FORM 1 & FORM 1A FORM 1 & FORM 1A For “Viva Residency” - Proposed Residential & Commercial project plot bearing C.T.S. No.86 B, Chakradhar nagar, Achole road, Nallasopara West. PROJECT BY Mr. Deepak H. Thakur Enviro Analysts and Engineers Pvt Ltd. FORM – I “Viva Residency” - Proposed Residential & Commercial Project FORM 1 FORM-1 (I) Basic Information Sr. Item No. 1 Name of the Project 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Details “Viva Residency” - Proposed Residential & Commercial project at plot bearing C.T.S. No.86 B, Chakradhar nagar, Achole road, Nallasopara West. S. No. in the Schedule Building and Construction Project, Category ‘B’ [(As per 14.09.2006 Notification, Project or Activity-8 (a)] Proposed capacity/area /length/tonnage to Plot Area. 11364.10 Sq.mt be handled/command area/lease area/ FSI Area 20571.87 Sq.mt number of wells to be drilled Non-FSI Area 26538.36 Sq.mt Total Construction Area 47110.23 Sq.mt New/Expansion/Modernization New Project Existing Capacity/Area etc. Nil Category of Project i.e. ‘A’ or ‘B’ ‘B’ Does it attract the general condition? If No Yes, Please specify Does it attract the specific condition? If Not Applicable yes, Please specify Location Plot/Survey/Khasra No. Plot Bearing C.T.S. No.86 B, H.No.1 to 4 & 8 to 10 Chakradhar nagar, Achole road, Nallasopara West. Village Nallasopara Tehsil Vasai. District Palghar State Maharashtra. Nearest railway station/airport along with Nallasopara Railway Station. distance in km. (Aerial distance : 0.5 Km towards North) Nearest Town, City, District Headquarters Mumbai. along with distance in km. Village Panchayats, ZillaParishad, Vasai Virar municipal Corporation Municipal Corporation, Local body Virar East, Opposite Savitribhai Phule Market, Near (complete postal addresses with telephone Virar East Police Station, Thane - 401305 nos. to be given) Name of the applicant Mr. Deepak H. Thakur Registered Address Chakradhar nagar, Achole road, Nallasopara West. Near Railway Station, S.T. Depot Road, Nallasopara (W). Address for correspondence: As above M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 1 “Viva Residency” - Proposed Residential & Commercial Project Name Designation(Owner/Partner/CEO) Address Pin Code E-mail Telephone No. Fax No. 16 17 18 19 20 21 22 23 24 Details of Alternative Sites examined, If any. Location of these sites should be shown on a topo sheet Interlinked Projects Whether separate application of interlinked project has been submitted? If yes, date of submission If no, reason Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972? The C.R.Z. Notification, 1991? Whether there is any Government Order/Policy relevant/relating to the site? Forest land involved (hectares) Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Name of the Court/ Case No. / Orders/directions of the Court, if any and its Relevance with the proposed project. FORM 1 Mr. Deepak H. Thakur Owner Near Railway Station, S.T. Depot Road, Nallasopara (W). [email protected] 0250-6454996 -None No Not Applicable Not Applicable Not Applicable No No No No * Capacity corresponding to sectorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 2 “Viva Residency” - Proposed Residential & Commercial Project FORM 1 (II) Activity 1. Sr. No. 1.1 1.2 1.3 1.4 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information/Checklist Confirmation Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Clearance of existing land, vegetation and building? Creation of new land uses: Yes No Yes No Yes 1.5 Pre-construction investigations Yes e.g. bore houses, soil testing? Construction Works? Yes 1.6 Démolition Works? 1.7 Temporary sites used for Yes construction works or housing of construction workers? Above ground buildings, Yes structures or earthworks including linear structures, cut and fill or excavations. 1.8 M/s. Enviro Analysts & Engineers Pvt. Ltd. No / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data It is a New project. The developers have proposed a residential Building. After completion of the project the land use will be for Residence purpose. No trees available The proposed project is a Residential Building, After competition of the project the land will be used for Residential purpose. Pre – Feasibility studies, Geo-Technical investigations will be carried out. The project involves construction of a group housing1 no Building, having A to C wings. Building Wing Configuration Details Bldg A to C Ground floor shopping + 1st No. 1 (A) Floor shopping + 1st (B) Floor shopping + 2nd Level R.G Podium + 3rd to 22nd upper Floors Total Construction Area -47110.23 Sq.mt As the proposed site is a vacant plot, there is no requirement of any demolition. • Part of the project site will be used for temporary housing for up to 60-80 workers. The housing/sheds will be temporary. • The above ground structures will comprise 1 residential building. Building Wing Configuration Details Bldg A to C Ground floor shopping + 1st Page 3 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. 1.9 Information/Checklist Confirmation Yes No Underground works including No mining or tunneling? 1.10 Reclamation works? No 1.11 Dredging? 1.12 Offshore structures? 1.13 Production and manufacturing Process? 1.14 Facilities for storage of goods or materials? No No No Yes 1.15 Facilities for treatment or Yes disposal of solid waste or liquid effluents? FORM 1 / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data No. 1 (A) Floor shopping + 1st (B) Floor shopping + 2nd Level R.G Podium + 3rd to 22nd upper Floors • The maximum height of the proposed project will be 69.95 m. • . No underground works including mining / Tunneling is required except excavation of earth only for foundation, lay down of pipes, underground storage tank, electric cables, soak pits, septic tanks etc. As this is a new construction project, hence no reclamation work required. Not Applicable Not Applicable Not Applicable Separate raw material storage yard will be made, which will be temporary. Construction Phase: Temporary sheds will be provided for the storage of construction materials. Operation Phase: Storage area for Manure and Sludge will be provided. Construction Phase: During the construction phase soak pits and septic tanks will be provided for disposal of waste water. Temporary sanitary toilets will be provided. Operation Phase: Total solid wastes Biodegradable waste Non- Biodegradable waste 716 Kg / Day 408 Kg / Day 308 Kg / Day Treatment & Disposal : The biodegradable waste (408 Kg / Day) will be treated in Organic Waste Composter (OWC). Manure obtained from OWC will be used for gardening purpose. Non–Biodegradable waste: 308 kg/day is M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 4 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Information/Checklist Confirmation Yes No 1.16 Facilities for long term No housing of operational workers? 1.17 New road, rail or sea traffic No during construction of operation? 1.18 New road, rail, air, waterborne No or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No lines or pipelines? 1.21 Impoundment, damming, No culverting, realignment or other changes to the hydrology M/s. Enviro Analysts & Engineers Pvt. Ltd. FORM 1 / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data generated which will be handed over to recyclers. • Sludge Quantity: 15 kg dry sewage sludge will be used as manure for gardening. • 150 KLD wastewater will be treated in STP of 155 KLD capacity. Treated water will be utilized as follows; Flushing 64 KLD Gardening 8 KLD Only during construction phase temporary in nature. • The project site is adjacent to 30 m wide D.P road adjoining the plot at west will be utilized during construction and operational phase. There will be no new road and rail. • During construction phase, traffic will increase due to inward movement of raw materials. • In the post construction phase, there will be increase in the traffic levels due to proposed project. The increased traffic load due to the proposed project will be 286 vehicles including the traffic load contributed by visitors. The parking of 4 wheelers details are as under: Parking provided: 286 no’s. No new Rail/road is required. The entire essential infrastructure already exists. There will be no diversion or closure of the existing transport routes and infrastructure. Diversion of electrical transmission line is not envisaged; however, the project involves construction of new internal pipelines for fresh water, recycled water, rain water harvesting, sewer lines and internal power distribution lines. Not applicable Page 5 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. FORM 1 Information/Checklist Confirmation of watercourses or aquifers? 1.22 Stream crossings? 1.23 Abstraction or transfers of water from ground or surface waters? Yes No / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data No Yes 1.24 Changes in water bodies or the land surface affecting drainage or run-off 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? No No There is no stream passing through the site. Water requirement in the construction phase will be supplied from tanker (30 KLD). Total water demand of 195 KLD will be met from VVCMC and recycled water There will be no change in the drainage pattern The drainage network of the project will be designed in line with natural drainage pattern. The 30 m wide D.P road near by the site will be utilized for the transportation of material. Workers required during peak hours which will be fulfilled from local or nearby area. Not Applicable. No Not Applicable. No Construction Phase: During the construction phase about 60-80 Labors will be provided with housing facilities which will be purely in temporary basis and during peak hours remaining will be deployed from nearby places. No 1.29 Introduction of alien species? No 1.30 Loss of native species or No genetic diversity? 