INFORMATION FOR BUILDERS AND HOMEOWNERS HOUSE OUTSIDE OF THE HOUSE INSIDE THE HOUSE Builder / Owner to supply (prerequisite): Builder / Owner to supply as a minimum: · Builder to supply GPO in meter box LBNCo to supply NTD · Builder to supply lead-in conduit and connect to starter pipe Front Boundary Starter pipe ABN 84 073 226 114 p. 1300 667 863 f. 08 9249 8858 e. [email protected] w. www.lbnco.com.au · Lead-in conduit. · Must be white RC20 PVC communications pipe (ID 23.3mm) to match the starter pipe from the Pit. · Must be connected to the starter pipe or “stub” from the Pit. · Must be installed at a minimum depth 300mm and maximum depth 500mm. · Radius of bends must be at least 300mm. · The conduit must be terminated adjacent to the electricity (power) meter box and at least 500mm above finished ground level. Power point for NTD. · DIN Rail GPO in the electricity meter box for the Network Termination Device (NTD). LBNCo to supply : · Network Termination Device (NTD) · All fibre optic lead-in cables. Voice, Data and TV. · TV cable from NTD to TV outlet. · Telephone cable from the NTD to telephone outlet. · Data cable from the NTD to the data/internet outlet. Builder / Owner recommended to supply: Smart Wire Hub. · Voice, data and TV cables connected from NTD to Smart Wire Hub. · Voice, data and TV distributed through home from Smart Wire Hub. · TV Splitter. · If more than one TV outlet is desired, it is recommended a four-way passive splitter is installed. · TV Cable. · It is recommended that RG6 quad shielded coaxial cable be used for television cabling. · Voice & Data cable. · It is recommended that CAT5/6 cable is used for telephone. · It is recommended that CAT5e/6 cable is used data/internet. · Communications pit in verge To ensure your home is properly provisioned, please contact your builder or our locally based connection staff as earlier as possible.
© Copyright 2024