N7 Newlands Cross & N11 Arklow Rathnew PPP Issue 5 (N11), Feb 2015 Section A - N11 Arklow/Rathnew PPP Project – Q1 2015 Aerial view of Jack Whites Aerial view of Scratenagh Summary Construction Works - Current Section A of the N11 Arklow/Rathnew PPP Project is the Design and Construction of a 16km section of the N11 dual carriageway in County Wicklow. The works involve building two new grade separated junctions (located at Jack Whites Pub and the Beehive Pub), eight bridges and a variety of link roads to tie into the existing road network. On completion there will be huge advantages in both travel times and road safety to both local and inter urban (Dublin /Wexford) traffic. Regular N11 road users will have noted the significant progress that has been made through the autumn and winter months. The new dual carriageway will be constructed over a period of approximately 24 months with an expected completion date of late summer 2015. The general public have been very cooperative during the road closures of the Brittas Bay Road, the Coolbeg Road, the Rahaval Road, Ballyclough Road, and Breagura Road. The last big interfaces between construction works and traffic will be the new roundabouts to be constructed at the Scratenagh, Kilmurry and the Beehive. Those who use the road regularly will have already seen the progress made at these locations and your continued cooperation is appreciated. With the bulk earthworks now complete the focus moves to drainage, road pavement works and Landscaping. Between now and the road opening at the end of the summer we will we have laid 130,000 tonnes of Asphalt, 100,000 tonnes of CBM, 32000m meters of new drainage pipes, 64000m of ducting and plant over 15,000 trees! The onsite structures works which commenced in late 2013 have progressed well and are now virtually complete with the bridge at Jack Whites the last to have the beams installed which happened in early February. Mainline Ballinameesda Upper The temporary traffic switches at Kilmurray and Scratenagh and the permanent traffic switch at Jack Whites are now working well with all road users enjoying the benefits of the new construction. Mainline Ballyclough South New Jack Whites Roundabout Construction Works – Planned: The coming months will see works progressing on the Beehive junction. Finishing works on all structures constructed will be completed. The main focus will be on Pavement works, Drainage pipes, landscaping and finishes. As noted above the two major traffic diversions continue to be in place and a 60kmph speed limit will continue to be enforced. This speed reduction and associated installation of Traffic Management schemes are necessary to ensure the safety of both construction crews and the road users. We will endeavour to minimise any inconvenience caused by these unavoidable works and would request that all drivers respect these revised speed limits. Good progress during the spring time will ensure that the site is ready for the opening on schedule in the late summer this year. Mainline Ballinacor East SECTION C - Gorey Service Area Summary Construction – Current & Planned Section C of the N11 Arklow Rathnew PPP Project is the Design and Construction of the Gorey Service Area in County Wexford. The site is located adjacent to the M11 between Junctions 21 and 22. The works involve the construction of a motorway service station (amenity building & fuel station facility) and an associated interchange with a bridge over the existing M11. Works have steadily progressed in the second half of 2014 and into 2015 with significant progress on the entire service station development. The work commenced in late 2013 and is currently being completed to a pre- fit-out stage. The service station will open to the public mid-2015. M11 users and local people will have noticed that the various works associated with the development have continued, in particular, the formation of the various access/egress points of the interchange to allow traffic from all directions to use the facility. At this stage all elements of the development are substantially complete with snagging and commissioning works of the various systems remaining. Operations & Maintenance (O&M) Update-Q1 2015 However we would like to remind all road users that the Services will not be opened to the public until later this year. Upcoming works planned for the 1st quarter of 2015 will include the final completion aspects of the facility and the completion of the sewer rising main from the service station to the Coolgreaney Wastewater treatment plant. Traffic management is currently installed on the Ballyelin Road, R772 (old N11) and the L-500701 (known locally as Long Lane). These works will be complete by mid-march 2015. We appreciate your patience whilst these works are being undertaken. SECTION B N11/M11 All works in Section B are now complete. BAM Civil have been maintaining the Gorey and Arklow Bypasses on behalf of the NRA since May 2013. The quarter one (2015) works are predominately associated with winter maintenance, this involves salting the roads and keep the road way safe for all users. As the winter gives way to spring and summer the focus will shift onto the maintenance of landscaping (trees/bushes) along the length of the motorway. One important issue we would like to make people aware of is illegal dumping and littering. Our operatives spend a lot of time picking up rubbish from the road and the surrounding areas and we work with the Gardai to ensure that the culprits are identified. N11 Arklow - Rathnew PPP. South Dublin Co. Co. Kildare National Roads Office. (E) info@n7n11. ie (E) info@sdublincoco. ie (W) www. n7n11. ie (W) www. sdcc. ie (T) 01 485 3357 (T) 01 414 9000 (E) newlandsx@kildarenrdo. com (W) www. kildare. ie/countycouncil/ nationalroadsoffice National Roads Authority. Wicklow Co. Co. (E) info@nra. ie (E) roadtran@wicklowcoco. ie (W) www. nra. ie (W) www. wicklow. ie (T) (01) 660 2511 (T) 0404 64280 (T) 045 988 900 Wexford Co. Co. (W) www. wexford. ie (T) 053 919 6000
© Copyright 2024