SYNTEX Group of Industries HYDROXIDE Knitwear Ltd. (Unit I, II & III) SYNTEX Knitwear Ltd. (Unit IV) Mouchak (opposite National Scout Camp) Kaliakor, Gazipur, Bangladesh Phone: (8802) 9297923-5 Fax: (8802) 9297926 Head Office: House 33, Road 4, Block F, Banani Dhaka 1213, Bangladesh Phone: (8802) 8810640, +8801712204249 Fax: (8802) 8828291 Email: [email protected] Website: www.hydroknit.com About us: Syntex Group has been a major manufacturer of Sweaters and Cardigans in Bangladesh since 2002. Our state of the art production facility has a capacity of 3,33,500 pieces basic sweater per month comprising 5 individual production units under separate management. Our factory has over 198,000 sft floor production space and meets the quality and compliance standards of the top retailers in the world. The Board of Directors of the Group is: 1. Mr. Abdul Hamid Chowdhury (Chairman) 2. Mr. Omar Hamid Chowdhury (Managing Director) 3. Mr. Akbar Hamid Chowdhury (Director) Contact Person: Himoo Palash Sales & Marketing Email: [email protected] Our Banker: One Bank Limited Kawran Bazar Branch HRC Bhaban, 46 Kawran Bazar C/A Dhaka 1000 Phone: 8802 8156054, 8155158 Swift Code: ONEBBDDHA012 Message from the M.D Our Mission Statement to our customers is that we promise uncompromising quality, competitive prices and on time delivery. Syntex Group has emerged as a leader in the sweater industry in Bangladesh because of our high business ethics, commitment and innovation in new design development. While we are continuously setting new standards in the knitwear industry, we also strive to set the highest standards in regards to the welfare of our employees, local community and environment. Best Regards, Omar Hamid Chowdhury Managing Director Production Related Information: 1. Knitting Machines & CapacityGauge 12gg 7gg 5gg 7gg+5gg 3gg Jacquard No. of Machines 950 sets 210 sets 200 sets 240 sets 510 sets 42 sets Monthly Production 1,20,500 Pcs 45,500 Pcs 46,000 Pcs 53,000 Pcs 125,000 Pcs 52000 pcs 2. Finishing Sections (Wash, Dry, Iron, PQC + Packing) = 4 Units Finishing Capacity = 350,000 Pieces Per Month 3. Factory Layout (6 floors x 33,000 sft/floor = 198,000 sft) Ground Floor: Bonded Warehouse, Knitting Substation + Generators, Boilers, ( Workers Canteen , Wending , Child-Care Center, Chemical Store ) Other Shed. First Floor / Unit I: Knitting (3, 5 & 7gg) > Link/ Trim/ Mend > Wash/ Dry /Iron /PQC + Packing Second Floor / Unit II: Knitting (12gg) > Link/ Trim/ Mend > Wash/ Dry /Iron /PQC + Packing+ Doctor’s Room Third Floor / Unit III: Knitting (12gg) > Link/ Trim/ Mend > Wash/ Dry /Iron /PQC + Packing+ Sample Room. Fourth Floor / Unit IV: Knitting (3, 5, & 7gg) > Link/ Trim/ Mend > Wash/ Dry /Iron /PQC + Packing Fifth Floor / Unit V: Knitting (12gg ) > Link/ Trim/ Mend > Wash/ Dry /Iron /PQC + Packing Quality Assurance: Our quality control team conducts in line inspection at every stage of production to ensure conformity with the customers requirements. The Quality Control Manager inspects every shipment and reports directly to the Managing Director. Factory Compliance Checklist: + Ethical & Social Compliance + Payroll & Overtime records + Personnel File for every employee + Safe & Sanitary working environment + Workers Canteen + Child Care Facility + Clinic & Full Time Doctor for workers Our Vision: Our Customer is our top priority. We pride ourselves on being the industry leaders in Customer Satisfaction Quality Commitment Environmental Consciousness Social Responsibility
© Copyright 2024