Report and Recommendation of the President to the Board of Directors Project Number: 41629 August 2010 Proposed Loan and Technical Assistance Grant India: Bihar State Highways II Project CURRENCY EQUIVALENTS (as of 4 August 2010) Currency Unit – Indian rupee/s (Re/Rs) Re1.00 $1.00 = = $0.0217 Rs46.1500 ABBREVIATIONS ADB BSRDC EIRR EMP GDP km LIBOR TA – – – – – – – – Asian Development Bank Bihar State Road Development Corporation Limited economic internal rate of return environment management plan gross domestic product kilometer London interbank offered rate technical assistance NOTES (i) The fiscal year (FY) of the Government of India begins on 1 April and ends on 31 March. “FY” before a calendar year denotes the year in which the fiscal year begins, e.g., FY2010 begins on 1 April 2010. (ii) In this report, “$” refers to US dollars. Vice-President Director General Director X. Zhao, Operations 1 S. Rahman, South Asia Department (SARD) S. Widowati, Transport and Communications Division, SARD Team leader Team members M. Roesner, Transport Specialist, SARD M. Ajmera, Social Development Specialist, SARD K. Emzita, Senior Counsel, Office of the General Counsel V. Lisack, Transport Specialist, SARD C. San Miguel, Project Implementation Officer, SARD L. Tai, Transport Specialist, SARD H. Yamaguchi, Principal Transport Specialist, SARD M. Alam, Head, Project Administration Unit, Transport and Urban Development Division, Southeast Asia Department Peer Reviewer In preparing any country program or strategy, financing any project, or making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page PROJECT AT A GLANCE MAP I. THE PROPOSAL 1 II. THE PROJECT A. Rationale B. Impact and Outcome C. Outputs D. Investment and Financing Plans E. Implementation Arrangements 1 1 2 2 2 3 III. TECHNICAL ASSISTANCE 4 IV. DUE DILIGENCE A. Technical B. Economic C. Governance D. Poverty and Social E. Safeguards F. Risks and Mitigating Measures 5 5 5 5 6 7 8 V. ASSURANCES 9 VI. RECOMMENDATION 9 APPENDIXES 1 Design and Monitoring Framework 10 2 List of Linked Documents 12 Project at a Glance 1. Project Name: 3. Country: Bihar State Highways II Project (formerly Bihar State Roads II) India 4. Department/Division: 5. Sector Classification: 2. Project Number: South Asia Department Transport and Communications Division Sectors Primary Subsectors Transport, and information and communication technology 6. Thematic Classification: Themes 1 Road transport Primary Subthemes 1 Economic growth Widening access to markets and economic opportunities 0 Capacity development 6a. Climate Change Impact: Adaptation Mitigation Institutional development 6b. Gender Mainstreaming: Gender equity theme Effective gender mainstreaming Some gender benefits No gender elements 7. Targeting Classification: Targeted Intervention Geographic Millennium Income poverty dimensions of Development at household General Intervention inclusive growth Goals level 0 0 0 0 0 1 0 8. Location Impact: Rural Urban National Regional High Medium Low 1 9. Project Risk Categorization: Complex 10. Safeguard Categorization: Environment Involuntary resettlement Indigenous peoples B A C 11. ADB Financing: Sovereign/Nonsovereign Sovereign 41629-01-3 Modality Source Project loan Ordinary capital resources Amount ($ million) 300.0 Total 300.0 12. Cofinancing: No Cofinancing available. 13. Counterpart Financing: Source Amount ($ million) Government 124.0 14. Aid Effectiveness: Parallel project implementation unit Program-based approach No No 100 100 95 95 75 75 25 25 5 5 0 0 100 100 95 95 75 75 25 25 5 5 0 0 ind2158 Monday, 09 August, 2010 4:41:36 PM I. THE PROPOSAL 1. I submit for your approval the following report and recommendation on a proposed loan to India for the Bihar State Highways II Project. The report also describes proposed technical assistance (TA) for the Capacity Building for Bihar State Road Sector. If the Board approves the proposed loan, I, acting under the authority delegated to me by the Board, will approve the TA. 2. The Bihar State Highways II Project 1 will build and upgrade about 356 kilometers (km) of state highways identified under the State Highway Development Program in Bihar. It will involve upgrading roads to two lanes, strengthening culverts and bridges, building new road sections and bridges and cross-drainage structures, and building structures for resettlement and rehabilitation. Consulting support will be provided to support implementation of civil works. II. A. THE PROJECT Rationale 3. Under the India country partnership strategy (2009–2012), the Asian Development Bank (ADB) supports all levels of the road sector development as a core infrastructure operation to facilitate sustainable economic growth. The project is consistent with the strategic objective set out in the country partnership strategy and included in the India country operations business plan (2010). 