NOTES COPYRIGHT ROBERT POTTER & PARTNERS LLP 2012 existing chimney serving living room to be retained, repaired where required with new application of white render to match external walls DO NOT SCALE DIMENSIONS FROM THIS DRAWING. ALL DIMENSIONS, INCLUDING FIGURED DIMENSIONS, TO BE CHECKED ON SITE PRIOR TO COMMENCING ANY WORKS new stainless steel flue terminal serving existing boiler new concrete roof tiles with wet ridges to hips - Marley "Ludlow", colour grey existing cast iron gutter to be retained and re-painted black existing timber fascia/soffit to be replaced where required and repainted black new timber fully reversible windows with white paint finish new hardwood glazed door and frame with laminated glazing insulated render system, Alumasc "Swisslab", with white Silkolitt silicone render finish new concrete roof tiles with wet ridges to hips - Marley "Ludlow", colour grey North Elevation existing base course to be re-painted black as existing insulation to ventilated roofspace existing cast iron RWP and SVP to be relocated to accommodate insulated render system insulated render system, Alumasc "Swisslab" or equal, with white Silkolitt silicone render finish West Elevation existing chimney serving living room to be retained, repaired where required with new application of render to match external walls Bedroom Bedroom new concrete roof tiles with wet ridges to hips - Marley "Ludlow", colour grey existing cast iron gutter to be retained and re-painted black existing timber fascia/soffit to be replaced where required and repainted black new timber fully reversible windows with white paint finish insulation fitted between floor joists new hardwood glazed door and screen with laminated glazing Section A-A insulated render system, Alumasc "Swisslab", with white Silkolitt silicone render finish existing handrail to be painted black existing base course to be re-painted black as existing existing cast iron RWP and SVP to be relocated to accommodate insulated render system South Elevation existing PIR light to be checked and re-used new window East Elevation boiler flue PIR A svp relocated rwp relocated extract terminal tile (bath) PRELIMINARY new window extract terminal tile (kitchen) new extract fan new extract fan REVISIONS & ADDITIONS DATE A 03.04.12 Main entrance door elevation updated BY CDF Bedroom 1 Bathroom existing boiler to be re-used N D2 new door Kitchen W. Linen W. PROJECT existing chimney repaired where required Hatch National Trust forScotland Brodick Castle and Country Park Proposed Upgrading Works to Wineport Lodge Hall Lounge DRAWING TITLE Bedroom 2 D1 Proposed Plans, Elevations & Section new window new entry door & screen ROBERT POTTER & PARTNERS CHARTERED ARCHITECTS & PROJECT MANAGERS new window rwp relocated PIR 7 MILLER ROAD, AYR 51 NEWALL TERRACE, DUMFRIES 87 HANOVER STREET, STRANRAER 169 ELDERSLIE STREET, GLASGOW new window existing PIR light to be checked and re-used Ground Floor Plan A Roof Plan SCALE 1: 50 @ A1 1: 100 @ A3 DATE Jan. 2012 DRAWN BY CHECKED BY CDF KA7 2AX DG1 1LN DG9 7RS G3 7JR 01292 - 261228 01387 - 255509 01776 - 703453 0141- 332 9111 7585/02 REVISION A
© Copyright 2024