Business Plan for St John's Church, Cove: Access for All Project Submitted by St. John’s Church Vision Group on behalf of the Cove Parochial Church Council, December 2013 1 1. Summary of Organisation Cove Parochial Church Council (PCC) administers the three churches of the Parish of Cove, including St John's, Cove (where the proposed project will take place). We are part of the Diocese of Guildford, in the Church of England. We are a registered charity with a legal mandate and corporate responsibility to serve our expanding parish community of around 25,000 people in pastoral and social care, as well as outreach and hospitality. St John’s, built as the original Parish Church in 1844, is a historic local landmark, with a large churchyard designated as a Site of Interest for Nature Conservation (SINC) and a hall used midweek as a pre-School by an independent trust. St John’s has its own legal sub-group of the PCC, the District Church Council (known as the Church Vision Group, hereafter CVG) which is seeking to make St John’s church building an accessible modern community facility with access for all, providing for our diverse and changing local communities. This is in line with our PCC constitution which has been uploaded with the online application. All Church of England PCCs have charitable status in law, and are governed by statute, as recorded at http://www.legislation.gov.uk/ukcm/Eliz2/4-5/3/data.pdf. As our audited accounts show, the Parish of Cove and in this case, St John’s in particular, sustains itself through the generous giving of church and community members. Whilst we do share one set of finances and accounts, funding relating to each church is clearly accounted for, reserves are kept and funds are restricted for certain uses. Moreover, we do not receive ‘handouts’ from the central Church of England; in fact, we contribute directly towards our local Guildford Diocesan ‘Parish Share’ which ensures that the incumbent vicar of St John’s and the other two churches receives a stipend from the Diocese, as well as the Diocese providing certain services to us as a parish, including supporting clergy housing and advice on church building and legal matters through the Guildford Diocesan Advisory Committee (DAC) and Registry. All local spending relating to our activities and property is raised locally. We have worked hard over many years to raise funds towards making St John’s church building accessible to all and fit-for-purpose, and now we are attempting to bring this work to fruition. 2 2. Background to the organisation and the project St John’s CVG has a proven track record of handling building works and of promoting effective community engagement. This application is to support the second phase of a long-standing project. Phase 1, completed in September 2009 under the leadership of the CVG, reordered the ill-equipped interior of the church building. This included fitting a new carpet, installing new under-floor heating, rewiring the electrics, adding a new audiovisual system, undertaking redecoration and removing some pews to create a carpeted community space with 50 moveable chairs. This has revolutionised the potential use of the building and turned a cold Victorian building into a warm and welcoming space, without any loss of heritage. These works, funded through the sale of a parish house, came in on budget. See images below. After: new carpeted multi-purpose area in the chancel area Before: view from nave to chancel (emptied for works) After: new view from nave, including audiovisual system 3 Phase 2: Extension for an Accessible Toilet, Kitchenette and Welcome Area For this second phase, we have already raised significant local funding, re-enlisted the same architect, Nye Saunders, and formed the same essential committee of volunteers, as overleaf. We are now addressing a second long-standing problem. St John’s Church has no foyer space, toilet or proper catering facilities on site (although we do have small sink and a kettle in the vestry at the East end of the building, which we manage to use at present). A routine five-yearly building inspection undertaken in April 2012 for the Diocese of Guildford again identified access for all as an urgent issue. Although the Church Hall toilets are 80 metres walk away, they are accessible only via a sloping pathway and through the main area of the church hall. However, during the week the St John’s pre-School hires (at a very affordable rate) the hall from 9.30am-12.30pm and 12.30-3.30pm for all but two weekday sessions to deliver statutory pre-School provision. This makes the hall off-limits, practically and in terms of safeguarding, during those hours. The Parish has a long-standing and excellent partnership with the St John’s Pre-School, an independent trust which has used the St John’s Church Hall for over 40 years to cater for local families. The trust has expressed their support in writing for this