Roadworks & events report Effective from 13th March 2015 For further information please contact the following: Edinburgh and Midlothian contact CLARENCE on 0800 23 23 23 Lafarge Tarmac contact 01698 575 600 Traffic Scotland - information on motorways and City Bypass Forth Road Bridge Transport for Edinburgh - Lothian Buses and Edinburgh Trams Follow Edintravel on Twitter for regular updates See details of Ward boundaries Entries are arranged by Ward and then by start date. Underlined entries contain links to maps or further information Planned roadworks and events affecting major routes have been approved by the Citywide Traffic Management Group (a partnership between City of Edinburgh Council Transport Officers, local Neighbourhood teams, Lothian Buses and Police Scotland.) new information in this version Ward Almond Street SOCIETY ROAD, SOUTH QUEENSFERRY = temporary traffic lights in use Location In its entirety Between Bo'ness Road and Headrig Road = diversion in operation Description Traffic Control Transport Scotland - road widening as part of Forth Various arrangements including lane closures and temporary traffic lights Replacement Crossing project Start date Finish date 15/07/13 Ongoing Transport Scotland - works to realign A904 as part Major works under various traffic management layouts but maintaining of Forth Replacement Crossing project two-way traffic 25/09/13 March 2015 Transport Scotland - road reconstruction Two-way traffic maintained. 24/10/14 Summer 2015 City of Edinburgh Council - path upgrade Path closed, diversion signed via Dalmeny estate. Off-peak lane closure on A90 Almond A904 Almond B800 Almond A90 Cycleway / footpath between Burnshot and Barnbougle 02/02/15 17/04/15 Almond A904 BUILYEON ROAD Between B924 Bo'ness Road and Echline Road closed overnight (7.30pm - 6.30am) Sunday to Thursday nights. OffCity of Edinburgh Council - carriageway resurfacing 08/03/15 junction peak temporary traffic lights as required 28/03/15 Almond GOGAR STATION ROAD Between Gogar Burn bridge and poultry farm City of Edinburgh Council - drainage works ahead of forthcoming carriageway resurfacing Off-peak temporary traffic lights 16/03/15 20/03/15 City Centre ABBEYHILL From Croft-an-Righ to Abbey Lane Building development works and associated utility connections Temporary traffic lights. 21/04/14 30/09/15 City Centre ST ANDREW SQUARE South side, and South St David Street Building development works (nos 3 - 8 St Andrew Square south side) Lane closures, alterations to parking bays and pedestrian crossings *South side of Square closed 4pm 18/03/15 - 12pm 20/03/15 for deliveries to development site* 02/06/14 2017 City Centre GEORGE STREET City of Edinburgh Council - creation of increased pedestrian space and dedicated cycle lanes Road closed eastbound Charlotte Square to Frederick Street and westbound St Andrew Square to Frederick Street 16/06/14 September 2015 City Centre YORK LANE Between York Place and Dublin Street Lane South Site compound for development of 44 York Place Road closed 27/09/14 21/11/15 City Centre MORRISON STREET At Morrison Link SGN - gas mains replacement project No restrictions at this time 11/10/14 City Centre CRANSTON STREET and EAST MARKET STREET City Centre WAVERLEY BRIDGE Between Princes Street & Market Street City of Edinburgh Council - 'Streetscape' improvements. Click cell for more information City Centre ROYAL CIRCUS North east leg between Circus Place and NE Circus Place Scottish Power - urgent works to repair a power fault City Centre CALTON ROAD Near Abbeyhill Crescent City Centre LADY LAWSON STREET Between Lauriston Place and West Port City Centre HORSE WYND City Centre GEORGE STREET City Centre Building development project Cranston Street open southbound only (REVERSAL OF PREVIOUS LAYOUT) and no right turn into High Street; East Market Street open westbound only between New Street and Cranston Street Road closed southbound - diversions via Princes Street, South St David Street, Queen Street, Hanover Street, The Mound & Market Street. 