1.31 Any other actions? No M/s. Enviro Analysts & Engineers Pvt. Ltd. Operation Phase: On completion of the project, there will be regular movement of residents, visitors, staff and related personals. Total population is expected to be 1573 No’s. -Not applicable Not applicable Page 6 “Viva Residency” - Proposed Residential & Commercial Project 2. Use of Natural resources for construction or operation of project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply). Sr. No. Information/Checklist Confirmation 2.1 Land specially undeveloped or No agricultural land (ha) Water (expected source & Yes competing users) unit KLD 2.2 FORM 1 Yes /No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data The proposed plan is on Non agricultural land. Construction Phase: It is expected to house about 60 to 80 labours at site. (Depending upon construction activity) Domestic usage 12 KLD Construction Activity 18 KLD The water demand will be met by water tankers. Operation Phase: Total water demand of the project is expected to be 195 KLD approximately; Domestic 123 KLD Flushing 64 KLD Gardening 8 KLD 2.3 2.4 2.5 Minerals (MT) No Construction material – stone, Yes aggregates, and/soil (expected source-MT) Forests and timber (source-MT) Yes 2.6 Energy including electricity and Yes fuels (source, competing users) Unit: fuel (MT), energy (KW) 2.7 Any other natural resources (use Yes appropriate standard units) M/s. Enviro Analysts & Engineers Pvt. Ltd. And the water requirement will be met by the VVCMC / Recycled water. -The construction materials, which will be used in the project site, will be procured from authorized local dealer. Certified Timber will be purchased from nearby markets. • Construction Phase: 80 kW • Operation Phase : 3704 kW • Source: MSEDCL 1 DG Sets of 300 KVA will be proposed for back up during power failure. HSD will be used as fuel to run standby D.G. sets. Solar energy will be utilised for common area & water heating purpose. Page 7 “Viva Residency” - Proposed Residential & Commercial Project 3. Sr. No. 3.1 3.2 3.3 3.4 3.5 4. Sr. No. 4.1 4.2 FORM 1 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health Information/Checklist Confirmation Yes / Details thereof (with approximate quantities/ No rates, wherever possible) with source of information data Not applicable Use of substances or materials, No which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) Changes in occurrence of No During the entire construction phase adequate disease or affect disease vectors precaution will be taken like centralized canteen for (e.g. insect or water borne labours, modular STP, OWC for construction phase diseases) will be provided. Positive impact due to enhanced and hygienic living Affect the welfare of people e.g. Yes conditions generation. Aesthetic value of area will be by changing living conditions? improved.. EMP shall be implemented during construction and operation phase to mitigate the impacts on surrounding locality There are no vulnerable receptors within 500mts Vulnerable groups of people No from the site. who could be affected by the project e.g. hospital patients, children, the elderly etc., Any other causes No No other causes identified. Production of solid wastes during construction or operation or decommissioning (MT/month) Information/Checklist Confirmation Yes / Details thereof (with approximate quantities / No rates, wherever possible) with source of information data Spoil, overburden or mine No There is no activity which may generate spoil, wastes overburden & mine waste. Municipal waste (domestic and Yes Operation Phase: M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 8 FORM 1 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Information/Checklist Confirmation or commercial wastes) Yes / Details thereof (with approximate quantities / No rates, wherever possible) with source of information data Total solid wastes 716 Kg/Day Biodegradable waste 408 Kg/Day Non- Biodegradable waste 308 Kg/Day Treatment & Disposal : • The biodegradable waste (408 Kg/Day) will be processed in OWC. • Maximum requirement of manure for gardening will be used, while remaining quantity of manure will be handed over to recyclers. • Non- Biodegradable waste will be handed over to VVCMC. • Sludge Quantity: 15 Kg 4.3 4.4 4.5 4.6 Hazardous wastes (as per Yes hazardous waste management rules) Other industrial process wastes No Surplus product No Dry sewage sludge will be used as manure for gardening. Used oil from DG set will be stored carefully at separate location duly marked and will be sold to CPCB authorized recyclers. Not Applicable Not Applicable Sewage sludge or other sludge Yes from effluent treatment Construction or demolition Yes wastes Dewatered sludge from STP will be used as manure for gardening. EMP shall be implemented during construction and operation phase to mitigate the impacts on surrounding locality Redundant machinery or No equipment Contaminated soils or other No materials All Equipments used for construction will be of standard quality and maintained on regular basis. 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Only Municipal solid waste will be generated. 4.7 4.8 4.9 M/s. Enviro Analysts & Engineers Pvt. Ltd. Not Applicable Page 9 “Viva Residency” - Proposed Residential & Commercial Project 5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Sr. No. Information/Checklist Confirmation 5.1 Emissions from combustion of Yes fossil fuels from stationary or mobile sources 5.2 Emission from production No processes Emissions from materials Yes handling including storage or transport 5.3 FORM 1 Yes/ No 5.4 Emissions from construction Yes activities including plant and equipment 5.5 Dust or odors from handling of Yes materials including construction materials, sewage and waste Details thereof (with approximate quantities/ rates, wherever possible) with source of information data • Emission will be generated from vehicular transport to the project. • Standby DG set will emit air pollutants (PM, SO 2 and NOx). DG set shall be installed as per CPCB guidelines and manufacturers instruction to keep the emissions within limits of CPCB. Stack height shall be provided as per CPCB guideline for adequate dispersion of released pollutant and to have negligible GLCs in the surrounding area. There is no production as the proposed project is residential project. • Emissions will be generated, while handling and transportation of materials like cement, sand etc. to site, will be temporary in nature. • RMC shall be used preferably to reduce fugitive emissions due to material handling. • Regular water sprinkling shall be done to reduce dust generation Transportation shall be done in covered trucks The project may cause rise in dust levels during construction phase. Precautions will be taken to reduce dust generation during construction phase. • RMC use will eliminate the handling of cement, sand and concrete thus dust emission will be minimized. • RMC use will also reduce the trucks trips. • Tarpaulins will be used to cover trucks carrying debris. • Water sprinkling will be done at regular intervals to reduce control of dust generation. Construction Phase: Dust is likely to be generated during construction, this will be water sprinkled and Tarpaulin covers will be provided over stored raw material to reduce dust emission. Operation Phase: During Operation Phase, emissions will be generated M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 10 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Information/Checklist Confirmation 5.6 Emissions from incineration of No waste Emissions from burning of No waste in open air (e.g. slash materials, construction debris) Emissions from any other No sources 5.7 5.8 6. Sr. No. 6.1 6.2 6.3 Yes/ No FORM 1 Details thereof (with approximate quantities/ rates, wherever possible) with source of information data from Operation of DG sets. Minimal emissions will be generated from movement of vehicles as dust, as the roads will be paved roads. Odor can be from STP. However, the STP will be working on appropriate technology, so as to minimize odor problems, and it will be strategically located so that no adverse impact is caused. Not Applicable. No such practices shall be entertained Not Applicable. Generation of Noise and vibration, and emissions of Light and heat. Information/Checklist Confirmation Yes / Details thereof (with approximate quantities/ No rates, wherever possible) with source of information data From operation of equipment Yes Noise generation from construction equipment’s used e.g. engines, ventilation plant, for drilling, cutting operations. crushers During Operation Phase, Noise will be generated due to operation of DG sets. For control of noise following measures shall be adopted: • Properly maintained equipment’s with mufflers will be used. • High noise generating construction activities would be carried out only during day time. • Workers working near high noise construction machinery would be provided with ear muffs/ear plugs. • Acoustic enclosure for DG Set with proper stack height will be provided. From industrial or similar No Not Applicable processes From construction or demolition Yes The construction noise will be localized, intermittent M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 11 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. 6.4 6.5 Information/Checklist Confirmation FORM 1 Yes / Details thereof (with approximate quantities/ No rates, wherever possible) with source of information data in nature. The construction activities will include the following noise generating activities ; 1. Excavation activities etc. 2. Concreting and mixing. 3. Heavy vehicle movement. 4. Operation of D.G sets. From blasting or piling No From construction or operational Yes traffic Following precautions shall be taken to control noise pollution : High noise generating construction activities would be carried out during day time only. • Installation, use and maintenance of mufflers on equipment. • Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. • Acoustic enclosure for DG Set with proper stack height will be provided Not Applicable. Construction phase: There will be transport of materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. Operation Phase : The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion. 6.6 6.7 From lighting or cooling No systems From any other sources No M/s. Enviro Analysts & Engineers Pvt. Ltd. Local native plants will be used in plantation which will help to reduce the impact of air and noise pollution. Not Applicable. Not Applicable. Page 12 “Viva Residency” - Proposed Residential & Commercial Project 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea Sr. No. Information/Checklist Confirmation 7.1 From handling, storage, use or No spillage of hazardous materials From discharge of sewage or Yes other effluents to water or the land (expected mode and place of discharge) 7.2 Yes/ No 7.3 By deposition of pollutants No emitted to air into the land or into water 7.4 7.5 From any other sources No Is there a risk of long term No buildup of pollutants in the environment from these sources? 