“Viva Residency” - Proposed Residential & Commercial project

FORM 1 & FORM 1A
FORM 1 & FORM 1A
For
“Viva Residency” - Proposed Residential & Commercial project
plot bearing C.T.S. No.86 B, Chakradhar nagar, Achole road, Nallasopara West.
PROJECT BY
Mr. Deepak H. Thakur
Enviro Analysts and Engineers Pvt Ltd.
FORM – I
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1
FORM-1
(I) Basic Information
Sr.
Item
No.
1
Name of the Project
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Details
“Viva Residency” - Proposed Residential &
Commercial project at plot bearing C.T.S. No.86 B,
Chakradhar nagar, Achole road, Nallasopara West.
S. No. in the Schedule
Building and Construction Project, Category ‘B’
[(As per 14.09.2006 Notification, Project or
Activity-8 (a)]
Proposed capacity/area /length/tonnage to Plot Area.
11364.10 Sq.mt
be handled/command area/lease area/ FSI Area
20571.87 Sq.mt
number of wells to be drilled
Non-FSI Area
26538.36 Sq.mt
Total Construction Area
47110.23 Sq.mt
New/Expansion/Modernization
New Project
Existing Capacity/Area etc.
Nil
Category of Project i.e. ‘A’ or ‘B’
‘B’
Does it attract the general condition? If No
Yes, Please specify
Does it attract the specific condition? If Not Applicable
yes, Please specify
Location
Plot/Survey/Khasra No.
Plot Bearing C.T.S. No.86 B, H.No.1 to 4 & 8 to 10
Chakradhar nagar, Achole road, Nallasopara West.
Village
Nallasopara
Tehsil
Vasai.
District
Palghar
State
Maharashtra.
Nearest railway station/airport along with Nallasopara Railway Station.
distance in km.
(Aerial distance : 0.5 Km towards North)
Nearest Town, City, District Headquarters Mumbai.
along with distance in km.
Village
Panchayats,
ZillaParishad, Vasai Virar municipal Corporation
Municipal Corporation, Local body Virar East, Opposite Savitribhai Phule Market, Near
(complete postal addresses with telephone Virar East Police Station, Thane - 401305
nos. to be given)
Name of the applicant
Mr. Deepak H. Thakur
Registered Address
Chakradhar nagar, Achole road, Nallasopara West.
Near Railway Station, S.T. Depot Road, Nallasopara
(W).
Address for correspondence:
As above
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 1
“Viva Residency” - Proposed Residential & Commercial Project
Name
Designation(Owner/Partner/CEO)
Address
Pin Code
E-mail
Telephone No.
Fax No.
16
17
18
19
20
21
22
23
24
Details of Alternative Sites examined, If
any.
Location of these sites should be shown on
a topo sheet
Interlinked Projects
Whether separate application of interlinked
project has been submitted?
If yes, date of submission
If no, reason
Whether
the
proposal
involves
approval/clearance under: if yes, details of
the same and their status to be given.
The Forest (Conservation) Act, 1980?
The Wildlife (Protection) Act, 1972?
The C.R.Z. Notification, 1991?
Whether there is any Government
Order/Policy relevant/relating to the site?
Forest land involved (hectares)
Whether there is any litigation pending
against the project and/or land in which the
project is propose to be set up?
Name of the Court/ Case No. /
Orders/directions of the Court, if any and
its Relevance with the proposed project.
FORM 1
Mr. Deepak H. Thakur
Owner
Near Railway Station, S.T. Depot Road, Nallasopara
(W).
[email protected]
0250-6454996
-None
No
Not Applicable
Not Applicable
Not Applicable
No
No
No
No
* Capacity corresponding to sectorial activity (such as production capacity for
manufacturing, mining lease area and production capacity for mineral production, area of
mineral exploration, length for linear transport infrastructure, generation capacity for power
generation etc.)
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 2
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1
(II) Activity
1.
Sr.
No.
1.1
1.2
1.3
1.4
Construction, operation or decommissioning of the Project involving actions, which will
cause physical changes in the locality (topography, land use, changes in water bodies,
etc.)
Information/Checklist
Confirmation
Permanent
or
temporary
change in land use, land cover
or
topography
including
increase in intensity of land
use (with respect to local land
use plan)
Clearance of existing land,
vegetation and building?
Creation of new land uses:
Yes
No
Yes
No
Yes
1.5
Pre-construction investigations Yes
e.g. bore houses, soil testing?
Construction Works?
Yes
1.6
Démolition Works?
1.7
Temporary sites used for Yes
construction works or housing
of construction workers?
Above ground buildings, Yes
structures
or
earthworks
including linear structures, cut
and fill or excavations.
1.8
M/s. Enviro Analysts & Engineers Pvt. Ltd.
No
/ Details thereof (with approximate quantities/ rates,
wherever possible) with source of information data
It is a New project.
The developers have proposed a residential Building.
After completion of the project the land use will be
for Residence purpose.
No trees available
The proposed project is a Residential Building, After
competition of the project the land will be used for
Residential purpose.
Pre – Feasibility studies, Geo-Technical investigations
will be carried out.
The project involves construction of a group housing1
no Building, having A to C wings.
Building Wing
Configuration
Details
Bldg
A to C Ground floor shopping + 1st
No. 1
(A) Floor shopping + 1st (B)
Floor shopping + 2nd Level
R.G Podium + 3rd to 22nd upper
Floors
Total Construction Area -47110.23 Sq.mt
As the proposed site is a vacant plot, there is no
requirement of any demolition.
• Part of the project site will be used for temporary
housing for up to 60-80 workers. The
housing/sheds will be temporary.
• The above ground structures will comprise 1
residential building.
Building Wing
Configuration
Details
Bldg
A to C Ground floor shopping + 1st
Page 3
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
1.9
Information/Checklist
Confirmation
Yes
No
Underground works including No
mining or tunneling?
1.10 Reclamation works?
No
1.11 Dredging?
1.12 Offshore structures?
1.13 Production and manufacturing
Process?
1.14 Facilities for storage of goods
or materials?
No
No
No
Yes
1.15 Facilities for treatment or Yes
disposal of solid waste or
liquid effluents?
FORM 1
/ Details thereof (with approximate quantities/ rates,
wherever possible) with source of information data
No. 1
(A) Floor shopping + 1st (B)
Floor shopping + 2nd Level
R.G Podium + 3rd to 22nd upper
Floors
• The maximum height of the proposed project will
be 69.95 m.
• .
No underground works including mining / Tunneling
is required except excavation of earth only for
foundation, lay down of pipes, underground storage
tank, electric cables, soak pits, septic tanks etc.
As this is a new construction project, hence no
reclamation work required.
Not Applicable
Not Applicable
Not Applicable
Separate raw material storage yard will be made,
which will be temporary.
Construction Phase:
Temporary sheds will be provided for the storage
of construction materials.
Operation Phase:
Storage area for Manure and Sludge will be provided.
Construction Phase:
During the construction phase soak pits and septic
tanks will be provided for disposal of waste water.
Temporary sanitary toilets will be provided.
Operation Phase:
Total solid wastes
Biodegradable waste
Non- Biodegradable waste
716 Kg / Day
408 Kg / Day
308 Kg / Day
Treatment & Disposal :
The biodegradable waste (408 Kg / Day) will be
treated in Organic Waste Composter (OWC). Manure
obtained from OWC will be used for gardening
purpose.
Non–Biodegradable waste: 308 kg/day is
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 4
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Information/Checklist
Confirmation
Yes
No
1.16 Facilities for long term No
housing
of
operational
workers?
1.17 New road, rail or sea traffic No
during
construction
of
operation?
1.18 New road, rail, air, waterborne No
or
other
transport
infrastructure including new or
altered routes and stations,
ports, airports etc.?
1.19 Closure or diversion of No
existing transport routes or
infrastructure
leading
to
changes in traffic movements?
1.20 New or diverted transmission No
lines or pipelines?
1.21 Impoundment,
damming, No
culverting, realignment or
other changes to the hydrology
M/s. Enviro Analysts & Engineers Pvt. Ltd.
FORM 1
/ Details thereof (with approximate quantities/ rates,
wherever possible) with source of information data
generated which will be handed over to recyclers.
• Sludge Quantity: 15 kg dry sewage sludge will be
used as manure for gardening.
• 150 KLD wastewater will be treated in STP of 155
KLD capacity. Treated water will be utilized as
follows;
Flushing
64 KLD
Gardening
8 KLD
Only during construction phase temporary in nature.
• The project site is adjacent to 30 m wide D.P road
adjoining the plot at west will be utilized during
construction and operational phase. There will be
no new road and rail.
• During construction phase, traffic will increase
due to inward movement of raw materials.
• In the post construction phase, there will be
increase in the traffic levels due to proposed
project. The increased traffic load due to the
proposed project will be 286 vehicles including
the traffic load contributed by visitors.
The parking of 4 wheelers details are as under:
Parking provided: 286 no’s.
No new Rail/road is required. The entire essential
infrastructure already exists.
There will be no diversion or closure of the existing
transport routes and infrastructure.
Diversion of electrical transmission line is not
envisaged; however, the project involves construction
of new internal pipelines for fresh water, recycled
water, rain water harvesting, sewer lines and internal
power distribution lines.
Not applicable
Page 5
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
FORM 1
Information/Checklist
Confirmation
of watercourses or aquifers?
1.22 Stream crossings?
1.23 Abstraction or transfers of
water from ground or surface
waters?
