ITEM NO. 4f SUBMITTAL TO THE CITY COUNCIL CITY OF INDIO, CALIFORNIA March 18, 2015 FROM: Public Works Department SUBJECT: Award of a construction contract for the Highway 111 and Jefferson Street Sidewalk Infill and ADA Improvement Project to Tryco General Engineering in the amount of $325, 888. RECOMMENDED MOTION: Approve the design plans and specifications for the Highway 111 and Jefferson Street Sidewalk Infill and ADA Improvement Project, award the construction contract to Tryco General Engineering in the amount of $ 325, 888, and approve a 10% contingency for the project. SUMMARY: In 2013 staff successfully secured funding from the Riverside County Transportation Commission ( RCTC) toward installation of sidewalks along Jefferson Street between Indio Boulevard and Avenue 50, and to upgrade all access ramps and driveways to current standards Highway along 111 between Rubidoux Street and Arabia Street. The two projects were combined into one bid document and bid and are now ready for construction. Tryco submitted the lowest bid, and after performing due diligence of this bidder, staff is recommending the award of the project to Tryco General Engineering. Continued on the next page) 4 Z' Pre kl //-X red By: om rox fferty, P. E. Pnricpal Civil Engineer Cost associated with this action: 200, 000 In current year budget: FINANCIAL Current F.Y. general fund cost: Future F. Y. cost: DATA Source of Account funds: number: o Budget adjustment: No 158,476 For fiscal year: Various ( See Financial Analysis) Current account balance: Various ( See Financial Analysis) Legal Review: Yes 14/ 15 Various ( See Financial Analysis) Balance remaining if approved: Department Review: Various ( See Financial Analysis) Financial Review: awj- hi t- Roxanne M. Diaz Jua City Attorney Interim Public Works Director/City Assistant City Manager/ Engineer Finance Director R' S RECOMMEN Approve Raya, P. E. Award the Construction Contract for the Highway 111 and Jefferson Street Sidewalk Infill and ADA Improvement Project to Tryco General Engineering in the amount of $325, 888 March 18, 2015 Page 2 BACKGROUND: In May of 2013, the City of Indio submitted two separate funding proposals response to their Call for Projects for SB -821 funding. SB -821 funding is a regional funding set aside for non -motorized transportation projects. The City of Indio to RCTC in requested funding to add sidewalks down Jefferson Street to finalize the continuity of pedestrian access throughout the entire length of Jefferson Street between Indio Boulevard and Avenue 50, as well as to upgrade the access ramps and driveways along Highway 111 from Rubidoux Street to Arabia Street to current ADA standards. The City was successful in receiving funding for both projects and proceeded to complete the design and bid the project. The design plans and specifications were prepared by Cozad and Fox and comply with the City of Indio and Riverside County Standard Plans. The City Engineer has reviewed the design plans for the project and in his opinion the design is reasonable and meets professional standards. engineering Therefore the City of Indio recommends that the Council also approve the plans and specifications, which are on file in the office of the Department of Public Works. The City was successful in receiving funding for both projects and proceeded to complete the design and bid the project. On February 24, 2015, the City Clerk received and opened 5 responsive bids summarized below. Tryco General Engineering is the lowest responsive bidder and, after performing due diligence, Staff found them to be a responsible bidder and recommends awarding the contract to Tryco General Engineering. Bidder's Name City Total Bid Tryco General Engineer Rimforest, CA Dateland Construction Company Global Power Group EBS General Engineering C. S. Legacy Construction Indio, CA 391, 878. 40 Lakeside, CA 410, 788. 00 Corona, CA 434, 185. 00 Pomona, CA 438, 426. 00 325, 888. 00 Construction is scheduled to take place between May and August of this year. FINANCIAL ANALYSIS: The total construction cost, including contingency, is anticipated to be $ 358, 476 as outlined below: Contractor ( Tryco General Contingency 325, 888 Engineering) $ ( 10%) 32, 588 Construction Costs $ 358, 476 The funding sources are proposed as shown: SB821 Grant for the Jefferson Street Sidewalk Project $ SB 821 Grant for the Highway 111 Sidewalk and Ramp Project $ Local Measure A ( Fund 210) $ Highway 111 ( Fund 330) $ 98, 500 74, 900 128, 500 56. 576 Construction Funding $ 358, 476 Award the Construction Contract for the Highway 111 and Jefferson Street Sidewalk Infill and ADA Improvement Project to Tryco General Engineering in the amount of $325, 888 March 18, 2015 Page 3 The funding shown above is already appropriated in the budget. The SB821 grants are reimbursable, and therefore, the City will need to front the money until the city is reimbursed the City will do this through monthly invoices). No general fund money will be used for this project. ALTERNATIVES: 1. Reject bid from Tryco General Engineering and direct staff to determine second lowest responsive bidder. 2. Reject all bids and not award contract at this time. ATTACHMENTS: None
© Copyright 2024