project, although it will have no direct bearing on their own facilities. This second phase project envisages an imaginative extension to the west end of the church building, to incorporate a new community facility into the building. This includes an extension with an overall net floor area of 32 sq m, fitting just below the current roofline, finished in render; new pathways around the West End to allow level wheelchair access to the church; a welcoming foyer with hard wearing floor, well lit by an elongated window to the north wall, an accessible toilet and baby-changing facilities (requiring the laying of a foul drain from the church to the church hall) and kitchenette facilities for hospitality. See church /churchyard plans and the CAD images in appendix C. The accessible toilet and catering facilities will have evident benefits for existing users. Moreover, a community vision process undertaken by the CVG in November 2011 identified that we would like our building open for at least 120 days a year. For instance, we will extend our successful drop-in parent and toddler groups to a second session (to this end, we have obtained a petition of over 50 local parents), increase our schools’ visits, increase our existing ‘café’ opening times for the elderly and churchyard visitors, and offer free English conversation for members of the growing Nepalese community (now 10% of the Borough of Rushmoor; for this we have obtained a letter of support from members of the local Nepalese community). We would like to offer our church building for use and hire by other local groups, focussing on exclusion. We receive occasional hire requests from the following local organisations: St John’s Pre-School (parent engagement meetings), Parity for Disability, our local AA (which currently meets in the church hall committee room) and Farnborough Food Bank, who would like to run a drop-in coffee morning in the building, were facilities available. St John’s also has strong partnerships with one local Junior School (Cove Junior) and two local Infant Schools, Parsonage Farm and Cove Infants, and the governors of the latter have expressed their support, as it will greatly assist their regular class visits and events held at St John’s. We have recently obtained a £2500 grant from Hampshire and the Islands Historic Churches Trust for the project (www.hihct.org.uk ). 4 The Church Fabric Committee, appointed by and responsible to the CVG, will be responsible for this project. This is a sub-group has the following members and areas of responsibility. Rev Esther Prior (Vicar, ex-officio PCC member, Chair of Church Vision Group and Fabric Committee member with responsibility for market research, and liaison with schools and youth/children’s groups and School Governor). Esther has a background in sales and marketing, and is experienced in working with schools, young people and children. She will be responsible for maintaining the vision and community liaison. Rev Matthew Prior (Non-Stipedniary Minister, Chair of Fabric Committee, with responsibility for Council/community liaison). Matt has a background in church community projects and liaising with local authorities. Geoff Dives (Fabric Committee member with responsibility for liaising with on-site contractors over site management and specifications). Geoff is a retired consulting engineer experienced at advising on building specifications. Sandra Panter (Fabric Committee member with responsibility for churchyard maintenance). Sandra is a retired local teacher, with knowledge of the local community and expertise in local ecology. Julia Ruskell (Churchwarden with legal responsibility for the buildings and site. Hall Maintenance manager). Julia has extensive connections in the community and manages our relationships with the Pre-School and other groups currently using the hall. She runs our Parent and Toddler Group. Les Ruskell (Fabric Committee secretary, with responsibility for tendering and liaison with architect). Les is a retired MOD scientist experienced in handling tenders and monitoring and evaluation of contracts. Dave Turnbull (PCC Treasurer, Church Vision Group member and long term Fabric Committee member with responsibility for finance and programming). Dave is a retired business analysis manager with proven skills in project management and financial programming. Dave was involved in the management of phase 1 of the project. Steve Davis (Fundraising co-ordinator). Steve has a background in the MoD as well as an academic interest in Technology Transfer. Until recently, he was a lecturer with Southampton Solent University. 