Yes
No
/ Details thereof (with approximate quantities/ rates,
wherever possible) with source of information data
No
Yes
1.24 Changes in water bodies or the
land surface affecting drainage
or run-off
1.25 Transport of personnel or
materials for construction,
operation
or
decommissioning?
1.26 Long-term dismantling or
decommissioning
or
restoration works?
1.27 Ongoing
activity
during
decommissioning which could
have an impact on the
environment?
1.28 Influx of people to an area in
either
temporarily
or
permanently?
No
No
There is no stream passing through the site.
Water requirement in the construction phase will be
supplied from tanker (30 KLD). Total water demand
of 195 KLD will be met from VVCMC and recycled
water
There will be no change in the drainage pattern The
drainage network of the project will be designed in
line with natural drainage pattern.
The 30 m wide D.P road near by the site will be
utilized for the transportation of material. Workers
required during peak hours which will be fulfilled
from local or nearby area.
Not Applicable.
No
Not Applicable.
No
Construction Phase:
During the construction phase about 60-80 Labors
will be provided with housing facilities which will be
purely in temporary basis and during peak hours
remaining will be deployed from nearby places.
No
1.29 Introduction of alien species?
No
1.30 Loss of native species or No
genetic diversity?
1.31 Any other actions?
No
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Operation Phase:
On completion of the project, there will be regular
movement of residents, visitors, staff and related
personals. Total population is expected to be 1573
No’s.
-Not applicable
Not applicable
Page 6
“Viva Residency” - Proposed Residential & Commercial Project
2.
Use of Natural resources for construction or operation of project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short
supply).
Sr.
No.
Information/Checklist
Confirmation
2.1
Land specially undeveloped or No
agricultural land (ha)
Water (expected source & Yes
competing users) unit KLD
2.2
FORM 1
Yes
/No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
The proposed plan is on Non agricultural land.
Construction Phase: It is expected to house about 60
to 80 labours at site.
(Depending upon construction activity)
Domestic usage
12 KLD
Construction Activity
18 KLD
The water demand will be met by water tankers.
Operation Phase:
Total water demand of the project is expected to be
195 KLD approximately;
Domestic
123 KLD
Flushing
64 KLD
Gardening
8 KLD
2.3
2.4
2.5
Minerals (MT)
No
Construction material – stone, Yes
aggregates, and/soil (expected
source-MT)
Forests and timber (source-MT) Yes
2.6
Energy including electricity and Yes
fuels (source, competing users)
Unit: fuel (MT), energy (KW)
2.7
Any other natural resources (use Yes
appropriate standard units)
M/s. Enviro Analysts & Engineers Pvt. Ltd.
And the water requirement will be met by the
VVCMC / Recycled water.
-The construction materials, which will be used in the
project site, will be procured from authorized local
dealer.
Certified Timber will be purchased from nearby
markets.
• Construction Phase: 80 kW
• Operation Phase : 3704 kW
• Source: MSEDCL
1 DG Sets of 300 KVA will be proposed for back up
during power failure. HSD will be used as fuel to run
standby D.G. sets.
Solar energy will be utilised for common area &
water heating purpose.
Page 7
“Viva Residency” - Proposed Residential & Commercial Project
3.
Sr.
No.
3.1
3.2
3.3
3.4
3.5
4.
Sr.
No.
4.1
4.2
FORM 1
Use, storage, transport, handling or production of substances or materials, which could
be harmful to human health or the environment or raise concerns about actual or
perceived risks to human health
Information/Checklist
Confirmation
Yes / Details thereof (with approximate quantities/
No
rates, wherever possible) with source of
information data
Not applicable
Use of substances or materials, No
which are hazardous (as per
MSIHC rules) to human health
or the environment (flora, fauna,
and water supplies)
Changes in occurrence of No
During the entire construction phase adequate
disease or affect disease vectors
precaution will be taken like centralized canteen for
(e.g. insect or water borne
labours, modular STP, OWC for construction phase
diseases)
will be provided.
Positive impact due to enhanced and hygienic living
Affect the welfare of people e.g. Yes
conditions generation. Aesthetic value of area will be
by changing living conditions?
improved..
EMP shall be implemented during construction and
operation phase to mitigate the impacts on
surrounding locality
There are no vulnerable receptors within 500mts
Vulnerable groups of people No
from the site.
who could be affected by the
project e.g. hospital patients,
children, the elderly etc.,
Any other causes
No
No other causes identified.
Production of solid wastes during construction or operation or decommissioning
(MT/month)
Information/Checklist
Confirmation
Yes / Details thereof (with approximate quantities /
No
rates, wherever possible) with source of
information data
Spoil, overburden or mine No
There is no activity which may generate spoil,
wastes
overburden & mine waste.
Municipal waste (domestic and Yes
Operation Phase:
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 8
FORM 1
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Information/Checklist
Confirmation
or commercial wastes)
Yes / Details thereof (with approximate quantities /
No
rates, wherever possible) with source of
information data
Total solid wastes
716 Kg/Day
Biodegradable waste
408 Kg/Day
Non- Biodegradable waste 308 Kg/Day
Treatment & Disposal :
• The biodegradable waste (408 Kg/Day) will be
processed in OWC.
• Maximum requirement of manure for gardening
will be used, while remaining quantity of manure
will be handed over to recyclers.
• Non- Biodegradable waste will be handed over
to VVCMC.
• Sludge Quantity: 15 Kg
4.3
4.4
4.5
4.6
Hazardous wastes (as per Yes
hazardous waste management
rules)
Other industrial process wastes
No
Surplus product
No
Dry sewage sludge will be used as manure for
gardening.
Used oil from DG set will be stored carefully at
separate location duly marked and will be sold to
CPCB authorized recyclers.
Not Applicable
Not Applicable
Sewage sludge or other sludge Yes
from effluent treatment
Construction or demolition Yes
wastes
Dewatered sludge from STP will be used as manure
for gardening.
EMP shall be implemented during construction and
operation phase to mitigate the impacts on
surrounding locality
Redundant
machinery
or No
equipment
Contaminated soils or other No
materials
All Equipments used for construction will be of
standard quality and maintained on regular basis.
4.10
Agricultural wastes
No
Not Applicable
4.11
Other solid wastes
No
Only Municipal solid waste will be generated.
4.7
4.8
4.9
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Not Applicable
Page 9
“Viva Residency” - Proposed Residential & Commercial Project
5.
Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)
Sr.
No.
Information/Checklist
Confirmation
5.1
Emissions from combustion of Yes
fossil fuels from stationary or
mobile sources
5.2
Emission
from
production No
processes
Emissions
from
materials Yes
handling including storage or
transport
5.3
FORM 1
Yes/
No
5.4
Emissions from construction Yes
activities including plant and
equipment
5.5
Dust or odors from handling of Yes
materials including construction
materials, sewage and waste
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
• Emission will be generated from vehicular
transport to the project.
• Standby DG set will emit air pollutants (PM, SO 2
and NOx). DG set shall be installed as per CPCB
guidelines and manufacturers instruction to keep
the emissions within limits of CPCB. Stack
height shall be provided as per CPCB guideline
for adequate dispersion of released pollutant and
to have negligible GLCs in the surrounding area.
There is no production as the proposed project is
residential project.
•
Emissions will be generated, while handling and
transportation of materials like cement, sand etc.
to site, will be temporary in nature.
• RMC shall be used preferably to reduce fugitive
emissions due to material handling.
• Regular water sprinkling shall be done to reduce
dust generation
Transportation shall be done in covered trucks
The project may cause rise in dust levels during
construction phase. Precautions will be taken to
reduce dust generation during construction phase.
• RMC use will eliminate the handling of cement,
sand and concrete thus dust emission will be
minimized.
• RMC use will also reduce the trucks trips.
• Tarpaulins will be used to cover trucks carrying
debris.
• Water sprinkling will be done at regular intervals
to reduce control of dust generation.
Construction Phase:
Dust is likely to be generated during construction,
this will be water sprinkled and Tarpaulin covers will
be provided over stored raw material to reduce dust
emission.
Operation Phase:
During Operation Phase, emissions will be generated
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 10
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Information/Checklist
Confirmation
5.6
Emissions from incineration of No
waste
Emissions from burning of No
waste in open air (e.g. slash
materials, construction debris)
Emissions from any other No
sources
5.7
5.8
6.
Sr.
No.
6.1
6.2
6.3
Yes/
No
FORM 1
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
from Operation of DG sets.
Minimal emissions will be generated from movement
of vehicles as dust, as the roads will be paved roads.
Odor can be from STP. However, the STP will be
working on appropriate technology, so as to
minimize odor problems, and it will be strategically
located so that no adverse impact is caused.
Not Applicable.
No such practices shall be entertained
Not Applicable.
Generation of Noise and vibration, and emissions of Light and heat.
Information/Checklist
Confirmation
Yes / Details thereof (with approximate quantities/
No
rates, wherever possible) with source of
information data
From operation of equipment Yes
Noise generation from construction equipment’s used
e.g. engines, ventilation plant,
for drilling, cutting operations.
crushers
During Operation Phase, Noise will be generated due
to operation of DG sets.
For control of noise following measures shall be
adopted:
• Properly maintained equipment’s with mufflers will
be used.
• High noise generating construction activities would
be carried out only during day time.
• Workers working near high noise construction
machinery would be provided with ear muffs/ear
plugs.
• Acoustic enclosure for DG Set with proper stack
height will be provided.
