National Grid Power Point template

European Workgroup
Place your chosen
image here. The four
corners must just
cover the arrow tips.
For covers, the three
pictures should be the
same size and in a
straight line.
European Workgroup
5th June 2014
1. General Update
2
Code Status Update
Code
Current Status
Implementation date
Congestion
Management
(CMP)
Implemented
1st October 2013 (Fixed)
Capacity
Allocation
Mechanism
(CAM)
CAM approved for EU wide implementation at relevant EU IPs.
1st November 2015
(Fixed)
Gas Balancing
(BAL)
BAL approved for EU wide implementation 26th March 2014 (Commission
Regulation (EU) No 312/2014 establishing a Network Code on Gas Balancing of
Transmission Networks.)
Interoperability In comitology. Comitology meetings postponed from 28th April and 11th July 2014,
& Data
now to take place July and September/October 2015 (dates TBC).
Exchange (INT)
Under development. Code to be submitted 31st December 2014.
Tariffs
Incremental
Capacity
Under development. Incremental Capacity to be introduced via combination of
new articles in CAM Network Code and via Tariffs Network Code. Code
amendment to be submitted 31st December 2014.
1st Oct 2015 (subject to
NRA approval for
additional 12 months)
(Fixed)
Q4 2015 (Estimated)
Estimated earliest mid
January 2017. Applicable
from October 2017.
Applicable from March
2017
Gas Codes Timeline
Status of Development of European Gas Network Codes
Future dates are subject to change
KEY
Dates shown in italics are best approximations based on current understanding.
Activities undertaken by ACER
It has been necessary to 'round' some dates for the benefits of the diagram
Activities undertaken by ENTSOG
Activities undertaken by European Commission
TODAY
Balancing
Comitology Phase
Interoperability & Data
Exchange
Comitology
Tariffs
Stakeholder Workgroups
Comitology
ACER
Review
ENTSOG
ACER
revision
Review
of Code
Finalise
drafting
Comitology
ACER Review
ENTSOG Drafting
Initial drafting
ACER Develops
Framework
Guidelines on
Tariffs
Consu
ltation
Finalise
drafting
ACER Review
Go Live (?)
ACER Develops
Framework
Guidelines on
Interoperability &
Data Exchange
Go Live
ENTSOG Drafting
Initial Cons
draftin ultatio
g
n
Comitology
(duration unknown)
ENTSOG Drafting
FG Extension
Initial drafting
Cons
ultati
on
Finalise
drafting
ACER Review
Comitology
(duration unknown)
Go Live (?)
Post-Comitology
2016
Go Live
Capacity Allocation
Mechanisms (CAM)
2015
Go Live
Implementation of CMP
obligations for 1st October
2013
2014
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Congestion Management
Principles (CMP)
2013
Mar
Next Step
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
2012
Network Code / Guideline
Road Map
Notes: 1) Long term capacity auctions may need to be delivered in conjunction with short term auctions
2. EU Code Updates
CAM
Matthew Hatch
CAM & Bacton UNC Modifications
 First Modification Development Workgroup held 3 June
2014
Key principles CAM Mod 500
Key principles Bacton split Mod 501
 Next Workgroup planned for early July 2014 (date to be
confirmed)
8
Consultation on Capacity Booking Platforms
 ENTSOG press release 16th May 2014
ENTSOG launched consultation on Capacity booking
platforms
The consultation started 19 May 2014 and will be open until
30 June 2014
ENTSOG website can be found at http://www.entsog.eu/
9
Tariff Code & Incremental Capacity Amendment
Colin Hamilton
EU Tariff Code update
 Draft TAR NC completed and approved by ENTSOG
Board 28th May
 Draft Code and supporting document published end
May
 http://www.entsog.eu/publications/tariffs
 Public Consultation on the draft TAR NC will take place
from the end of May to the end of July
 Next Stakeholder Workshop – 25th June
EU Incremental Amendment update
 Draft INC Amendment now completed and approved by
ENTSOG Board 28th May.
