stud partitions or masonry; including 30 minute fire rated perimeter sealant joints al round B for lobby door and side screen - single door and side screen for glass panel; frame dimensions to be provided by Contractor to suit size of door and screen; door frame set; grooved for intumescent strip; overall frame size 2295mm wide x 2100mm high; as frame detail 04 on drawing 3739-525 L20 GENERAL GLAZING Glazing to doors and side screens; Pilkington Pyrodur Plus 7mm to achieve class B safety standards to BS6206 to achieve half hour fire integrity resistance; glazing set in 20 x 2 Dufaylite Interdens intumescent sea glazing gasket To timber beads and channels C size 614 x 1606mm (to lobby door) 4 Nr - D size 1173 x 1993mm (to lobby side screen) 4 Nr - 140 m - P20 UNFRAMED ISOLATED TRIMS/SKIRTINGS/ SUNDRY ITEMS MDF; plugged, screwed and countersunk to metal stud partitions or masonry Architraves E 20 x 50mm (to both sides of IT store room door, both sides of lobby screen and one side of mechanical and electrical doors) TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:42 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE Medium density fibreboard; plugged, screwed and countersunk to metal stud partitions or masonry Skirtings A 100 x 20mm 175 m - 96 m - Stair strings; cut to profile of treads and risers B 265mm (overall) wide x 20mm Stair Wall Cappings; MDF moisture resistant; Oak veneered; plugged, screwed and countersunk to masonry; as Stair Wall Capping detail drawing 3739-532 Cappings C D 305 x 95mm; return - 2Nr; chamfered top edges - 2Nr Extra; mitred corner 17 m - 4 Nr - 12 Nr - Plywood ; MR Bonding, grade B/BB, internal quality Pattresses; for extinguishers E 300 x 300 x 12mm; screwed to and to include timber noggins TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:43 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 JOINERY PACKAGE COLLECTION - Page 2:41 " 2:42 - " 2:43 - Stairs Areas Total - carried to Joinery Package Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:44 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 JOINERY PACKAGE IRONMONGERY Fix the following iromnmongery (supply of ironmongery included as a provisional sum elsewhere) Fix only the following ironmongery to wood A Satin stainless Steel Coat hooks Fjord Range with concealed fixings 144 Nr - B Glutz Sprung loaded Satin Stainless Steel 19 mm dia Lever handle on concealed fixiing rose with bolt through fixing and Heso spindle 288 Nr - C Satin stainless steel half set levers handles on roses 18 Nr - D Concealed fixing Satin stainless steel Euro profile escutchoen plate with bolt through fixing to steel rose 288 Nr - E Bathroom thumbturn and emergency release with indicator concealed rose fixing with Heso spindle and grub screw fixing 144 Nr - F Glutz 425 mmx19mm dia bolt through fixing pull handles in satin stainless steel 22 Nr - G Patented Eccentric pinion overhead door closer With Progressive Decreasing power curve non projecting guide rail and arm Size 2 to 3 BS EN 1154 Certifire approved CE Marked With Valve adjustable closing speed and Latch action 184 Nr - H Master Keyed Cam lock suited to internal suiting system 144 Nr - I Protection plates radius corner 500mmx75mm satin stainless steel with screws 22 Nr - J Master keyed euro pro-file single cylinder 45mm with patent protection keyway & Anti bumping mechanism.(no keys) 132 Nr - K Master keyed euro single cylinder 45mm with patent protection keyway sn finish (with 2 keys) 4 Nr - L master keyed euro pro-file cylinder and thumbturn 71mm with patent protection keyway mechanism with 2 keys 148 Nr - M master keyed cylinder 45mm to be common under new master key (no keys) 18 Nr - N Chrome finish barrel bolts 200mmx32mm with screws 72 Nr - O Emergency mortice nightlatch cases 50mm 18 Nr - P Qube euro-profile small deadlock case 76mm with bolt through fixing for cylinders 136 Nr - Q Satin stainless euro profile cylinder pulls ch316 136 Nr - R Satin stainless steel blank escutcheons 18 Nr - S Wall mounted door stop on concealed fix rose satin stainless steel T Satin stainless floor door stops U Satin stainless steel 75mm dia disc to read fire door keep shut complete with screws V 75mm dia disc sign with fire door keep locked in s.a.a. Finish complete with screws W Satin stainless steel 75mm sign to read automatic fire door keep clear X Satin stainless steel butt hinges 3mm Toggle gap and radius corners complete with screws Y Assa Half Splitting Spindle 43mm Z 18 Nr - 166 Nr - 64 Nr - 144 Nr - 36 Nr - 1500 Nr - 18 Nr - 935mm silver silver dropdown seal with 13mm gap mortice to bottom of door 144 Nr - AA Mortice sashlock case 72mm centres 60mm backset din standards C E Marked 1121 144 Nr - AB Electro magnetic hold open device to be supplied by others 18 Nr - AC Satin stainless steel upside down euro cylinder pull 18 Nr - AD Fixings packs 18 Nr - Ironmongery Total - carried to Joinery Package Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) - 2:45 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 INTERNAL PARTITIONS PLASTERBOARD DRY LINING/PARTITIONS/ CEILINGS Type 1 - Bed to Bed and Bed to Corridor - all as NBS K10/127A and as shown on ABW drawing 3739-530 (Note: skim coat measured in Wall Finishes) Partitions; 143mm thick (nominal thickness excluding finishes); built to underside of soffit A 2700 - 3000mm high (Approx height 2800mm) 790 m - B Abutments to walls; blockwork; plugging and screwing 403 m - C Tee junction to partitions 202 m - D Forming opening for single door (bedroom door) 144 Nr - E Forming opening for single door (duct door) 72 Nr - E Forming opening for double door (double duct door) 36 Nr - F Head detail; apply continuous bead acoustic sealant to clean, dry dust free surfaces, leaving no gaps at junctions to adjoining structure; as noted on drawing 3739-530 790 m - 790 m - 90 m - 168 m - G Plate detail; apply continuous bead acoustic sealant to clean, dry dust free surfaces, leaving no gaps at junctions to adjoining structure; as noted on drawing 3739-530 Type 2 - Riser to stair core area - all as NBS K10/127D and as shown on ABW drawing 3739-530 (Note: skim coat measured in Wall Finishes); built to underside of soffit Partitions; 77mm thick (nominal thickness excluding finishes) H 2700 - 3000mm high (Approx height 2800mm) I Abutments to walls; blockwork; plugging and screwing J Tee junction to partitions 70 m - K End to partitions 70 m - L Forming opening for single door 36 Nr - H less than 1500mm high (Approx height 1000mm); infill partition over flat entrance door 12 m - Head detail; apply continuous bead acoustic sealant as NBS K10/526A to clean, dry dust free surfaces, leaving no gaps at junctions to adjoining structure; as noted on drawing 3739530 102 m - Plate detail; apply continuous bead acoustic sealant as NBS K10/526A to clean, dry dust free surfaces, leaving no gaps at junctions to adjoining structure; as noted on drawing 3739530 90 m - M N TO SUMMARY £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 46 - BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FLOOR FINISHES Total FLOOR FINISHES; REFER TO GA INTERNAL FINISHES LAYOUT (DRAWING NR 3692/520) CEMENT AND SAND SCREEDS Screeds; cement and sand (1:4) with fibremesh; as NBS M10/115-700 Screed; laid level and to falls not exceeding 15 degrees from horizontal A 100mm thick; over 300mm wide; to ground floor 1,173 m2 - B 100mm thick; over 300mm wide; to first floor 1,173 m2 - C 100mm thick; over 300mm wide; to second floor 1,173 m2 - D 50mm thick; over 300mm wide; to staircase landings and half landings 133 m2 - over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to ground floor 1,173 m2 - over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to first floor 1,173 m2 - over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to 2nd floor 1,173 m2 - 133 m2 - DPM to concrete screeds; preparing surfaces; P131 Neopreme x 2 coats Tremco ES3000 DPM; Stop Gap Green Bag Moisture Tolerant; NBS spec ref M50/110171 Floors E F G H over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to staircase landings and half landings TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 47 - BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FLOOR FINISHES Total Self levelling screeds; Ardex screeds; to screeded floors; Minimum 2mm thick; NBS spec ref M50/460 Floors A B C D over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to ground floor 1,173 m2 - over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to first floor 1,173 m2 - over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to 2nd floor 1,173 m2 - 133 m2 - over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to staircase landings and half landings CARPET NOT MEASURED IN ACCORDANCE WITH SMM 7 Carpet roll; Timzo Oxford Broadloom carpet; including Durafit 650 Underlay; standard colour; As NBS M50/130 Bedrooms; over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to screeded floors; carpet to be laid under bedroom furniture G Block A; 24Nr Item H Block B; 48Nr Item I Block C; 48Nr Item J Block D; 24Nr Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 48 - BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FLOOR FINISHES Total Carpet tiles; Burmatex Tivoli Carpet tiles; 600 x 600mm including Durafit 650 Underlay; standard colour; As NBS M50/130 Floors Corridors to bedrooms; over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to screeded floors A Block A; 3 Nr Item B Block B (double block); 6 Nr Item C Block C (double block); 6 Nr Item D Block D; 3 Nr Item Staircase areas; over 300mm wide; level or to falls not exceeding 15 degrees from horizontal; to concrete E F G H Stair - A; to full stairwell (all floors); including landings and half landings Item Stair - B; to full stairwell (all floors); including landings and half landings Item Stair - C; to full stairwell (all floors); including landings and half landings Item Stair - D; to full stairwell (all floors); including landings and half landings Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 49 - BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FLOOR FINISHES Total Staircase areas; not exceeding 300mm wide; to stair treads and risers; to concrete A Stair - A; to treads and risers Item B Stair - B; to treads and risers Item C Stair - C; to treads and risers Item D Stair - D; to treads and risers Item MARMOLEUM SHEETING Marmoleum sheeting; manufacturered by Forbo Flooring Systems; Marmoleum Real 2.5mm Range ; standard colour; mastic sealed at perimeters in accordance with the manufacturers recommendations; As NBS M50/110 Floors Lounge and Kitchen areas; over 300mm wide; laid level or to falls not exceeding 15 degrees from horizontal; to screeded floors E Block A; 3 Nr Item F Block B (double block); 6 Nr Item G Block C (double block); 6 Nr Item H Block D; 3 Nr Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 50 - BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FLOOR FINISHES Total GENERAL FIXTURES/FURNISHINGS/EQUIPMENT Entrance matting; Heckmondwhite Diamond Entrance Barrier Matting; including aluminium matwell edge trim Entrance matting; including aluminium matwell edge trim over 300mm wide; laid level or to falls not exceeding 15 degrees from horizontal; to concrete; Entrance areas A Stair - A; Ground floor entrance area Item B Stair - B; Ground floor entrance area Item C Stair - C; Ground floor entrance area Item D Stair - D; Ground floor entrance area Item Accessories; As Drawing 3739-531 Aluminium stair nosings; Gradus range aluminium nosings with contrasting PVC inserts; product reference ELA 51750; plugged and screwed and glued to concrete; NBS M50/750 Nosings; staircase areas; to staircase treads and landings and half landings areas E Stair - A Item F Stair - B Item G Stair - C Item H Stair - D Item Thresholds; timber; carpet to carpet; to match door finish; plugged and screwed to screed Type T1; bedroom and corridor areas I Block A; 24Nr Item J Block B; 48Nr Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 51 - BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FLOOR FINISHES Total A Block C; 48Nr Item B Block D; 24Nr Item Thresholds; Gradus TA6 aluminium threshold; Carpet to Marmoleum; plugged and screwed and glued to screed Type T2; Corridor to Kitchen C Block A; 3 Nr Item D Block B (double block); 6 Nr Item E Block C (double block); 6 Nr Item F Block D; 3 Nr Item Thresholds; timber; barrier matting to carpet; to match door finish; plugged and screwed to screed Type T3; entrance lobby areas G Stair - A; Ground floor entrance area Item H Stair - B; Ground floor entrance area Item I Stair - C; Ground floor entrance area Item J Stair - D; Ground floor entrance area Item Thresholds; aluminium threshold; part of entrance door system; plugged and screwed to screed Type T4; Entrance Lobby areas K Stair - A; Ground floor entrance area Item L Stair - B; Ground floor entrance area Item M Stair - C; Ground floor entrance area Item N Stair - D; Ground floor entrance area Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 52 - BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FLOOR FINISHES Total COLLECTION 0.00 Page 2:47 " 2:48 0.00 " 2:49 0.00 " 2:50 0.00 " 2:51 0.00 " 2:52 0.00 To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 53 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 WALL FINISHES WALL FINISHES Wall lining on adhesive; British Gypsum DriLyner Basic; all as NBS K10/187A and as shown on ABW drawing 3739-530 (Note: skim coat measured separately - see Wall Finishes) Walls A over 300mm wide; ground, first and second floors B not exceeding 300mm wide; ground, first and second floors A over 300mm wide; C over 300mm wide; in staircase areas D not exceeding 300mm wide; ground, first and second floors; in staircase areas 5580 m2 - 781 m - m 2 - 531 m 2 - 65 m - m2 - m - 5580 Plaster; British Gypsum Thistle Board Finish or Thistle Multi-Finish; skim coat; 2mm thick; on plasterboard as Spec ref K10/681A Walls E over 300mm wide G not exceeding 300mm wide; ground, first and second floors H over 300mm wide; in staircase areas I not exceeding 300mm wide; ground, first and second floors; in staircase areas 5,600 420 2 531 m 65 m - m2 - - Plaster; British Gypsum Thistle DuraFinish; skim coat; 2mm thick; on plasterboard as Spec ref K10/681B Walls E over 300mm wide F over 300mm wide; to face of bathroom pods to align surfaces (Provisional) 390 m2 - not exceeding 300mm wide; ground, first and second floors 421 m - 1,200 m - 1,200 m - G 4,920 Angle beads; thin coat J ref 553; fixing with plaster dabs to plasterboard (Provisional) Stop beads; thin coat K ref 560; fixing with plaster dabs to plasterboard (Provisional) TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 54 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 WALL FINISHES M40 STONE/CONCRETE/QUARRY CERAMIC TILING/MOSAIC Ceramic tiling: Pilkington or other similar approved; product reference Prismatic Satin White, size 150mm x 150mm x 6.5mm thick, adhesive and grout as manufacturers recommendations, fixing to plastered surfaces as specification clause M40/110-250 Walls L over 300mm wide M not exceeding 300mm wide 144 m2 - 36 m - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 55 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 WALL FINISHES COLLECTION - Page 2:54 " - 2:55 TO SUMMARY £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 56 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 CEILING FINISHES Total CEILING FINISHES British Gypsum; Gyproc Fireline Board (thickness and Nr of layers as noted below); including visqueen vapour/air tightness barrier, lapped and taped joints; additional noggins where required; fixed to underside of timber roof structure; All as NBS K10 / 210; fixed in accordance with manufacturers recommendations Ceilings A B C over 300mm wide; including Visqueen and 2 Nr layers 15mm Fireline Board; 2nd floor 1163 m2 - over 300mm wide; including Visqueen and 2 Nr layers 15mm Fireline Board; 2nd floor; to staircase areas Extra; forming bulkheads 300 - 600mm girth (Provisional) 2 11 m 25 m - 1163 m2 - 11 m2 - 25 m - - Suspended ceiling with metal framing; substrate ceiling to 2nd F only; Gyproc Casoline MF ceiling system; British Gypsum; composite suspended ceiling system including hangers, primary and secondary grids, perimeters, lining and fixing; fixed to timber / fireline board; Gyproc Wallboard (thickness and Nr of layers as noted below); All as NBS K10 / 220; fixed in accordance with manufacturers recommendations D E F over 300mm wide; including 1 Nr layer 12.5mm Gyproc Wall Board; substrate ceiling to 2nd floor over 300mm wide; including 1 Nr layer 12.5mm Gyproc Wall Board; substrate ceiling to 2nd floor; staircase areas Extra; forming bulkheads 300 - 600mm girth (Provisional) TO COLLECTION £ 2:57 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 CEILING FINISHES Suspended ceiling with metal framing; Gyproc Casoline MF ceiling system; British Gypsum; composite suspended ceiling system including hangers, primary and secondary grids, perimeters, lining and fixing; fixed to concrete soffits; depth of suspension as shown on drawings, generally 400500mm; Gyproc Wallboard (thickness and Nr of layers as noted below); All as NBS K10 / 216; fixed in accordance with manufacturers recommendations Ceilings A A B A D over 300mm wide; including 1 Nr layer 12.5mm Gyproc Wall Board; ground floor 1163 m2 - over 300mm wide; including 1 Nr layer 12.5mm Gyproc Wall Board; ground floor; to staircase areas 11 m2 - 1163 m2 - 11 m2 - 100 m - 3489 m2 - over 300mm wide; including 1 Nr layers 15mm Gyproc Wall Board; 1st floor over 300mm wide; including 1 Nr layer 12.5mm Gyproc Wall Board; ground floor; to staircase areas Extra; forming bulkheads 300 - 600mm girth (Provisional) Plaster; British Gypsum Thistle Board Finish skim coat; As NBS K10 681A; steel trowelled finish; 2mm thick Ceilings E over 300mm wide; ground, first and second floors F over 300mm wide; in staircase areas 33 m 2 G over 300mm wide; to bulkheads 300 - 600mm girth 75 m 2 TO COLLECTION £ 2:58 - - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 CEILING FINISHES Insulation Glass fibre sound deadening insulation; Isover APR 1200; laid in position within MF ceiling