From industrial or similar No
Not Applicable
processes
From construction or demolition Yes
The construction noise will be localized, intermittent
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 11
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
6.4
6.5
Information/Checklist
Confirmation
FORM 1
Yes / Details thereof (with approximate quantities/
No
rates, wherever possible) with source of
information data
in nature. The construction activities will include the
following noise generating activities ;
1. Excavation activities etc.
2. Concreting and mixing.
3. Heavy vehicle movement.
4. Operation of D.G sets.
From blasting or piling
No
From construction or operational Yes
traffic
Following precautions shall be taken to control noise
pollution :
High noise generating construction activities would
be carried out during day time only.
• Installation, use and maintenance of mufflers on
equipment.
• Workers working near high noise construction
machinery would be supplied with ear muffs/ear
plugs.
• Acoustic enclosure for DG Set with proper stack
height will be provided
Not Applicable.
Construction phase:
There will be transport of materials for construction
work. Precautions will be taken to reduce the impact
of the vehicular movement such as vehicular trips
will not be at peak traffic hours.
Operation Phase :
The vehicular parking will be restricted only in the
adequate parking area provided, which would help in
reducing noise pollution due to traffic congestion.
6.6
6.7
From lighting or cooling No
systems
From any other sources
No
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Local native plants will be used in plantation which
will help to reduce the impact of air and noise
pollution.
Not Applicable.
Not Applicable.
Page 12
“Viva Residency” - Proposed Residential & Commercial Project
7.
Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, coastal waters or the sea
Sr.
No.
Information/Checklist
Confirmation
7.1
From handling, storage, use or No
spillage of hazardous materials
From discharge of sewage or Yes
other effluents to water or the
land (expected mode and place
of discharge)
7.2
Yes/
No
7.3
By deposition of pollutants No
emitted to air into the land or
into water
7.4
7.5
From any other sources
No
Is there a risk of long term No
buildup of pollutants in the
environment from these sources?
8.
Sr.
No.
FORM 1
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
Not Applicable.
The total wastewater generated (150 KLD) from the
buildings will be treated in STP of 155 KLD capacity
and the Recycled water (72 KLD) will be utilized for
landscaping, car washing and flushing purpose. 63
KLD of excess water will be drained to existing
municipal drain.
Dust generated during construction phase will be
contained locally within site only. Same shall be
controlled by barricades.
Stack shall be provided to DG set with height as per
CPCB norm.
Not Envisaged
D.G sets will be used in case of power failure, as a
backup source.
Risk of accidents during construction or operation of the project, which could affect
human health or the environment
Information/Checklist
Confirmation
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Yes
/No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
Page 13
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1
8.1
From explosions, spillages, fires No
etc from storage, handling, use
or production of hazardous
substances
During construction all construction workers will be
provided with suitable Personal Protective
Equipment as required under the health & safety
norms. Suitable fire fighting measures will be
provided to reduce damage due to fire-accidents.
8.2
8.3
From any other causes
No
Could the project be affected by Yes
natural
disasters
causing
environmental damage (e.g.
floods, earthquakes, landslides,
could burst etc)?
-The project falls under seismic zone-III as per
IS1893 (Part-1):2002,
9.
Factors which should be considered (such as consequential development) which could
lead to environmental effects or the potential for cumulative impacts with other existing
or planned activities in the locality
Sr.
No.
Information/Checklist
Confirmation
9.1
Lead
to
development
of No
supporting, utilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g.:
Supporting infrastructure (roads,
power supply, waste or waste
water treatment, etc)
Yes
/No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
The project provides a well-designed residential
housing area for the occupants.
Yes
Internal Roads, Rainwater Harvesting, STP etc. will
be provided.
Housing development
Extractive industries
Supply industries
Other
Yes
Residential Project
No
9.2
No
Lead to after use of the site, No
which could have an impact on
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Not Applicable.
Page 14
FORM 1
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Information/Checklist
Confirmation
Yes
/No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
the environment
9.3
Set a precedent
developments
for
later No
Not Applicable.
9.4
Have cumulative effects due to No
proximity to other existing or
planned projects with similar
effects
Not Applicable.
(iii) Environmental Sensitivity
Sr.
No.
1
2
3
4
5
6
7
Areas
Name/Identity Aerial distance (with 15-km) Proposed
project location boundary
Areas protected under international No
There are no notified eco sensitive zones
conventions, national or local
in and around the project site (2 km).
legislation for their ecological,
landscape, cultural or other related
value
Areas which are important or --sensitive of ecological reasons –
wetlands, water courses or other
water bodies, coastal zone,
biospheres, mountains, forests
Areas used by protected, important --or sensitive species of flora or
fauna for breeding, nesting,
foraging, resting, over wintering,
migration.
Inland,
coastal,
marine
or --underground waters
State, national boundaries
No
The project is located within Municipal
limits.
Routes or facilities used by the No
public for access to recreation or
other tourist, pilgrim areas
Defense installations
No
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Not Applicable.
No
defense
neighborhood.
installation
in
Page 15
the
FORM 1
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Areas
Name/Identity Aerial distance (with 15-km) Proposed
project location boundary
8
Densely populated or built-up area
Yes
9
Areas occupied by sensitive man -made land uses (hospitals, schools,
places of worship, community
facilities)
Areas containing important, high No
quality or scarce resources (ground
water resource, surface resources,
forestry, agriculture, fisheries,
tourism, minerals)
Areas already subjected to pollution No
or environmental damage. (those
where existing legal environmental
standards are exceeded)
--
Areas susceptible to natural hazard No
which could cause the project to
present environmental problems
(earthquakes,
subsidence,
landslides, erosion, flooding or
extreme or adverse climatic
conditions)
This area is generally plain& come under
seismic zone –III according to Indian
Standard Seismic zoning map.
10
11
12
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Residential, Commercial and Industrial
area all around the site.
The project will meet water from
VVCMC for its use after proper
permissions are obtained.
All parameters of Air, water and Noise
etc. will be maintained within the
permissible limit.
Page 16
FORM – IA
ANNEXURE
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1
FORM-1
(I) Basic Information
Sr.
Item
No.
1
Name of the Project
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Details
“Viva Residency” - Proposed Residential &
Commercial project at plot bearing C.T.S. No.86 B,
Chakradhar nagar, Achole road, Nallasopara West.
S. No. in the Schedule
Building and Construction Project, Category ‘B’
[(As per 14.09.2006 Notification, Project or
Activity-8 (a)]
Proposed capacity/area /length/tonnage to Plot Area.
11364.10 Sq.mt
be handled/command area/lease area/ FSI Area
20571.87 Sq.mt
number of wells to be drilled
Non-FSI Area
26538.36 Sq.mt
Total Construction Area
47110.23 Sq.mt
New/Expansion/Modernization
New Project
Existing Capacity/Area etc.
Nil
Category of Project i.e. ‘A’ or ‘B’
‘B’
Does it attract the general condition? If No
Yes, Please specify
Does it attract the specific condition? If Not Applicable
yes, Please specify
Location
Plot/Survey/Khasra No.
Plot Bearing C.T.S. No.86 B, H.No.1 to 4 & 8 to 10
Chakradhar nagar, Achole road, Nallasopara West.
Village
Nallasopara
Tehsil
Vasai.
District
Palghar
State
Maharashtra.
Nearest railway station/airport along with Nallasopara Railway Station.
distance in km.
(Aerial distance : 0.5 Km towards North)
Nearest Town, City, District Headquarters Mumbai.
along with distance in km.
Village
Panchayats,
ZillaParishad, Vasai Virar municipal Corporation
Municipal Corporation, Local body Virar East, Opposite Savitribhai Phule Market, Near
(complete postal addresses with telephone Virar East Police Station, Thane - 401305
nos. to be given)
Name of the applicant
Mr. Deepak H. Thakur
Registered Address
Chakradhar nagar, Achole road, Nallasopara West.
Near Railway Station, S.T. Depot Road, Nallasopara
(W).
Address for correspondence:
As above
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 1
“Viva Residency” - Proposed Residential & Commercial Project
Name
Designation(Owner/Partner/CEO)
Address
Pin Code
E-mail
Telephone No.
Fax No.
16
17
18
19
20
21
22
23
24
Details of Alternative Sites examined, If
any.
Location of these sites should be shown on
a topo sheet
Interlinked Projects
Whether separate application of interlinked
project has been submitted?
If yes, date of submission
If no, reason
Whether
the
proposal
involves
approval/clearance under: if yes, details of
the same and their status to be given.
The Forest (Conservation) Act, 1980?
The Wildlife (Protection) Act, 1972?
The C.R.Z. Notification, 1991?
Whether there is any Government
Order/Policy relevant/relating to the site?
Forest land involved (hectares)
Whether there is any litigation pending
against the project and/or land in which the
project is propose to be set up?
Name of the Court/ Case No. /
Orders/directions of the Court, if any and
its Relevance with the proposed project.
FORM 1
Mr. Deepak H. Thakur
Owner
Near Railway Station, S.T. Depot Road, Nallasopara
(W).
[email protected]
0250-6454996
-None
No
Not Applicable
Not Applicable
Not Applicable
No
No
No
No
* Capacity corresponding to sectorial activity (such as production capacity for
manufacturing, mining lease area and production capacity for mineral production, area of
mineral exploration, length for linear transport infrastructure, generation capacity for power
generation etc.)
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 2
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1
(II) Activity
1.
Sr.
No.