5 3. Market research and community survey Woodland Garden project We recently advanced the process of community engagement through our woodland garden project in the churchyard. This area includes picnic tables and an interpretation board on the biodiversity of the churchyard habitat. The Council approved the £1000 environmental grant in March 2012 to develop the woodland garden, which was opened in June 2012. The opening was attended by over 100 people (see below). This enabled us to promote the potential for the community impact of the church building by giving out handouts and a slide show (for which we have collected local press and Council publication articles). We have in this way sought to connect the idea of the churchyard as a community resource to the church as a community facility. We have received letters of support for the extension project from Rushmoor Council and from a local Councillor. Councillor Barbara Hurst after the opening the new area. The nature trail begins... The interpretation sign.... Tea, cake and information about the building... The local Sea Scouts recently made the woodland garden their community project. They have written in support of the project, as toilet and catering facilities will enable continued volunteering around the site. We have invited the Pre-School and local schools, as well as the local Cove Brookway group, to make use of this new ‘breathing space’. 6 Alongside the Woodland Garden, we use our extensive churchyard for contemplative use by the public. For instance, in partnership with Cove Infants, for the two weeks of the Easter holidays, we set up displays in the churchyard and opened the church for school visits and to the general public. This year we had a footfall of over 400 people. . Also popular is our invitation to the passing public to bring their prayers to the Garden of Tears at Easter and Peace Tree at other times of the year. We are aware of our inability to offer proper facilities to this group of people – some of whom are regular visitors to the churchyard tending family graves. Community end-users and our volunteer base What this project enables is the creation of a new community space both for church volunteer-led initiatives, as well as creative hires to community groups (with a focus on exclusion), who would pay a minimal affordable hire rate. That includes all those organisations listed on page 4 known to us, and other organisations we would hope to reach through our contacts with local groups, the Council and through word of mouth. We do not intend to create another ‘private hire’ facility for its own sake, or to make a profit from hire, but to cover our overheads, as the financial projections make clear. Our proposed hire rates are attached in appendix B. The added value of this project is the volunteer base that we will bring to the project. Using a resource called the Community Value Toolkit recommended for use by churches (http://www.cuf.org.uk/act/resources-projects/community-value-toolkit), we have calculated that we currently offer 120 volunteer hours per week at present in directly church-led activities (i.e. not including volunteering in other areas of life). The total financial value of these volunteer hours per year is estimated at £37,440 (based on £6 per hour volunteer time). This is in a range of roles such as catering, bereavement 7 and pastoral care, youth and children’s work (for which all our volunteers are CRB-checked), maintenance and cleaning, and supporting the work of international agencies such Christian Aid and running a fair-trade stall (we are certified as a fair-trade church). We are committed to increase these hours to ensure any new initiatives are sustainable. Our policy indicates that we would be unable to hire out the newly created community space for private parties (for which the church hall would continue to be most appropriate). Other community facilities We are not aware of competing with other community facilities, but we are aware of a lack of community provision in this part of Cove (corroborated by local Council and community members’ letters), especially given the density of the population of children and young families (see neighbourhood statistics below, and the letter from the Council). Our own church hall has more demand for its use than we can accommodate (its hire rates are attached as an appendix, and its current hours of usage are below). The nearby Gower Lodge on Fleet Road hosts Little Monkeys parent and toddler group and Southwood preSchool, and we have good relationships with both groups (Southwood visits the church), as well as with the uniformed groups that meet there. Blunden Hall (hired out by Farnborough Leisure Centre) hosts a preSchool, Second Cove Sea Scouts (with whom we were in partnership for the community garden), occasional hiring groups and private parties. Figure 1: Current church and hall usage, November 2011. Type building of Hours used per Hours used per Hours used per Total hours used week for worship week by church week by external per week activities/ projects orgs services Church 4 2 0 6 Church hall 3 5 55 61 Figure 2: Estimated annual footfall, November 2011. Total annual footfall (excluding preSchool and hall hires): 