09/02/15 22/02/16 24/02/15 20/03/15 Road closed to through traffic 05/03/15 13/03/15 SGN - laying new gas supply Temporary traffic lights 09/03/15 23/03/15 City of Edinburgh Council / Lafarge Tarmac carriageway resurfacing Road reopened 4pm 13/03/15 09/03/15 15/03/15 Event Road closed 10am - 3pm 14/03/15 14/03/15 Between Charlotte Square and Castle Street Cannonball Run Road closed 8am 12pm 15/03/15 15/03/15 LONDON ROAD At Easter Road Scottish Water - manhole repairs 4-way temporary traffic lights 15/03/15 15/03/15 City Centre RUTLAND STREET Westwards from Lothian Road junction City of Edinburgh Council - carriageway maintenance Lane and parking restrictions as signed 16/03/15 17/03/15 City Centre WEST COLLEGE STREET Development works at Law School Road closed 16/03/15 13/08/16 From 13 March 2015 www.edinburgh.gov.uk/edintravel Start dates indicate earliest anticipated start. Finish dates represent formal notice periods works may finish earlier or be extended. Colinton/ Fairmilehead REDFORD AVENUE Between Redford Crescent and Redford Terrace Scottish Water - sewer repairs Road closed to through traffic. Works extended on 17/02/15 06/10/15 30/04/15 Colinton/ Fairmilehead COLINTON ROAD Near Redford Road City of Edinburgh Council - carriageway patching Off-peak temporary traffic lights 09/03/15 16/03/15 Colinton/ Fairmilehead FROGSTON ROAD WEST At Frogston Terrace Scottish Water - repairs to burst pipe Temporary traffic lights 12/03/15 18/03/15 Corstorphine/ Murrayfield RAVELSTON DYKES ROAD At Ravelston Golf Club (near junction with Scottish Water - repairs to water leak Craigcrook Road) Temporary traffic lights proposed 10/03/15 16/03/15 Corstorphine/ Murrayfield CORSTORPHINE ROAD Between Ormidale Terrace and Kwik Fit 15/03/15 15/03/15 Craigentinny/ Duddingston NORTHFIELD AREA 24/11/14 15/03/15 Craigentinny/ Duddingston WILLOWBRAE ROAD Between Paisley Drive and Abercorn Crescent SGN - gas mains replacement project Lane closures and parking restrictions. See entry below in addition 02/03/15 19/04/15 Craigentinny/ Duddingston WILLOWBRAE GARDENS In its entirety SGN - gas mains replacement project Road closed to through traffic. Temporary traffic lights at Willowbrae Road 09/03/15 16/03/15 Craigentinny/ Duddingston RESTALRIG ROAD SOUTH Between Sleigh Drive and Lochend Crescent Scottish Water - manhole repairs Off-peak temporary traffic lights 16/03/15 16/03/15 Drum Brae / Gyle MEADOW PLACE ROAD Between Broomhall Gardens and Forrester High School City of Edinburgh Council - installation of pedestrian islands Off-peak temporary traffic lights 07/12/14 20/03/15 Drum Brae / Gyle DRUM BRAE NORTH Between Drum Brae Terrace and Barntongate Avenue City of Edinburgh Council - carriageway resurfacing Lane closures, temporary traffic lights and side roads closed as required 16/02/15 24/04/15 Drum Brae / Gyle DRUM BRAE SOUTH At Craigmount View BT - manhole repairs Temporary traffic lights. Pedestrian crossing out of use 15/03/15 15/03/15 SGN - gas mains replacement project g restrictions affecting g York Road,, Trinity y Road,, parking Lane closures and p East Trinity Road, South Trinity Road, Clark Avenue, Denham Green Terrace, Place and Avenue, Wardie Road, Rosebank Road and Gardens, Bangholm Bower Avenue, Lennox Row, Zetland Place 19/01/15 April 2015 City of Edinburgh Council - installation of cycle loop Off-peak lane closures / contraflow counter Lane closures and parking restrictions. Rolling programme affecting Piershill Square W est, Piershill Place, Baronscourt Road & Terrace, SGN - gas mains replacement project Willowbrae Gardens, Northfield Road, Avenue, Broadway, Square, Gardens & Drive Forth TRINITY AREA Forth LOWER GRANTON ROAD Just east of Granton Square Scottish Water - investigate / repair water