system A 100mm thick; to ground and first floors (Provisional) B 300mm thick; to tops of bathroom pods and metal frame above; (Provisional) 2 2346 m 144 Nr TO COLLECTION £ 2:59 - - - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 CEILING FINISHES COLLECTION Page 2:57 0.00 " 2:58 0.00 " 2:59 0.00 To Summary £ 2:60 0.00 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 DECORATION Total M60 PAINTING/CLEAR FINISHING; INTERNALLY NOT MEASURED IN ACCORDANCE WITH SMM 7 Painting plaster surfaces; one mist coat; one undercoats; two coats matt emulsion; as NBS M60/110 & 111; as Drawing 3739-531 Generally; to walls and ceilings Bedroom Areas A Block A; 18Nr Item B Block B; 36Nr Item C Block C; 36Nr Item D Block D; 18Nr Item Corridor Areas E Block A; 3Nr Item F Block B; 6Nr Item G Block C; 6Nr Item H Block D; 3Nr Item Painting plaster surfaces; one mist coat; one undercoats; two coats eggshell emulsion; as NBS M60/150; as Drawing 3739-531 Generally; to walls and ceilings Kitchen Areas; allow for 2Nr colours I Block A; 3Nr Item J Block B; 6Nr Item K Block C; 6Nr Item TO COLLECTION £ 2:61 ‐ EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 DECORATION A Block D; 3Nr Item Starcase and lobby Areas B Stair - A Item C Stair - B Item D Stair - C Item E Stair - D Item Prepare, paint one coat primer, two undercoats and two coats eggshell paint; as NBS M60/151 & 152; as Drawing 3739-531 General wood surfaces, including MDF skirtings, architraves, window boards, linings, doors, etc. Generally Bedroom Areas F Block A; 18Nr Item G Block B; 36Nr Item H Block C; 36Nr Item I Block D; 18Nr Item TO COLLECTION £ 2:62 ‐ EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 DECORATION Corridor Areas A Block A; 3Nr Item B Block B; 6Nr Item C Block C; 6Nr Item D Block D; 3Nr Item Kitchen Areas; allow for 2Nr colours E Block A; 3Nr Item F Block B; 6Nr Item G Block C; 6Nr Item H Block D; 3Nr Item Starcase and lobby Areas I Stair - A Item J Stair - B Item K Stair - C Item L Stair - D Item TO COLLECTION £ 2:63 ‐ EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 DECORATION COLLECTION Page 2:61 0.00 " 2:62 0.00 " 2:63 0.00 To Summary £ 2:64 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FITTINGS Total BEDROOM FITTINGS / FIXED FURNITURE Note: The following Bedroom Fittings / Fixed Furniture are to be as manufactured and supplied by the following named supplier. No alternatives will be accepted. OEP Building Services Ltd 31-33 Sun Street Lancaster LA1 1EW Tel: 01524 841266 Fax: 01524 848403 Contact: Jan Zawadski Email: [email protected] Supply and install composite furniture / prefabricated units to bedrooms; to be delivered to site/bedroom fully assembled with protective wrapping; construction, finish, ironmongery all as detailed and specified on ABW drawing nr 3739-533 Composite Furniture to bedrooms as follows:A Desk / wardrobe 144 Nr - 144 Nr - NOTE: desk / wardrobe to include the above desk pinboard; however, the 300 x 300mm plywood pattress to take TV bracket is measured separately in the joinery package and should not be priced with this item. Desk / wardrobe to include for cut-out hole for pattress B Bed / Headboard TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:65 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FITTINGS Total KITCHEN FITTINGS NOTE: The following fittings related to kitchen fittings to be manufactured, supplied and installed complete to separate kitchens in the accommodation blocks Supply and install composite furniture / prefabricated units to kitchens; to be delivered to site/bedroom fully assembled with protective wrapping; construction, finish, ironmongery all as detailed and specified on ABW drawing nr 3739-533 Composite Furniture to kitchens as follows:A B student food store; all as detailed and specified on ABW drawing nr 3739-533 MVHR unit enclosure; to be lockable enclosure; internally lined with acoustic foam and sealed to reduce noise breakout; condensate pipe to drain into SVP in pod riser; all as detailed and specified on ABW drawing nr 3739-529 18 Nr - 18 Nr - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:66 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FITTINGS Total Note: The following Kitchens are to be as manufactured and supplied by the following named supplier. No alternatives will be accepted. OEP Building Services Ltd 31-33 Sun Street Lancaster LA1 1EW Tel: 01524 841266 Fax: 01524 848403 Contact: Jan Zawadski Email: [email protected] Supply and install new kitchen fittings; base units, wall units and worktops all as NBS N11; include for silicone sealant to worktops and units; as GA kitchen layouts shown on ABW typical kitchen layout as detailed on drawing nr 3739-529 Kitchen installation complete; including 2 Nr integrated electric induction hobs, 2 Nr integrated ovens and 2 Nr single drainer sinks with taps; as GA kitchen layouts shown on ABW drawing nr 3739-529 A to Block A 3 Nr - B to Block B 6 Nr - C to Block C 6 Nr - D to Block D 3 Nr - 36 Nr ‐ - 36 Nr ‐ - E F Extra; integrated induction Hob - Lamona LAM1761 Extra; integrated oven - Lamona 72cm LAM4401 TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:67 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FITTINGS Total LOOSE FITTINGS Supply and install the following fixtures and fittings to Kitchens A Fridge - Hotpoint RLA36P 36 Nr - - B Freezer - Hotpoint RZA36P 36 Nr - - C Induction Hob - Lamona LAM1761 (included above see Kitchen Fittings section) 36 Nr ‐ INCL 36 Nr ‐ INCL D Oven - Lamona 72cm LAM4401 (included above - see Kitchen Fittings section) E Television - LG 32LN5400 32" 18 Nr - - F Television Bracket - Wall 1105 TV Bracket 18 Nr - - G Extraction Fan 18 Nr - - Blinds; wipe clean fabric blind with side chain operation; fabric openness to be 3% providing solar shading; to be Astralux 3000 system or other similar and approved; operation by slide ball chain restrainer; Astralux Century Anti-Microbial; colour to be confirmed; as NBS N10/110 I To suit Window Type E 9 Nr - J To suit Window Type F 4 Nr - K To suit Window Type G 4 Nr - L To suit Window Type M 9 Nr - M To suit Window Type N 5 Nr - N To suit Window Type P 5 Nr - O To suit Window Type Q 9 Nr - To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:68 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FITTINGS Total A Iron - Igenix IG3118 Steam Iron 18 Nr - - B Ironing Board - Peelmount Ironboard/4 Metal Mesh 18 Nr - - C Ironing Board -Cover 18 Nr - - D Table; Cloud Level A frame kirk range 2000mm x 1000mm deep, Silver with 25mm MFC Top KRK/2010REC/E 18 Nr - - E Chairs; Chair with upholstered seat pad in Xtreme Plus - CALIXO-ACS-UP-XTREME 144 Nr - - E Bean bags; Adult - Panelled XL 18 Nr - - F Recycling Bins - Jewsons Limited, Linear 360 recycle bins, Ex Carron Pheonix (2 x 15Ltr & 1 x 30 litre) 18 Nr - - 18 Nr - - 2 Nr - - 18 Nr - - 4 Nr - - G Vacuum Cleaner - Nilfisk NER200 H Mop Handle & Head - Vertella - TEY3015 (Box of 15) I J Mop Bucket - Vertella 15 Litre Bucket (Yellow) HA089 Warning Cone - Vertella 21" Wet Floor Cone (Yellow) 992387 (set of 5) K Hand Brush & Pan - Vertella SU071 (Blue) 18 Nr - - L Induction Hob Pan Set - Ready Steady Cook Set - 5 Piece 18 Nr - - M Microwave - Panasonic NN-ST479SBQ 18 Nr - - N Kettle - Dualit Jug ST/ST 72400 18 Nr - - O Toaster - Dualit ST/ST Newgen 47240 18 Nr - - P Whiteboard; 210 x 297mm; as Drawing 3692-528 18 Nr - - Q Sofas; Spark 3 Seater with raised back and spark corner unit with raised back - refs: Figaro Heather FIG023 - Band B faux leather 18 Nr - - Stools; bar stools, translucent clear 72 Nr - - R To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:69 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FITTINGS Total A Signage 18 Nr - B Waste Bin 18 Nr - C 1200 x 750mm 6mm toughened coloured glass splashback behind hobs; as drawing 3739-529; as NBS N11/360 18 Nr 144 Nr - - 144 Nr - - 147 Nr - - Supply and install the following fixtures and fittings to Student Bedrooms D E F Chair; Malika Chrome skid base chair - MAL2/US/B Mattress - EH Standard (Bed Factory Contracts Kirkby) Fridge - Mini Fridge Caldura SF40BK (Black) 18.5kg - Dimensions 450x490x620 GW (including 3 spares) Blinds; wipe clean fabric blind with side chain operation; fabric openness to be 3% providing solar shading; to be Astralux 3000 system or other similar and approved; operation by slide ball chain restrainer; Astralux Obscura blackout; colour to be confirmed; NBS N10/110 G H To suit Window Type A 144 Nr - TV/Monitor - LG 22" Full HD 1080P LG Monitor with freeview Tuner 22MN43D (including 3 spares) 147 Nr - - TV/Monitor Bracket - Turnstone AV AM50-B Dual Articulated 144 Nr - - J Waste Bin; Metal mesh - 1523789 144 Nr - - K Whiteboard; 210 x 297mm; as Drawing 3739-534 144 Nr - - I L Signage 144 Nr - - M Coat Hooks 144 Nr - - N Mirror; 450 x 1800mm high; fixed with secret fixings; NBS N10/110 144 Nr - - To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:70 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FITTINGS Total Supply and install the following fixtures and fittings to Circulation / Corridor Areas A Fire Extinguisher 18 Nr - B Fire Blanket 18 Nr - C Fire Action Notice 18 Nr - D Muster Point 18 Nr - E Recycling Bins 18 Nr - F Manifestations 18 Nr - G Notice Board; Slim lock A1 poster holder to each block entrance lobby. Retailer: UK Point of Sale product ref: SLF2A1 18 Nr - Building Block Name Board; 610 x 300mm; as Drawing 3739-534 18 Nr - 18 Nr - H I Post Boxes; postbox solutions Ltd; Knobloch postboxes, 3 x Horizontal letterbox (300x220x380) HA3022 Zinced steel, 3 x Box door Zinced steel, Opening flap (265x35) HA3022 Aluminium, 1 x Masonry trim plate TE110 Aluminium, Unit Colour: RAL9016 Grey Aluminium; include for forming opening and building in to partitions To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:71 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FITTINGS Total COLLECTION - Page 2:65 " 2:66 - " 2:67 - " 2:68 - " 2:69 - " 2:70 - " 2:71 - To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:72 0.