Crissy Field Marsh Mason St Quartermaster Reach 603 653 610 (Sports Basement) yle (Do Dr) 228 229 201 io P id Pres ay arkw Fre nch 227 Ct Gr Hallec ah a k St m St 106 St 210 ery 105 ntg om 215 Mo 218 0ft 100ft 200ft aA ve 222 St ln Blv d 36 ah 87 Gr parking sA ve 86 overlook 35 400ft to ns 2 Fu Civil War Parade Me sa St 37 nA ve ye public restrooms Ke accessible paths co am water feature interpretive feature loading orientation/information Lin An z trees furnishing existing buildings new buildings lawns gardens & meadows bluff slope predominately native plantings dunes/learning landscape paths terraces & gathering areas parking area secure area at youth campus site boundary 220 Main Parade Ground 104 223 JAMES CORNER FIELD OPERATIONS Alternative 3 – New Presidio Parklands Concept 1 The New Presidio Parklands Alternative Concepts were developed by James Corner Field Operations in partnership with the New Presidio Parklands Project Team, and emerged from the design submitted during the “Imagine” phase and subsequent public input. The following three concepts respond to public input received to date and may be modified and/or merged into a single alternative during the “Design” phase. A small structure is added in the visitor plaza for restroom. Concept 1 includes a Youth Campus that comprises the Crissy Field Center (Building 603) and a Learning Landscape at the base of the bluff where outdoor environmental education and immersive exhibits are offered. Crissy Field Center remains as is. Concept 1 includes three overlooks. Concept 1 is an open, naturalistic setting for individuals, families, and small groups. Some Key elements: Pathways, gardens, and programming and small-scale events can be meadows; a central fire p it n ear t he p laza a nd areas to picnic, sit, and gather; three overlooks; accommodated. areas for programming; and 26,518 square The Observation Post (Building 211) is feet of building space 64 parking spaces. demolished and not replaced. Building 201 is moved to its permanent location on the west side of Halleck Street and rehabilitated by the Presidio Parkway (Doyle Drive) project. 210 is rehabilitated as the new Presidio Visitor Center under a separate Trust action. 215 remains the Transit Center. Alternative 3 – New Presidio Parklands Alternatives Alternative 3 – Concept 1 Alternative 3 – Concept 2 Alternative 3 – Concept 3
© Copyright 2024