Iron ore concentration plants PROJECT SUMMARY

Project summary
Kaunisvaara project, Sweden
Northland Resources
Kaunisvaara- Iron Ore Project, Sweden
• 5 million tons per year of high grade Iron Ore Concentrate
• Commissioning:
- 2012 Line 1
- 2014 Line 2
• Approx. contract value 350 MUSD,
2
© Metso
Date Author Title
Kaunisvaara- Flowsheet
3
© Metso
Date Author Title
Kaunisvaara
4
© Metso
Date Author Title
Source: http://www.northland.eu/sv-se/projekt/kaunisvaara
INTERNAL
Kaunisvaara Site
5
© Metso
Date Author Title
Kaunisvaara- Scope of Supply
Basic and detail engineering, project management, site management, site
supervision, training, erection, commissioning
6
Main Metso process equipment:
Other process equipment:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Primary crushers, MK54-75
Apron feeders
SAG mills, 34’
Vertimills, VTM3000
Multislope screens
Grizzly screens
Magnetic separators
Flotation cells, RCS200
Screw classifiers
Slurry pumps
Pressure filter, VPA 2040-54
© Metso
Date Author Title
Conveyors
Cyclones
Agitators
Thickeners, HDT
Air compressors
Vibrating feeders,
Big bag handling system
Flotation air blowers
Steelworks and plateworks
Wearplate, rubber
Piping
Electrical instrumentation and automation
Kaunisvaara- Timeline
Time Line
Design Engineering
Study by Metso
May 2008
Basic Eng. Contract
Jan 2011
Long Lead Items
Feb 2011
Main Contract Metso
April 2011
Metso Access to Site
April 2012
Mech Completion Line 1
Nov. 2012
First production of Iron
ore concentrate
Dec, 2012
Mech Completion Line 2
7
© Metso
Date Author Title
Q2 2014
Kaunisvaara
Process Guarantees
Grade
Recovery
Capacity Feed
Capacity Comminution
Moisture content in conc.
8
© Metso
Date Author Title
Kaunisvaara – LCS Involvement
Integration with LCS
• Early involvement from LCS in design, include global experience
from LCS in how to improve plant design in order to minimize
down time.
• LCS involvement in erection and commissioning gives smooth
transfer from project to operations.
• Per ton basis for LCS contract for maintenace of all equipment
• Lower Capex due to spare and wears included in LCS (for
example mill liner handler)
• Higher plant availability
• Lower overall operating costs
9