8. Sr. No. FORM 1 Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Not Applicable. The total wastewater generated (150 KLD) from the buildings will be treated in STP of 155 KLD capacity and the Recycled water (72 KLD) will be utilized for landscaping, car washing and flushing purpose. 63 KLD of excess water will be drained to existing municipal drain. Dust generated during construction phase will be contained locally within site only. Same shall be controlled by barricades. Stack shall be provided to DG set with height as per CPCB norm. Not Envisaged D.G sets will be used in case of power failure, as a backup source. Risk of accidents during construction or operation of the project, which could affect human health or the environment Information/Checklist Confirmation M/s. Enviro Analysts & Engineers Pvt. Ltd. Yes /No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Page 13 “Viva Residency” - Proposed Residential & Commercial Project FORM 1 8.1 From explosions, spillages, fires No etc from storage, handling, use or production of hazardous substances During construction all construction workers will be provided with suitable Personal Protective Equipment as required under the health & safety norms. Suitable fire fighting measures will be provided to reduce damage due to fire-accidents. 8.2 8.3 From any other causes No Could the project be affected by Yes natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, could burst etc)? -The project falls under seismic zone-III as per IS1893 (Part-1):2002, 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Sr. No. Information/Checklist Confirmation 9.1 Lead to development of No supporting, utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc) Yes /No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data The project provides a well-designed residential housing area for the occupants. Yes Internal Roads, Rainwater Harvesting, STP etc. will be provided. Housing development Extractive industries Supply industries Other Yes Residential Project No 9.2 No Lead to after use of the site, No which could have an impact on M/s. Enviro Analysts & Engineers Pvt. Ltd. Not Applicable. Page 14 FORM 1 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Information/Checklist Confirmation Yes /No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data the environment 9.3 Set a precedent developments for later No Not Applicable. 9.4 Have cumulative effects due to No proximity to other existing or planned projects with similar effects Not Applicable. (iii) Environmental Sensitivity Sr. No. 1 2 3 4 5 6 7 Areas Name/Identity Aerial distance (with 15-km) Proposed project location boundary Areas protected under international No There are no notified eco sensitive zones conventions, national or local in and around the project site (2 km). legislation for their ecological, landscape, cultural or other related value Areas which are important or --sensitive of ecological reasons – wetlands, water courses or other water bodies, coastal zone, biospheres, mountains, forests Areas used by protected, important --or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. Inland, coastal, marine or --underground waters State, national boundaries No The project is located within Municipal limits. Routes or facilities used by the No public for access to recreation or other tourist, pilgrim areas Defense installations No M/s. Enviro Analysts & Engineers Pvt. Ltd. Not Applicable. No defense neighborhood. installation in Page 15 the FORM 1 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Areas Name/Identity Aerial distance (with 15-km) Proposed project location boundary 8 Densely populated or built-up area Yes 9 Areas occupied by sensitive man -made land uses (hospitals, schools, places of worship, community facilities) Areas containing important, high No quality or scarce resources (ground water resource, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution No or environmental damage. (those where existing legal environmental standards are exceeded) -- Areas susceptible to natural hazard No which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) This area is generally plain& come under seismic zone –III according to Indian Standard Seismic zoning map. 10 11 12 M/s. Enviro Analysts & Engineers Pvt. Ltd. Residential, Commercial and Industrial area all around the site. The project will meet water from VVCMC for its use after proper permissions are obtained. All parameters of Air, water and Noise etc. will be maintained within the permissible limit. Page 16 FORM – IA ANNEXURE “Viva Residency” - Proposed Residential & Commercial Project FORM 1 FORM-1 (I) Basic Information Sr. Item No. 1 Name of the Project 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Details “Viva Residency” - Proposed Residential & Commercial project at plot bearing C.T.S. No.86 B, Chakradhar nagar, Achole road, Nallasopara West. S. No. in the Schedule Building and Construction Project, Category ‘B’ [(As per 14.09.2006 Notification, Project or Activity-8 (a)] Proposed capacity/area /length/tonnage to Plot Area. 11364.10 Sq.mt be handled/command area/lease area/ FSI Area 20571.87 Sq.mt number of wells to be drilled Non-FSI Area 26538.36 Sq.mt Total Construction Area 47110.23 Sq.mt New/Expansion/Modernization New Project Existing Capacity/Area etc. Nil Category of Project i.e. ‘A’ or ‘B’ ‘B’ Does it attract the general condition? If No Yes, Please specify Does it attract the specific condition? If Not Applicable yes, Please specify Location Plot/Survey/Khasra No. Plot Bearing C.T.S. No.86 B, H.No.1 to 4 & 8 to 10 Chakradhar nagar, Achole road, Nallasopara West. Village Nallasopara Tehsil Vasai. District Palghar State Maharashtra. Nearest railway station/airport along with Nallasopara Railway Station. distance in km. (Aerial distance : 0.5 Km towards North) Nearest Town, City, District Headquarters Mumbai. along with distance in km. Village Panchayats, ZillaParishad, Vasai Virar municipal Corporation Municipal Corporation, Local body Virar East, Opposite Savitribhai Phule Market, Near (complete postal addresses with telephone Virar East Police Station, Thane - 401305 nos. to be given) Name of the applicant Mr. Deepak H. Thakur Registered Address Chakradhar nagar, Achole road, Nallasopara West. Near Railway Station, S.T. Depot Road, Nallasopara (W). Address for correspondence: As above M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 1 “Viva Residency” - Proposed Residential & Commercial Project Name Designation(Owner/Partner/CEO) Address Pin Code E-mail Telephone No. Fax No. 16 17 18 19 20 21 22 23 24 Details of Alternative Sites examined, If any. Location of these sites should be shown on a topo sheet Interlinked Projects Whether separate application of interlinked project has been submitted? If yes, date of submission If no, reason Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972? The C.R.Z. Notification, 1991? Whether there is any Government Order/Policy relevant/relating to the site? Forest land involved (hectares) Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Name of the Court/ Case No. / Orders/directions of the Court, if any and its Relevance with the proposed project. FORM 1 Mr. Deepak H. Thakur Owner Near Railway Station, S.T. Depot Road, Nallasopara (W). [email protected] 0250-6454996 -None No Not Applicable Not Applicable Not Applicable No No No No * Capacity corresponding to sectorial activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area of mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 2 “Viva Residency” - Proposed Residential & Commercial Project FORM 1 (II) Activity 1. Sr. No. 1.1 1.2 1.3 1.4 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information/Checklist Confirmation Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Clearance of existing land, vegetation and building? Creation of new land uses: Yes No Yes No Yes 1.5 Pre-construction investigations Yes e.g. bore houses, soil testing? Construction Works? Yes 1.6 Démolition Works? 1.7 Temporary sites used for Yes construction works or housing of construction workers? Above ground buildings, Yes structures or earthworks including linear structures, cut and fill or excavations. 1.8 M/s. Enviro Analysts & Engineers Pvt. Ltd. No / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data It is a New project. The developers have proposed a residential Building. After completion of the project the land use will be for Residence purpose. No trees available The proposed project is a Residential Building, After competition of the project the land will be used for Residential purpose. Pre – Feasibility studies, Geo-Technical investigations will be carried out. The project involves construction of a group housing1 no Building, having A to C wings. Building Wing Configuration Details Bldg A to C Ground floor shopping + 1st No. 1 (A) Floor shopping + 1st (B) Floor shopping + 2nd Level R.G Podium + 3rd to 22nd upper Floors Total Construction Area -47110.23 Sq.mt As the proposed site is a vacant plot, there is no requirement of any demolition. • Part of the project site will be used for temporary housing for up to 60-80 workers. The housing/sheds will be temporary. • The above ground structures will comprise 1 residential building. Building Wing Configuration Details Bldg A to C Ground floor shopping + 1st Page 3 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. 1.9 Information/Checklist Confirmation Yes No Underground works including No mining or tunneling? 1.10 Reclamation works? No 1.11 Dredging? 1.12 Offshore structures? 1.13 Production and manufacturing Process? 