4. In India, road transport accounts for 68% of freight movement and 87% of passenger traffic. The national highways and the secondary system are unable to cope with the rapid traffic growth. In the road sector, freight traffic increased at about 12% per year and passenger traffic at about 8% in the past decade. The rapid growth in traffic leads to congestion, deterioration of roads and increase in the cost of transport. State highways, the secondary road system in India, link national highways with district headquarters and important towns. The secondary system comprises about 13% of the road network and carries about 40% of traffic. It is estimated that about half of the roads in the secondary system are of poor riding quality. 5. Bihar is one of the economically backward states of India. Judged by the per capita state income of Rs9,765 in the FY2007, Bihar ranks far below the all India average of Rs33,299, which is a measure of standard of living. The road network in Bihar is very poor in terms of coverage and conditions while demand for road transport is increasing. The road density in Bihar is only 861 km per million population, compared with the national average of 2,828 km. About half of villages lack all-weather road connectivity. Insufficient funding for road maintenance in the past has increased the number of roads beyond maintainable condition. 6. The government of Bihar is undertaking the State Highway Development Program to rehabilitate and upgrade state highways to at least two lanes and expand the state highway network by upgrading major district roads to two lanes. The program covers upgrading 2,831 km out of the 3,127 km of state highways during the 11th Five Year Plan period (2007–2012) through various schemes, including government schemes, pilot projects such as the public– private–partnership scheme with a build–operate–transfer contract for a major bridge and ADB assistance. The ongoing Bihar State Highways Project 2 is providing financial assistance for 1 2 ADB provided project preparatory technical assistance (TA 7198-IND). ADB. 2008. Report and Recommendation of the President to the Board of Directors: Proposed Loan to India for the Bihar State Highways Project. Manila (Loan 2443-IND). 2 widening of 820 km of state highways to two lanes. The improvement of 356 km of state highways to be financed under the proposed loan is part of the program to help meet increased demands for road transport, and accelerate the process of sustainable economic growth. 7. The Bihar State Highways Project is progressing well and is expected to be completed before the loan closes on 31 July 2012. All civil works contracts were awarded in the first year after loan approval, and the performance and disbursement targets have been achieved. ADB TA supported the institutional strengthening of the Bihar State Road Development Corporation Limited (BSRDC), which was established by the Bihar government in February 2009 to implement the project. 3 BSRDC’s experience in the ongoing project and its institutional strengthening has benefited the preparation of the proposed loan and boosted project readiness. 8. As lack of road maintenance and inability to spend the allocated budget for road maintenance in the past were identified as key factors leading to the deteriorated status of many project roads, the focus of institutional strengthening by the capacity development TA will be on completion of a state wide roads asset registry and improving maintenance management. B. Impact and Outcome 9. The project impact will be a more efficient state road transport system supporting sustainable economic growth in Bihar by (i) improving the state highway network’s efficiency by reducing the travel times, (ii) facilitating safe road transport by full implementation of the recommendations from the road safety audit for the project roads, and (iii) enhancing the government of Bihar’s capacity for road asset management and road maintenance. The project outcome will be increased transport efficiency and safety on project roads. C. Outputs 10. The project output will be (i) building and upgrading 356 km of state highways identified under the State Highway Development Program (Table 1) and (ii) improved management of road assets and maintenance of project roads by BSRDC. Table 1: Project Roads State Highway Project Road 78 Bihta–Sarmera 81 Sakkadi–Nasrigunj Mohammadpur–Chapra 90 Birpur–Udakishunganj 91 Total Length (kilometer) 100 85 69 102 356 Source: Bihar State Road Development Corporation Limited. D. Investment and Financing Plans 11. The project is estimated to cost $424 million including local taxes and duties estimated at $30.5 million and financing charges (Table 2). ADB will finance the local taxes and duties associated with project expenditures for works in the amount of about $27.7 million. This is in line with the India country partnership strategy (2009–2012), which considers taxes and duties not exceeding 10% of project costs reasonable, transparent, and nondiscriminatory. 3 Attached to ADB. 2008. Report and Recommendation of the President to the Board of Directors: Proposed Loan to India for the Bihar State Highways Project. Manila (TA 7130-IND). 