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BATHROOM PODS Total BATHROOM PODS Note: The following Bathroom Pods are to be as manufactured and supplied by the following named supplier. No alternatives will be accepted. OEP Building Services 4 Hunting Gate Hitchin Herts SG4 0TJ Tel: 01524 841266 Fax: 01524 848403 Contact: Jan Zawadski Email: [email protected] Contractor designed bathroom pods; supply and install prefabricated bathroom pods; to be delivered to site/bedroom fully assembled with protective wrapping; construction, finish, ironmongery all as detailed and specified on ABW drawing nr 3739-527 and Residential Accommodation Phase 10 M&E Specification by AECOM; refer also to NBS B11/110910 Prefabricated bathroom pods A 144 supplied and installed to each bedroom To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:73 Nr - 0.00 BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 AIR TIGHTNESS TO EXTERNAL ENVELOPE Quantity Unit AIR TIGHTNESS TO EXTERNAL ENVELOPE Air tightness to external envelope of the building; to be contractor Designed; the Contractor is to allow within the tender for complying with the requirements of air permeability as defined in the Preliminaries Clause A33/570 (AIR PERMEABILITY: Method: Pressure test in accordance with the ATTMA publication: TS 1: Measuring Air Permeability of Building Envelopes; Requirement: Air leakage not to exceed 4 m³/(h.m²) at an internal to external pressure difference of 50 Pascals. The Contractor shall include for all costs to achieve this with all elements of the Construction. Air tightness to external envelope of the building; Contractor Designed A Item generally TO SUMMARY £ 2:74 Rate £ Total £ BILL NR. 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 FIRE PROTECTION / COMPARTMENTATION Quantity Unit to tops of 215mm thick blockwork to underside of concrete soffit; 60 minutes 196 m to tops of 215mm thick blockwork to underside of roofing; 60 minutes 98 m 1008 m 150 m2 75 m2 Rate £ Total £ FIRE PROTECTION / COMPARTMENTATION CONTRACTOR TO ALL FOR THE FOLLOWING FIRE PROTECTION / COMPARTMENTATION; AS DESCRIBED ON ABW DRAWING 3739/526 Fire stop top of wall with Rockwool Intumescent Seal or other equal approved; to meet fire rating as noted below A B C Vertical fire batt to complete 1 hour fire compartmentation; approximately 100 x 100mm; as detailed on drawing 3739/526 FIRE PROTECTION TO STEELWORK FRAME Fire protection to steelwork frame; to be Contractor designed; Prepare primed steel; As NBS M61/115-530; exposed steelwork requiring fire protection to have a fire rated coating with a top sealer coat finish Fire protection to steelwork; To primed steel for Internal Exposure; as shown on drawings; to achieve 60mins D fire protection to steelwork columns (PROVISIONAL) E fire protection to floor supporting steelwork (PROVISIONAL) TO SUMMARY £ 1272-Sports Building 2:75 - 20th February 2014 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 MECHANICAL SERVICES INSTALLATION Analysis of Mechanical Tender Sum Provide with the returned tender documents a completed copy of this annexure, indicating against each item the cost and totalling the sums carried forward to the form of tender 1 Preliminaries Preliminaries for the Contract contain information relating to the site, access, scope and extent of the works, special conditions affecting the manner of working and restrictions or obligations imposed by the Employer which will affect the cost of the Contract Works The tenderer is to insert below clause numbers from the General Engineering Technical Items contained in the Specification as required. Clause numbers and prices not detailed below are deemed to have been priced/included elsewhere. General Preliminaries Item Work Section A31 Clause 3200 Installation drawings Item Work Section A37 Clause 3200 Record drawings Item Work Section A37 Clause 3200 O & M Manuals Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:76 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 MECHANICAL SERVICES INSTALLATION 2 THE MECHANICAL DRAWINGS INDICATE AN ENGINEERING DESIGN FOR EACH TYPICAL BLOCK. THE CONTRACTOR SHALL USE THESE DESIGNS TO FORM THE BASIS OF ADAPTING AND INCORPORATING THE DESIGN INTO THE OTHER PERMUTATIONS OF STOREY HEIGHT AND BED LAYOUT. 2.1 Edge Hill University - Residences Phase 10 - Block A-D inclusive over three floors (GRD, First and Second) please adapt the current design provided in line with number of bedrooms & number of storey’s of this particular block and the concept design principles LTHW heating primary risers in each block and internal 2.1.2 a. distribution within each flat (installation, testing & commissioning) Item Internal Domestic water primary rising maion and 2.1.3 b. internal distribution within each flat (installation, testing & commissioning) Item Above ground 2.1.4 c. commissioning) Item drainage (installation, testing & 2.1.5 d. Ventilation (installation, testing & commissioning) Item 2.1.7 e. Flat station controller/sensors etc Item Site infrastructure External LTHW district heating mains from Phase 10 2.1.8 b. site boundary into each block (note external LTHW district heating mains up to the Phase 10 boundary to be installed by other under an enabling works contract Item External mains cold water from Phase 10 site boundary 2.1.9 b. into each block (note external main cold water up to the Phase 10 boundary to be installed by other under an enabling works contract Item 2.1.10 Containerised specification Item temporary boiler house as defined in TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:77 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 MECHANICAL SERVICES INSTALLATION 3 BUILDERS WORK IN CONNECTION WITH SERVICES Contractor designed builders works in connection with Mechanical Services; Contractor to make allowance for all builders work for services and make good to existing structures and finishes or leave in suitable condition for new finishes measured elsewhere; to include all associated air tightness seals and fire protection where required. Builders work Item Generally all services passing through compartment walls to be fitted with fire dampers to achieve 1 hour fire rating (refer to drawing 3739/526 for areas of fire compartmentation) Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:78 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 MECHANICAL SERVICES INSTALLATION COLLECTION - Page 2:76 " 2:77 - " 2:78 - To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:79 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 ELECTRICAL SERVICES INSTALLATION Analysis of Electrical Tender Sum Provide with the returned tender documents a completed copy of this annexure, indicating against each item the cost and totalling the sums carried forward to the form of tender. 1 Preliminaries Preliminaries for the Contract contain information relating to the site, access, scope and extent of the works, special conditions affecting the manner of working and restrictions or obligations imposed by the Employer which will affect the cost of the Contract Works. The tenderer is to insert below clause numbers from the General Engineering Technical Items contained in the Specification as required. Clause numbers and prices not detailed below are deemed to have been priced/included elsewhere. General Preliminaries Item Work Section A31 Clause 3200 Installation drawings Item Work Section A37 Clause 3200 Record drawings Item Work Section A37 Clause 3200 O & M Manuals Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:80 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 ELECTRICAL SERVICES INSTALLATION 2 THE ELECTRICAL DRAWINGS INDICATE AN ENGINEERING DESIGN FOR EACH TYPICAL BLOCK. THE CONTRACTOR SHALL USE THESE DESIGNS TO FORM THE BASIS OF ADAPTING AND INCORPORATING THE DESIGN INTO THE OTHER PERMUTATIONS OF STOREY HEIGHT AND BED LAYOUT. 