1.14 Facilities for storage of goods or materials? No No No Yes 1.15 Facilities for treatment or Yes disposal of solid waste or liquid effluents? FORM 1 / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data No. 1 (A) Floor shopping + 1st (B) Floor shopping + 2nd Level R.G Podium + 3rd to 22nd upper Floors • The maximum height of the proposed project will be 69.95 m. • . No underground works including mining / Tunneling is required except excavation of earth only for foundation, lay down of pipes, underground storage tank, electric cables, soak pits, septic tanks etc. As this is a new construction project, hence no reclamation work required. Not Applicable Not Applicable Not Applicable Separate raw material storage yard will be made, which will be temporary. Construction Phase: Temporary sheds will be provided for the storage of construction materials. Operation Phase: Storage area for Manure and Sludge will be provided. Construction Phase: During the construction phase soak pits and septic tanks will be provided for disposal of waste water. Temporary sanitary toilets will be provided. Operation Phase: Total solid wastes Biodegradable waste Non- Biodegradable waste 716 Kg / Day 408 Kg / Day 308 Kg / Day Treatment & Disposal : The biodegradable waste (408 Kg / Day) will be treated in Organic Waste Composter (OWC). Manure obtained from OWC will be used for gardening purpose. Non–Biodegradable waste: 308 kg/day is M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 4 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Information/Checklist Confirmation Yes No 1.16 Facilities for long term No housing of operational workers? 1.17 New road, rail or sea traffic No during construction of operation? 1.18 New road, rail, air, waterborne No or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No lines or pipelines? 1.21 Impoundment, damming, No culverting, realignment or other changes to the hydrology M/s. Enviro Analysts & Engineers Pvt. Ltd. FORM 1 / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data generated which will be handed over to recyclers. • Sludge Quantity: 15 kg dry sewage sludge will be used as manure for gardening. • 150 KLD wastewater will be treated in STP of 155 KLD capacity. Treated water will be utilized as follows; Flushing 64 KLD Gardening 8 KLD Only during construction phase temporary in nature. • The project site is adjacent to 30 m wide D.P road adjoining the plot at west will be utilized during construction and operational phase. There will be no new road and rail. • During construction phase, traffic will increase due to inward movement of raw materials. • In the post construction phase, there will be increase in the traffic levels due to proposed project. The increased traffic load due to the proposed project will be 286 vehicles including the traffic load contributed by visitors. The parking of 4 wheelers details are as under: Parking provided: 286 no’s. No new Rail/road is required. The entire essential infrastructure already exists. There will be no diversion or closure of the existing transport routes and infrastructure. Diversion of electrical transmission line is not envisaged; however, the project involves construction of new internal pipelines for fresh water, recycled water, rain water harvesting, sewer lines and internal power distribution lines. Not applicable Page 5 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. FORM 1 Information/Checklist Confirmation of watercourses or aquifers? 1.22 Stream crossings? 1.23 Abstraction or transfers of water from ground or surface waters? Yes No / Details thereof (with approximate quantities/ rates, wherever possible) with source of information data No Yes 1.24 Changes in water bodies or the land surface affecting drainage or run-off 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? No No There is no stream passing through the site. Water requirement in the construction phase will be supplied from tanker (30 KLD). Total water demand of 195 KLD will be met from VVCMC and recycled water There will be no change in the drainage pattern The drainage network of the project will be designed in line with natural drainage pattern. The 30 m wide D.P road near by the site will be utilized for the transportation of material. Workers required during peak hours which will be fulfilled from local or nearby area. Not Applicable. No Not Applicable. No Construction Phase: During the construction phase about 60-80 Labors will be provided with housing facilities which will be purely in temporary basis and during peak hours remaining will be deployed from nearby places. No 1.29 Introduction of alien species? No 1.30 Loss of native species or No genetic diversity? 1.31 Any other actions? No M/s. Enviro Analysts & Engineers Pvt. Ltd. Operation Phase: On completion of the project, there will be regular movement of residents, visitors, staff and related personals. Total population is expected to be 1573 No’s. -Not applicable Not applicable Page 6 “Viva Residency” - Proposed Residential & Commercial Project 2. Use of Natural resources for construction or operation of project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply). Sr. No. Information/Checklist Confirmation 2.1 Land specially undeveloped or No agricultural land (ha) Water (expected source & Yes competing users) unit KLD 2.2 FORM 1 Yes /No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data The proposed plan is on Non agricultural land. Construction Phase: It is expected to house about 60 to 80 labours at site. (Depending upon construction activity) Domestic usage 12 KLD Construction Activity 18 KLD The water demand will be met by water tankers. Operation Phase: Total water demand of the project is expected to be 195 KLD approximately; Domestic 123 KLD Flushing 64 KLD Gardening 8 KLD 2.3 2.4 2.5 Minerals (MT) No Construction material – stone, Yes aggregates, and/soil (expected source-MT) Forests and timber (source-MT) Yes 2.6 Energy including electricity and Yes fuels (source, competing users) Unit: fuel (MT), energy (KW) 2.7 Any other natural resources (use Yes appropriate standard units) M/s. Enviro Analysts & Engineers Pvt. Ltd. And the water requirement will be met by the VVCMC / Recycled water. -The construction materials, which will be used in the project site, will be procured from authorized local dealer. Certified Timber will be purchased from nearby markets. • Construction Phase: 80 kW • Operation Phase : 3704 kW • Source: MSEDCL 1 DG Sets of 300 KVA will be proposed for back up during power failure. HSD will be used as fuel to run standby D.G. sets. Solar energy will be utilised for common area & water heating purpose. Page 7 “Viva Residency” - Proposed Residential & Commercial Project 3. Sr. No. 3.1 3.2 3.3 3.4 3.5 4. Sr. No. 4.1 4.2 FORM 1 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health Information/Checklist Confirmation Yes / Details thereof (with approximate quantities/ No rates, wherever possible) with source of information data Not applicable Use of substances or materials, No which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) Changes in occurrence of No During the entire construction phase adequate disease or affect disease vectors precaution will be taken like centralized canteen for (e.g. insect or water borne labours, modular STP, OWC for construction phase diseases) will be provided. Positive impact due to enhanced and hygienic living Affect the welfare of people e.g. Yes conditions generation. Aesthetic value of area will be by changing living conditions? improved.. EMP shall be implemented during construction and operation phase to mitigate the impacts on surrounding locality There are no vulnerable receptors within 500mts Vulnerable groups of people No from the site. who could be affected by the project e.g. hospital patients, children, the elderly etc., Any other causes No No other causes identified. Production of solid wastes during construction or operation or decommissioning (MT/month) Information/Checklist Confirmation Yes / Details thereof (with approximate quantities / No rates, wherever possible) with source of information data Spoil, overburden or mine No There is no activity which may generate spoil, wastes overburden & mine waste. Municipal waste (domestic and Yes Operation Phase: M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 8 FORM 1 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Information/Checklist Confirmation or commercial wastes) Yes / Details thereof (with approximate quantities / No rates, wherever possible) with source of information data Total solid wastes 716 Kg/Day Biodegradable waste 408 Kg/Day Non- Biodegradable waste 308 Kg/Day Treatment & Disposal : • The biodegradable waste (408 Kg/Day) will be processed in OWC. • Maximum requirement of manure for gardening will be used, while remaining quantity of manure will be handed over to recyclers. • Non- Biodegradable waste will be handed over to VVCMC. • Sludge Quantity: 15 Kg 4.3 4.4 4.5 4.6 Hazardous wastes (as per Yes hazardous waste management rules) Other industrial process wastes No Surplus product No Dry sewage sludge will be used as manure for gardening. Used oil from DG set will be stored carefully at separate location duly marked and will be sold to CPCB authorized recyclers. Not Applicable Not Applicable Sewage sludge or other sludge Yes from effluent treatment Construction or demolition Yes wastes Dewatered sludge from STP will be used as manure for gardening. EMP shall be implemented during construction and operation phase to mitigate the impacts on surrounding locality Redundant machinery or No equipment Contaminated soils or other No materials All Equipments used for construction will be of standard quality and maintained on regular basis. 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No Only Municipal solid waste will be generated. 