1.1
1.2
1.3
1.4
Construction, operation or decommissioning of the Project involving actions, which will
cause physical changes in the locality (topography, land use, changes in water bodies,
etc.)
Information/Checklist
Confirmation
Permanent
or
temporary
change in land use, land cover
or
topography
including
increase in intensity of land
use (with respect to local land
use plan)
Clearance of existing land,
vegetation and building?
Creation of new land uses:
Yes
No
Yes
No
Yes
1.5
Pre-construction investigations Yes
e.g. bore houses, soil testing?
Construction Works?
Yes
1.6
Démolition Works?
1.7
Temporary sites used for Yes
construction works or housing
of construction workers?
Above ground buildings, Yes
structures
or
earthworks
including linear structures, cut
and fill or excavations.
1.8
M/s. Enviro Analysts & Engineers Pvt. Ltd.
No
/ Details thereof (with approximate quantities/ rates,
wherever possible) with source of information data
It is a New project.
The developers have proposed a residential Building.
After completion of the project the land use will be
for Residence purpose.
No trees available
The proposed project is a Residential Building, After
competition of the project the land will be used for
Residential purpose.
Pre – Feasibility studies, Geo-Technical investigations
will be carried out.
The project involves construction of a group housing1
no Building, having A to C wings.
Building Wing
Configuration
Details
Bldg
A to C Ground floor shopping + 1st
No. 1
(A) Floor shopping + 1st (B)
Floor shopping + 2nd Level
R.G Podium + 3rd to 22nd upper
Floors
Total Construction Area -47110.23 Sq.mt
As the proposed site is a vacant plot, there is no
requirement of any demolition.
• Part of the project site will be used for temporary
housing for up to 60-80 workers. The
housing/sheds will be temporary.
• The above ground structures will comprise 1
residential building.
Building Wing
Configuration
Details
Bldg
A to C Ground floor shopping + 1st
Page 3
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
1.9
Information/Checklist
Confirmation
Yes
No
Underground works including No
mining or tunneling?
1.10 Reclamation works?
No
1.11 Dredging?
1.12 Offshore structures?
1.13 Production and manufacturing
Process?
1.14 Facilities for storage of goods
or materials?
No
No
No
Yes
1.15 Facilities for treatment or Yes
disposal of solid waste or
liquid effluents?
FORM 1
/ Details thereof (with approximate quantities/ rates,
wherever possible) with source of information data
No. 1
(A) Floor shopping + 1st (B)
Floor shopping + 2nd Level
R.G Podium + 3rd to 22nd upper
Floors
• The maximum height of the proposed project will
be 69.95 m.
• .
No underground works including mining / Tunneling
is required except excavation of earth only for
foundation, lay down of pipes, underground storage
tank, electric cables, soak pits, septic tanks etc.
As this is a new construction project, hence no
reclamation work required.
Not Applicable
Not Applicable
Not Applicable
Separate raw material storage yard will be made,
which will be temporary.
Construction Phase:
Temporary sheds will be provided for the storage
of construction materials.
Operation Phase:
Storage area for Manure and Sludge will be provided.
Construction Phase:
During the construction phase soak pits and septic
tanks will be provided for disposal of waste water.
Temporary sanitary toilets will be provided.
Operation Phase:
Total solid wastes
Biodegradable waste
Non- Biodegradable waste
716 Kg / Day
408 Kg / Day
308 Kg / Day
Treatment & Disposal :
The biodegradable waste (408 Kg / Day) will be
treated in Organic Waste Composter (OWC). Manure
obtained from OWC will be used for gardening
purpose.
Non–Biodegradable waste: 308 kg/day is
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 4
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Information/Checklist
Confirmation
Yes
No
1.16 Facilities for long term No
housing
of
operational
workers?
1.17 New road, rail or sea traffic No
during
construction
of
operation?
1.18 New road, rail, air, waterborne No
or
other
transport
infrastructure including new or
altered routes and stations,
ports, airports etc.?
1.19 Closure or diversion of No
existing transport routes or
infrastructure
leading
to
changes in traffic movements?
1.20 New or diverted transmission No
lines or pipelines?
1.21 Impoundment,
damming, No
culverting, realignment or
other changes to the hydrology
M/s. Enviro Analysts & Engineers Pvt. Ltd.
FORM 1
/ Details thereof (with approximate quantities/ rates,
wherever possible) with source of information data
generated which will be handed over to recyclers.
• Sludge Quantity: 15 kg dry sewage sludge will be
used as manure for gardening.
• 150 KLD wastewater will be treated in STP of 155
KLD capacity. Treated water will be utilized as
follows;
Flushing
64 KLD
Gardening
8 KLD
Only during construction phase temporary in nature.
• The project site is adjacent to 30 m wide D.P road
adjoining the plot at west will be utilized during
construction and operational phase. There will be
no new road and rail.
• During construction phase, traffic will increase
due to inward movement of raw materials.
• In the post construction phase, there will be
increase in the traffic levels due to proposed
project. The increased traffic load due to the
proposed project will be 286 vehicles including
the traffic load contributed by visitors.
The parking of 4 wheelers details are as under:
Parking provided: 286 no’s.
No new Rail/road is required. The entire essential
infrastructure already exists.
There will be no diversion or closure of the existing
transport routes and infrastructure.
Diversion of electrical transmission line is not
envisaged; however, the project involves construction
of new internal pipelines for fresh water, recycled
water, rain water harvesting, sewer lines and internal
power distribution lines.
Not applicable
Page 5
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
FORM 1
Information/Checklist
Confirmation
of watercourses or aquifers?
1.22 Stream crossings?
1.23 Abstraction or transfers of
water from ground or surface
waters?
Yes
No
/ Details thereof (with approximate quantities/ rates,
wherever possible) with source of information data
No
Yes
1.24 Changes in water bodies or the
land surface affecting drainage
or run-off
1.25 Transport of personnel or
materials for construction,
operation
or
decommissioning?
1.26 Long-term dismantling or
decommissioning
or
restoration works?
1.27 Ongoing
activity
during
decommissioning which could
have an impact on the
environment?
1.28 Influx of people to an area in
either
temporarily
or
permanently?
No
No
There is no stream passing through the site.
Water requirement in the construction phase will be
supplied from tanker (30 KLD). Total water demand
of 195 KLD will be met from VVCMC and recycled
water
There will be no change in the drainage pattern The
drainage network of the project will be designed in
line with natural drainage pattern.
The 30 m wide D.P road near by the site will be
utilized for the transportation of material. Workers
required during peak hours which will be fulfilled
from local or nearby area.
Not Applicable.
No
Not Applicable.
No
Construction Phase:
During the construction phase about 60-80 Labors
will be provided with housing facilities which will be
purely in temporary basis and during peak hours
remaining will be deployed from nearby places.
No
1.29 Introduction of alien species?
No
1.30 Loss of native species or No
genetic diversity?
1.31 Any other actions?
No
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Operation Phase:
On completion of the project, there will be regular
movement of residents, visitors, staff and related
personals. Total population is expected to be 1573
No’s.
-Not applicable
Not applicable
Page 6
“Viva Residency” - Proposed Residential & Commercial Project
2.
Use of Natural resources for construction or operation of project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short
supply).
Sr.
No.
Information/Checklist
Confirmation
2.1
Land specially undeveloped or No
agricultural land (ha)
Water (expected source & Yes
competing users) unit KLD
2.2
FORM 1
Yes
/No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
The proposed plan is on Non agricultural land.
Construction Phase: It is expected to house about 60
to 80 labours at site.
(Depending upon construction activity)
Domestic usage
12 KLD
Construction Activity
18 KLD
The water demand will be met by water tankers.
Operation Phase:
Total water demand of the project is expected to be
195 KLD approximately;
Domestic
123 KLD
Flushing
64 KLD
Gardening
8 KLD
2.3
2.4
2.5
Minerals (MT)
No
Construction material – stone, Yes
aggregates, and/soil (expected
source-MT)
Forests and timber (source-MT) Yes
2.6
Energy including electricity and Yes
fuels (source, competing users)
Unit: fuel (MT), energy (KW)
2.7
Any other natural resources (use Yes
appropriate standard units)
M/s. Enviro Analysts & Engineers Pvt. Ltd.
And the water requirement will be met by the
VVCMC / Recycled water.
-The construction materials, which will be used in the
project site, will be procured from authorized local
dealer.
Certified Timber will be purchased from nearby
markets.
• Construction Phase: 80 kW
• Operation Phase : 3704 kW
• Source: MSEDCL
1 DG Sets of 300 KVA will be proposed for back up
during power failure. HSD will be used as fuel to run
standby D.G. sets.
Solar energy will be utilised for common area &
water heating purpose.
Page 7
“Viva Residency” - Proposed Residential & Commercial Project
3.
Sr.
No.
3.1
3.2
3.3
3.4
3.5
4.
Sr.
No.
4.1
4.2
FORM 1
Use, storage, transport, handling or production of substances or materials, which could
be harmful to human health or the environment or raise concerns about actual or
perceived risks to human health
Information/Checklist
Confirmation
Yes / Details thereof (with approximate quantities/
No
rates, wherever possible) with source of
information data
Not applicable
Use of substances or materials, No
which are hazardous (as per
MSIHC rules) to human health
or the environment (flora, fauna,
and water supplies)
Changes in occurrence of No
During the entire construction phase adequate
disease or affect disease vectors
precaution will be taken like centralized canteen for
(e.g. insect or water borne
labours, modular STP, OWC for construction phase
diseases)
will be provided.