2.1 Edge Hill University - Residences Phase 10 - Block A-D inclusive over three floors (GRD, First and Second) please adapt the current design provided in line with number of bedrooms & number of storey’s of this particular block and the concept design principles 2.1.2 a. LV distribution, cabling & containment (installation & testing) Item 2.1.3 b. LV distribution boards & metering (installation & testing) Small power 2.1.4 c. commissioning) Earthing 2.1.5 d. commissioning) installation (containment, testing Item & Item installation (containment, testing & Item 2.1.6 e. Lightning protection installation (containment, testing & commissioning) Item 2.1.7 f. General lighting controls (inc testing & commissioning) Item General lighting installation, (containment, testing & 2.1.8 g. commissioning) Item 2.1.9 h. IT CAT 6 cabling, & cabinets (installation, containment, testing & commissioning) Item Fire alarms 2.1.10 i. commissioning Item installation, containment, testing & Access control installation (containment, testing & 2.1.11 j. commissioning) Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:81 - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 ELECTRICAL SERVICES INSTALLATION Student room access control installation (containment, 2.1.12 k. testing & commissioning) Item 2.1.13 l. TV cabling distribution (containment, installation testing & commissioning) Item Site infrastructure 2.1.14 m. Termination of incoming LV supply cable into Block B main distribution board (note incoming LV supply cables to be installed by other under an enabling works contract Item External Lighting 2.1.15 Include the provisional sum of Fifteen Thousand Pounds for External Lighting 2.1.16 Allow for Main Contractors general attendances Item 15,000.00 Item 2.1.17 Allow for Main Contractors Discount, overheads and profit 3 Item BUILDERS WORK IN CONNECTION WITH SERVICES Contractor designed builders works in connection with Electrical Services; Contractor to make allowance for all builders work for services and make good to existing structures and finishes or leave in suitable condition for new finishes measured elsewhere; to include all associated air tightness seals and fire protection where required. Builders work Generally Item all services passing through compartment walls to be fitted with fire dampers to achieve 1 hour fire rating (refer to drawing 3739/526 for areas of fire compartmentation) Item TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:82 15,000.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 ELECTRICAL SERVICES INSTALLATION COLLECTION - Page 2:80 " 2:81 " 2:82 - To Summary £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2:83 - EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 NEW SERVICES ROUTES Quantity Unit EXTERNAL SERVICES (ALL PROVISIONAL) THE FOLLOWING IN WATER SERVICES P30 TRENCH/PIPEWAYS/PITS FOR BURIED ENGINEERING SERVICES Excavating trenches For services A 350 wide; 1000 to 1250 average depth; backfilling with selected excavated material; compacting; filling in layers; disposal of surplus excavated material off site 200 m Extra over trench excavation; excavating in weathered rock (Provisional) 100 m Disposal Surface water B generally Item Sieved sand Beds C 300 x 100 thick; for services x 1 160 m 160 m Granular material; single sized aggregate 10mm to BS 12620 Bed and surround D 325 x 325; for 125mm diameter pipe TO COLLECTION £ 2:84 Rate £ Total £ EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 NEW SERVICES ROUTES Plain concrete; BS 5328, ordinary prescribed mix C25P, 20 aggregate Beds A 425 x 150 thick surround 150 thick Ducts 100 nominal size x 1 40 m 150 m 100 m THE FOLLOWING IN ELECTRICAL (HV) SERVICES P30 TRENCHES/PIPEWAYS/PITS FOR BURIED ENGINEERING SERVICES Excavating trenches For services B C 400 wide; 750 to 1000 average depth; backfilling with selected excavated material; compacting; filling in layers; disposal of surplus excavated material off site Extra over trench excavation; excavating in weathered rock (Provisional) Disposal Surface water D generally Item Sieved sand Beds E 400 x 150 thick surround 150 thick ducts 150 nominal size x 1 150 m Plain concrete; BS 5328, ordinary prescribed mix C25 P, 20 aggregate Beds F 400 x 150 thick surround 150 thick ducts 100 nominal size x 1 40 m TO COLLECTION £ 2:85 ‐ EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 NEW SERVICES ROUTES Ducts; UPVC or equal and approved Ducts; including draw wire A 150 nominal size B 150 nominal size; casting into concrete C Extra over for sweep bends; casting into concrete 150 m 40 m 2 Nr 150 m 40 m 2 Nr 150 m 450 m 50 m Ducts; including draw wire D 150 nominal size E 150 nominal size; casting into concrete F Extra over for sweep bends; casting into concrete Sundries Identification strips G 150 thick comprising interlocking clay or concrete tiles marked "danger electricity" THE FOLLOWING IN MULTI DUCT SERVICES P30 TRENCHES/PIPEWAYS/PITS FOR BURIED ENGINEERING SERVICES Excavating trenches For services H I 550 wide; 500 to 750 average depth; backfilling with selected excavated material; compacting; filling in layers; disposal of surplus excavated material off site Extra over trench excavation; excavating in weathered rock (Provisional) Disposal Surface water J generally Item Sieved sand Beds E 400 x 150 thick 315 m TO COLLECTION £ 2:86 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 NEW SERVICES ROUTES Plain concrete; BS 5328, ordinary prescribed mix C25 P, 20 aggregate Beds A 400 x 150 thick surround 150 thick ducts 100 nominal size x 1 35 m 18 Nr CABLE DRAW PITS Composite item; comprising excavation, disposal of surplus excavated material off site, backfilling with selected material, construction of new draw pit including concrete base, brickwork chamber, ductile iron cover and frame B generally Ducts; UPVC or equal and approved Ducts C 150 nominal size 400 m D 150 nominal size; casting into concrete 100 m 20 Nr 350 m 400 wide; 500 to 750 average depth; backfilling with selected excavated material; compacting; filling in layers; disposal of surplus excavated material off site 350 m Extra over trench excavation; excavating in weathered rock (Provisional) 100 m E Extra over for sweep bends Sundries Identification strips F 150 wide comprising interlocking clay or concrete tiles marked "danger electricity" THE FOLLOWING IN DATA SERVICES P30 TRENCHES/PIPEWAYS/PITS FOR BURIED ENGINEERING SERVICES Excavating trenches For services G H TO COLLECTION £ 2:87 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 NEW SERVICES ROUTES Disposal Surface water A generally Item Sieved sand Beds B 400 x 150 thick 315 m 35 m 315 m 35 m 20 Nr 350 m Plain concrete; BS 5328, ordinary prescribed mix C25 P, 20 aggregate Beds C 400 x 150 thick surround 150 thick ducts 100 nominal size x 1 Ducts; UPVC or equal and approved Ducts D 100 nominal size E 100 nominal size; casting into concrete F Extra over for sweep bends; casting into concrete Sundries Identification tapes G 50 wide; for data services TO COLLECTION £ 2:88 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 BILL NR 2 NEW SERVICES ROUTES COLLECTION Page 2:84 ‐ " 2:85 ‐ " 2:86 ‐ " 2:87 ‐ " 2:88 ‐ TO SUMMARY £ 2:89 ‐ RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ FOUL WATER DRAINAGE Excavating trenches For pipes; not exceeding 200 nominal diameter; backfilling above bed and surround with selected excavated material compacting in maximum 300 thick layers A B C D 750 to 1000 average depth; disposal of surplus spoil off site 61 m - 20 m - 16 m - 26 m - 221 m - 84 m - 1000 - 1250 average depth; disposal of surplus spoil off site 1250 - 1500 average depth; disposal of surplus spoil off site 2250 - 2500 average depth; disposal of surplus spoil off site For pipes; not exceeding 200 nominal diameter; backfilling above bed and surround with imported hardcore compacting in maximum 150 thick layers E F 750 to 1000 average depth; disposal of surplus spoil off site 1000 - 1250 average depth; disposal of surplus spoil off site TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 90 - RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ 123 m - 306 m - 429 m - Extra; bends; 45 degree bend/oblique 45 degree junction as required 45 Nr - E Extra; Rest bends; bedding in concrete 42 Nr - F Extra; Sweep 'T', 150 x 150 x 100 5 Nr - 42 Nr - Granular material filling; Class S surround; Spec AJP R12/667 Beds and surrounds A 500 x 500; for pipe 150 nominal diameter Class 2 concrete; Spec AJP R12/678 Beds and surrounds B 500 x 500; for pipe 150 nominal diameter Clay pipework; BS EN 2952; flexible joints; AJP R12/121 Pipes C D 150 nominal diameter; in trenches Sealed BIG G 100 diameter outlet trap with vertical back inlet hopper and raising piece; double seal plate wit frame to hopper; bedding and surrouding in concrete as Spec TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 91 - RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ PRECAST CONCRETE INSPECTION CHAMBERS Inspection chambers; precast concrete; cut outs for inflow/outflow pipes; heavy duty precast concrete chamber rings and cover slabs to BS 5911, Part 2, jointing in cement mortar; in-situ concrete as Specification, minimum 150 thick bed and protection; in situ concrete in benchings in bottoms average 300 thick, finished with 25 thick granolithic rendering, trowelled smooth; formwork; excavate pit starting from reduced level including working space as required, backfilling working