4.7 4.8 4.9 M/s. Enviro Analysts & Engineers Pvt. Ltd. Not Applicable Page 9 “Viva Residency” - Proposed Residential & Commercial Project 5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Sr. No. Information/Checklist Confirmation 5.1 Emissions from combustion of Yes fossil fuels from stationary or mobile sources 5.2 Emission from production No processes Emissions from materials Yes handling including storage or transport 5.3 FORM 1 Yes/ No 5.4 Emissions from construction Yes activities including plant and equipment 5.5 Dust or odors from handling of Yes materials including construction materials, sewage and waste Details thereof (with approximate quantities/ rates, wherever possible) with source of information data • Emission will be generated from vehicular transport to the project. • Standby DG set will emit air pollutants (PM, SO 2 and NOx). DG set shall be installed as per CPCB guidelines and manufacturers instruction to keep the emissions within limits of CPCB. Stack height shall be provided as per CPCB guideline for adequate dispersion of released pollutant and to have negligible GLCs in the surrounding area. There is no production as the proposed project is residential project. • Emissions will be generated, while handling and transportation of materials like cement, sand etc. to site, will be temporary in nature. • RMC shall be used preferably to reduce fugitive emissions due to material handling. • Regular water sprinkling shall be done to reduce dust generation Transportation shall be done in covered trucks The project may cause rise in dust levels during construction phase. Precautions will be taken to reduce dust generation during construction phase. • RMC use will eliminate the handling of cement, sand and concrete thus dust emission will be minimized. • RMC use will also reduce the trucks trips. • Tarpaulins will be used to cover trucks carrying debris. • Water sprinkling will be done at regular intervals to reduce control of dust generation. Construction Phase: Dust is likely to be generated during construction, this will be water sprinkled and Tarpaulin covers will be provided over stored raw material to reduce dust emission. Operation Phase: During Operation Phase, emissions will be generated M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 10 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Information/Checklist Confirmation 5.6 Emissions from incineration of No waste Emissions from burning of No waste in open air (e.g. slash materials, construction debris) Emissions from any other No sources 5.7 5.8 6. Sr. No. 6.1 6.2 6.3 Yes/ No FORM 1 Details thereof (with approximate quantities/ rates, wherever possible) with source of information data from Operation of DG sets. Minimal emissions will be generated from movement of vehicles as dust, as the roads will be paved roads. Odor can be from STP. However, the STP will be working on appropriate technology, so as to minimize odor problems, and it will be strategically located so that no adverse impact is caused. Not Applicable. No such practices shall be entertained Not Applicable. Generation of Noise and vibration, and emissions of Light and heat. Information/Checklist Confirmation Yes / Details thereof (with approximate quantities/ No rates, wherever possible) with source of information data From operation of equipment Yes Noise generation from construction equipment’s used e.g. engines, ventilation plant, for drilling, cutting operations. crushers During Operation Phase, Noise will be generated due to operation of DG sets. For control of noise following measures shall be adopted: • Properly maintained equipment’s with mufflers will be used. • High noise generating construction activities would be carried out only during day time. • Workers working near high noise construction machinery would be provided with ear muffs/ear plugs. • Acoustic enclosure for DG Set with proper stack height will be provided. From industrial or similar No Not Applicable processes From construction or demolition Yes The construction noise will be localized, intermittent M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 11 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. 6.4 6.5 Information/Checklist Confirmation FORM 1 Yes / Details thereof (with approximate quantities/ No rates, wherever possible) with source of information data in nature. The construction activities will include the following noise generating activities ; 1. Excavation activities etc. 2. Concreting and mixing. 3. Heavy vehicle movement. 4. Operation of D.G sets. From blasting or piling No From construction or operational Yes traffic Following precautions shall be taken to control noise pollution : High noise generating construction activities would be carried out during day time only. • Installation, use and maintenance of mufflers on equipment. • Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. • Acoustic enclosure for DG Set with proper stack height will be provided Not Applicable. Construction phase: There will be transport of materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. Operation Phase : The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion. 6.6 6.7 From lighting or cooling No systems From any other sources No M/s. Enviro Analysts & Engineers Pvt. Ltd. Local native plants will be used in plantation which will help to reduce the impact of air and noise pollution. Not Applicable. Not Applicable. Page 12 “Viva Residency” - Proposed Residential & Commercial Project 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea Sr. No. Information/Checklist Confirmation 7.1 From handling, storage, use or No spillage of hazardous materials From discharge of sewage or Yes other effluents to water or the land (expected mode and place of discharge) 7.2 Yes/ No 7.3 By deposition of pollutants No emitted to air into the land or into water 7.4 7.5 From any other sources No Is there a risk of long term No buildup of pollutants in the environment from these sources? 8. Sr. No. FORM 1 Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Not Applicable. The total wastewater generated (150 KLD) from the buildings will be treated in STP of 155 KLD capacity and the Recycled water (72 KLD) will be utilized for landscaping, car washing and flushing purpose. 63 KLD of excess water will be drained to existing municipal drain. Dust generated during construction phase will be contained locally within site only. Same shall be controlled by barricades. Stack shall be provided to DG set with height as per CPCB norm. Not Envisaged D.G sets will be used in case of power failure, as a backup source. Risk of accidents during construction or operation of the project, which could affect human health or the environment Information/Checklist Confirmation M/s. Enviro Analysts & Engineers Pvt. Ltd. Yes /No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data Page 13 “Viva Residency” - Proposed Residential & Commercial Project FORM 1 8.1 From explosions, spillages, fires No etc from storage, handling, use or production of hazardous substances During construction all construction workers will be provided with suitable Personal Protective Equipment as required under the health & safety norms. Suitable fire fighting measures will be provided to reduce damage due to fire-accidents. 8.2 8.3 From any other causes No Could the project be affected by Yes natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, could burst etc)? -The project falls under seismic zone-III as per IS1893 (Part-1):2002, 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Sr. No. Information/Checklist Confirmation 9.1 Lead to development of No supporting, utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc) Yes /No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data The project provides a well-designed residential housing area for the occupants. Yes Internal Roads, Rainwater Harvesting, STP etc. will be provided. Housing development Extractive industries Supply industries Other Yes Residential Project No 9.2 No Lead to after use of the site, No which could have an impact on M/s. Enviro Analysts & Engineers Pvt. Ltd. Not Applicable. Page 14 FORM 1 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Information/Checklist Confirmation Yes /No Details thereof (with approximate quantities/ rates, wherever possible) with source of information data the environment 9.3 Set a precedent developments for later No Not Applicable. 9.4 Have cumulative effects due to No proximity to other existing or planned projects with similar effects Not Applicable. (iii) Environmental Sensitivity Sr. No. 1 2 3 4 5 6 7 Areas Name/Identity Aerial distance (with 15-km) Proposed project location boundary Areas protected under international No There are no notified eco sensitive zones conventions, national or local in and around the project site (2 km). legislation for their ecological, landscape, cultural or other related value Areas which are important or --sensitive of ecological reasons – wetlands, water courses or other water bodies, coastal zone, biospheres, mountains, forests Areas used by protected, important --or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. Inland, coastal, marine or --underground waters State, national boundaries No The project is located within Municipal limits. Routes or facilities used by the No public for access to recreation or other tourist, pilgrim areas Defense installations No M/s. Enviro Analysts & Engineers Pvt. Ltd. Not Applicable. No defense neighborhood. installation in Page 15 the FORM 1 “Viva Residency” - Proposed Residential & Commercial Project Sr. No. Areas Name/Identity Aerial distance (with 15-km) Proposed project location boundary 8 Densely populated or built-up area Yes 9 Areas occupied by sensitive man -made land uses (hospitals, schools, places of worship, community facilities) Areas containing important, high No quality or scarce resources (ground water resource, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution No or environmental damage. (those where existing legal environmental standards are exceeded) -- Areas susceptible to natural hazard No which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) This area is generally plain& come under seismic zone –III according to Indian Standard Seismic zoning map. 10 11 12 M/s. Enviro Analysts & Engineers Pvt. Ltd. Residential, Commercial and Industrial area all around the site. The project will meet water from VVCMC for its use after proper permissions are obtained. All parameters of Air, water and Noise etc. will be maintained within the permissible limit. Page 16 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project FORM-1A (Only for Construction Projects listed under Item 8 of Schedule) Checklist of Environmental Impacts 1. Land Environment (Attach panoramic view of the project site & the vicinity) Requirement Compliance 1.1. Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the 1. The project is “Viva Residency” - Proposed Residential & Commercial project. 2. The site is under Jurisdiction of Vasai Virar Municipal Corporation. approved Master Plan/Development Plan 3. The proposed land use is in conformation with the of the area. Change of land use if any and approved Municipal Master Plan / Development Plan the of VVCMC. statutory competent approval authority form are the submitted). Attach Maps of (i) site location, (ii) Enclosed maps: surrounding features of the proposed site 1. Google Image. (ANNEXURE I) (within 500 meters) and (iii) the site 2. Layout Plan. (ANNEXURE II) (indicating levels & contours) to appropriate scales. 1.2. List out all the major project requirements in terms of the land area, Name & location: “Viva Residency” - Proposed Residential built up area, water consumption, power & Commercial project, On plot Bearing C.T.S. No.86 B, requirement, connectivity, community Chakradhar nagar, Achole road, Nallasopara West. facilities, parking needs etc. A. Propose Building Details : Building Wing Details Bldg No. A to C 1 Configuration Ground floor shopping + 1st (A) Floor shopping + 1st (B) Floor shopping + 2nd Level R.G Podium + 3rd to 22nd upper Floors B. Area Statement : (i)Land Area: M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 1 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project Plot Area 11364.10 Sq.mt FSI Area 20571.87 Sq.mt Non-FSI Area 26538.36 Sq.mt Total Construction Area 47110.23 Sq.mt R.G Area 1505.26 Sq mt C. Parking Details : Parking Required 286 No’s Total Provided 286 No’s D. Occupancy Load: 1573 No’s. E. Water requirement : Construction phase : Total Water Required 30 KLD Domestic usage 12 KLD Construction 18 KLD Source: Tanker (depending upon construction activity) Operation Phase: 195 KLD; Source: VVCMC/recycle water. Domestic 123 KLD Flushing 64 KLD Gardening 8 KLD F. Power Requirement : Construction Phase : 80 kW Operation Phase : 3704 kW G. Road Connectivity: 30 m wide D.P Road towards East. H. Community facilities : -I. Amenities : -1.3. What are the likely impacts of the Adequate open spaces and amenity facilities are provided as proposed activity on the existing per development plan for the project. There are no negative facilities adjacent to the proposed site? impacts of the project on surrounding existing facilities. (Such as open spaces, community facilities, details of the existing land use, M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 2 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project disturbance to the local ecology) 1.4. Will there is any significant land There will be no significant land disturbance due to the distribution resulting in erosion, project. The existing land and surrounding area is flat/table subsidence & instability? (Details of soil land without having any undulations. The existing terrain will type, slope analysis, vulnerability to be retained.This area is generally plain & come under seismic subsidence, seismicity etc may be given) zone –III according to Indian Standard Seismic zoning map. 1.5. Will the proposal involve alteration Natural Drainage System will not be altered. of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) 1.6. What are the quantities of earthwork Excavation in the form of rubble and soil. The excavated involved in the construction activity- material will be used for refilling, excess quantity if any will cutting, filling, reclamation etc. (Give be used for Landscaping. details of the quantities of earthwork involved, transport of fill materials from outside the site etc) 1.7. Give details regarding water supply, Construction phase: It is expected to house about 60 to 80 waste handling etc. during the labours at site; construction period. SOURCE : Tanker (Depending upon construction activity) Total Water Required 30 KLD Domestic usage 12 KLD Construction 18 KLD The waste water generated from human settlement will be collected in septic tank and soak pits. 1.8. Will the low lying areas & wetlands No low lying area, no wetlands within 500 m around the site. get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9. Whether construction debris & waste The construction debris will include sand, soil bricks and tiles. during construction cause health hazards? All this material will be utilized on the same site or used for (Give quantities of various types of land fillings or other development sites. No hazardous waste is M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 3 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project wastes generated during construction involved. including the construction labour and the means of disposal) 2. Water Environment Requirement Compliance 2.1. Give the total quantity of water Source: VVCMC / Recycled Water requirement for the proposed project with Total water requirement 195 KLD the break-up of requirements for various Domestic usage 123 KLD uses. How will the water requirements Flushing 64 KLD met? State the sources & quantities and Gardening 8 KLD furnish a water balance statement. Sewage Generation: Description Construction phase Operational Phase Quantity of Sewage generated (KLD) 3.2 150 Treatment/ Disposal Septic Tank and Soak pit. Treated sewage water will be used For Flushing and gardening. Excess treated sewage water will be Disposed to existing sewer line. Water balance sheet attached herewith as annexure (III) 2.2. What is the capacity (dependable For water supply the project will be dependent on flow or yield) of the proposed source of VVCMC/recycled water. The source of water for gardening water? & flushing is dependable one, as the project will be providing recycled water. 2.3. What is the quality of water required, Water will be supplied from VVCMC. in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 4 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project 2.4. How much of the water requirement Total Recycled water 72 KLD will be used at maximum can be met from the recycling of treated extent for ; wastewater? (Give the details of quantities, sources and usage) Flushing 64 KLD Green Area 8 KLD 2.5. Will there be diversion of water from No other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6. What is the incremental pollution The sewage generation from the proposed project will be 150 load from wastewater generated from the KLD. STP of total capacity 155 KLD will be provided for proposed activity? (Give details of the treating the waste water. quantities and composition of wastewater Give details of sewage specification. generated from the proposed activity) Expected Characteristics of Raw Sewage Untreated sewage Characteristics: Sr. No. Parameter Unit Raw sewage 1 pH -- 6.5 – 7.5 2 BOD 3 days at 27 C 3 COD mg/l 600 – 700 mg/l 4 Suspended Solids mg/l 150 – 200 mg/l 5 Oil & Grease mg/l 50 mg/l 0 200 – 400 mg/l Treated Sewage Characteristics. Sr. No. Parameter Unit Treated sewage Characteristics 1 pH -- 7 – 7.5 2 BOD 3 days at Less than 5 0 27 C M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 5 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project 2.7. Give details of the 3 COD mg/l Less than 15 4 Suspended Solids mg/l Less than 10 5 Oil & Grease mg/l Less than 10 water Runoff from terrace will be diverted to rain water harvesting requirements met from water harvesting? tank. The overflow will be diverted to storm water drain. Furnish details of the facilities created. Rainwater harvesting is possible for terrace area in the present proposal. 2.8. What would be the impact of the The run-offs will be channelized properly through storm land use changes occurring due to the water drain. proposed project on the runoff Management plan for Flood is as follows : characteristics (Quantitative as well as • Storm water drain shall be cleaned at regular interval. qualitative) of the area in the post • Demarcating the areas within or leading in or out of the construction phase on a long term basis? building that will be water logged, flooded or isolated Would it aggravate the problems of due to the flood. The areas will be marked after flooding or water logging in any way? completion of the project (as final ground levels etc. will be available after completion). 2.9. What are the impacts of the proposal There will be no ground water extraction. The rain water on the ground water? (Will there be collected on the terrace will be harvested in RWH tanks. tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any) 2.10. What precautions/measures are The run-off during construction phase is expected to carry taken to prevent the run-off from heavy amount of silt and the other material from the site, construction activities polluting land and which may result in contamination of land and the ground aquifers? (Give details of quantities and water aquifer. The following measures will be adopted the measures taken to avoid the adverse especially during rainy seasons to effectively combat the impacts) situation: • Construction material will be stored at the earmarked places and will be covered with a temporary shed M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 6 “Viva Residency” - Proposed Residential & Commercial Project FORM 1A ensuring that no leachates or spoilage of land occurs. • The construction waste will be stored at the earmarked place to ensure that the same is not carried away with the storm water. • The rain water entering into the pit will be screened for the removal of heavy silt and other materials. • Diverting up-slope water with turf and not mixing mortar in locations that will drain into storm water system. • Preventing wastewater from brick cutting activities and stockpiles entering the storm water system. • Constructing a fence around the site to trap sediment whilst allowing water to flow through. • Excavation work will not be carried out during monsoon season. • Ensuring vehicles stick to the access track to prevent mud and dirt being deposited on roads. • Cleaning all mud and dirt deposited on roads from construction-related activities. • Stabilizing a single entry/exit point to ensure sediment is not tracked off site-this will also increase site durability during wet weather. 