3 Table 2: Project Investment Plan ($ million) Item A. B. C. a Amounta b Base Cost 1. Investment component 2. Institutional development component Subtotal (A) Contingenciesc Financing Charges during Implementationd Total (A + B + C) 370.68 3.00 373.68 33.82 16.50 424.00 Includes taxes and duties of about $30.5 million. About $27.7 million of taxes and duties for works will be financed from ADB loan resources. b In mid-2010 prices. c Physical contingencies computed at 5% for civil works; price contingencies at 0.8% of foreign exchange costs and 6% of local currency costs, including provision for fluctuations in the purchasing power parity exchange rate if this rate is used. d Includes interest and commitment charges. Interest during construction for the ADB loan(s) is computed at the 5-year forward London interbank offered rate plus a spread of 0.3%. Commitment charges for an ADB loan are 0.15% per year on the undisbursed loan amount. Source: Asian Development Bank estimates. 12. The Government of India has requested a loan of $300.0 million from ADB’s ordinary capital resources for the project. The loan will have a term of 25 years, including a grace period of 5 years, an annual interest rate determined according to ADB’s London interbank offered rate (LIBOR)-based lending facility, subject to a commitment charge of 0.15% per year, and other terms and conditions set forth in the draft loan agreement. The government has provided ADB with (i) the reasons for its decision to borrow under ADB’s LIBOR-based lending facility on the basis of these terms and conditions, and (ii) an undertaking that these choices were its own independent decision and not made in reliance on any communication or advice from ADB. 13. The financing plan is in Table 3. The ADB loan will finance 70.75% of the project cost. This is considered acceptable, taking into account that the government of Bihar has allocated its counterpart financing for 29.25% of the cost. By including more roads in the loan, the benefits will be spread into more areas of the state. 14. The government will provide the loan proceeds in local currency to the government of Bihar on the same terms and conditions as received from ADB. The government of Bihar will bear the foreign exchange risk on the loan. Table 3: Financing Plan Source Asian Development Bank Government Total Amount ($ million) 300.00 124.00 424.00 Share of Total (%) 70.75 29.25 100.00 Source: Asian Development Bank estimates. E. Implementation Arrangements 15. The executing agency for the project will be the government of Bihar acting through BSRDC. BSRDC is wholly owned by the government of Bihar and has been equipped with adequate capacity to implement the project. The project will use project implementation units that exist in the project area in Biharsharif, Ara, Hajipur, and Araria, and will place additional 4 staff to specifically work on the project. Each project team in a project implementation unit is headed by a deputy general manager and will be responsible for implementation in the field. One or two full-time project managers will be assigned for each contract package. The project managers will be delegated adequate technical and administrative authority for expeditious project implementation. BSRDC will engage construction supervision consultants to act as the engineer for the construction contracts. 16. The implementation arrangements are summarized in Table 4 and described in detail in the project administration manual. 4 Table 4: Implementation Arrangements Aspect Implementation period Estimated project completion date Project management (i) Executing agency (ii) Project implementation units Procurement Consulting services Retroactive financing and advance contracting Disbursement Arrangements 4 years 31 December 2014 Government of Bihar, acting through the Bihar State Road Development Corporation Limited In Biharsharif, Ara, Hajipur, and Araria: 1 deputy general manager (tech), 1 or 2 project managers, and supporting staff for each unit International 4 civil works $54,000,000– competitive bidding contracts $88,000,000 each National competitive Maximum 5 Maximum bidding contracts for supply $3,000,000 (total) of goods Shopping Maximum 5 Maximum $300,000 contracts for supply (total) of goods Quality- and costAround 2,950 $10,500,000 based selection; full person-months technical proposal Works and consulting services The loan proceeds will be disbursed according to ADB’s Loan Disbursement Handbook (2007, as amended from time to time) and detailed arrangements agreed on between the Government of India and ADB. Source: Asian Development Bank. III. TECHNICAL ASSISTANCE 17. Capacity development TA for $1,000,000 to build the capacity of the Bihar state road sector will further support the institutional development initiatives of the government of Bihar. The TA will assist and support the recently established BSRDC in improving project implementation, designing future projects, and ensuring the future operation and maintenance of the improved roads through the full consumption of the budget allocated for road asset management. The consultants will conduct district and statewide training and workshops as required. 4 Project Administration Manual (Appendix 2). 