3744 at Sunday services annually + 7696 at church-led activities annually + 2000 at events annually + 2000 at pastoral and seasonal services such as weddings annually = 15,440 (estimated figure) 8 Community Data Survey drawn from Neighbourhood Statistics (ONS) on Super Output Areas (SOA) The Office of National Statistics (ONS) publishes Community Survey Data on England and Wales, including information on age distribution and deprivation. The congregation of St John’s Church is drawn mainly from two “super output areas” 005C and 006F (England and Wales are divided into 34,738 Lower-level SOAs), with a significant number also from adjacent 003D and 005E. The results of the 2001 Census were studied to gain background information on the population living around St John’s Church, and particularly the age distribution and the degree of deprivation. The age distribution was found to mirror that of England as a whole, except that SOA 003D was found to have a greater proportion of the population on the 20-40 age group and a smaller proportion of elderly residents. The median age of Rushmoor 005 was 34, compared with 37 for the whole of England. The vast majority of the residents classified themselves as Christian. The SOAs are also ranked against seven criteria indicative of levels of deprivation (with 1 being the most deprived). The criteria are: income; employment; deprivation and disability; education, skills and training; barriers to housing and services; crime; and living environment. Areas 005C and 006F score consistently well (in or just missing the top half the ranking) against all criteria except barriers to housing and services. This measure is an indicator for the level of local community amenities and at rankings of 10,656 and 11,539 respectively are far worse than any of the other categories. Whilst there is no guidance on whether this ranking is good or bad in absolute terms, the fact that it is so much worse than any of the other categories suggests an imbalance of provision of local amenity which should be redressed. The proposed extension to St John’s Church will be a significant contributor to improving this position. More details of the SOAs, with maps and pointers to significant items, are at Appendix A. The Nepalese community in Rushmoor and Cove Joanna Lumley’s involvement in the high-profile and ultimately successful campaign for legal right to remain in the UK for former Gurkha soldiers and their families has had a big impact on the Borough of Rushmoor. A recent report suggested that up to 10% of the Borough is now of Nepalese origin (see http://www.bbc.co.uk/news/uk-england-hampshire-15712930) This presents wonderful opportunities for long term intercultural enrichment, but also poses challenges in the medium term as regards integration, language and service provision. See http://www.gethampshire.co.uk/news/s/2087542_report_highlights_nepalese_struggles for examples, including those relating to the Cove area. See the letter of support for our proposed new community facility from a member of the local Nepalese community. 9 Marketing the project We already advertise our existing community provision through proven popular means such as word of mouth and reputation (for example, our baby and toddler provision is very popular among the many army families living in the local Rhine Banks and Chavasse Way estates (GU14), where we are commended on our warm welcome, spacious hall and generous portions of free coffee and cake!) We have an effective website which we will use for advertising the hire of the hall. More formally, all our existing hall users have received a letter and an information paper with an invitation to respond to us concerning what use they might wish to make of the new facility. This includes Guides/Brownies/ Rainbows, a Zumba exercise class, a children’s ballet and contemporary dance school Jacaranda. We have hosted two Jacaranda dance events in the last year (see letters of support) and we want to encourage music/dance groups to use the new facilities along with the existing carpeted area and excellent audiovisual facilities. Our recent woodland garden project gained valuable publicity for the church and its community facilities. 