Positive impact due to enhanced and hygienic living
Affect the welfare of people e.g. Yes
conditions generation. Aesthetic value of area will be
by changing living conditions?
improved..
EMP shall be implemented during construction and
operation phase to mitigate the impacts on
surrounding locality
There are no vulnerable receptors within 500mts
Vulnerable groups of people No
from the site.
who could be affected by the
project e.g. hospital patients,
children, the elderly etc.,
Any other causes
No
No other causes identified.
Production of solid wastes during construction or operation or decommissioning
(MT/month)
Information/Checklist
Confirmation
Yes / Details thereof (with approximate quantities /
No
rates, wherever possible) with source of
information data
Spoil, overburden or mine No
There is no activity which may generate spoil,
wastes
overburden & mine waste.
Municipal waste (domestic and Yes
Operation Phase:
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 8
FORM 1
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Information/Checklist
Confirmation
or commercial wastes)
Yes / Details thereof (with approximate quantities /
No
rates, wherever possible) with source of
information data
Total solid wastes
716 Kg/Day
Biodegradable waste
408 Kg/Day
Non- Biodegradable waste 308 Kg/Day
Treatment & Disposal :
• The biodegradable waste (408 Kg/Day) will be
processed in OWC.
• Maximum requirement of manure for gardening
will be used, while remaining quantity of manure
will be handed over to recyclers.
• Non- Biodegradable waste will be handed over
to VVCMC.
• Sludge Quantity: 15 Kg
4.3
4.4
4.5
4.6
Hazardous wastes (as per Yes
hazardous waste management
rules)
Other industrial process wastes
No
Surplus product
No
Dry sewage sludge will be used as manure for
gardening.
Used oil from DG set will be stored carefully at
separate location duly marked and will be sold to
CPCB authorized recyclers.
Not Applicable
Not Applicable
Sewage sludge or other sludge Yes
from effluent treatment
Construction or demolition Yes
wastes
Dewatered sludge from STP will be used as manure
for gardening.
EMP shall be implemented during construction and
operation phase to mitigate the impacts on
surrounding locality
Redundant
machinery
or No
equipment
Contaminated soils or other No
materials
All Equipments used for construction will be of
standard quality and maintained on regular basis.
4.10
Agricultural wastes
No
Not Applicable
4.11
Other solid wastes
No
Only Municipal solid waste will be generated.
4.7
4.8
4.9
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Not Applicable
Page 9
“Viva Residency” - Proposed Residential & Commercial Project
5.
Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)
Sr.
No.
Information/Checklist
Confirmation
5.1
Emissions from combustion of Yes
fossil fuels from stationary or
mobile sources
5.2
Emission
from
production No
processes
Emissions
from
materials Yes
handling including storage or
transport
5.3
FORM 1
Yes/
No
5.4
Emissions from construction Yes
activities including plant and
equipment
5.5
Dust or odors from handling of Yes
materials including construction
materials, sewage and waste
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
• Emission will be generated from vehicular
transport to the project.
• Standby DG set will emit air pollutants (PM, SO 2
and NOx). DG set shall be installed as per CPCB
guidelines and manufacturers instruction to keep
the emissions within limits of CPCB. Stack
height shall be provided as per CPCB guideline
for adequate dispersion of released pollutant and
to have negligible GLCs in the surrounding area.
There is no production as the proposed project is
residential project.
•
Emissions will be generated, while handling and
transportation of materials like cement, sand etc.
to site, will be temporary in nature.
• RMC shall be used preferably to reduce fugitive
emissions due to material handling.
• Regular water sprinkling shall be done to reduce
dust generation
Transportation shall be done in covered trucks
The project may cause rise in dust levels during
construction phase. Precautions will be taken to
reduce dust generation during construction phase.
• RMC use will eliminate the handling of cement,
sand and concrete thus dust emission will be
minimized.
• RMC use will also reduce the trucks trips.
• Tarpaulins will be used to cover trucks carrying
debris.
• Water sprinkling will be done at regular intervals
to reduce control of dust generation.
Construction Phase:
Dust is likely to be generated during construction,
this will be water sprinkled and Tarpaulin covers will
be provided over stored raw material to reduce dust
emission.
Operation Phase:
During Operation Phase, emissions will be generated
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 10
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Information/Checklist
Confirmation
5.6
Emissions from incineration of No
waste
Emissions from burning of No
waste in open air (e.g. slash
materials, construction debris)
Emissions from any other No
sources
5.7
5.8
6.
Sr.
No.
6.1
6.2
6.3
Yes/
No
FORM 1
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
from Operation of DG sets.
Minimal emissions will be generated from movement
of vehicles as dust, as the roads will be paved roads.
Odor can be from STP. However, the STP will be
working on appropriate technology, so as to
minimize odor problems, and it will be strategically
located so that no adverse impact is caused.
Not Applicable.
No such practices shall be entertained
Not Applicable.
Generation of Noise and vibration, and emissions of Light and heat.
Information/Checklist
Confirmation
Yes / Details thereof (with approximate quantities/
No
rates, wherever possible) with source of
information data
From operation of equipment Yes
Noise generation from construction equipment’s used
e.g. engines, ventilation plant,
for drilling, cutting operations.
crushers
During Operation Phase, Noise will be generated due
to operation of DG sets.
For control of noise following measures shall be
adopted:
• Properly maintained equipment’s with mufflers will
be used.
• High noise generating construction activities would
be carried out only during day time.
• Workers working near high noise construction
machinery would be provided with ear muffs/ear
plugs.
• Acoustic enclosure for DG Set with proper stack
height will be provided.
From industrial or similar No
Not Applicable
processes
From construction or demolition Yes
The construction noise will be localized, intermittent
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 11
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
6.4
6.5
Information/Checklist
Confirmation
FORM 1
Yes / Details thereof (with approximate quantities/
No
rates, wherever possible) with source of
information data
in nature. The construction activities will include the
following noise generating activities ;
1. Excavation activities etc.
2. Concreting and mixing.
3. Heavy vehicle movement.
4. Operation of D.G sets.
From blasting or piling
No
From construction or operational Yes
traffic
Following precautions shall be taken to control noise
pollution :
High noise generating construction activities would
be carried out during day time only.
• Installation, use and maintenance of mufflers on
equipment.
• Workers working near high noise construction
machinery would be supplied with ear muffs/ear
plugs.
• Acoustic enclosure for DG Set with proper stack
height will be provided
Not Applicable.
Construction phase:
There will be transport of materials for construction
work. Precautions will be taken to reduce the impact
of the vehicular movement such as vehicular trips
will not be at peak traffic hours.
Operation Phase :
The vehicular parking will be restricted only in the
adequate parking area provided, which would help in
reducing noise pollution due to traffic congestion.
6.6
6.7
From lighting or cooling No
systems
From any other sources
No
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Local native plants will be used in plantation which
will help to reduce the impact of air and noise
pollution.
Not Applicable.
Not Applicable.
Page 12
“Viva Residency” - Proposed Residential & Commercial Project
7.
Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, coastal waters or the sea
Sr.
No.
Information/Checklist
Confirmation
7.1
From handling, storage, use or No
spillage of hazardous materials
From discharge of sewage or Yes
other effluents to water or the
land (expected mode and place
of discharge)
7.2
Yes/
No
7.3
By deposition of pollutants No
emitted to air into the land or
into water
7.4
7.5
From any other sources
No
Is there a risk of long term No
buildup of pollutants in the
environment from these sources?
8.
Sr.
No.
FORM 1
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
Not Applicable.
The total wastewater generated (150 KLD) from the
buildings will be treated in STP of 155 KLD capacity
and the Recycled water (72 KLD) will be utilized for
landscaping, car washing and flushing purpose. 63
KLD of excess water will be drained to existing
municipal drain.
Dust generated during construction phase will be
contained locally within site only. Same shall be
controlled by barricades.
Stack shall be provided to DG set with height as per
CPCB norm.
Not Envisaged
D.G sets will be used in case of power failure, as a
backup source.
Risk of accidents during construction or operation of the project, which could affect
human health or the environment
Information/Checklist
Confirmation
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Yes
/No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
Page 13
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1
8.1
From explosions, spillages, fires No
etc from storage, handling, use
or production of hazardous
substances
During construction all construction workers will be
provided with suitable Personal Protective
Equipment as required under the health & safety
norms. Suitable fire fighting measures will be
provided to reduce damage due to fire-accidents.
8.2
8.3
From any other causes
No
Could the project be affected by Yes
natural
disasters
causing
environmental damage (e.g.
floods, earthquakes, landslides,
could burst etc)?
-The project falls under seismic zone-III as per
IS1893 (Part-1):2002,
9.
Factors which should be considered (such as consequential development) which could
lead to environmental effects or the potential for cumulative impacts with other existing
or planned activities in the locality
Sr.
No.
Information/Checklist
Confirmation
9.1
Lead
to
development
of No
supporting, utilities, ancillary
development or development
stimulated by the project which
could have impact on the
environment e.g.:
Supporting infrastructure (roads,
power supply, waste or waste
water treatment, etc)
Yes
/No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
The project provides a well-designed residential
housing area for the occupants.
Yes
Internal Roads, Rainwater Harvesting, STP etc. will
be provided.
Housing development
Extractive industries
Supply industries
Other
Yes
Residential Project
No
9.2
No
Lead to after use of the site, No
which could have an impact on
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Not Applicable.
