PUBLIC WORKS DEPARTMENT Project: Babcock Phase V Precinct: 3 Location / Limits: From Camp Bullis to Heuermann (Kyle Seale Pkwy to Camp Bullis Rd). Scope: Reconstruction of Babcock Rd to include two travel lanes and fourfoot shoulders. Roadway reconstruction will provide unflooded access to this segment of roadway and will include the construction of four bridges and a bridge class culvert. Status: Construction (52 %) Additional Information: Consultant: TEDSI Bid Opening: July 1, 2013 Contractor: J3 Companies LLC Construction Start: Nov. 19, 2013 Construction Cost: $ 8,566,353.95 Construction End Date: 1 Q 2016 Joint Bid: CPS & SAWS With Flood Control Component May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Borgfeld Dr Phase I Precinct: 3 Location / Limits: From Timberline Dr to Hwy 281. Scope: Reconstruction approximately 14,300 linear feet of Borgfeld Road to a Secondary Arterial Type “A” street and reconstruct drainage culverts. Streets section will consist of a 56 foot wide pavement, including four 12 foot lanes and 4 foot wide shoulders, with roadside ditches. Status: Construction ( 59 %) Additional Information: Consultant: Jacobs Bid Opening : April 5, 2013 Contractor: SMC Contractors Construction Start: July 15, 2013 Construction Cost: $ 8,696,305 Construction End Date: 3 Q 2015 Joint Bid: SAWS, CPS Gas Bond 2003 May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Borgfeld Dr Phase II Precinct: 3 Location / Limits: From Timberline Dr to FM 2696 (Blanco Rd) including Old Blanco Rd south of Borgfeld Drive. Scope: The project consists of 2 miles of roadway reconstruction to two-12 ft. travel lanes in each direction designated turn lanes at intersections, two 4-foot shoulders and necessary drainage. Status: Final Design Additional Information: Consultant: CDS Muery Services Advertise Date: Contractor: TBD Construction Start Date: 3 Q 2015 Construction Cost: $ 6,909,167 Construction End Date: 2 Q 2017 Joint Bid: TBD May 11, 2015 4 Q 2015 PUBLIC WORKS DEPARTMENT Project: Boerne Stage Road Precinct: 3 Location / Limits: From Cross Mountain Trail to Intersection of IH 10. . Scope: The project consists of 1.1 miles of roadway reconstruction to 2-12 ft. lanes and a 14 ft. continuous center turn lane with a 6 ft. shoulder in most sections. It also consists of channel improvements to Leon Creek and drainage structure. Status: Construction (76 %). Additional Information: Consultants: AECOM Bid Opening: August 9, 2013 Contractor: Texas Sterling Construction Start : Dec 2, 2013 Construction Cost: $ 8,171,894 Construction End Date: 3 Q 2015 Joint Bid: SAWS, CPS-Gas With Flood Control Component May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Bulverde Rd Phase IV Precinct: 3 Location / Limits: Expansion of Bulverde Rd from Marshall Road to approximately 6,300 ft. north. Scope: Project will expand the existing two lane rural roadway section to an urban roadway section consisting of two 12 foot travel lanes in each direction with a 14 foot center median/turn lane within an 86’ ROW (Typical). Status: Final Design Additional Information: Consultant: LAN Inc. Advertise Date: 4 Q 2015 Contractor: TBD Construction Start Date: 3 Q 2016 Construction Cost: $ 7,631,300 Construction End Date: 4 Q 2017 Joint Bid: SAWS , CPS Gas MPO Project May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Bulverde Road Phase V Precinct: 3 Location / Limits: From the end of Bulverde Road Phase IV (approx. 6,300 ft. north of Marshall Rd) to Smithson Valley Rd. Scope: Project will expand the existing two-lane rural roadway section to an urban roadway section consisting of two 12-foot travel lanes in each direction and 2 ft. to 4 ft. shoulders within an 86’ ROW (typical). Status: Construction (68 %). Additional Information: Consultants: HALFF Bid Opening: Aug. 16, 2013 Contractor: Capital Excavation Construction Start: Nov. 19, 2013 Construction Cost: $ 8,066,351 Construction End Date: 3 Q 2015 Joint Bid: SAWS, CPS-Gas With Flood Control Component May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Bulverde Rd Pedestrian Amenities Precinct: 3 Location / Limits: Bulverde Rd from Evans Rd to Marshall Rd. Scope: The proposed project will involve the installment of pedestrian amenities within the existing 86 foot Bulverde Road right-of-way for the benefit of area bicyclists and pedestrians stretching 6,864 linear feet. Status: Preliminary Design. Additional Information: Consultant: KLOTZ Associates Advertise Date: TBD Contractor: TBD Construction Start Date: TBD Construction Cost: 1,200,000 Construction End Date: TBD Joint Bid: N/A May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Marshall Rd Precinct: 3 Location / Limits: From US 281 to Bulverde Rd. Scope: Roadway reconstruction and expansion from a 2 lanes to a 3 lane urban configuration with drainage improvements and pedestrian amenities within a 80’ ROW (typical) . 4,800 L.F. Status: R.F.Q. Additional Information: Consultant: TBD Advertise Date: Contractor: TBD Construction Start Date: Construction Cost: $ 3,000,000 Construction End Date: TBD Joint Bid: TBD May 11, 2015 TBD TBD
© Copyright 2024