2.11. How is the storm water from within The storm water from roof top, paved surfaces and the site managed? (State the provisions landscaped surfaces will be properly channelized to the rain made to avoid flooding of the area, water harvesting sumps through storm water network. Proper details of the drainage facilities provided rainwater harvesting structure will be design for maximum along with a site layout indication capture of surface run off. The rain water harvested will be contour levels) used for ground water recharge to keep the ground water level consistent. 2.12. Will the deployment of construction During construction phase the sewage generated will be labourers particularly in the peak period around 3.2 KLD and will be treated in septic tank and soak lead to unsanitary conditions around the pit. project site (Justify with explanation) M/s. Enviro Analysts & Engineers Pvt. Ltd. proper Hence it will not lead to unsanitary conditions around the project site. Page 7 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project • Proper sanitation facilities will be provided at site for construction labours and staff. • There will be no stagnant water at site, as the runoff will be systematically drained into the storm water line. • Temporary toilets with septic tank and soak pit will be provided considering peak labour force. • Adequate housekeeping facilities and practices will be maintained. 2.13. What on-site facilities are provided The quantity of wastewater (150 KLD) generated from the for the collection, treatment & safe project will be treated in STP (capacity 155 KLD) and disposal of sewage? (Give details of the recycled and used for gardening and flushing purpose. 63 quantities of wastewater generation, KLD water will be released into sewer line. treatment capacities with technology & STP Technology & its details in brief: facilities for recycling and disposal) The proposed Sewage Treatment System will have the following major components : a. MBBR Units b. Tube Settler Unit. c. Aeration System. d. Multimedia Filter Unit. e. Disinfection System Sewage specification after treatment in STP. PARAMETER Nature of Waste water UNITS Domestic Sewage and Kitchen Waste --- IN OUT 6 – 8.5 7 – 7.5 Suspended Solids PPM 180 -250 mg/lit < 10 BOD 5 PPM < 10 COD PPM Odor --- Colour --- 250 – 400 mg/lit 600- 800 mg/lit Medium to Strong Grace Brown Oil & Grease --- PH M/s. Enviro Analysts & Engineers Pvt. Ltd. Up to 50 mg/lit < 30 NIL Colour less < 10 mg/lit Page 8 “Viva Residency” - Proposed Residential & Commercial Project FORM 1A 2.14. Give details of dual plumbing There will be separate pipelines for the supply of treated system if treated wastewater is used for water from STP and the fresh water. Treated water will be flushing of toilets or any other use. used for the flushing purposes and landscaping purposes. M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 9 “Viva Residency” - Proposed Residential & Commercial Project FORM 1A 3. Vegetation Requirement Compliance 3.1. Is there any threat of the project to The project site is surrounded by developed roads. The local the biodiversity? (Give a description of ecosystem and biodiversity will not be hampered because of the local ecosystem with its unique this development. features, if any) 3.2. Will the construction involve Total Green Area: 1505.26 Sq mt. extensive clearing or modification of Only endemic or Native trees will be planted which are listed vegetation? (Provide a detailed account by VVCMC. of the trees & vegetation affected by the project) 3.3. What are the measures proposed to Due care will be taken to protect the important site features: be taken to minimize the likely impacts • Tree plantation will be done to protect the site features on important site features (Give details of such as topsoil erosion, ground water attenuation and proposal for tree plantation, landscaping, avoiding contamination by leachates. creation of water bodies etc. along with a layout plan to an appropriate scale) • No heavy work will be done before 10 am and during the night time. • The excavated soil will be stored at earmarked places protected from contamination and from polluting the existing features and will be used for surface leveling and for creation of landscaped areas. • In the operational phase, a total of 1505.26 Sq.mt will be under landscape area so as to rejuvenate the important site features. M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 10 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project 4. Fauna Requirement Compliance 4.1. Is there likely to be any displacement There will be no displacement of fauna - both terrestrial and of fauna – both terrestrial and aquatic or aquatic and there will be no barrier on their movement. There creation of barriers for their movement? is no endangered species found except the local species. Provide the details. 4.2. Any direct or indirect impacts on the There will be no impact on the avifauna (birds) of the area. avifauna of the area? Provide details. The site was not found to be nesting/breeding/feeding ground for any significant bird species. The trees planted may attract birds in the future creating a positive impact on the avifauna. 4.3. Prescribe measures such as corridors, The project is located on landmass and there is no need to fish ladders etc. to mitigate adverse provide corridors and fish ladders etc. impacts on fauna. 5. Air Environment Requirement Compliance 5.1. Will the project increase atmospheric The proposed project activity will not increase any concentration of gases & result in heat atmospheric concentration of gases and result in heat islands. islands? (Give details of background air Air emissions will increase due to vehicular movements. quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) 5.2. What are the impacts on generation There will be burning of fuel through D.G. sets, traffic of dust, smoke, odorous fumes or other movements, operation of construction machines / equipment hazardous gases? Give details in relation and domestic activities at site. Construction activities will lead to all the meteorological parameters. to dust generation, emission of NO 2 , SO 2 and PM. The impacts on the ambient air quality during construction phase will be temporarily and reversible in nature (for short duration) and will be restricted to only a small area. During operation phase, D.G. set will be having adequate stack M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 11 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project height, there will be development of green-area and maintenance of vehicles, all these efforts will reduce the impact. 5.3. Will the proposal create shortage of The proposed project will provide sufficient parking to its parking space for vehicles? Furnish occupants and visitors. details of the present level of transport Adequate measures have been proposed to manage the traffic infrastructure and measures proposed for within and outside the site. The vehicular traffic movement improvement including the traffic within the facility will be such that it will not disturb the management at the entry and exit to the landscaped areas and organized open spaces. Entry and exit project site. will be provided to ensure that no hindrance is caused to the site traffic. Roads of sufficient width will be provided. Necessary arrangements will be made for smooth entry and exit of vehicles. Parking Area: As per Municipal norms. Total no of parking provided: Parking Details Four wheeler Provided 286 No’s 5.4. Provide details of the movement Adequate provisions have been made in the internal roads, for patterns with internal roads, bicycle smooth vehicles entry and exit and as well as pedestrian tracks, pedestrian pathways, footpaths movements. etc., with areas under each category. 5.5. Will there be significant increase in As the entry and exit will be made safe and smooth, there will traffic noise & vibrations? Give details of be no noise and vibrations due to increased traffic. the sources and the measures proposed During construction activity vehicular movement and for mitigation of the above. vehicular movement will be the major source. During Operational Phase D.G sets, machines and Vehicular movement will be the major source. The mitigation is proposed through a detailed EMP that has been planned to reduce the noise and vibration impacts during the construction phase. The project proponents have proposed to provide well organized parking arrangement, which would help in reducing noise levels due to vehicular movement in the parking area. M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 12 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project 5.6. What will be the impact of D.G. sets D.G. set will create no noise due to vibration as sound proof & other equipment on noise levels & canopy will be provided. Acoustic enclosure will be provided vibration in & ambient air quality around with proper stack height. the project site? Provide details. 6. Aesthetics Requirement Compliance 6.1. Will the proposed constructions in The proposed construction activity will not result in the any way result in the obstruction of a obstructions of a view, scenic amenity or landscapes. Better view, scenic amenity or landscapes? Are designed structure and well planned landscape will add up these considerations taken into account aesthetics of that zone. by the proponents? 6.2. Will there be any adverse impacts There will be negligible adverse impact due to new from new constructions on the existing constructions on the existing structures. structures? What are the considerations Due care will be taken to minimize the impacts on taken into account? surroundings: • Excavators will be used for excavation activities will be of rig type which will help to avoid hammering clutter and knocking noises. • The construction site will be covered from all 4 sides with tin sheets to prevent dust emissions and other pollutants to the surrounding environment. • The setbacks are sufficient to take care of the depth to which the structure goes without the fear of soil collapse in addition to piling. 