"Contract Allocation" CALL CT 2003 / 2013 Rev 1 CONTRACT ALLOCATION NO. : CT 2003/2013/5077 RD File No. : TM File No. : Other related files : RD40/15 CLASSIFICATION OF WORK ASSIGNMENT: RWP Ref : CA Issue Date : Level 1 CLOSING DATE : X RWP1-426/15 Level 2 Level 3 CLOSING TIME : Level 3 LOCATION FOR SUBMISSION: 1. 2. Locality and Location of Works : p/o Strait Street, Valletta (btw South Str and Melita Str) Entity Requiring work : X Transport Malta Other : 3. Description of works required : Paving Works and other ancillary infrastructural works. 4. Delivery Period of Works : 5. Works Order Ref. : 6. Start Date : 7. Total "Contract Allocation" Value : € 56,492.28 8. Enclosed Documents forming part of this Works Order Contract : Site Plan: X ____35_____ calendar days (ref to cl. 1.1.11 as necessary). _____________ (if applicable). ____/_____/_____ End Date : ____/_____/_____ attached Construction detail(s): X Copy of works' permit and conditions: X Programme of works: X attached Traffic management plan: X attached Quality assurance programme: attached attached Comments : Page 1 of 2 CT 2003 / 2013 "Contract Allocation" CALL 9. General : i. The Contract and the Works emanating from the award of this "Call-Off" shall be regulated by all the applicable Contract Conditions and Specifications defined under the Framework Agreement for the construction and maintenance of roads and for trenching and plant laying works for the extension and renewal of electricity cable, potable water and waste water pipe networks in different localities in Malta and Gozo on behalf of the Authority for Transport in Malta. ii. The appointed contractor shall enter into a Contract of Works in respect of this assignment in accordance with Appendix I of Volume 1 of the Invitation for participation in the Framework Agreement. 10. Product & Performance Guarantee : € _________________ To be submitted as per cl. 1.1.14 and Volume 2, Section 4; 10% of this Contract Allocation Value. Submission within 10 days from Notification of Award. 11. Declaration : In response to your invitation to tender for the above contract, I / we, the undersigned, hereby i. declare that: I / We have examined and accept in full the content of this “Contract Allocation" No. […….......]. I / We have inspected and familiarised myself / ourselves with the location of the Works and the corresponding site conditions. I / We hereby accept the provisions of this dossier in their ii. entirety, without reservation or restriction; I / We offer to execute and complete, in accordance with the terms of the "Contract Allocation" dossier and the conditions and time limits laid down, without reserve and restriction, the iii. required works; The price of my / our tender is to be decided in accordance with the rates tendered in the attached Schedule of Rates. It is also declared that if no other rates are indicated in this iv. Schedule of Rates our tender shall be as per maximum rate. This tender is for a period of 150 days from the final date of submission of tender. v. If my / our tender is accepted, I / we undertake to abide by all applicable contract conditions and specifications defined under this Framework Agreement that I / we have entered into with the Authority for Transport in Malta. Name & Surname : _________________________ authorised to sign obo : __________________ Signiture : Date : Stamp of the company : Page 2 of 2 Rev 1 SITE S IR A ST CHIEF OFFICER PROJECT TITLE : S.GRIMA ARCHITECT A.C. CHECKED BY * VALLETTA DRAWING TITLE : TRIQ ID-DEJQA B/W SOUTH TO MELITA SITE PLAN DATE : J.B. FILE No : DRAWING No : RD40/15 February 2015 RD26/15 PROJECT No. : DRAWN BY P:\Design\Common Area\Traffic Management\2015\Valletta\2015 Valletta.dwg SHEET SIZE M.B. A4 SCALE : 1 : 2500 REVISION : A SHEET No : 2 25 m 25 m CHIEF OFFICER PROJECT TITLE : S.GRIMA ARCHITECT A.C. CHECKED BY * VALLETTA DRAWING TITLE : TRIQ ID-DEJQA B/W SOUTH TO MELITA TRAFFIC MANAGEMENT DATE : J.B. FILE No : DRAWING No : RD40/15 February 2015 RD26/15/a PROJECT No. : SHEET SIZE DRAWN