5 18. The TA will be financed with a grant from ADB’s Technical Assistance Special Fund (TASF–Others). An international consulting firm will be recruited by ADB according to its Guidelines on the Use of Consultants (2010, as amended from time to time). Consultants will be asked to submit simplified technical proposals, and the selection will be in accordance with ADB’s quality- and cost-based selection method using a quality–cost ratio of 80:20. IV. A. DUE DILIGENCE Technical 19. The project was prepared with the enhanced capacity of BSRDC, which has been gained through the ongoing loan and ADB TA provided for capacity building of the Road Construction Department and BSRDC. BSRDC engaged detailed design consultants with its own funds to prepare detailed design documents for roads proposed for possible ADB financing, incorporating ADB’s requirements of economic, social, and environmental studies into the consultants’ terms of reference. The government of Bihar asked ADB for TA to conduct due diligence to ensure that the detailed design consultants’ work fully complies with ADB requirements. Engineering design is prepared to minimize land acquisition as well as social and environmental impacts. A road safety audit was performed as part of the TA and the recommendations were incorporated in the engineering design of the project. Advance actions have been taken to ensure that the construction can commence early. All of these measures have improved project readiness and will mitigate the risk of delay. B. Economic 20. The economic evaluation of the project followed the standard practice of comparing life-cycle road agency and user costs with and without the project, using net present value with a 12% discount rate and economic internal rate of return (EIRR) as decision criteria. The Highway Development and Management (HDM-4) system was used in the analysis, which focused on transport cost savings. 21. Value added from better transport links resulting in new industries and employment are not quantified in this analysis but are captured through benefits to generated traffic. 22. The EIRR for the four roads evaluated (Table 1) varies from 17.1% to 28.8%. Overall, the project is very robust with a high EIRR, satisfying the economic efficiency criteria. 23. The sensitivity of the EIRR for the project roads was analyzed with respect to changes in the benefit and cost streams. The following sensitivity test cases were examined: (i) construction costs increased by 15%, (ii) time benefits reduced by 50%, (iii) benefits decreased by 15%, and (iv) a combination of (i) and (iii). The results show that the quantified economic benefits are robust to various sensitivity tests. All selected roads have an EIRR above 12% in all sensitivity tests. 5 C. Governance 24. Institutional capacity. A project preparatory TA consultant and a capacity development TA consultant from the Bihar State Highways Project approved in 2008 supplemented BSRDC’s capacity during project preparation. BSRDC’s capacity for implementation will be further 5 Economic Analysis (Appendix 2). 6 supported by the supervision consultant, who will assist with the supervision of civil works. For long-term capacity strengthening, TA will be provided to make BSRDC more effective in developing, operating, and maintaining the state highways. 25. Financial management. BSRDC has ongoing experience with implementing an ADBfunded project (footnote 2). 6 It has satisfactory capacity for project financial accounting and sufficient knowledge of ADB’s disbursement procedures. 26. Procurement. Goods and works will be procured according to the ADB Procurement Guidelines (2010, as amended from time to time), with prior reviews by ADB at key steps in the process. BSRDC has successfully awarded the first works contract for the project as part of advance procurement action. The e-tendering system of Bihar will be assessed and, if found to meet ADB’s requirements, may be used for future procurement with prior approval from ADB. 27. Anticorruption. ADB’s Anticorruption Policy (1998, as amended to date) has been explained to and discussed with the government and BSRDC. The specific policy requirements and supplementary measures are described in the project administration manual. D. Poverty and Social 28. Poverty reduction and social impact. Bihar state is India’s 12th largest in geographic size (99,200 km²) and third largest in population. Nearly 85% of the population is rural. Bihar has the highest proportion of the population living below the poverty line, at 42.6%, according to estimates of the state government and the Planning Commission of India. The human development index (a composite of literacy, life expectancy, and per capita income) has increased for Bihar, as it has for the rest of India. But Bihar still ranks 15th among the states, the same rank it has held since 1981. In 2001 its human development index was 0.267, compared with 0.472 for India. 29. The population of Bihar in 2001 was 82,878,796, 28.43% more than in 1991. The overall population density was 880 persons per square km. Nearly 20% of the population is in the 0–6 age group. There are 921 females for every 1,000 males. Bihar has the lowest literacy rate in India, the average for the state being 47%. Close to 60% of males, but only 33.1% of females, are literate. Life expectancy is 61 years, almost at par with the national life expectancy of 62.7 years. 