Page 14
FORM 1
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Information/Checklist
Confirmation
Yes
/No
Details thereof (with approximate quantities/
rates, wherever possible) with source of
information data
the environment
9.3
Set a precedent
developments
for
later No
Not Applicable.
9.4
Have cumulative effects due to No
proximity to other existing or
planned projects with similar
effects
Not Applicable.
(iii) Environmental Sensitivity
Sr.
No.
1
2
3
4
5
6
7
Areas
Name/Identity Aerial distance (with 15-km) Proposed
project location boundary
Areas protected under international No
There are no notified eco sensitive zones
conventions, national or local
in and around the project site (2 km).
legislation for their ecological,
landscape, cultural or other related
value
Areas which are important or --sensitive of ecological reasons –
wetlands, water courses or other
water bodies, coastal zone,
biospheres, mountains, forests
Areas used by protected, important --or sensitive species of flora or
fauna for breeding, nesting,
foraging, resting, over wintering,
migration.
Inland,
coastal,
marine
or --underground waters
State, national boundaries
No
The project is located within Municipal
limits.
Routes or facilities used by the No
public for access to recreation or
other tourist, pilgrim areas
Defense installations
No
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Not Applicable.
No
defense
neighborhood.
installation
in
Page 15
the
FORM 1
“Viva Residency” - Proposed Residential & Commercial Project
Sr.
No.
Areas
Name/Identity Aerial distance (with 15-km) Proposed
project location boundary
8
Densely populated or built-up area
Yes
9
Areas occupied by sensitive man -made land uses (hospitals, schools,
places of worship, community
facilities)
Areas containing important, high No
quality or scarce resources (ground
water resource, surface resources,
forestry, agriculture, fisheries,
tourism, minerals)
Areas already subjected to pollution No
or environmental damage. (those
where existing legal environmental
standards are exceeded)
--
Areas susceptible to natural hazard No
which could cause the project to
present environmental problems
(earthquakes,
subsidence,
landslides, erosion, flooding or
extreme or adverse climatic
conditions)
This area is generally plain& come under
seismic zone –III according to Indian
Standard Seismic zoning map.
10
11
12
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Residential, Commercial and Industrial
area all around the site.
The project will meet water from
VVCMC for its use after proper
permissions are obtained.
All parameters of Air, water and Noise
etc. will be maintained within the
permissible limit.
Page 16
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
FORM-1A
(Only for Construction Projects listed under Item 8 of Schedule)
Checklist of Environmental Impacts
1. Land Environment (Attach panoramic view of the project site & the vicinity)
Requirement
Compliance
1.1. Will the existing land use get
significantly altered from the project that
is not consistent with the surroundings?
(Proposed land use must conform to the
1. The
project
is
“Viva
Residency”
-
Proposed
Residential & Commercial project.
2. The site is under Jurisdiction of Vasai Virar Municipal
Corporation.
approved Master Plan/Development Plan
3. The proposed land use is in conformation with the
of the area. Change of land use if any and
approved Municipal Master Plan / Development Plan
the
of VVCMC.
statutory
competent
approval
authority
form
are
the
submitted).
Attach Maps of (i) site location, (ii) Enclosed maps:
surrounding features of the proposed site
1. Google Image. (ANNEXURE I)
(within 500 meters) and (iii) the site
2. Layout Plan. (ANNEXURE II)
(indicating
levels
&
contours)
to
appropriate scales.
1.2. List out all the major project
requirements in terms of the land area, Name & location: “Viva Residency” - Proposed Residential
built up area, water consumption, power & Commercial project, On plot Bearing C.T.S. No.86 B,
requirement, connectivity, community Chakradhar nagar, Achole road, Nallasopara West.
facilities, parking needs etc.
A. Propose Building Details :
Building
Wing
Details
Bldg No. A to C
1
Configuration
Ground floor shopping + 1st (A) Floor
shopping + 1st (B) Floor shopping +
2nd Level R.G Podium + 3rd to 22nd
upper Floors
B. Area Statement :
(i)Land Area:
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 1
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
Plot Area
11364.10 Sq.mt
FSI Area
20571.87 Sq.mt
Non-FSI Area
26538.36 Sq.mt
Total Construction Area
47110.23 Sq.mt
R.G Area
1505.26 Sq mt
C. Parking Details :
Parking Required
286 No’s
Total Provided
286 No’s
D. Occupancy Load: 1573 No’s.
E. Water requirement :
Construction phase :
Total Water Required
30 KLD
Domestic usage
12 KLD
Construction
18 KLD
Source: Tanker (depending upon construction activity)
Operation Phase: 195 KLD; Source: VVCMC/recycle water.
Domestic
123 KLD
Flushing
64 KLD
Gardening
8 KLD
F. Power Requirement :
Construction Phase : 80 kW
Operation Phase : 3704 kW
G. Road Connectivity: 30 m wide D.P Road towards East.
H. Community facilities : -I. Amenities : -1.3. What are the likely impacts of the Adequate open spaces and amenity facilities are provided as
proposed
activity
on
the
existing per development plan for the project. There are no negative
facilities adjacent to the proposed site? impacts of the project on surrounding existing facilities.
(Such
as
open
spaces,
community
facilities, details of the existing land use,
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 2
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
disturbance to the local ecology)
1.4. Will there is any significant land There will be no significant land disturbance due to the
distribution
resulting
in
erosion, project. The existing land and surrounding area is flat/table
subsidence & instability? (Details of soil land without having any undulations. The existing terrain will
type, slope analysis, vulnerability to be retained.This area is generally plain & come under seismic
subsidence, seismicity etc may be given)
zone –III according to Indian Standard Seismic zoning map.
1.5. Will the proposal involve alteration Natural Drainage System will not be altered.
of natural drainage systems? (Give
details on a contour map showing the
natural drainage near the proposed
project site)
1.6. What are the quantities of earthwork Excavation in the form of rubble and soil. The excavated
involved in the construction activity- material will be used for refilling, excess quantity if any will
cutting, filling, reclamation etc. (Give be used for Landscaping.
details of the quantities of earthwork
involved, transport of fill materials from
outside the site etc)
1.7. Give details regarding water supply, Construction phase: It is expected to house about 60 to 80
waste
handling
etc.
during
the labours at site;
construction period.
SOURCE : Tanker (Depending upon construction activity)
Total Water Required
30 KLD
Domestic usage
12 KLD
Construction
18 KLD
The waste water generated from human settlement will be
collected in septic tank and soak pits.
1.8. Will the low lying areas & wetlands No low lying area, no wetlands within 500 m around the site.
get altered? (Provide details of how low
lying and wetlands are getting modified
from the proposed activity)
1.9. Whether construction debris & waste The construction debris will include sand, soil bricks and tiles.
during construction cause health hazards? All this material will be utilized on the same site or used for
(Give quantities of various types of land fillings or other development sites. No hazardous waste is
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 3
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
wastes generated during construction involved.
including the construction labour and the
means of disposal)
2. Water Environment
Requirement
Compliance
2.1. Give the total quantity of water Source: VVCMC / Recycled Water
requirement for the proposed project with
Total water requirement
195 KLD
the break-up of requirements for various
Domestic usage
123 KLD
uses. How will the water requirements
Flushing
64 KLD
met? State the sources & quantities and
Gardening
8 KLD
furnish a water balance statement.
Sewage Generation:
Description
Construction
phase
Operational
Phase
Quantity of
Sewage
generated
(KLD)
3.2
150
Treatment/ Disposal
Septic Tank and Soak
pit.
Treated sewage water
will be used For Flushing
and gardening. Excess
treated sewage water will
be Disposed to existing
sewer line.
Water balance sheet attached herewith as annexure (III)
2.2. What is the capacity (dependable For water supply the project will be dependent on
flow or yield) of the proposed source of VVCMC/recycled water. The source of water for gardening
water?
& flushing is dependable one, as the project will be providing
recycled water.
2.3. What is the quality of water required, Water will be supplied from VVCMC.
in case, the supply is not from a
municipal source? (Provide physical,
chemical, biological characteristics with
class of water quality)
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 4
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
2.4. How much of the water requirement Total Recycled water 72 KLD will be used at maximum
can be met from the recycling of treated extent for ;
wastewater?
(Give
the
details
of
quantities, sources and usage)
Flushing
64 KLD
Green Area
8 KLD
2.5. Will there be diversion of water from No
other users? (Please assess the impacts of
the project on other existing uses and
quantities of consumption)
2.6. What is the incremental pollution The sewage generation from the proposed project will be 150
load from wastewater generated from the KLD. STP of total capacity 155 KLD will be provided for
proposed activity? (Give details of the treating the waste water.
quantities and composition of wastewater Give details of sewage specification.
generated from the proposed activity)
Expected Characteristics of Raw Sewage
Untreated sewage Characteristics:
Sr.
No.
Parameter
Unit
Raw sewage
1
pH
--
6.5 – 7.5
2
BOD 3 days at 27 C
3
COD
mg/l
600 – 700
mg/l
4
Suspended Solids
mg/l
150 – 200
mg/l
5
Oil & Grease
mg/l
50 mg/l
0
200 – 400
mg/l
Treated Sewage Characteristics.
Sr.
No.
Parameter
Unit
Treated sewage
Characteristics
1
pH
--
7 – 7.5
2
BOD 3 days at
Less than 5
0
27 C
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 5
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
2.7.
Give
details
of
the
3
COD
mg/l
Less than 15
4
Suspended
Solids
mg/l
Less than 10
5
Oil & Grease
mg/l
Less than 10
water Runoff from terrace will be diverted to rain water harvesting
requirements met from water harvesting? tank. The overflow will be diverted to storm water drain.