10 4. Resources In addressing resources the project is conveniently divided into two parts. The first part is the building, fitting and commissioning of the extension. The second part is the ongoing task of running the facility, both in terms of managing the use and ensuring that the extension is cleaned and its fabric is maintained. The resources required from St John’s for the first part consist solely of those required to manage the project. The project management team is essentially the Church Fabric Committee as described in section 2 above. Design work for the extension is being conducted by a firm of qualified architects (Nye Saunders Ltd), who are also responsible for direct liaison with the DAC, obtaining planning and building approval, and for running the bidding process. Their detailed drawings are in appendix C below. The building work itself will be carried out by the winning bidder, Matrix Construction, who will provide the necessary vehicles, machinery, equipment and staff to carry out the building work (a copy of their final priced specification will be sent by email). No resources for carrying out the building works will therefore be required from St John’s. It is extremely important that resources for the second part of the project, the ongoing task of running the new facility, are adequately addressed. The necessary tasks will be absorbed by the infrastructure already in place for managing and running the church and hall facilities in accordance with the following guidelines: a. booking and hiring of the extension will be co-ordinated, as now, by the Parish Office and overseen by the Churchwarden. Income generated and expenses incurred will be managed by the Parish Treasurer; b. maintenance of the new plumbing and heating will be subsumed into the existing maintenance contract for the church hall; c. items of maintenance in the extension, other than those covered by the plumbing and heating maintenance contract, will be covered by volunteers. Currently the church is cleaned and maintained by volunteers, but given that the kitchen and toilet will need to be cleaned more frequently than the church itself, it is anticipated that an extra two hours’ paid cleaning per week will be required. These hours will be offered to the current paid hall cleaner and funded from hire fees. See our financial projection below. 11 5. Finance and Programming (please note that the timing in this section are now outdated, but the sequencing is stiil correct) Gantt Chart 12 St John's Church Extension - Financial Projections Preamble: assumptions for Financial Projections Income User Groups start mid soon after completion of works and build to 30 weeks per year usage with up to 14 hours per week split between extra Little Fishes group and small and medium sized groups with charges at the low end of current hall user charges. Expenditure 13 Additional parish office administration initially at 2 hours per month, rising to 3 hours per month as project has more users (approx 4 hours per month currently allocated to church hall administration) Church cleaning would continue to be undertaken by volunteers but an additional 2-3 hours per week paid cleaning is envisaged to ensure facilities are prepared for user groups (currently 6 hours per week for church hall) A small additional workload is anticipated for the church hall caretaker and £10-£15 per month has been allowed for this (current church hall costs £107 per month) Additional electricity costs will be incurred while user groups are in the church - mainly lighting plus some use of catering facilities - 6 kWhr per hour of usage. Background heating of the church is maintained with underfloor heating from a gas-fired boiler, but some boosting will be needed when groups are in. Average additional cost £0.60 per hour of use. Some additional maintenance of the building will be needed with the increased use. Mostly this will be undertaken by volunteers, but a small budget for materials and specialised work is envisaged. St John's Church Extension - Financial Projection 2011 2012 2013 2014 2014 optimistic 2015 2016 2017 A - Hrs /week 3 3 3 A - Wks/year 30 30 30 New Little Fishes £200.00 £250.00 £300.00 B - Hrs /week 4 5 6 B - Wks /year 20 30 30 B - hourly rate £7.00 £7.25 £7.50 B - income £560.00 £1,087.50 £1,350.00 C - Hrs /week 3 4 ANALYSIS OF INCOME AND RUNNING COSTS New user income A - hourly rate 14 5 C - Wks/year 20 30 30 C - hourly rate £4.00 £4.00 £4.00 C - income £240.00 £480.00 £600.00 Project Income £1,000.00 £1,817.50 £2,250.00 Additional Costs Parish Office Admin Additonal hours per month 2 3 3 Hourly Rate £9.70 £10.00 £10.30 Months incurred 11 11 11 Parish Office Costs 207.90 320.10 330.00 Cleaning Costs Additional Hours per week 2 2 2.5 3 Additional weeks 10 20 30 30 Hourly rate £7.60 £7.80 £8.00 £8.20 Cleaning costs £152.00 £304.00 £585.00 £720.00 15 Caretaker Costs Additional Monthly Charge 10 12 15 15 No of months 4 12 12 12 Caretaking Costs £40.00 £144.00 £180.00 £180.00 76 230 360 420 kWHr/Hr 6 6 6 6 Unit charge(p/unit) 12 12.5 13 13.5 Electricity costs £54.72 £172.50 £259.20 £315.00 Ave costs/hr (over background) £0.60 £0.63 £0.66 £0.69 Heating costs £45.60 £144.90 £237.60 £289.80 Additional Maintenance £0.00 £100.00 £200.00 £200.00 Additional Costs £367.92 £1,073.30 £1,781.90 £2,034.80 Utility Costs Hours of Usage Electricity Costs Heating costs 16 Surplus/Deficit -£72.92 SUMMARY OF INCOME AND RUNNING COSTS -£73.30 £35.60 £215.20 2015 2016 2017 Income Extra Little Fishes Sessions £75 £200 £250 £300 Medium Group Users £156 £560 £1,088 £1,350 Small Group Users £64 £240 £480 £600 Total Income £295 £1,000 £1,818 £2,250 Office Admin £76 £208 £320 £330 Cleaning £152 £304 £585 £720 Caretaker £40 £144 £180 £180 Electricity £55 £173 £259 £315 Extra Heating £46 £145 £238 £290 Additional Maintenance £0 £100 £200 £200 Expenditure 17 Ongonig Expenditure £368 £1,073 £1,782 £2,035 Surplus/(Deficit) -£73 -£73 £36 £215 CASH FLOW CONSTRUCTION PHASE Fundraising(1) 3,013.54 Fundraising(2) Donations + Gift Aid 12,946.01 4,400.00 1,000.00 58,552.76 5,960.48 Gift Aid due 791.04 Fundraising(3) 16,381.00 8,821.00 3,000.00 Interest 317.66 Ecclesiastical Grant 1,750.00 AF pledge 1,500.00 Grant 3 4,000.00 Veolia grant less 10% other contributor 76,898.86 Hampshire All-Churches Trust 2,500.00 Transfer from Lease Fund 18 521.71 Cash In 59,074.47 10,082.72 12,946.01 120,250.86 Architect Fees (inc VAT) 6,252.67 £3,825.00 Planning Application Fee (inc VAT) 170.00 Structural calcs (inc VAT) 2,100.00 Other project costs 1,395.65 Cash Out 5392.64 Contractor Fee (VATEX) 150,388.16 VAT to contractor 30,082.51 Opening + Publicity 300.00 Total project costs for year 0.00 9,918.32 5,392.64 184,595.67 Cumulative project cost 0.00 9,918.32 15,310.96 184,595.67 Net Cash 59,074.47 164.40 7,553.37 -64,344.81 Cum Net Cash 59,074.47 59,238.87 66,792.24 19 2,447.43 CASH FLOW including Construction and Operation Net Cash for construction 59074.47 164.40 Net cash for Operation 7553.37 -64344.81 0.00 0.00 0.00 -72.92 -73.30 -73.30 35.60 215.20 Total Net Cash Flow 59074.47 164.40 7480.45 -64418.11 -73.30 35.60 215.20 Cumulative Cash Flow 59074.47 59238.87 66719.32 2301.21 2227.91 2263.51 2478.71 20 6. Review The St John’s church Fabric Committee is currently managing all aspects of the extension project. This meets approximately every two months. A member of this committee will liaise with the contractor on a day-to-day basis, and it is envisaged that this committee will monitor the project and keep progress under ongoing review at its regular meetings. However, there are a number of stages at which a meeting of the committee will be convened with the specific aim of taking stock of the situation and reviewing the project progress. These stages correspond to the milestones indicated on the Gantt Chart, and are essentially contract award, start of building work and completion. Before contract award the committee will need to review progress to ensure that all the necessary approvals are in place, with no show-stoppers or potential delays to prevent the contractors going ahead once the contract is placed, and to be clear that all the necessary funding is in place. Before building work starts the committee will need to review the requirement with the contractor and the architect to ensure that all are clear on the detailed plan for the way ahead for the forthcoming months and to allow any last-minute issues to be raised. Finally, the committee will need to inspect the completed building work to ensure that the contractual requirements have been met. Clearly, the dates shown on the chart are current best estimates, and are based on certain assumptions about funding. The timescales on the chart will need to be kept under constant review as circumstances change. 21 Appendix A: Community Data Survey General Geographical Background The aim of this Annex is to present general background information on the area from which the congregation of St John’s Church and the potential users of its amenities are drawn. Figures are mainly from the 2001 Census1 as published by the Office of National Statistics (ONS), with updates where available. England and Wales are divided into 34,738 Super Output Areas (SOAs) for the 2001 Census, with St John’s Church situated in Middle-Layer SOA Rushmoor 005, which has 8,437 residents. The map below shows middle-layer Rushmoor 005. St John’s Church Railway Line M3 Motorway Airfield SOAs are subdivided into Lower-Level SOAs, with St John’s Church located in 005C, but because of its situation close to the corner of Rushmoor 005 the congregation is drawn mainly from 005C and 005E from within SOA 005, and from 003D and 006F from the adjacent areas Rushmoor 003 and Rushmoor 006. The map below shows the Lower layer SOA 005C, with the main community facilities marked. 1 th The first results of the 2011 Census have started to be published from 16 July 2012, but detailed data are not yet available online and, for the purposes of this application, the 2001 Census figures are considered to be adequate. 