6.3. Whether there are any local The design of the project is influenced by the regulation set considerations of urban form & urban out by local authority and modern needs of the society. design influencing the design criteria? They may be explicitly spelt out. 6.4. Are there any anthropological or There are no anthropological or archaeological sites or archaeological sites or artefacts nearby? artefacts nearby proposed site. State if any other significant features in M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 13 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project the vicinity of the proposed site have been considered. 7. Socio-Economic Aspects Requirement Compliance 7.1. Will the proposal result in any There will be no change to the demographic structure of local changes to the demographic structure of population due to the proposed activity. The expected local population? Provide the details. population will be 1573 No’s. The proposed project shall provide value addition to the existing infrastructure, as due to development of this Project facility such as public transport, water supply, telex communications, power lines, road maintenance etc. shall be upgraded in and around the project premises. 7.2. Give details of the existing social Proposed project is located within the residential zone of high infrastructure around the proposed urban infrastructure region. It is a well-developed area, having project. all modern amenities. Civil structures, School, Colleges, Hospitals, Recreation facilities, Markets, etc. are available in the area to a reasonable degree. 7.3. Will the project cause adverse effects The proposed project will not cause any adverse effects on on local communities, disturbance to local communities, disturbance to sacred sites or other cultural sacred sites or other cultural values? values. What are the safeguards proposed? M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 14 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project 8. Building Materials Requirement Compliance 8.1. May involve the use of building • The basic engineering materials like aggregate, cement, materials with high-embodies energy. sand and bricks/blocks will be purchased locally. Are the construction materials produced However, finishing materials will be purchased energy with energy efficient processes? (Give conservation measures in the selection of building details of energy conservation measures materials and their energy efficiency. in the selection of building materials and • Cement shall be used which already contains Fly ash, their energy efficiency) Construction materials from nearest source shall be chosen to minimize energy consumption during their transportation. 8.2. Transport and handling of materials During construction phase, sources of noise pollution will be during construction may result in due to operation of pollution, noise & public nuisance. What machinery like compressors, compactors, concrete plant, measures are taken to minimize the excavators, cranes etc. as well as impacts? Transportation vehicles. This will cause nuisance to the occupants of the nearby area. The project proponents have agreed to take precautions to control noise pollution as mentioned under: • Use of equipment generating noise of not greater than 90 dB (A). • High noise generating construction activities would be carried out only during day time and in a staggered fashion. • Installation, use and maintenance of mufflers on equipment. • Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. To reduce air emissions: • All vehicles will be having proper PUC certificates. • Roads will be paved in advance to reduce dust emissions. • Unpaved roads will be kept wet. M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 15 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project • Stock piles will be secured by covering with plastic. • Construction machinery will be regularly maintained. 8.3. Are recycled materials used in roads Yes. Inert demolished material will be used in road filling to and structures? State the extent of savings maximum extent. Centring material will be reused from other achieved? projects of the same contractor. A target of minimum 5% savings will be kept. 8.4. Give details of the methods of The solid waste management facility will be proposed as per collection, segregation & disposal of the MSW rules. Garbage will be collected manually from each of garbage generated during the operation the building in the garbage collection room. The garbage phases of the project. collected from area will be segregated into wet and dry garbage. Operation Phase: Total solid wastes 716 Kg/Day Biodegradable waste 408 Kg/Day Non- Biodegradable waste 308 Kg/Day Treatment & Disposal : • The biodegradable waste (408 Kg /Day) will be processed in OWC. • Maximum requirement of manure for gardening will be used, while remaining quantity of manure will be sold to local vendors. • Non- Biodegradable waste will be handed over to VVCMC. • Sludge Quantity: 15 Kg. Dry sewage sludge will be used as manure for gardening. M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 16 FORM 1A “Viva Residency” - Proposed Residential & Commercial Project 9. Energy Conservation Requirement 9.1. Give details of Compliance the power Power requirement: requirements, source of supply, backup (a) Construction Phase – 80 kW source (b) Operation Phase – 3704 kW etc. What is the energy consumption assumed per square foot of Source : MSEDCL build-up area? How have you tried to minimize energy consumption? To minimize the energy consumption, solar energy will be utilized as much as possible. Energy conservation measures : • Purchase of energy efficient appliance. • Adjusting the settings and illumination levels to ensure minimum energy used for desired comfort levels. • Installing programmable on/ off timers and sensors for low occupancy areas. • Use of solar systems. • Use of compact fluorescent lamps and low voltage lighting. • Use of common lights with CFL & LED luminary in landscaping area. 9.2. What type of, and capacity of, power 1 No. of 300 Kva DG Set will be proposed in case of power back-up to you plan to provide? failure or emergency facility. 9.3. What are the characteristics of the Glass used for buildings and residences will be plain clear glass you plan to use? Provide glass. specifications of its characteristics related to both short wave and long wave radiation? 9.4. What passive solar architectural Building orientation, wall to window ratio and thermal features are being used in the building? properties of envelop are being looked into reduce solar heat Illustrate the applications made in the gain and provide natural light and adequate ventilation to proposed project. reduce humidity. 9.5. Does the layout of streets and Yes. Solar lights will be provided for common amenities buildings maximize the potential for solar where feasible. energy devices? Have you considered the M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 17 “Viva Residency” - Proposed Residential & Commercial Project FORM 1A use of street lighting, emergency lighting and solar hot water systems for use in the building complex? 9.6. Is shading effectively used to reduce Depending upon the site condition location, efforts will be cooling/heating loads? What principles made by the Architects to maximize the shading of walls on have been used to maximize the shading the East and West and the Roof. of Walls on the East and West and the Roof? How much energy saving has been effected? 9.7. Do the structures use energy-efficient space conditioning, lighting Most of the electrical installations and structures will be and energy efficient. mechanical systems? Provide technical details. Provide transformers and details motor of the efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. 9.8. What are the likely effects of the There will not be any effect of the building activity in altering building activity in altering the the microclimates particularly creation of heat islands & microclimates? Provide a self assessment inversion effects. on the likely impacts of the proposed construction on creation of heat islands & inversion effects? 9.9. What are the thermal characteristics Roof will be of high quality concrete as per the NBC rules of the building envelope? (a) roof; (b) 2005. external walls; and (c) Fenestration? Give U-factor R-Value 2-o (W/m K) (m2oK/) details of the material used and the UWall U-2.05 R- 0.48 values or the R-values of the individual Roof U- 1.85 R-0.54 components. Fenestrati U- 5.7 R-0.17 on 9.10. What precautions & safety Standard fire safety norms as prescribed by chief fire officers measures are proposed against fire will be followed as per the government norms. To the extent hazards? Furnish details of emergency possible fire proof materials will be used in structures. Refuse M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 18 “Viva Residency” - Proposed Residential & Commercial Project plans. FORM 1A area will be provided as per norms. 9.11. If you are using glass as wall No glass will be used for walls. material, provide details and specifications including emissivity and thermal characteristics. 9.12. What is the rate of air infiltration Proper ventilation will be providing in rooms. Air into the building? Provide details of how changes/hour is as per Bureau of Indian Standards (National you are mitigating the effects of Building Code, 2005). infiltration. 9.13. To what extent the non- Every effort will be made to generate and use non- conventional energy technologies are conventional energy and renewable energy, depending upon utilised in the overall energy the circumstances and chances of generating energy. consumption? Provide details of the renewable energy technologies used. M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 19 “Viva Residency” - Proposed Residential & Commercial Project FORM 1A Annexure-I Google Image M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 20 “Viva Residency” - Proposed Residential & Commercial Project FORM 1A Annexure-IIA WATER BALANCE CHART M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 21 “Viva Residency” - Proposed Residential & Commercial Project FORM 1A Annexure-III LAYOUT PLAN M/s. Enviro Analysts & Engineers Pvt. Ltd. Page 22
© Copyright 2024