BY P:\Design\Common Area\Traffic Management\2015\Valletta\2015 Valletta.dwg M.B. A4 SCALE : 1 : 2500 REVISION : A SHEET No : 2a 0 1 2 3 4 5 6 7 8 9 10 20 30 N -1.0 40m 3 1 2 2 Plan indicating Paving as Existing Scale: 1:200 3 9 15.30 16.30 Existing Street Lighting LEGEND for Proposed Paving: Plan indicating Paving as Proposed 9 Old hardstone steps to be lifted, restored and re-layed on a new bedding, Scale: 1:200 10 LEGEND for Existing Paving: 1 2 3 4 Deteriorating old hardstone steps showing: 1) settling 2) cracks and missing parts New hardstone paving as existing New hardstone paving as existing 5 6 Deteriorating new hardstone paving as existing showing: 1) settling 2) cracking concencrated in areas marked in red. 40W LED 3025 lumens 3000 K colour temperature Lava / hardstone paving as proposed NOTES: 11 Old hardstone steps to be lifted, restored and re-layed on a new bedding. Concrete sections are to be removed and replaced with recycled hardstone 12 Hardstone paving steps as proposed 1. 2. 3. All dimensions are in Metres. Do not scale directly from drawing. This drawing is covered by copyright and may not be reproduced without the permission of the Director General - Projects Design and Implementation Division. Extent of deterioration shown on drawing is only indicative. 4. Pressed pattern concrete paving 7 Concrete cast in situ 8 Deteriorating old hardstone steps alternating with concrete and deffun fill showing: 1) settling 2) cracks and missing parts PROJECT TITLE : REHABILITATION PROJECTS OFFICE 210, TRIQ IR-REPUBLIKA, VALLETTA Tel: (+0356) 22921800 TRIQ ID-DEJQA PAVING PROJECT DRAWING TITLE : DIRECTOR GENERAL : R. FARRUGIA Lava paving as existing 80W 6050 lumens 3000 K colour temperature CHIEF DRAUGHTSMAN : DIRECTOR : CHIEF ARCHITECT : N. GATT DRAUGHTSMAN : M. FSADNI SURVEYOR : - S.S.I. TRACED BY : --DATE : ARCHITECT / ENGINEER : --- DATE : DRAWING SCALE : 1:200 DETERIORATION DATA GATHERED BY : -- --- DATE : 15-14 FILE No : DRAWN BY : S.S.I. 001 P:\Design\Common Area\Local councils\VALLETTA\Triq Id-Dejqa\\Triq Id-Dejqa Pavement Drawings.dwg SHEET SIZE A3 DRAWING No : RD 40/15 February 2015 DETERIORATION DATA PLOTTED BY : SCALE : 1:200 REVISION : A RD21/15 SHEET No : 1 PROJECT Strait Street, Valletta (btw Melita Street str and Melita Street) LOCALITY Valletta Item 1 2 3 Week 1 4 5 6 7 34 35 WSC works Excavation works Road formation works Paving Works Item Week 5 29 WSC works Excavation works Road formation works Paving Works 30 31 32 33 8 9 Week 2 10 11 12 13 14 15 16 Week 3 17 18 19 20 21 22 23 Week 4 24 25 26 27 28 EXISTING WALL GRADIENT 1:40 PROPOSED STAIRS LEVELS EXISTING HARDSTONE SLABS SAND-CEMENT BEDDING AS PER SPECIFICATIONS 150MM THICK CONCRETE SLAB C25 WITH A252 EXISTING SUB-BASE MATERIAL NOTES: 1. ALL DIMENSIONS ARE IN MILLIMETERS. Rev : Remarks : tm Transport Malta Roads & Infrastructure Directorate - M:\Common\Daniel Micallef\Road Construction\Residential Roads\Residential Roads.dwg Issued drawing. Drawn : M.Borg Date : 16-3-15 Title : Drawing No. : PAVEMENT CONSTRUCTION SECTION DETAILS - 2000 1250 tm Transport Malta 2000 tm Transport Malta 1250 APPROVED PROJECT : ARCHITECT DRAWING TITLE : DESIGN MANAGER DRAWING No. : Framework Drawings FM-20 DRAWN BY SCALE : 1 : 20 File Path : M:\Common\Mark Borg\Traffic Management\framework drwgs.dwg tm Valletta Paving Roads TM Works Signs DATE: File No. : 02-02-2015 Revision : * Transport Malta Roads & Infrastructure Directorate SHEET SIZE : A4 * Revision Alterations Date 900 900 Warning 600 600 Keep out Construction Area Authorized Personnel only Sign 900 900 600 600 ROAD CLOSED tm Transport Malta MUST BE WORN AT ALL TIMES Construction Area Safety Wear Sign APPROVED PROJECT : Framework Drawings ARCHITECT DRAWING TITLE : Construction Area Works Signs DESIGN MANAGER DRAWING No. : FM-19 SCALE : DRAWN BY p:\design\common area\public transport reform\framework.dwg File No. : 16-1-2013 Revision : n.t.s. File Path : DATE: * Roads & Infrastructure Directorate SHEET SIZE : A3 * Revision Alterations Date
© Copyright 2024