leak Works complete 13/03/15 12/03/15 19/03/15 Forth FERRY ROAD At Easter Drylaw View Scottish Water - manhole repairs Off-peak 3-way temporary traffic lights 22/03/15 22/03/15 Forth FERRY ROAD Between Granton Road and Wardie Road Scottish Water - manhole repairs Off-peak temporary traffic lights 22/03/15 22/03/15 Fountainbridge/ Craiglockhart GARDNER'S CRESCENT At Fountainbridge Hotel development works Road closed northbound. Diversion signed via Semple Street - Morrison Street. Access to Port Hamilton maintained and pedestrian access maintained 24/03/14 Summer 2015 Fountainbridge/ Craiglockhart DUNDEE STREET At Fountainpark exit City of Edinburgh Council - installation of cycle loop Off-peak temporary traffic lights counter 19/03/15 19/03/15 Inverleith SOUTH LEARMONTH GARDENS In its entirety City of Edinburgh Council - footway resurfacing (south side) Lane closures and parking restrictions as signed. Actual start date 21/10/14 06/10/14 31/03/15 Inverleith BRANDON STREET At junction with Eyre Place / Henderson Row Fujitsu - clearing blocked cable ducts for Virgin Media 4-way temporary traffic lights. *Works to be rescheduled, awaiting revised dates* 01/02/15 01/02/15 Inverleith COMELY BANK AVENUE Between Dean Park Crescent and South Learmonth Gardens Scottish Power - cable works Parking restrictions on west side, including bays. No significant carriageway occupation expected 03/03/15 16/03/15 Inverleith DEANHAUGH STREET Between Haugh Street and bridge at Wate BT - cable works (in footway) of Leith Parking restrictions as signed. No significant carriageway occupation expected 11/03/15 15/03/15 Inverleith CREWE ROAD SOUTH At Western General Hospital 3-way temporary traffic lights at Carrington Gardens 12/03/15 18/03/15 From 13 March 2015 Scottish Water - mains connections www.edinburgh.gov.uk/edintravel Start dates indicate earliest anticipated start. Finish dates represent formal notice periods works may finish earlier or be extended. Inverleith QUEENSFERRY ROAD At Craigleith junction Scottish Water - repairs to water leak 12/03/15 18/03/15 Inverleith INVERLEITH ROW At Warriston Crescent City of Edinburgh Council - installation of cycle loop Off-peak temporary traffic lights counter 14/03/15 14/03/15 Inverleith STRACHAN ROAD Between Hillhouse Road and March Road City of Edinburgh Council - footway resurfacing Lane closures and parking restrictions 14/03/15 15/03/15 Inverleith QUEENSFERRY ROAD At Orchard Brae House Scottish Water - manhole repairs 1 lane closed in each direction 15/03/15 15/03/15 Inverleith DEANHAUGH STREET At Dean Street City of Edinburgh Council - installation of cycle loop 4-way temporary traffic lights 7pm - 10pm counter 16/03/15 16/03/15 Inverleith QUEENSFERRY ROAD North side of Dean Bridge City of Edinburgh Council - installation of cycle loop Temporary traffic lights. Eton Terrace and Belgrave Crescent closed. counter 7pm - 10pm 18/03/15 18/03/15 Leith QUEEN CHARLOTTE STREET Between Constitution Street and John's Place Lafarge Tarmac for City of Edinburgh Council footway works Lane clos closures ures and parking restrictions 26/01/15 20/03/15 Leith Walk LEITH WALK From Crown Place to Foot of the Walk junction City of Edinburgh Council - reconstruction of carriageway and footways and junction redesign Lane closures and temporary traffic lights. Constitution Street closed. 