30. A poverty and social assessment made during project preparation showed that Bihar has a largely service-oriented economy with a significant agriculture base and a small industrial sector. In 2008 agriculture accounted for 35%, industry for 9%, and services for 55% of the state’s economy. Agriculture, including crop cultivation and livestock production, is the source of livelihood of the majority of the population. Bihar has the lowest gross domestic product (GDP) per capita in India, although there are pockets of higher-than-average per capita income. Between 1999 and 2008, GDP grew by 5.1% yearly, below the Indian average of 7.3%. More recently, it grew by 18% from 2006 to 2007, making Bihar the fastest-growing major state. 31. Bihar is among India’s economically backward states. Per capita income in the state in FY2007 was Rs9,765, far below the national average of Rs33,299. The improvements in state highways are expected to increase economic opportunities by (i) enabling villagers to shift from 6 Since its creation on 17 February 2009, under Resolution Sec 8/Misc/05-117/2006-1014 (s)we, BSRDC has taken over project implementation work from the Road Construction Department. 7 subsistence farming to market-oriented agricultural surplus production; and (ii) helping local people, particularly the rural youth, to find better-paying jobs in trading and other new jobs. The project will contribute indirectly to better access to health, education, and social services. It will also have a short-term impact on poverty reduction, as the rural poor will be hired for construction, tree planting, and ensuing maintenance. These opportunities will increase the earnings of the poor, who now depend largely on occasional and uncertain employment. 7 32. Gender. There are 921 females for every 1,000 males in Bihar (2001 census). Although the literate population is still disproportionately male (para. 29), substantial improvements have been made of late. Almost all girls are now enrolled in school up to the secondary level, and the state has launched innovative schemes such as integrated education development and the provision of bicycles and school uniforms, scholarships, and hostel facilities for female students. Focus group discussions with women from different socioeconomic groups in the project influence areas revealed that the majority work in the home and outside and are consulted by their spouse and other family members before any family decision. Better roads will promote better transport services, and give everyone better access to social services, markets, workplaces, higher education, health facilities, and employment opportunities. 33. HIV and AIDS. India’s National AIDS Control Organization estimates the number of persons living with HIV in India at 2.31 million in 2007, and adult HIV prevalence at 0.34%. The HIV sentinel surveillance in 2007 did not include Bihar as a prevalent area for HIV or AIDS. 34. According to India’s National AIDS Control Organization, HIV infection is typically concentrated among the poor and marginalized groups (including such high-risk groups as sex workers, drug users, migrant laborers, and truck drivers). These groups, particularly truckers, propel the HIV epidemic, and studies indicate that the infection is spreading rapidly to the general population. But Bihar is a low-prevalence state. The detailed study done during project preparation did not anticipate any risks of a rise in HIV or AIDS as a result of the project. The health department and the Bihar State AIDS Control Society are already carrying out state, district, and block campaigns to increase awareness of the disease. In addition, BSRDC and implementing nongovernment organizations will involve the Bihar State AIDS Control Society and local health agencies in social awareness programs (on various subjects including HIV and AIDS) in the project areas. E. Safeguards 35. Environmental impact. The project is classified under category B in accordance with ADBs Safeguard Policy Statement (2009) and therefore, initial environmental examinations were prepared for the four project roads. The findings show that the project is unlikely to have any site-related impact on the environment that is significant, adverse, or irreversible, since it will not cross any forest area, wildlife sanctuary, national park, critical habitat, or other ecosensitive area for biodiversity ecosystems. Most of the impact is likely to occur during construction, from earth movement, ground shaping, heavy equipment operation, and travel over unpaved roads. This impact will be temporary, and mitigation measures can be easily designed and implemented. No further environmental impact assessment is therefore necessary. BSRDC will be responsible for the implementation of the environmental management plan (EMP). The fully functional environment, social development, and resettlement cell, which was actively involved in the implementation of the EMP for the Bihar State Highways Project, will 7 Summary Poverty Reduction and Social Strategy (Appendix 2). 8 also implement the EMP for this project. Some activities will be implemented by contractors, particularly during construction. 