here - City Connect

CityConnect Canal Phase 1 Closures - Final Surfacing
No further surfacing
1 July 2015 - 3 July 2015
Bridge 209 to Bridge 207d
Area 4 Thackley
Area 2
Rodley Calverley
Area 5 Shipley
Area 3 Apperley Bridge
1 May 2015 - 7 May 2015
Locks 8,9 & 10 to
Newlay Locks
No further surfacing
7 May 2015 - 11 May 2015
Newlay Locks to Bridge 221
24 June 2015 to 30 June 2015
Bridge 215 to Bridge 214
Area 1
Kirkstall Rodley
19 June 2015 to 30 June 2015
Bridge 218 to Bridge 217
The red and blue lines show the extent of the individual
sections of path closures for works
17 June 2015 18 June 2015
Bridge 219 to Bridge 218
12 June 2015 - 16 June 2015
Bridge 221 to Bridge 218
28 April 2015 1 May 2015
Bridge 222 - Locks 8,9 & 10
The purple line indicates that no further surfacing works
will take place.
Notice of path section closure timings will be provided on
site and on CityConnect and Canal River Trust websites.
www.cyclecityconnect.co.uk
www.canalrivertrust.org.uk
This map is reproduced from Ordnance Survey material with the permission of Ordinance Survey
on behalf of the Controller of Her Majesty's Stationary office © Crown Copyright
Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings (100020521) 2014
and © OpenStreetMap contributors 2014
0
0.35
0.7 Kilometers
¯
1:26,619 @ A3
© 2009 OpenStreetMap