space with imported hardcore, deposited and compacted in maximum 150 thick layers, compacting bottoms of excavations, dispose of excavated material by removing from site Precast concrete inspection chambers complete with cover and frame type BS EN 124 Grade D400, Spec R12/471, 600 x 600 clear opening; bedding frame in cement mortar, grease and sand to moving parts; precast concrete step irons, cut and pinned to chamber wall; one brick thick x minimum two courses high raising kerbs in class B engineering bricks in cement mortar (1:3), facing and pointing one side A B C chamber 1050 internal diameter; depth to invert 500 - 750 5 Nr - 2 Nr - 1 Nr - 6 Nr - chamber 1050 internal diameter; depth to invert 750 - 1000 chamber 1050 internal diameter; depth to invert 1750 - 2000 Vitrified clay channels and branch bends in inspection chamber bottoms; bedding, jointing and pointing in cement mortar D 150 diameter half round main channel; 1050 girth; TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 92 - RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity A Unit Rate £ Total £ 150 diameter half round main channel; 1050 girth; curved 2 Nr - 10 m3 - SUNDRIES IN CONNECTION WITH FOUL WATER Extra over excavations irrespective of classification or depth for breaking out B rock C concrete 5 m3 - D reinforced concrete 5 m3 - 30 3 m - 1 item - E tarmac Allow for breaking into exisitng foul water manhole, including all excavation, backfilling and all necessary temporary works F Keeping excavations free of surface water 1 Item - G Allow for testing the foul water drainage installations as the work proceeds and upon completion 1 Item - 1 Item - 1 Item - Cleaning H on completion CCTV survey I on completion TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 93 - RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ 111 m - 18 m - 22 m - 10 m - SURFACE WATER DRAINAGE Excavating trenches For pipes; not exceeding 200 nominal diameter; backfilling above bed and surround with selected excavated material compacting in maximum 300 thick layers A B 750 to 1000 average depth; disposal of surplus spoil off site 1000 to 1250 average depth; disposal of surplus spoil off site For pipes; 300 nominal diameter; backfilling above bed and surround with selected excavated material compacting in maximum 300 thick layers C D 1000 to 1250 average depth; disposal of surplus spoil off site 1250 to 1500 average depth; disposal of surplus spoil off site TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 94 - RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ Granular material filling; Class S surround; Spec AJP R12/667 Beds and surrounds A 500 x 500; for pipe 150 nominal diameter 95 m - Class 2 concrete; Spec AJP R12/678 Beds and surrounds B 900 x 900; for pipe 300 nominal diameter 32 m - C 500 x 500; for pipe 150 nominal diameter 35 m - 130 m - Extra; bends; 45 degree bend/oblique 45 degree junction as required 8 Nr - F Extra; Sweep 'T', 150 x 150 x 100 4 Nr - G Extra; rodding eye point with sealing plate and safety valve; including 2 Nr slow radius bends; bedding and surrounding in in-situ concrete as Specification 2 Nr - 32 m - 3 Nr - 13 Nr - 550 m2 1 Item 20 m - - 100 m - - Clay pipework; BS EN 2952; flexible joints; AJP R12/121 Pipes D E H I 150 nominal diameter; in trenches 300 nominal diameter; in trenches Extra; bends; 45 degree bend/oblique 45 degree junction as required RWP BIG J for pipe 150 nominal diameter, Grade C light duty oval cover, sealing ring and rodding eye; 150mm insitu concrete surround as Spec Contractor designed aquavoid as shown on the Engineers Drawings; including all excavation, backfilling work and reinstatement of tarmacadam Aquavoid formed with cellular units strictly in accordance with the manufacturers recommendations K L 55m long x 10m wide x 1m deep Extra; drainage outflow connections to surface water drainage system M Excavate and install Aco drain, including excavation, beds and backfilling; to include ends and outlets; set in paviors N Excavate and install perforated land drain, 150mm dia; including excavation, beds and backfilling, average 1000mm deep TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 95 - - - RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ POLYPROPYLENE INSPECTION CHAMBERS Inspection chambers; Hepworth PPIC polypropylene inspection chambers; complete units with bases, walls, tops, cover slabs and access covers and frames; including all connection rings and other components required for complete assembly; coupling adaptors for connection of inflow/outflow pipes, stoppers to unused inlets/outlets; bedding and surrounding with in-situ concrete, mix as Specification, miniumum 150 thick bed and wall protection (minimum 300 wide x 150 deep collar to top: formwork; excavate pit starting from reduced level including working space as required, backfilling working space with imported hardcore, deposited and compacted in maximum 150 thick layers, compacting bottoms of excavations, dispose of excavated material by removing from site Inspection chambers complete with cast iron covers and frames, solid top, non rocking, jointing frame to inspection chamber, grease and sand to moving parts; for 100/150 diameter inlet/outlet pipes A depth to invert 500 - 750 5 Nr - B depth to invert 750 - 1000 1 Nr - C depth to invert 1000 - 1250 4 Nr - TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 96 - RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ PRECAST CONCRETE INSPECTION CHAMBERS Inspection chambers; precast concrete; cut outs for inflow/outflow pipes; heavy duty precast concrete chamber rings and cover slabs to BS 5911, Part 2, jointing in cement mortar; in-situ concrete as Specification, minimum 150 thick bed and protection; in situ concrete in benchings in bottoms average 300 thick, finished with 25 thick granolithic rendering, trowelled smooth; formwork; excavate pit starting from reduced level including working space as required, backfilling working space with imported hardcore, deposited and compacted in maximum 150 thick layers, compacting bottoms of excavations, dispose of excavated material by removing from site Precast concrete inspection chambers complete with cover and frame type BS EN 124 Grade D400, Spec R12/471, 600 x 600 clear opening; bedding frame in cement mortar, grease and sand to moving parts; precast concrete step irons, cut and pinned to chamber wall; one brick thick x minimum two courses high raising kerbs in class B engineering bricks in cement mortar (1:3), facing and pointing one side A B C chamber 1050 internal diameter; depth to invert 500 - 750 3 Nr - 1 Nr - 2 Nr - 3 Nr - chamber 1200 internal diameter; depth to invert 750 - 1000 chamber 1200 internal diameter; depth to invert 1000 - 1250 Vitrified clay channels and branch bends in inspection chamber bottoms; bedding, jointing and pointing in cement mortar D 150 diameter half round main channel; 1050 girth; curved TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 97 - RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ A 300 diameter half round main channel; 1200 girth; curved 3 Nr - B 150 diameter three quarter section branch bends 3 Nr - 10 m3 - SUNDRIES IN CONNECTION WITH SURFACE WATER DRAINAGE Extra over excavations irrespective of classification or depth for breaking out C rock D concrete 5 m3 - E reinforced concrete 5 m3 - F tarmac 30 m3 - G Keeping excavations free of surface water 1 Item - H Allow for testing the surface water drainage installations as the work proceeds and upon completion 1 Item - 1 Item - 1 Item - Cleaning I on completion CCTV survey J on completion PROVISIONAL SUMS K Sum Foul and surface water connections to existing TO COLLECTION £ 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) 2: 98 5,000.00 5,000.00 RESIDENTIAL PHASE 10 DRAINAGE (ALL PROVISIONAL) Quantity Unit Rate £ Total £ COLLECTION - Page 2:90 " 2:91 - " 2:92 - " 2:93 - " 2:94 - " 2:95 - " 2:96 - " 2:97 - " 2:98 5,000.00 TO SUMMARY 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) £ 2: 99 BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS Quantity Unit Rate £ Total £ SITE PREPARATION Excavating To reduce levels A maximum depth not exceeding 0.25m (Provisional) B 1m maximum depth 445 m 3 - 75 m3 - Extra over excavation irrespective of depth for breaking out C concrete (Provisional) 5 m 3 - D reinforced concrete (Provisional) 5 m 3 - E brickwork (Provisional) 5 m 3 - F macadam surfacing 250 m2 - 20 m 2 - 1 item Earthwork support To faces of excavation G 1m maximum depth; distance between opposing faces not exceeding 1m Disposal Surface water H generally I excavated material off site 520 m 3 - 57 m3 - Filling; sand, firm gravel or PFA or other approved material applied to fill interstices and provide a smooth surface; as specification clause D20/730 Filling to make up levels; blinding J average thickness not exceeding 0.25m (50mm blinding) TO COLLECTION £ 2:100 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS Imported material; hard clean stone to pass through a 75mm sieve; spec ref DOT Type 1 Filling; depositing and compacting in