36. Land acquisition and resettlement impact. The project is classified under category A for resettlement impacts. The project was developed with a view to avoiding or minimizing land acquisition and involuntary resettlement by adopting the most feasible technical design. The proposed widening of roads will occur within the existing right-of-way, except for State Highway 78, and bypasses, which will be provided for congested villages and marketplaces. A full census based on the detailed designs for the four project roads was conducted. Resettlement plans were prepared according to the government’s National Rehabilitation and Resettlement Policy (2007), the Bihar Land Acquisition Resettlement and Rehabilitation Policy (2007), and ADB’s Safeguard Policy Statement (2009). According to the project census, 19,797 land units and 7,730 structures (7,619 private, 3 community, 60 religious, and 48 government) will be affected by the project. Among the 7,619 private structures, 5,954 belong to titleholders and 1,665 to non-titleholders. The 138,624 persons to be displaced by the project will be compensated for lost assets on the basis of replacement cost. Both titleholders and non-titleholders will be given resettlement assistance to help make up for lost income and livelihoods. The resettlement plans provide for special resettlement and rehabilitation measures for vulnerable displaced persons and households. The specific compensation and resettlement assistance available for each type of loss resulting from the project is spelled out in the entitlement matrix. The resettlement cost for the four road subprojects is estimated at Rs3,425 million ($76.96 million equivalent). 37. Impact on indigenous people. The project is classified under category C for impact on indigenous people. According to the 2001 census, Bihar has an indigenous population of 758,351, or 0.9% of its population, versus 8.2% for all of India. Of the 38 districts in the state, six have no indigenous people; in the rest, the indigenous population varies from 0.01% to 5.9%. The highest proportion of indigenous people is found in Katihar district (5.9%), followed by Jamui (4.8%), Banka (4.7%), and Purnia (4.4%); the lowest, in Darbhanga (0.03%), Khagaria (0.03%), and Sheohar (0.01%). The project area has no demarcated indigenous people areas. The social assessment revealed no impact on indigenous groups within the area of influence of the road subprojects. Indigenous members in the project area have been assimilated into the local population. The study done during project preparation did not show any difference in impact between indigenous and non-indigenous groups in the project locations. Construction will not adversely affect the socioeconomic conditions or the community life or culture of these communities. On the other hand, the improved road network is expected to give both indigenous groups and other parts of the project population easier access to socioeconomic facilities. F. Risks and Mitigating Measures 38. Major risks and mitigating measures are summarized in Table 5. 9 Table 5: Summary Risks and Mitigating Measures Risks Initial delays in project implementation Mitigating Measures BSRDC prepared the detailed design for the roads well in advance. Advance actions for procurement and ADB support ensure high project readiness, with the civil works contract for the first road already awarded and procurement for other roads and supervision consultants ongoing. BSRDC staff have been trained in safeguard and procurement requirements to mitigate the potential risk of initial delays due to procedural clearance. ADB has provided support for due diligence for all project roads. Insufficient maintenance financing The state government’s initiatives to implement road asset management systems in BSRDC for better planning and budgeting will be supported by the proposed capacity development TA. Bihar has increased the maintenance budget to substantially meet requirements. BSRDC’s strict monitoring systems for project implementation will minimize the risk of underutilizing the maintenance budget. ADB = Asian Development Bank, BSRDC = Bihar State Roads Development Corporation Limited, TA = technical assistance. Source: Asian Development Bank. V. ASSURANCES 39. The government and BSRDC have assured ADB that the implementation of the project shall conform to all applicable ADB policies including those concerning anticorruption measures, safeguards, gender, procurement, consulting services, and disbursement as described in detail in the project administration manual and loan documents. 