 Draft Code and supporting document published end
May
 http://www.entsog.eu/publications/incremental-capacity
 Public Consultation on the draft INC amendment will
take place from the end of May to the end of July
 Next Stakeholder Workshop – 24th June
For further information, please contact Colin Hamilton [email protected], 07971 760360)
3. UNC Modification Plans
Phase 2 UNC Modifications
Potential Timescales
EU Network Code
Panel Submission
Workgroup
Development
UNC
Consultation
March 2014
2 Months
June 2014
SMP Buy & Sell
April 2014
1 Month
June 2014
Nomination Process at IP’s
April 2014
6 - 9 Months
Q4 -2014
Capacity Allocation
(CAM)
CAM / CMP Compliant
Capacity Auctions
Q2 - 2014
6 - 9 Months
Q4 - 2014
Interoperability &
Data Exchange (INT)
OBAs / allocations
Jul/Aug 2014
6 Months
Q1 - 2015
Interconnection
Agreements/Contract
Changes
(facilitating Modification )
Q1 - 2015
3 Months
Q2 - 2015
Data Exchange
Q3 - 2014
3 Months
Q4 - 2014
Gas Balancing (BAL)
Area of change
Information Provision
4. Draft Modifications
Draft Tariff Code – Walk Through
Colin Hamilton
ENTSOg publishing document Friday
30th May therefore not available until
Monday 2nd June
REMIT
Michael Jenner
REMIT
Insider Information
Data feed to ACER
Jan 2015
Wholesale Energy Market
Transactions
Standard Contracts
Jan 2015
NG’s Spectron etc
Non Standard Contracts
Jun 2015
NG’s OM Contracts
Primary Capacity Trades
Jan 2015
NG’s & others Xoserve
Secondary Capacity Trades
Jan 2015
Market Participants
Buybacks ( Xoserve on behalf of
market participants)
Balancing Services
April 2017
NG’s & others
Non Xoserve
Transparency
Fundamental Data
Jan 2015
Nomination Data
NG or Xoserve
REMIT: Secondary Trade Reporting
 TSOs not obligated to provide secondary capacity trading data - we are
not one of the counter-parties and therefore do not hold the relevant data.
 Those trading on the secondary market need to provide this data.
 However, NG are very happy to work with market participants to find an
effective solution to provide this data to ACER.
 We suggest that one solution could be for Xoserve to become the delivery
agent for secondary data in much the same way as it will become for
primary data as per the NG project.
 NG is now beginning work with Xoserve on designing the IT systems to
provide primary data to ACER. We offer shippers and traders an
opportunity to collaborate with our REMIT reporting project such that
it could become a solution to secondary reporting requirements for
GB markets participants.
 However, Xoserve would need the price data which it does not currently
hold.
 If market participants wanted Xoserve to provide this REMIT data service
on their behalf, they may need to formally contract Xoserve to do so.
Confidentially assurances on how Xoserve would deal with and store the
relevant price data may be needed.
Bridge to 2025 & GTM
Michael Jenner
Bridge to 2025 and GTM
Bridge to 2025
 Bridge to 2025 consultation closes 16 June 2014
 Consultation can be found here:
http://www.acer.europa.eu/Media/Events/Launch-of-Energy-Regulation-A-Bridge-to2025/default.aspx
 Final bridge paper to be published September 2014
Gas Target Model (GTM) update
 Comments on GTM invited now
 Latest slides and updates from 15 May workshop can be found here:
http://www.acer.europa.eu/Media/Events/3rd-Gas-Target-Model-StakeholdersWorkshop/default.aspx
 Final GTM to be published September / October 2014
EU Gas Quality Harmonisation Update
Phil Hobbins
EU Gas Quality Harmonisation
 CEN has issued its draft gas quality standard for public
consultation to national standardising bodies
 BSI has published the standard on its website at
https://drafts.bsigroup.com/Home/Details/53031
 BSI committee GSE/4 will co-ordinate GB comments on the
standard
 BSI deadline for comments is 31st August 2014
 CEN deadline for BSI to send GB comments is 8th October 2014
 The EC are proposing to hold a Gas Quality workshop in Brussels
on 1st July 2014
 For further information, please contact
[email protected] (01926 653432)