maximum 150mm thick layers; blinding with sand; levelling and compacting ready to receive new finishes noted elsewhere A to make up levels; average 100 mm thick 277 m 2 - B to make up levels; average 150 mm thick 485 m 2 - C to make up levels; average 200 mm thick 385 m 2 - 1147 m 2 - 300 m - 300 m 2 - Surface treatments Levelling and compacting D bottoms of excavation EDGINGS AND TRIMS Timber edging; treated softwood E 25 x 150mm; 50 x 50 x 450mm softwood pegs at 1000mm centres, double at all joints and corners (Provisional) Granular material; buff gravel Building maintenance strip; loose gravel; 12mm crushed limestone or similar approved; F over 300mm wide; laid on hardcore (hardcore taken elsewhere) TO COLLECTION £ 2:101 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS Geotextile membrane; Terram 1000 Horizontal A 300 m 2 - to general areas; protecting, watering before practical completion, making good defects and maintenance after practical completion in accordance with the Specification requirements 1750 m 2 - to trees; protecting watering before practical completion; making good defects and maintenance after practical completion in accordance with the specification requirements (Provisional) 23 Nr - over 300mm wide; laid on topsoil (topsoil taken elsewhere) Maintenance of landscaped and grass areas B C TO COLLECTION £ 2:102 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS Quantity Unit Rate £ Total £ SITEWORKS -HARD LANDSCAPING; ALL PROVISIONAL NOTE: The following works are provisional and subject to remeasure. The works described are Builders Quantities and are not measured in accordance with the current SMM. They are 'all inclusive' composite items and the rates applied should include for all associated works A Contractors are referred to the accompanying drawings and must satisfy themselves that their prices cover for the full requirements as stated irrespective of the description in the schedule items below. B The quantities are approximate only and are not measured using SMM7 or other standard form of measurement. Contractors must satisfy themselves that they have covered in their costs for all works that could reasonably be expected, given the general description and scope of the works and materials specified C All prices are to be inclusive of all labour, plant and material costs in connection with the carrying out of the works described. D All prices are to include for off site disposal of surplus material at an approved licenced tip. E All prices are to include work by hand where use of machinery is impractical. All work shall be to same standard irrespective of whether carried out by machinery or by hand. F All prices to include for all Health and Safety requirements Refer to specification for fuller details of requirements. TO COLLECTION £ 2:103 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS EXCAVATION AND EARTHWORK Excavation Excavation to reduce levels; removing surplus materials from site A generally; Average 250mm deep; soft spots or the like after removal of tarmacadam surfaces noted elsewhere (Provisional) 150 m 3 - 1,147 m 2 - 351 m2 - 33 m - Mortar; cement and sand (1:3); as beds in making up levels for new finishes noted elsewhere; trowelling surfaces ready to receive new finishes Beds B Approx/average 100mm thick; to underside of all hard pavings (minimum 50mm thick) HARD LANDSCAPING Hard Paving/Edgings; preparing existing ground; including laying on and pointing in Easipoint fine bedding concrete ; allow for all associated curved and raking cutting (refer to drawings) Hardscape Mellifont Block Paving 120 x 160 x 80mm, 160 x 160 x 80mm, colour Rustic or similar approved; pointing in slurry applied Easipoint Grantech, laid on 50mm medium/ coarse sand bedding - NBS Q24/110 C Over 300mm wide Hardscape Mellifont Block edging 160 x 160 x 80mm, colour Rustic or similar approved; laid on 50mm medium/ coarse sand bedding; pointing in slurry applied Easipoint Grantech - NBS Q24/110 D 160mm soldier course - curved TO COLLECTION £ 2:104 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS Hardscape Kobra Granite slab 450, random length, 70mm thick, joints filled with slurry applied Easipoint Grantech, bedding mortar Easipoint Bond Plus or similar, laid on 40mm laying course Easipoint fine bedding concrete A Granite (Magma); 400 mm wide x various lengths (max 800) x 50 mm thick - NBS Q24/130 134 m 2 - 127 m - Hardscape Kobra Granite cobble edging 100 x 100 x 100mm; joints filled with slurry applied Easipoint Grantech, bedding mortar Easipoint Bond Plus or similar, laid on 40mm laying course Easipoint fine bedding concrete - NBS Q24/130 B 200mm wide (2 courses) TO COLLECTION £ 2:105 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS Quantity Unit Rate £ Total £ SITEWORKS - WALLS/RETAINING WALLS; ALL PROVISIONAL NOTE: The following works are provisional and subject to remeasure. The works described are Builders Quantities and are not measured in accordance with the current SMM. They are 'all inclusive' composite items and the rates applied should include for all associated works WALLS / RETAINING WALLS Excavate and prepare existing ground to receive new walls/retaining walls; construct new walls/retaining walls as detail shown on drawings; composite item; including concrete foundation (allow 600 x 150mm), 328mm masonry wall comprising 100mm concrete blockwork faced both sides with facing brickwork on 2 courses Class B engineering brick, 327 x 125 x 900mm length Hardscape Kobra Granite copings, type to be confirmed ; haunchings, pointing etc; Drawing ABW 3739-526 detail 04 A Low plinth wall; varying from 950 to 250mm high x 328 wide); straight Extra over for curved length 32 m - 6 m - 36 m - 15 Nr - 20 Nr - Excavate and prepare existing ground to receive new walls/retaining walls; construct new walls/retaining walls as detail shown on drawings; composite item; including concrete foundation (allow 900 x 150mm), 600mm masonry wall comprising two rows 100mm concrete blockwork with a 200mm cavity faced on both external sides with facing brickwork on 2 courses Class B engineering brick, 600 x 125 x 900mm length Hardscape Kobra Granite copings, type to be confirmed ; haunchings, pointing etc; Drawing ABW 3739-526 detail 05 B Low plinth wall; varying from 950 to 250mm high x 328 wide); curved Allow for the supply and fixing of recessed brick lights at low level C Low plinth wall; Excavate, concrete and backfill foundation for bollard lighting; composite item; including concrete foundation (allow 450 x450 x 150mm deep) D Bollard lights TO COLLECTION £ 2:106 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS Quantity Unit Rate £ Total £ SITEWORKS SOFT LANDSCAPING; ALL PROVISIONAL NOTE: The following works are provisional and subject to remeasure. The works described are Builders Quantities and are not measured in accordance with the current SMM. They are 'all inclusive' composite items and the rates applied should include for all associated works EARTHWORK Excavation Excavation to form tree pits; removing surplus materials from site A 1000 x 1000 x 750mm 23 Nr - Importing and lay good quality topsoil/compost ready to receive planting (planting included elsewhere) B Average 450mm thick; planting areas 191 m 3 - C Average 150mm thick; grassed areas 58 m 3 - D Average 750mm thick; to tree pits 15 m 3 - 710 m 2 - 384 m 2 - TURFING/SEEDING Preparing existing or new earth; rotovating / levelling; importing and laying new imported turf E Turf GRASS PROTECTION Cell grass protection; plastic; Terram Bodpave 85 or similar; including Tensar TX160 Geogrid membrane - NBS Q30/361 F Over 300mm wide TO COLLECTION £ 2:107 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS SOFT LANDSCAPING Q30-31 Inspect areas to be planted prior to works and carry out any additional clearance necessary including grubbing out old shrubs/stumps and other deleterious material prior to planting operations. A generally Spray off any weed growth with an approved herbicide. B Item generally Item TREES Supply and install New specimen trees (allow £200/tree supply only) C min 20-25cm; including tree support, double stake, tree pit, fertiliser, irrigation pipes, underground guying. 