NOTES COPYRIGHT ROBERT POTTER & PARTNERS LLP 2012 DO NOT SCALE DIMENSIONS FROM THIS DRAWING. ALL DIMENSIONS, INCLUDING FIGURED DIMENSIONS, TO BE CHECKED ON SITE PRIOR TO COMMENCING ANY WORKS Knauf Earthwool Loft Roll 44 quilt 100 mm thick laid between roof trusses and 250 mm thick Knauf Earthwool Loft Roll 44 quilt laid opposite direction over roof trusses/ quilt. one layer of reinforced roofing felt to BS 747 on 9.5mm OSB Sterling sarking boards 50 x 18mm treated softwood counter battens Marley 'Ludlow' concrete roof tile, nailed and clipped 25 x 50mm treated softwood battens 550 x 25mm Glidevale RV601 rafter ventilator with integral insect screen 325mm wide layer type 5U polyester based felt to BS747 underlapping first width of sarking felt and dressed down into gutter. treated softwood sprocket pieces fixed to trusses existing metal gutter bracket to be retained & re-used existing cast iron gutter to be retained & re-used existing concrete wall panel over fascia ventilator existing plasterboard lining on timber straps to inside face existing timber fascia and soffit re-painted existing cast iron rainwater pipe to be retained and re-painted. Position to be adjusted to accommodate insulated render system corner bead in powder coated galvanized steel dpc new hardwood decorative lintel to receive paint finish Alumasc Silkolitt silicone render finish reinforcing scrim embedded into scrim adhesive new timber double glazed window mechanical fixing to concrete panel render finish silicone mastic bead Insulated Render System (Alumasc Swisslab) Pretreatment:- Hack off all existing render surfaces and remove all defective, loose and damp areas of existing render. Clean down surface using a stiff brush to remove any friable or deleterious material and to provide a good key for insulated render board. Scrape off etc any heavy organic growths and apply one coat of MR fungicidal wash to the entire surface by roller or spray and allow to dry. Apply one coat of MR acrylic stabilising solution/bonding agent by roller / brush / spray to areas where existing render has been hacked off and require MRS5 Dubbing Render - all as per manufacturer's recommendations. Render Finish:- Alumasc ST Silkolitt Silicone render (colour white) with aggregate dash finish, average thickness 8mm. Render finish applied on to MR alkali resistent scrim (3mm thick), embedded into scrim adhesive. Insulation:- Alumasc 60mm Phenolic rigid insulation, density 40kg/m3. Boards to be mechanically fixed to concrete panels. Stop beading to be installed at base of system formed in white powder coated galvanized steel. Corner beading to be installed at external corners and at corners adjacent to window and door jambs, formed in coated galvanized steel. Existing air vent panels to be retained where possible and re-used within insulated render system. Ensure minimum window cill overhang of 50mm above insulated render system. 60mm phenolic insulation board dpc existing concrete wall panel mastic sealant expanded foam to limit air leakage and moisture ingress existing concrete wall panel existing plasterboard lining on timber straps to inside face dpc new softwood internal cill / apron with white paint finish existing plasterboard lining on timber straps to inside face expanded foam to limit air leakage and moisture ingress new double glazed timber window new softwood internal cill / apron with white paint finish Detailed plan of window at jamb scale 1:5 Alumasc Swisslab insulated render system incorporating Silkolitt silicone render finish on reinforcing scrim on 60mm phenolic rigid insulation, mechanically fixed to concrete panels 75mm thick Celotex GA4000 rigid insulation boards fitted between existing floor joists on 18 x 25mm battens Note: Area shaded grey denotes existing structure and is subject to confirmation on site. REVISIONS & ADDITIONS A DATE Insulation increased below floor; notes amended in relation to the render finish. 05.03.12 BY CDF stainless steel beading / insulation support rail PROJECT National Trust forScotland Brodick Castle and Country Park Proposed Upgrading Works to Wineport Lodge vented solum basecourse to be re-painted DRAWING TITLE rainwater shoe to be fitted to existing downpipe Detailed Section through External wall / Eaves / Floor new gulley hopper to be installed to accommodate re-positioned external RWPs ROBERT POTTER & PARTNERS CHARTERED ARCHITECTS & PROJECT MANAGERS 7 MILLER ROAD, AYR 51 NEWALL TERRACE, DUMFRIES 87 HANOVER STREET, STRANRAER 169 ELDERSLIE STREET, GLASGOW Detailed section thru' external wall / eaves / floor scale 1:5 SCALE 1 : 5@A1 1:10@A3 DATE Jan. 2012 DRAWN BY CHECKED BY CDF KA7 2AX DG1 1LN DG9 7RS G3 7JR 01292 - 261228 01387 - 255509 01776 - 703453 0141- 332 9111 7585/03 REVISION A
© Copyright 2024