EMC VxRail Appliance 4.x E22-285 Practice Exam

2018 New EMC VxRail Appliance 4.x E22-285 PDF Questions
Exam Code: E22-285
Exam Name: VxRail Appliance 4.x Deployment and Implementation Exam
Q & A: 80 Q&As
https://www.killtest.com/Product-Technology-Specific/E22-285.asp
Happy New Year. At Killtest, you can get 28% off on all products from Dec.27, 2017 to Jan.20,
2018. Just go for 2018 New EMC VxRail Appliance 4.x E22-285 PDF Questions now.
www.killtest.com
The safer , easier way to help you pass any IT exams. Exam
: E22-285
Title
: VxRail Appliance 4.x
Deployment and
Implementation Exam
Version : Demo
1/3
The safer , easier way to help you pass any IT exams. 1.Which user provided block of IP addresses to the VxRail initialization wizard may contain
non-contiguous addresses?
A. VMware Virtual SAN
B. ESXi host
C. vSphere vMotion
D. NTP Servers
Answer: D
2.A company wants to deploy VxRail on V Series nodes as a proof-of-concept (POC). Only one Top of
Rack (ToR) switch has been provided for the POC.
What is the Dell EMC best practice recommendation in this situation?
A. Connect the first host NIC to the ToR switch. Leave the second host NIC un-cabled.
B. Connect each host NIC to a port on a different switch packet buffer bank on the ToRswitch. Balance the
ports across two packet buffer banks.
C. Inform the company that the POC cannot proceed without a second ToR switch.
D. Connect the first host NIC to the TOR switch. Daisy chain the second NIC between hosts.
Answer: B
3.When preparing for a VxRail deployment, which components require forward and reserve DNS
records?
A. ESXi hosts, vRealize Log Insight, and Platform Services Controller
B. Platform Services Controller. vCenter, and ESRS/VE
C. ESXi hosts, vCenter, and vRealize Operations
D. ESXi Hosts, vCenter, and ESRS/VE
Answer: A
Explanation:
Referencehttps://www.emc.com/collateral/guide/vxrail-quickstart-guide.pdf
4.What is the correct command to restart the Loudmouth process on a VxRail node?
A. /usr/lib/vmware-loudmouth/bin/loudmouthc restart
B. systemctl restart vmware-loudmouth
C. /etc/init.d/loudmouth restart
D. /sbin/service loudmouth restart
Answer: C
Explanation:
Referencehttps://pbradz.wordpress.com/category/vxrail/
5.What is the VxRail maximum cluster size if using only 1 GbE links?
A. 8
B. 16
C. 32
D. 64 with an RPQ
Answer: A
Explanation:
2/3
The safer , easier way to help you pass any IT exams. Referencehttps://www.emc.com/collateral/specification-sheet/vxrail-4.0-spec-sheet.pdf
3/3
Killtest Exam Features
Real Exam Q&As
100% Passing Guarantee
PDF + Software
One Year Free Update
Once Failed, Full Refund
Subscribe Killtest Youtube To Get More Exam Info
Contact Us
Mail: [email protected]
Tel: +1 (315) 557-0907
FB Messenger: [email protected]
Live Online Support
Killtest would be the best choice for preparing your IT certification exams. Just come to Killtest
to choose your wish exam. We ensure your success.