23 Nr - 710 m2 - 250 m2 - 750 m2 - GRASS/BULBS Turfing Q30; Supply and spread evenly , approved compost PAS100 or similar at 0.75m3/10m2 (75mm/m2); Cultivate topsoil/compost to 200mm depth and bring bed to fine tilth just prior to turfing. Apply approved fertilizer before final cultivations; Supply and lay Rowlawn 'Medallion Turf' or similar approved D E Turfing Mass bulb planting. Rate 50 bulbs /per m² PLANTING Shrub/Herbaceous Q31 405-485A; Supply and spread evenly , approved compost PAS100 or similar at 1.5m3/10m2 (150mm/m2); Cultivate to full depth of topsoil/compost; Apply Enmag fertilizer as specified @ 50g/m2, carefully over all areas to be planted F Shrubs TO COLLECTION £ 2:108 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS Supply & plant ground cover/shrubs (£30/per m2, costing purposes); Supply & plant Specimen shrubs (1 plant /per 2m2, £25 /per plant, costing purposes); Supply and spread approved mulch 50mm thick (after settlement) over newly planted areas. A 750 Shrubs m2 - Maintenance (12 months) (In accordance with the specification); As NBS Q35 B Maintain turf in good condition in accordance with the specification Item C Maintain shrub beds and tree stations in accordance with the specification Item D Carry out pruning operations(according to species) as necessary to maintain shape, remove deadwood and generally assist establishment and good growth of all plants. Item Maintain full thickness and tidy appearance of mulch throughout the defects liability and maintenance periods. E Item Defects Liability (12 months) Allow for returfing of any grass areas that fail to establish. Item Allow for replacement of any shrubs/trees that fail to establish well or die. Item F G TO COLLECTION £ 2:109 - BILL NR 2 CCOMMODATION - PHASE 10 SITEWORKS COLLECTION - Page 2:100 " 2:101 - " 2:102 - " 2:103 - " 2:104 - " 2:105 - " 2:106 - " 2:107 - " 2:108 - " 2:109 - TO SUMMARY 2:110 £ - BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 CONTINGENCIES, DAYWORKS AND PROVISIONAL SUMS CONTINGENCIES, DAYWORKS AND PROVISIONAL SUMS Contingencies A £ Include the sum of One Hundred Thousand Pounds for Contingencies to be expended as directed by the Contract Administrator or deducted in whole or part if not expended. 100,000.00 Dayworks B Work ordered to be executed on a daywork basis before practical completion will be paid as follows:The definition of labour and materials shall be as defined in sections (3) and (4) respectively of "Definition of Prime Costs of Daywork carried out under a Building Contract", published 1st December 1975. The individual rates for plant, see section (5), shall be set out in the current (at tender date) "Schedule of Basic Plant Charges" applicable to a building contract. The definition of overheads shall be as defined in section (6). Where any work is executed as daywork, the daywork sheets are to be submitted in triplicate to the Contract Administrator for his approval and signature, at or before the end of the week following that in which the works were executed. The items given below apply to any daywork which may be carried out prior to Practical Completion of the Works. To Collection 2:111 £ BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 CONTINGENCIES, DAYWORKS AND PROVISIONAL SUMS Labour A B Include the Provisional Sum of Five Thousand Pounds for net cost of labour. Add for profit, overheads and established charges and all other liabilities and obligations (excluding M & E and specialist sub-contractor). 5,000.00 % Materials C D Include Provisional Sum of Two Thousand Pounds for the net cost (after deduction of all discounts for cash in excess of 2.5% and trade discounts, rebates and allowances) of materials used in daywork delivered to site. Add for profit, overheads and established charges and all other liabilities and obligations. 2,000.00 % Plant E F Include the Provisional Sum of Two Thousand Pounds for net cost of plant used at local hire charges. Add for profit, overheads and established charges and all other liabilities and obligations. Daywork carried out after Practical Completion G Dayworks carried out during the Defects Liability Period will be valued on the same basis as that carried out prior to the date of Practical Completion, except that an addition of 10% will be made to the value of labour To Collection 2:112 £ 2,000.00 % BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 CONTINGENCIES, DAYWORKS AND PROVISIONAL SUMS Provisional Sums Defined Provisional Sums have been included within the elemental sections of this document. These sums are strictly net, do not include any cash discount to the Main Contractor and are to be expended on the written instruction of the Contract Administrator only. Such sums may be expended or deducted in whole or part at the discretion of the Contract Administrator. The Contractor shall include at the end an allowance for main contractors overheads, profit, general attendance, etc. A 10,000.00 Supply and delivery and of External Furniture Allow for Main Contractors general attendances (comprising offloading, unwrapping quality control quality inspection at off-load stage, lifting into building and placing in position and removing all surplus waste material off site) Allow for Main Contractors Discount, overheads and profit B 15,000.00 Additional furniture and fittings Allow for Main Contractors general attendances (comprising offloading, unwrapping quality control quality inspectin at off-load stage, lifting into building and placing in position and removing all surplus waste material off site) Allow for Main Contractors Discount, overheads and profit C Supply, delivery and installation of general signage (Internal and External Signage) Allow for Main Contractors general attendances Allow for Main Contractors Discount, overheads and profit To Collection 2:113 £ 10,000.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 CONTINGENCIES, DAYWORKS AND PROVISIONAL SUMS A 25,000.00 Additional landscaping Allow for Main Contractors general attendances Allow for Main Contractors Discount, overheads and profit B 10,000.00 Roof access/safety harness system Allow for Main Contractors general attendances Allow for Main Contractors Discount, overheads and profit C 10,000.00 Additional loose secondary steelwork Allow for Main Contractors general attendances Allow for Main Contractors Discount, overheads and profit D Supply of ironmongery (fixing of ironmongery included in measured works) Allow for Main Contractors general attendances Allow for Main Contractors Discount, overheads and profit To Collection 2:114 £ 45,000.00 BILL NR 2 EHU - RESIDENTIAL ACCOMMODATION - PHASE 10 CONTINGENCIES, DAYWORKS AND PROVISIONAL SUMS Collection £ Page 2:111 - 2:112 - 2:113 - 2:114 - TOTAL CARRIED TO MAIN SUMMARY 2:115 £ - EHU RESIDENTIAL ACCOMMODATION - PHASE 10 SUMMARY ELEMENT PAGE FOUNDATIONS AND SUBSTRUCTURE WORKS 2:5 0.00 ROOF 2:9 0.00 METALWORK 2:16 0.00 UPPER FLOORS & STAIRS 2:19 0.00 HANDRAILS AND CANOPIES 2:20 0.00 EXTERNAL WALLS 2:28 0.00 WINDOWS AND EXTERNAL DOORS 2:32 0.00 JOINERY PACKAGE 2:33 0.00 INTERNAL PARTITIONS 2:46 0.00 FLOOR FINISHES 2:53 0.00 WALL FINISHES 2:56 0.00 CEILING FINISHES 2:60 0.00 DECORATION 2:64 0.00 FITTINGS 2:72 0.00 BATHROOM PODS 2:73 0.00 AIR TIGHTNESS 2:74 0.00 FIRE PROTECTION 2:75 0.00 MECHANICAL 2:79 0.00 ELECTRICAL 2:83 0.00 NEW SERVICES ROUTES 2:89 0.00 DRAINAGE 2:99 0.00 SITEWORKS 2:110 0.00 CONTINGENCIES, DAYWORKS AND PROVISIONAL SUMS 2:115 0.00 PRELIMINARIES (see separate Preliminaries section) 1:1 - 1:79 TOTAL MAIN SUMMARY CARRIED TO FORM OF TENDER 1280-003.Phase 10 Tender BOQ (Rev 3.Final Tender) MS/1 TOTAL £ £ 0.00 Phase 10 Residences Tender Documents List Type Drawing Number Rev Drawing Name ABW ARCHITECTS Architect 3739-500 3739-501 3739-502 3739‐503 3739‐504 3739-505 3739-506 3739-507 3739-508 3739-509 3739-510 3739-511 3739-512 3739-513 3739-514 3739-515 3739-516 3739-517 3739-518 / A A A / A / / / / / / / / / B B B A Site Location Plan Setting Out Ground Floor Plan First Floor Plan Second Floor Plan Roof Plan Ground Floor Plan 1 of 3 Ground Floor Plan 2 of 3 Ground Floor Plan 3 of 3 First Floor Plan 1 of 3 First Floor Plan 2 of 3 First Floor Plan 3 of 3 Second Floor Plan 1 of 3 Second Floor Plan 2 of 3 Second Floor Plan 3 of 3 GA Section A-A GA Section B-B GA Section C-C GASection D-D 3739-520 3739-521 3739-522 A A / Elevations Elevations Window-Screen-Schedule 3739-524 3739-525 3739-526 3739-527 3739-528 3739-529 3739-530 3739-531 3739-532 3739-533 3739-534 3739-535 3739-536 / / / A / / / / A / / / A Internal Door Schedule Internal Door Details Fire Compartmentation Bathroom Pod Details Kitchen Layouts Typical Kitchen Layouts Details Typical Partition Layouts Details Typical Finishes Layouts Joinery Details Furniture Details Signage Lobby Details External Works ABW NBS ABW Designers Risk Assessment 60321010-C-M-5000 60321010-C-M-5010 60321010-C-M-5020 60321010-C-M-9010 60321010 1 1 1 1 Heating and domestic water services typical schematic Ventilation and dry riser schematic Mechanical services layout External Mechanical Services Layout Mechanical Specification E1001 E2001 E5001 E6001 E7001 E8000 ESPC - LV Distribution Schematic IT Network Schematic Typical Block TV Distribution Schematic Typical Block Access Control Schematic Fire Alarm Schematic Typical Block Electrical Services Layout Electrical Scope of Works AMP ELECTRICAL CONSULTING Mechanical AECOM Electrical ALAN JOHNSTON PARTNERSHIP Structural 214-256 -100A 214-256 -101 214-256 -102 214-256 -103 214-256 -104 214-256 -105 214-256 -106 214-256-D01A B A A / A / / A Foundation Layout Ground Floor Layout First Floor Layout Second Floor Layout Foundation Sections Super Structure Sections & Details Roof Sections & Details Drainage Layout MDP PROJECT SERVICES Quantity Surveyor Bills of Quantities (including Preliminaries) SkW Construction Consultancy CDM-C Pre Construction Information GENERAL General ITT Document (including Form of Tender) General Letter to Tenderers
© Copyright 2024