Furnish details of the facilities created.
Rainwater harvesting is possible for terrace area in the
present proposal.
2.8. What would be the impact of the The run-offs will be channelized properly through storm
land use changes occurring due to the water drain.
proposed
project
on
the
runoff Management plan for Flood is as follows :
characteristics (Quantitative as well as
• Storm water drain shall be cleaned at regular interval.
qualitative) of the area in the post
• Demarcating the areas within or leading in or out of the
construction phase on a long term basis?
building that will be water logged, flooded or isolated
Would it aggravate the problems of
due to the flood. The areas will be marked after
flooding or water logging in any way?
completion of the project (as final ground levels etc. will
be available after completion).
2.9. What are the impacts of the proposal There will be no ground water extraction. The rain water
on the ground water? (Will there be collected on the terrace will be harvested in RWH tanks.
tapping of ground water; give the details
of
ground
water
table,
recharging
capacity, and approvals obtained from
competent authority, if any)
2.10. What precautions/measures are The run-off during construction phase is expected to carry
taken to prevent the run-off from heavy amount of silt and the other material from the site,
construction activities polluting land and which may result in contamination of land and the ground
aquifers? (Give details of quantities and water aquifer. The following measures will be adopted
the measures taken to avoid the adverse especially during rainy seasons to effectively combat the
impacts)
situation:
• Construction material will be stored at the earmarked
places and will be covered with a temporary shed
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 6
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1A
ensuring that no leachates or spoilage of land occurs.
• The construction waste will be stored at the earmarked
place to ensure that the same is not carried away with the
storm water.
• The rain water entering into the pit will be screened for
the removal of heavy silt and other materials.
• Diverting up-slope water with turf and not mixing mortar
in locations that will drain into storm water system.
• Preventing wastewater from brick cutting activities and
stockpiles entering the storm water system.
• Constructing a fence around the site to trap sediment
whilst allowing water to flow through.
• Excavation work will not be carried out during monsoon
season.
• Ensuring vehicles stick to the access track to prevent mud
and dirt being deposited on roads.
• Cleaning all mud and dirt deposited on roads from
construction-related activities.
• Stabilizing a single entry/exit point to ensure sediment is
not tracked off site-this will also increase site durability
during wet weather.
2.11. How is the storm water from within The storm water from roof top, paved surfaces and
the site managed? (State the provisions landscaped surfaces will be properly channelized to the rain
made to avoid flooding of the area, water harvesting sumps through storm water network. Proper
details of the drainage facilities provided rainwater harvesting structure will be design for maximum
along with a site layout indication capture of surface run off. The rain water harvested will be
contour levels)
used for ground water recharge to keep the ground water
level consistent.
2.12. Will the deployment of construction During construction phase the sewage generated will be
labourers particularly in the peak period around 3.2 KLD and will be treated in septic tank and soak
lead to unsanitary conditions around the pit.
project
site
(Justify
with
explanation)
M/s. Enviro Analysts & Engineers Pvt. Ltd.
proper Hence it will not lead to unsanitary conditions around the
project site.
Page 7
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
• Proper sanitation facilities will be provided at site for
construction labours and staff.
• There will be no stagnant water at site, as the runoff will
be systematically drained into the storm water line.
• Temporary toilets with septic tank and soak pit will be
provided considering peak labour force.
• Adequate housekeeping facilities and practices will be
maintained.
2.13. What on-site facilities are provided The quantity of wastewater (150 KLD) generated from the
for the collection, treatment & safe project will be treated in STP (capacity 155 KLD) and
disposal of sewage? (Give details of the recycled and used for gardening and flushing purpose. 63
quantities
of
wastewater
generation, KLD water will be released into sewer line.
treatment capacities with technology & STP Technology & its details in brief:
facilities for recycling and disposal)
The proposed Sewage Treatment System will have the
following major components :
a.
MBBR Units
b.
Tube Settler Unit.
c.
Aeration System.
d.
Multimedia Filter Unit.
e.
Disinfection System
Sewage specification after treatment in STP.
PARAMETER
Nature of
Waste water
UNITS
Domestic
Sewage and
Kitchen Waste
---
IN
OUT
6 – 8.5
7 – 7.5
Suspended
Solids
PPM
180 -250
mg/lit
< 10
BOD 5
PPM
< 10
COD
PPM
Odor
---
Colour
---
250 – 400
mg/lit
600- 800
mg/lit
Medium to
Strong
Grace Brown
Oil & Grease
---
PH
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Up to 50
mg/lit
< 30
NIL
Colour
less
< 10
mg/lit
Page 8
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1A
2.14. Give details of dual plumbing There will be separate pipelines for the supply of treated
system if treated wastewater is used for water from STP and the fresh water. Treated water will be
flushing of toilets or any other use.
used for the flushing purposes and landscaping purposes.
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 9
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1A
3. Vegetation
Requirement
Compliance
3.1. Is there any threat of the project to
The project site is surrounded by developed roads. The local
the biodiversity? (Give a description of
ecosystem and biodiversity will not be hampered because of
the local ecosystem with its unique
this development.
features, if any)
3.2. Will the construction involve
Total Green Area: 1505.26 Sq mt.
extensive clearing or modification of
Only endemic or Native trees will be planted which are listed
vegetation? (Provide a detailed account
by VVCMC.
of the trees & vegetation affected by the
project)
3.3. What are the measures proposed to Due care will be taken to protect the important site features:
be taken to minimize the likely impacts
• Tree plantation will be done to protect the site features
on important site features (Give details of
such as topsoil erosion, ground water attenuation and
proposal for tree plantation, landscaping,
avoiding contamination by leachates.
creation of water bodies etc. along with a
layout plan to an appropriate scale)
• No heavy work will be done before 10 am and during the
night time.
• The excavated soil will be stored at earmarked places
protected from contamination and from polluting the
existing features and will be used for surface leveling and
for creation of landscaped areas.
• In the operational phase, a total of 1505.26 Sq.mt will be
under landscape area so as to rejuvenate the important site
features.
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 10
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
4. Fauna
Requirement
Compliance
4.1. Is there likely to be any displacement There will be no displacement of fauna - both terrestrial and
of fauna – both terrestrial and aquatic or aquatic and there will be no barrier on their movement. There
creation of barriers for their movement? is no endangered species found except the local species.
Provide the details.
4.2. Any direct or indirect impacts on the There will be no impact on the avifauna (birds) of the area.
avifauna of the area? Provide details.
The site was not found to be nesting/breeding/feeding ground
for any significant bird species. The trees planted may attract
birds in the future creating a positive impact on the avifauna.
4.3. Prescribe measures such as corridors, The project is located on landmass and there is no need to
fish ladders etc. to mitigate adverse provide corridors and fish ladders etc.
impacts on fauna.
5.
Air Environment
Requirement
Compliance
5.1. Will the project increase atmospheric The proposed project activity will not increase any
concentration of gases & result in heat atmospheric concentration of gases and result in heat islands.
islands? (Give details of background air Air emissions will increase due to vehicular movements.
quality levels with predicted values based
on dispersion models taking into account
the increased traffic generation as a result
of the proposed constructions)
5.2. What are the impacts on generation There will be burning of fuel through D.G. sets, traffic
of dust, smoke, odorous fumes or other movements, operation of construction machines / equipment
hazardous gases? Give details in relation and domestic activities at site. Construction activities will lead
to all the meteorological parameters.
to dust generation, emission of NO 2 , SO 2 and PM.
The impacts on the ambient air quality during construction
phase will be temporarily and reversible in nature (for short
duration) and will be restricted to only a small area. During
operation phase, D.G. set will be having adequate stack
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 11
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
height, there will be development of green-area and
maintenance of vehicles, all these efforts will reduce the
impact.
5.3. Will the proposal create shortage of The proposed project will provide sufficient parking to its
parking space for vehicles? Furnish occupants and visitors.
details of the present level of transport Adequate measures have been proposed to manage the traffic
infrastructure and measures proposed for within and outside the site. The vehicular traffic movement
improvement
including
the
traffic within the facility will be such that it will not disturb the
management at the entry and exit to the landscaped areas and organized open spaces. Entry and exit
project site.
will be provided to ensure that no hindrance is caused to the
site traffic. Roads of sufficient width will be provided.
Necessary arrangements will be made for smooth entry and
exit of vehicles.
Parking Area: As per Municipal norms.
Total no of parking provided:
Parking Details Four wheeler
Provided
286 No’s
5.4. Provide details of the movement Adequate provisions have been made in the internal roads, for
patterns with internal roads, bicycle smooth vehicles entry and exit and as well as pedestrian
tracks, pedestrian pathways, footpaths movements.
etc., with areas under each category.
5.5. Will there be significant increase in As the entry and exit will be made safe and smooth, there will
traffic noise & vibrations? Give details of be no noise and vibrations due to increased traffic.
the sources and the measures proposed During construction activity vehicular movement and
for mitigation of the above.
vehicular movement will be the major source. During
Operational Phase D.G sets, machines and Vehicular
movement will be the major source. The mitigation is
proposed through a detailed EMP that has been planned to
reduce the noise and vibration impacts during the construction
phase.
The project proponents have proposed to provide well
organized parking arrangement, which would help in reducing
noise levels due to vehicular movement in the parking area.
