Comisión Federal de Electricidad Colombia – Escobedo Gas Pipeline Colombia – Escobedo pipeline will transport natural gas from Webb County, Texas to Mexico. It will supply natural gas to CFE’s new power generation plants in the State of Nuevo Leon, as well as the North and Northeast regions. This pipeline will be interconnected to the National Pipeline System in the State of Nuevo Leon. This system will supply natural gas to new power generation plants, as well as those currently operating with fuel oil which will be converted to use natural gas as their base fuel. Transparencia Mexicana will overview the bidding process in order to comply with the highest standards of transparency. Project Details: The project comprises the design, engineering, procurement, construction, operating and maintenance of a pipeline with capacity up to 505 million cubic feet per day (MMCFD). However, the developer will have the option of calling for an open season after the CFE award to oversize the pipeline if the market The pipeline will have 250 kilometers long and a 42-inch diameter at least to supply CFE’s needs. The estimated project implementation time is 24 months. Geographic Location: State of Nuevo Leon Relevant Facts: Estimated Investment: 450 Colombia Escobedo NUEVO LEÓN million U.S. dollars CFE Capacity: 505 MMCFD Length (approx.): 250 km Pre-bid Docs Publication: March, 2015 Final Docs Publication: March, 2015 Proposals Filing: May, 2015 Awarding of Contract: June, 2015 Commercial Operation: June, 2017 Dates under approval by authorities and government regulators.
© Copyright 2024