2370 Skyway Drive, #104 Santa Maria, CA 93455 Phone: 805.347.7860 Fax: 805.456.0248 [email protected] http://www.glr-construction.com DUNS NO. 79-0996875 CAGE Code 4ZEE6 Contractors License No. 891245, Class “B” General Building Contractor NAICS Codes (not all inclusive): 236210 Industrial Building Construction 236220 Commercial & Institutional Building Construction 237110 Water, Sewer Line & Related Structures Construction 237120 Oil, Gas Pipeline & Related Structures Construction 237130 Power and Communication Line and Related Structures Construction 237310 Highway, Street & Bridge Construction 237990 Other Heavy and Civil Engineering Construction 237110 Poured Concrete Foundation and Structure Contractors 238130 Framing Contractors 238160 Roofing Contractors 238190 Other Foundation, Structure and Building Exterior Contractors 238310 Drywall & Insulation Contractors BONDING CAPACITY $4M Single Job $10M Aggregate For more information, please contact our Corporate Office 805.347.7860 February 2015 Company History Barbara Ramirez founded GLR Construction in 2007 and later incorporated in 2010. She has more than 22 years of project management experience and is highly knowledgeable in all aspects of construction. Her team of employees have more than 40 years of experience in public, private and federal construction projects. GLR’s Texas-Arkansas office was established in April 2014 and the Electrical Division opened in October 2014. GLR Construction, Inc. specializes in building new structures, remodeling existing structures, and performing all necessary site work. The primary focus of work is federal, state and public projects. GLR Construction is an EPA Lead-Safe Certified Firm. GLR is also certified as a Small Disadvantaged Business Enterprise, SBA Certified 8(a) Company; Minority Woman-Owned Small Business; Economically Disadvantaged Woman-Owned Small Business (EDWOSB); California Certified Small Disadvantaged Business Enterprise (formerly known as UDBE); and EPA LeadSafe Certified Firm. Self-Performance We self-perform the following trades: Site Safety Quality Control Project Management Carpentry Drywall Wood and metal framing Concrete Site work All other trades are subcontracted with local licensed professional contractors. Sample Completed Projects with References Repair Sewer Laterals, Vandenberg AFB, $3,386,852, Contract No. FA4610-14-C-0040, 30th CONS, William Davis (805) 605-0496, [email protected] NRO HVAC, Bldg. 1728 and 2506, Vandenberg AFB, $825,684, Contract No. W912PL-13-D-0006_0003, US Army Corps of Engineers, Damon Durham, (805) 734-4670, [email protected] FCA Interior Finishes, Bldg, 126, Veterans Administration (VA) Hospital Long Beach CA, $1,994,184.34, Contract No. W912PL-11-D-0062 (US Army Corps of Engineers, Thien Vu , (626) 401-4095, [email protected]) Monterey Bldg. 704 & Bldg. 436, Naval Post Graduate School, Monterey CA, $654,000, Contract No. N62473-11-R-1014, Task Order 0001 (Dept of the Navy, Andrew Chan (831) 656-6229, [email protected]) Bldg. 150 Replace SCI Shower Doors, VA Hospital Long Beach CA, $629,738, Contract No. W912PL-11-D-0042 (Army Corp of Engineers, Thien Vu - (626) 401-4095, [email protected]) Replace Switches at Substations and Switching Station, Vandenberg AFB, CA, $3,789,000, Contract No. W912PL-D-0024, Task Order 0001 (US Army Corps of Engineers, Nicholas Cugini (805) 606-3590, [email protected]) Replace Floor Coating System, Vandenberg AFB, CA, $163,889, Contract No. FA4610-12-C-0016 (30th CONS, Frank Vitelli (805) 605-4658, [email protected]) Repair/Upgrade Rooms, Facility 8401, Vandenberg AFB, CA, $220,442, Contract No. FA4610-12-C-0021 (30th CONS, Hilton MacDonald (805) 606-3983, [email protected]) Install Access Ramp, Fort Hunter Liggett CA, $44,828, Contract No. W9124N-13-C-0013 (Fort Hunter Liggett Army Base, Cliff Skinner, Engineer Tech, [email protected], (831) 386-2422) United Launch Alliance (ULA) SLC3 Floor Ground Level Rm 106, Vandenberg AFB CA, $75,356, Contract No. 4500040417 (United Launch Alliance Contracting, Nick Sehgal, CO (805) 605-5315, [email protected]) ULA SLC6 B399 Remodel, Vandenberg AFB CA, $64,068, Contract No. 4500040454 (United Launch Alliance Contracting, Alan Kruthers, CO (805) 605-6340, [email protected]) ULA Safety Improvements Design-Build, Vandenberg AFB, CA, $491,101, Hensel Phelps Construction Contract No. 7101305-0330100 (Hensel Phelps Construction, David Milford, CO (571) 921-5873, [email protected]) NRO Replace Roofing Building 2500, Vandenberg AFB CA, $257,595, Contract No. W912PL-13-D-0006, Task Order 0002 (US Army Corps of Engineers, Shannon Cossa (213) 452-3240, [email protected]) Key Personnel Barbara Ramirez: Barbara founded GLR Construction in 2007. She has more than 22 years of project management experience with general contractors throughout California. Barbara has experience