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 12
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
5.6. What will be the impact of D.G. sets D.G. set will create no noise due to vibration as sound proof
& other equipment on noise levels & canopy will be provided. Acoustic enclosure will be provided
vibration in & ambient air quality around with proper stack height.
the project site? Provide details.
6.
Aesthetics
Requirement
Compliance
6.1. Will the proposed constructions in The proposed construction activity will not result in the
any way result in the obstruction of a obstructions of a view, scenic amenity or landscapes. Better
view, scenic amenity or landscapes? Are designed structure and well planned landscape will add up
these considerations taken into account aesthetics of that zone.
by the proponents?
6.2. Will there be any adverse impacts There will be negligible adverse impact due to new
from new constructions on the existing constructions on the existing structures.
structures? What are the considerations Due care will be taken to minimize the impacts on
taken into account?
surroundings:
• Excavators will be used for excavation activities will be of
rig type which will help to avoid hammering clutter and
knocking noises.
• The construction site will be covered from all 4 sides with
tin sheets to prevent dust emissions and other pollutants to
the surrounding environment.
• The setbacks are sufficient to take care of the depth to
which the structure goes without the fear of soil collapse in
addition to piling.
6.3.
Whether
there
are
any
local The design of the project is influenced by the regulation set
considerations of urban form & urban out by local authority and modern needs of the society.
design influencing the design criteria?
They may be explicitly spelt out.
6.4. Are there any anthropological or There are no anthropological or archaeological sites or
archaeological sites or artefacts nearby? artefacts nearby proposed site.
State if any other significant features in
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 13
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
the vicinity of the proposed site have
been considered.
7.
Socio-Economic Aspects
Requirement
Compliance
7.1. Will the proposal result in any There will be no change to the demographic structure of local
changes to the demographic structure of population due to the proposed activity. The expected
local population? Provide the details.
population will be 1573 No’s. The proposed project shall
provide value addition to the existing infrastructure, as due to
development of this Project facility such as public transport,
water supply, telex communications, power lines, road
maintenance etc. shall be upgraded in and around the project
premises.
7.2. Give details of the existing social Proposed project is located within the residential zone of high
infrastructure
around
the
proposed urban infrastructure region. It is a well-developed area, having
project.
all modern amenities. Civil structures, School, Colleges,
Hospitals, Recreation facilities, Markets, etc. are available in
the area to a reasonable degree.
7.3. Will the project cause adverse effects The proposed project will not cause any adverse effects on
on local communities, disturbance to local communities, disturbance to sacred sites or other cultural
sacred sites or other cultural values? values.
What are the safeguards proposed?
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 14
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
8.
Building Materials
Requirement
Compliance
8.1. May involve the use of building •
The basic engineering materials like aggregate, cement,
materials with high-embodies energy.
sand and bricks/blocks will be purchased locally.
Are the construction materials produced
However, finishing materials will be purchased energy
with energy efficient processes? (Give
conservation measures in the selection of building
details of energy conservation measures
materials and their energy efficiency.
in the selection of building materials and •
Cement shall be used which already contains Fly ash,
their energy efficiency)
Construction materials from nearest source shall be chosen
to
minimize
energy
consumption
during
their
transportation.
8.2. Transport and handling of materials During construction phase, sources of noise pollution will be
during
construction
may
result
in due to operation of
pollution, noise & public nuisance. What machinery like compressors, compactors, concrete plant,
measures are taken to minimize the excavators, cranes etc. as well as
impacts?
Transportation vehicles. This will cause nuisance to the
occupants of the nearby area.
The project proponents have agreed to take precautions to
control noise pollution as mentioned under:
• Use of equipment generating noise of not greater than 90
dB (A).
• High noise generating construction activities would be
carried out only
during day time and in a staggered
fashion.
• Installation, use and maintenance of mufflers on
equipment.
• Workers working near high noise construction machinery
would be supplied with ear muffs/ear plugs.
To reduce air emissions:
• All vehicles will be having proper PUC certificates.
• Roads will be paved in advance to reduce dust emissions.
• Unpaved roads will be kept wet.
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 15
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
• Stock piles will be secured by covering with plastic.
• Construction machinery will be regularly maintained.
8.3. Are recycled materials used in roads Yes. Inert demolished material will be used in road filling to
and structures? State the extent of savings maximum extent. Centring material will be reused from other
achieved?
projects of the same contractor. A target of minimum 5%
savings will be kept.
8.4. Give details of the methods of The solid waste management facility will be proposed as per
collection, segregation & disposal of the MSW rules. Garbage will be collected manually from each of
garbage generated during the operation the building in the garbage collection room. The garbage
phases of the project.
collected from area will be segregated into wet and dry
garbage.
Operation Phase:
Total solid wastes
716 Kg/Day
Biodegradable waste
408 Kg/Day
Non- Biodegradable waste
308 Kg/Day
Treatment & Disposal :
• The biodegradable waste (408 Kg /Day) will be processed
in OWC.
• Maximum requirement of manure for gardening will be
used, while remaining quantity of manure will be sold to
local vendors.
• Non- Biodegradable waste will be handed over to
VVCMC.
• Sludge Quantity: 15 Kg.
Dry sewage sludge will be used as manure for gardening.
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 16
FORM 1A
“Viva Residency” - Proposed Residential & Commercial Project
9.
Energy Conservation
Requirement
9.1.
Give
details
of
Compliance
the
power Power requirement:
requirements, source of supply, backup
(a) Construction Phase – 80 kW
source
(b) Operation Phase – 3704 kW
etc.
What
is
the
energy
consumption assumed per square foot of Source : MSEDCL
build-up area? How have you tried to
minimize energy consumption?
To minimize the energy consumption, solar energy will be
utilized as much as possible.
Energy conservation measures :
• Purchase of energy efficient appliance.
• Adjusting the settings and illumination levels to ensure
minimum energy used for desired comfort levels.
• Installing programmable on/ off timers and sensors for low
occupancy areas.
• Use of solar systems.
• Use of compact fluorescent lamps and low voltage
lighting.
• Use of common lights with CFL & LED luminary in
landscaping area.
9.2. What type of, and capacity of, power 1 No. of 300 Kva DG Set will be proposed in case of power
back-up to you plan to provide?
failure or emergency facility.
9.3. What are the characteristics of the Glass used for buildings and residences will be plain clear
glass
you
plan
to
use?
Provide glass.
specifications of its characteristics related
to both short wave and long wave
radiation?
9.4. What passive solar architectural Building orientation, wall to window ratio and thermal
features are being used in the building? properties of envelop are being looked into reduce solar heat
Illustrate the applications made in the gain and provide natural light and adequate ventilation to
proposed project.
reduce humidity.
9.5. Does the layout of streets and Yes. Solar lights will be provided for common amenities
buildings maximize the potential for solar where feasible.
energy devices? Have you considered the
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 17
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1A
use of street lighting, emergency lighting
and solar hot water systems for use in the
building complex?
9.6. Is shading effectively used to reduce Depending upon the site condition location, efforts will be
cooling/heating loads? What principles made by the Architects to maximize the shading of walls on
have been used to maximize the shading the East and West and the Roof.
of Walls on the East and West and the
Roof? How much energy saving has been
effected?
9.7. Do the structures use energy-efficient
space
conditioning,
lighting
Most of the electrical installations and structures will be
and energy efficient.
mechanical systems? Provide technical
details.
Provide
transformers
and
details
motor
of
the
efficiencies,
lighting intensity and air-conditioning
load assumptions? Are you using CFC
and
HCFC
free
chillers?
Provide
specifications.
9.8. What are the likely effects of the There will not be any effect of the building activity in altering
building
activity
in
altering
the the microclimates particularly creation of heat islands &
microclimates? Provide a self assessment inversion effects.
on the likely impacts of the proposed
construction on creation of heat islands &
inversion effects?
9.9. What are the thermal characteristics Roof will be of high quality concrete as per the NBC rules
of the building envelope? (a) roof; (b) 2005.
external walls; and (c) Fenestration? Give
U-factor
R-Value
2-o
(W/m K)
(m2oK/)
details of the material used and the UWall
U-2.05
R- 0.48
values or the R-values of the individual
Roof
U- 1.85
R-0.54
components.
Fenestrati U- 5.7
R-0.17
on
9.10. What precautions & safety Standard fire safety norms as prescribed by chief fire officers
measures
are proposed
against
fire will be followed as per the government norms. To the extent
hazards? Furnish details of emergency possible fire proof materials will be used in structures. Refuse
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 18
“Viva Residency” - Proposed Residential & Commercial Project
plans.
FORM 1A
area will be provided as per norms.
9.11. If you are using glass as wall No glass will be used for walls.
material,
provide
details
and
specifications including emissivity and
thermal characteristics.
9.12. What is the rate of air infiltration Proper ventilation will be providing in rooms. Air
into the building? Provide details of how changes/hour is as per Bureau of Indian Standards (National
you
are
mitigating
the
effects
of Building Code, 2005).
infiltration.
9.13.
To
what
extent
the
non- Every effort will be made to generate and use non-
conventional energy technologies are conventional energy and renewable energy, depending upon
utilised
in
the
overall
energy the circumstances and chances of generating energy.
consumption? Provide details of the
renewable energy technologies used.
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 19
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1A
Annexure-I
Google Image
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 20
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1A
Annexure-IIA
WATER BALANCE CHART
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 21
“Viva Residency” - Proposed Residential & Commercial Project
FORM 1A
Annexure-III
LAYOUT PLAN
M/s. Enviro Analysts & Engineers Pvt. Ltd.
Page 22