16/02/15 15 weeks Leith Walk BEAVERHALL ROAD At Powderhall Road SGN - gas main connections Road closed. Diversion signed via Broughton Road - Logie Green Road 12/01/15 09/04/15 Leith Walk NEWHAVEN ROAD Between Ashley Place and Flaxmill Place Scottish Power - carriageway repairs Temporary traffic lights 17/03/15 21/03/15 Leith Walk BROUGHTON ROAD At Logie Green Road 3-way temporary traffic lights 22/03/15 22/03/15 Leith Walk EASTER ROAD Football fixture - Hibs v Rangers, kick-off 12.45pm Local road closures and parking restrictions 22/03/15 22/03/15 Liberton/ Gilmerton MOREDUN PARK ROAD In its entirety City of Edinburgh Council / Lafarge Tarmac carriageway resurfacing Road closed to through traffic. Side roads closed as required. Work done in sections. Lothian Buses 8 and 18 diverted from Monday 16/03/15 16/02/15 17/04/15 Liberton/ Gilmerton KIRK BRAE At Wolrige Road Scottish Power - cable works Temporary traffic lights 09/03/15 16/03/15 Liberton/ Gilmerton LIBERTON BRAE Between Alnwickhill Road and Mayfield Road Scottish Power - inspection of cable protection systems Lane closures as required, two-way traffic maintained 09/03/15 20/03/15 Liberton/ Gilmerton GILMERTON STATION ROAD Between Gilmerton Road and Ravenscroft Scottish Water - repairs to water leak Place Temporary traffic lights 10/03/15 16/03/15 Liberton/ Gilmerton CAMERON TOLL ROUNDABOUT North side City of Edinburgh Council - carriageway repairs Lane closures 15/03/15 15/03/15 Liberton/ Gilmerton HAZELWOOD GROVE At Walter Scott Avenue Crane operations Road closed to through traffic, local diversions as signed 15/03/15 15/03/15 Liberton/ Gilmerton KAIMES CROSSROADS Scottish Water - manhole repairs (Captain's Road approach) 4-way temporary traffic lights 15/03/15 15/03/15 Liberton/ Gilmerton GILMERTON DYKES DRIVE Between Gilmerton Dykes Street and Gilmerton Dykes Loan City of Edinburgh Council - footway resurfacing Road closed to through traffic, local diversions as signed 16/03/15 05/06/15 Meadows/ Morningside MARCHMONT ROAD Between Melville Drive and Warrender Park Road Scottish Water - sewer construction *Works postponed until further notice* Lane closures and temporary traffic lights. Warrender Park Road and Terrace closed as required 05/01/15 31/03/15 Meadows/ Morningside LAURISTON PLACE In its entirety (work done in phases) City of Edinburgh Council / Lafarge Tarmac carriageway resurfacing 15/03/15 10/04/15 Meadows/ Morningside HOME STREET Outside Cameo Cinema Maintenance works at Cameo 09/03/15 Ongoing Midlothian A6106 MILLERHILL ROAD Between Millerhill and Sheriffhall Roundabout Borders Railway project - realignment of existing carriageway From 13 March 2015 BT - installation of new street cabinet www.edinburgh.gov.uk/edintravel Westbound lane closure at the Esso garage Road closed overnight (7pm - 6am) Sunday to Thursday nights. Off-peak temporary traffic lights as required. Phase 1 - Lauriston Street to Tollcross Citybound lane closure between Lochrin Place & Thornybauk to accommodate temporary pedestrian walkway Spring 2015 Start dates indicate earliest anticipated start. Finish dates represent formal notice periods works may finish earlier or be extended. Road closed. Diversion via temporary road and roundabout 03/03/14 Midlothian A701 Between Bush estate and Straiton Scottish Power - laying cables Varying traffic management layouts including lane closures and temporary traffic lights 05/01/15 10/04/15 Midlothian LASSWADE ROAD At City Bypass on-slip Scottish Power Temporary traffic lights 12/03/15 25/03/15 Pentland Hills LANARK ROAD WEST Just west of Waulkmill Loan Scottish Power - locate and repair street lighting fault Temporary traffic lights, manually controlled at peak times 09/03/15 16/03/15 Pentland Hills LANARK ROAD Opposite Kingsknowe park City of Edinburgh Council - new vehicle restraint barrier Off-peak lane closures 12/03/15 16/03/15 Portobello/ Craigmillar PEFFERMILL ROAD Between Craigmillar Castle Gardens and Kings Haugh Network Rail - renewal of rail bridge Lane and parking restrictions as signed. Temporary traffic lights as required 05/05/14 28/03/15 Portobello/ Craigmillar RESTALRIG ROAD SOUTH At rail bridge Network Rail - overnight bridge works Road closed (except for access) - diversions as signed 9pm 23/02/15 6am 23/03/15 Portobello/ Craigmillar NEWCRAIGHA NEWCRAIGHALL LL ROAD East of Newc Newcraighall raighall Village Scottish Power Temporary traffic lights Temporary 