in all aspects of construction from administration and submittal processing to billings and subcontract management, from purchasing materials and supplies to serving as a field superintendent. She is highly knowledgeable in construction and has also served as a building permit technician for a local city ensuring she has knowledge of client requirements for building projects and required permits. John Close, Superintendent: John has been in the construction industry since 1978, advancing from a Michael “Mike” Stickler, Operations Manager: Mike laborer, an apprentice carpenter, journeyman carhas nearly 40 years experience in the construction penter, foreman and now currently a superintenfield as a carpenter and Superintendent. He is redent . John is qualified as a Site Safety & Health sponsible for supervising and coordinating projects Officer as well as a Quality Control Manager. He is at the field level and has been with GLR since 2008. experienced in the areas of: safety, quality control, Mike is skilled in concrete form work, structural and planning and scheduling, submittals, and customer non-structural cement finish work, metal and wood relations. John has completed the 40-hour EM 385stud framing, drywall, installation of doors, hard1-1 course. ware, windows, computer floors, and dropped ceilBob Burrow, Superintendent: Bob has served as a ings, and finish carpentry. superintendent since 1998 for companies throughJames “Jim” Sparks, Project Manager /Senior Estiout California. He joined the GLR team in 2014 as a mator: Jim has worked in construction since 1978 superintendent and carpenter. Bob specializes in as a carpenter, superintendent and project managdoors and hardware, and is experienced in all areas er. He has worked on a wide range of projects inof carpentry, building construction and remodeling. cluding high density residential condominiums, high rise office buildings, hospital and medical facilities, Jennifer Jamison, Accounting Department: Jennifer educational facilities, and military facilities. He has has been in the financial industry for more than 18 years. She is highly proficient in all aspects of Conskillfully managed and laid out projects that are struction Accounting and Human Resources, spearchitecturally detailed and others that are highly cializing in Job Costing. She oversees all business technical mechanical and electrical projects. He is and financial duties within GLR Construction, Inc. skilled in quality control and documentation, planning and CPM scheduling, customer relations and Danita Seyer, Operations Administrator: Danita the submittal process. serves as the company’s operations administrator Bobby Bergner , Electrical Division: Bobby manages and has more than 11 years of experience in project scheduling, subcontract administration, project GLR’s electrical construction workforce and has more than 25 years’ experience in the construction management and information technology. She is industry with a solid history of managing large-scale responsible for project planning and execution, scheduling, managing projects, administering the projects. He joined the GLR team in October 2014 after serving as vice president of electrical divisions company submittals process, writing technical bid and electrical superintendent at three previous em- proposals, writing administrative plans and preparing all marketing materials. ployers. His expertise in electrical estimating, contracting and project management is renowned. Christopher “Chris” Torres, Program Coordinator / Matt Campbell, Electrical Division: Matt is a licensed Estimator: Chris has been in the construction induselectrical contractor (California license no. 791989) try for more than 7 years. He prepares cost estiwith more than 32 years in the industry. He worked mates and proposals, conceptual models and budgets, and performs quantitative analysis of construcfor a major electrical utility in California for more tion document and project program requirements. than 20 years culminating in directing and coordinating a technical substation workforce of 65 elec- He also prepares and reviews submittals for their compliance with contract documentation. tricians and technicians. Since leaving the major utility in 2008, Matt has owned a company that Nadsya Efseaff, Administrative Assistant: Nadsya provides electrical transmission and distribution has been with GLR Construction since 2013 assistconsulting, testing and inspection services to utility ing Jennifer with accounting and Chris with preparcompanies in the electrical generation, substation ing bids for client review. In addition, she is responand line industries across the country. Matt joined sible for preparing, checking and submitting all comthe GLR team in June 2014. pany and subcontractor certified payrolls. February 2015
© Copyright 2024