22 Cove Infant School 003D Cove Secondary School 005E 006F C Further information on the various facilities can be found by following the links below: Cove Secondary School www.cove.hants.sch.uk Gower Lodge (Pre-School, Scouts, and Parent and Toddler Group) www.southwoodfamilypreschool.org.uk St John’s church, churchyard and hall (where pre-School meets) www.parishofcove.org.uk Cove Infant School www.coveinfantschool.co.uk 23 The map below shows the SOA 006F, the immediate community to the east of St John’s, with community facilities marked. Blunden Community Hall Cove Junior School Giffard Drive Surgery 005C Further information on the various facilities can be found by following the links below: Cove Junior School www.covejunior.co.uk Giffard Drive Surgery www.giffarddrivesurgery.co.uk Blunden Community Hall and Recreation ground www.rushmoor.gov.uk/article/3160/Blunden-Roadrecreation-ground-and-play-area (Home of pre-School and hiring groups such as Second Cove Sea Scouts). The recreation area is maintained in part by Cove Brook Greenway Group www.covebrook.hampshire.org.uk 24 The map below shows the SOA 003D, the immediate community to the east of St John’s, with community facilities marked. Small Parade of Shops Parsonage Farm Infant School and Pre-School 005C More information is available via the link Parsonage Farm Infant School and pre-School www.parsonagefarmschool.co.uk 25 Finally, the map below shows the SOA 005E, the immediate community to the west of St John’s, with community facilities marked. Army Officers’ accommodation, Rhine Banks 005C Parity for Disability St John’s Church Army accommodation Chavasse Way Whetstone Road small parade of shops Further information on Parity for Disability is at www.parityfordisability.org.uk Age Distribution of Population The four low-level SOAs around St John’s Church had a total population of 6,318 at the 2001 census, of whom 77% stated their religion as Christianity, 15% stated that they had no religion, 7% did not state their religion, and 1% claimed other religions. The median age of the population on Medium level SOA Rushmoor 005 is 34 (compared to 37 nationally), and the mean age is 34.5 (compared to 38.6 nationally). The chart below shows the distribution of ages in the four SOAs in ten-year bands, and compares them with the overall distribution throughout England. Rushmoor generally reflects the overall age distribution of England except for SOA 003D, where there would seem to be a somewhat higher number of residents in the 20-40 age group and fewer elderly people over the age of 60. 26 Age distribution in SOA Rushmoor 005 25 005C 006F 003D 005E percent of population 20 England 15 10 5 0 0 to 9 10 to 19 20 to 29 30 to 39 40 to 49 50 to 59 60 to 69 over 70 age range / years Index of Deprivation Based on research at the University of Oxford, a combination of social indicators is used by the ONS to measure the degree to which an SOA may be regarded as being deprived, and the aggregate score is used to rank areas throughout England. There were 32,482 areas in total for the 2010 assessment2, with the first-ranked (i.e. rank 1) being the most deprived area3 and 32,482 being the least-deprived. The assessment is made on the basis of seven categories of deprivation, and these are aggregated into an overall score. Data are currently available for 2010. The table below shows the Deprivation scores for the four Rushmoor areas being considered. Super Output Area Category 003D 005C 005E 006F Rank of Overall Index of Multiple Deprivation 28,080 24,132 20,292 29,602 Rank of Income score 30,535 20,003 16,675 29,069 Rank of Employment score 30,217 26,239 21,698 24,806 Rank of Health Deprivation and Disability score 29,064 20,184 25,429 27,713 Rank of Education, Skills and Training score 18,750 22,141 12,547 19,177 Rank of Barriers to Housing and Services score 11,539 29,635 10,656 32,057 Rank of Crime score 18,592 8,079 20,784 24,742 Rank of Living Environment score 22,728 23,839 22,852 22,120 It is clear from the table that in general the area does very well in terms of deprivation ranking, and there are only four instances where it lies in the bottom half of the rankings for England. There is little that improving church facilities could do to better the rankings of crime or education and skills, but two of these low-ranking instances occur in the “Rank of Barriers to Housing and Services” category. This category is based on the availability of local community amenities, of which access to facilities in the local church would be one. The extension to St John’s church will therefore go some way to addressing the imbalance and inconsistency in the Deprivation scores for the SOAs around the church. 2 3 Note this is slightly different from the 2001 Census figure. Jaywick Sands, Essex. 27 Appendix B Current Church Hall Charges 2013 charges Weekday Weekend Regular users –main 11.00 Regular users – cttee 4.50 Preschool (whole) 7.75 Uniformed – main Uniformed - cttee 6.10 3.40 AA – cttee 3.40 Occasional users 15.25 7.00 18.50 Proposed New Extension Hire Charges Type of Group Hire charges 2014/15 2015/6 Standard rate for funded community group or performance groups e.g. Dance 6.50 7.00 Discretionary rate for small struggling groups focussing on exclusion e.g. AA 3.50 4.00 28 Appendix C: Architect’s CAD drawings and plans 29 30 The complete set of tender issue drawings will be sent by email. 31
© Copyright 2024