03/03/15 Ongoing Portobello/ Craigmillar THE WISP On the bend roughly midway between Niddrie Mains Road and Millerhill Road Scottish Power - street lighting repairs Off-peak temporary traffic lights 03/03/15 16/03/15 Portobello/ Craigmillar SIR HARRY LAUDER ROAD Between Baileyfield Road and Fishwives' Causeway Scottish Power - installation of cables and ducting Lane closures, two-way traffic maintained. No right turn into Baileyfield Road 8am 16/03/15 until 6pm 20/03/15 04/03/15 17/03/15 Portobello/ Craigmillar DUDDINGSTON PARK SOUTH Between Niddrie Mains Road and Cleekim Scottish Water - relocation of mains valve Drive Parking restrictions as signed. No significant carriageway occupation expected 16/03/15 21/03/15 Portobello/ Craigmillar STANLEY STREET Various locations Scottish Power - cable works and carriageway reinstatements Temporary traffic lights 16/03/15 27/03/15 Sighthill/Gorgie RUSSELL ROAD At rail bridge Network Rail - bridge strengthening works Road closed - diversions as signed via Saughtonhall Drive - Balgreen Road - Gorgie Road. Pedestrian and cycle access maintained. 22/01/15 19/07/15 Sighthill/Gorgie TYNECASTLE AREA 14/03/15 14/03/15 Sighthill/Gorgie CULTINS ROAD Exit slip to Calder Road Scottish Water - manhole repairs Exit slip closed (no access to Calder Road). Diversion via Bankhead Terrace - Bankhead Avenue 15/03/15 15/03/15 Sighthill/Gorgie LONGSTONE ROAD At Kingsknowe Road North City of Edinburgh Council - footway reconstruction Off-peak temporary traffic lights 17/03/15 23/03/15 Southside/ Newington WEST MAINS ROAD At and around Mayfield Road junction Scottish Power - cable inspections Lane closures and parking restrictions. 4-way temporary traffic lights as required (dates for that TBC) 16/02/15 27/03/15 Southside/ Newington CLERK STREET At St Patrick Square 24/02/15 27/03/15 Southside/ Newington BUCCLEUCH STREET and SURROUNDING AREA 09/03/15 12/06/15 Southside/ Newington NEWINGTON ROAD At Salisbury Road City of Edinburgh Council / Lafarge Tarmac junction upgrade and carriageway resurfacing 09/03/15 17/04/15 Southside/ Newington NICOLSON STREET At Festival Theatre City of Edinburgh Council - installation of cycle loop Off-peak temporary traffic lights counter 22/03/15 22/03/15 Various MURRAYFIELD AREA Six Nations Rugby - Scotland v Ireland, kick-off 2.30pm Road closures and parking restrictions 21/03/15 21/03/15 Road closed both ways. Diversions as signed 8pm 13/03/15 and 20/03/15 6.30am 14/03/15 and 21/03/15 Football fixture - Hearts v Dumbarton, kick-off 3pm Mcleod Street closed, local parking restrictions City of Edinburgh Council - footway and garden works City of Edinburgh Council / Lafarge Tarmac upgrade of cycle facilities between Meadows and Innocent Path Citybound lane closure to accommodate temporary pedestrian walkway. Parking restrictions and temporary bus stop as signed Lane closures, off-peak temporary traffic lights (not at the same time as those on Newington Road) and side-road closures as required. Works on Clerk Street to follow, expected to start 27/04/15 Salisbury Road and Salisbury Place closed. Temporary traffic lights as required on Newington Road but not at the same time as those on Buccleuch Street Trunk roads (in date order) M8 From 13 March 2015 Between J3A and J4A Amey SE Scotland - carriageway resurfacing www.edinburgh.gov.uk/edintravel Start dates indicate earliest anticipated start. Finish dates represent formal notice periods works may finish earlier or be extended. Liberton/ Gilmerton From 13 March 2015 CITY BYPASS At Sheriffhall roundabout Amey SE Scotland - preparations for reopening of Lane closures all approaches and outer ring of roundabout closed Millerhill Road www.edinburgh.gov.uk/edintravel 8pm 20/03/15 5am 21/03/15 Start dates indicate earliest anticipated start. Finish dates represent formal notice periods works may finish earlier or be extended.
© Copyright 2024