CityConnect Canal Phase 1 Closures - Final Surfacing No further surfacing 1 July 2015 - 3 July 2015 Bridge 209 to Bridge 207d Area 4 Thackley Area 2 Rodley Calverley Area 5 Shipley Area 3 Apperley Bridge 1 May 2015 - 7 May 2015 Locks 8,9 & 10 to Newlay Locks No further surfacing 7 May 2015 - 11 May 2015 Newlay Locks to Bridge 221 24 June 2015 to 30 June 2015 Bridge 215 to Bridge 214 Area 1 Kirkstall Rodley 19 June 2015 to 30 June 2015 Bridge 218 to Bridge 217 The red and blue lines show the extent of the individual sections of path closures for works 17 June 2015 18 June 2015 Bridge 219 to Bridge 218 12 June 2015 - 16 June 2015 Bridge 221 to Bridge 218 28 April 2015 1 May 2015 Bridge 222 - Locks 8,9 & 10 The purple line indicates that no further surfacing works will take place. Notice of path section closure timings will be provided on site and on CityConnect and Canal River Trust websites. www.cyclecityconnect.co.uk www.canalrivertrust.org.uk This map is reproduced from Ordnance Survey material with the permission of Ordinance Survey on behalf of the Controller of Her Majesty's Stationary office © Crown Copyright Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings (100020521) 2014 and © OpenStreetMap contributors 2014 0 0.35 0.7 Kilometers ¯ 1:26,619 @ A3 © 2009 OpenStreetMap
© Copyright 2024