40. The government and BSRDC have agreed with ADB on certain covenants for the project, which are set forth in the loan agreement and project agreement. VI. RECOMMENDATION 41. I am satisfied that the proposed loan would comply with the Articles of Agreement of the Asian Development Bank (ADB) and recommend that the Board approve the loan of $300,000,000 to India for the Bihar State Highways II Project from ADB’s ordinary capital resources, with interest to be determined in accordance with ADB’s London interbank offered rate (LIBOR)–based lending facility; for a term of 25 years, including a grace period of 5 years; and other such terms and conditions as are substantially in accordance with those set forth in the draft loan and project agreements presented to the Board. Haruhiko Kuroda President 23 August 2010 10 Appendix 1 DESIGN AND MONITORING FRAMEWORK Design Summary Impact A more efficient state road transport system supporting sustainable economic growth in Bihar Outcome Increased transport efficiency and safety on project roads Performance Targets and Indicators with Baselines Data Sources and Reporting Mechanisms Road traffic on project roads increases by 90% until 2020 from current level (2009 baseline: between 1,858 vehicles per day on State Highway 81 and 4,276 vehicles per day on State Highway 91). Post-implementation measurement and traffic survey Per capita GDP in the project districts increases to 28% of India’s per capita GDP by 2020 (2007 baseline: 23%). Government of Bihar’s economic survey Vehicle travel time on the project roads is reduced because of the improved condition of the roads; travel speed increases to an average of 40 km/h for cars (2009 baseline: 15–25 km/h). Post-implementation measurement and traffic survey Road signage meets the requirements of the road safety audit upon project completion (2009 baseline: road signage is basic). Assumptions and Risks Assumptions Government development activities are effectively coordinated with road sector investment and the current economic growth rate is maintained. Risks Post-implementation survey Small roadside businesses could lose business opportunities because of increased efficiency and speed of travel of vehicles. Assumptions The project is delivered on time. The state-allocated maintenance budget remains sufficient for the maintenance of the entire rehabilitated road network. Strengthened management and monitoring capacity enables the full utilization of funds allocated for maintenance works. A road asset inventory database is established and project management tools are available and in use. Outputs 1. Built and upgraded state highways About 356 km of state highways are built or upgraded by the end of 2014. BSRDC/RCD annual report on road assets Assumptions Civil works are implemented on schedule. Qualified civil works contractors and consultants participate in the project. Procurement and compliance with safeguard policies are efficiently and effectively handled, following ADB’s procedures and requirements. Appendix 1 Design Summary 2. Improved management of road assets and maintenance of project roads by BSRDC Performance Targets and Indicators with Baselines One pilot performance-based maintenance contract is awarded by the end of 2014. Data Sources and Reporting Mechanisms BSRDC/RCD annual report on road assets 11 Assumptions and Risks Assumptions Qualified consultants participate in the project. Institutional strengthening is implemented. Road asset registry for state highways set up by the end of 2014 Risks Changes in BSRDC management may impact momentum for reforms. Activities with Milestones 1. Investment component Inputs 1.1 Construction supervision consultants recruited by July 2011 Loan 1.2 Procurement for all civil works completed by July 2011 Item 1.3 Construction of all civil works completed by December 2014 2. Institutional development (equipment) 2.1 Equipment procured by the end of 2013 3. Institutional development (technical assistance) 3.1 Consultants recruited by July 2011 3.2 Consulting services completed by July 2012 3.3 BSRDC staff trained by July 2011 4. Post-implementation traffic survey and measurement conducted by the end of 2014 ADB: $300,000,000 Investment component Institutional development component Amount ($ million) 255.45 3.00 Contingencies 31.05 Consulting services (about 2,936 person-months—85 international and 2,851 national) 10.50 Government: $124,000,000 Item Amount ($ million) Land acquisition, resettlement and rehabilitation, utility shifting 78.93 Investment component 22.80 Project management 3.00 Contingencies 2.77 Financing charges during implementation 16.50 ADB = Asian Development Bank, BSRDC = Bihar State Roads Development Corporation Limited, GDP = gross domestic product, km = kilometer, RCD = Road Construction Department. Source: Asian Development Bank. 12 Appendix 2 LIST OF LINKED DOCUMENTS http://www.adb.org/Documents/RRPs/?id=41629-01-3 1. Loan Agreement 2. Project Agreement 3. Sector Assessment (Summary): Roads 4. Project Administration Manual 5. Contribution to the ADB Results Framework 6. Development Coordination 7. Economic Analysis 8. Country Economic Indicators: India 9. Summary Poverty Reduction and Social Strategy 10. Initial Environmental Examination: Bihta-Sarmera (SH78) 11. Initial Environmental Examination: Sakkadi-Nasriganj (SH81) 12. Initial Environmental Examination: Mohammadpur-Chhapra (SH90) 13. Initial Environmental Examination: Birpur-Udakishanganj (SH91) 14. Resettlement Plan: Bihta-Sarmera (SH78) 15. Resettlement Plan: Sakkadi-Nasriganj (SH81) 16. Resettlement Plan: Mohammadpur-Chhapra (SH90) 17. Resettlement Plan: Birpur-Udakishanganj (SH91) 18. Risk Assessment and Risk Management Plan
© Copyright 2024