INFORMATION FOR BUILDERS AND HOMEOWNERS
HOUSE
OUTSIDE OF THE HOUSE
INSIDE THE HOUSE
Builder / Owner to supply
(prerequisite):
Builder / Owner to supply as a minimum:
·
Builder to supply
GPO in meter box
LBNCo to
supply NTD
·
Builder to supply lead-in
conduit and connect to
starter pipe
Front Boundary
Starter pipe
ABN 84 073 226 114
p. 1300 667 863
f. 08 9249 8858
e. [email protected]
w. www.lbnco.com.au
·
Lead-in conduit.
· Must be white RC20 PVC communications
pipe (ID 23.3mm) to match the starter pipe
from the Pit.
· Must be connected to the starter pipe or
“stub” from the Pit.
· Must be installed at a minimum depth
300mm and maximum depth 500mm.
· Radius of bends must be at least 300mm.
· The conduit must be terminated adjacent to
the electricity (power) meter box and at least
500mm above finished ground level.
Power point for NTD.
· DIN Rail GPO in the electricity meter box for
the Network Termination Device (NTD).
LBNCo to supply
:
·
Network Termination Device (NTD)
·
All fibre optic lead-in cables.
Voice, Data and TV.
· TV cable from NTD to TV outlet.
· Telephone cable from the NTD to telephone
outlet.
· Data cable from the NTD to the data/internet
outlet.
Builder / Owner recommended to supply:
Smart Wire Hub.
· Voice, data and TV cables connected from NTD
to Smart Wire Hub.
· Voice, data and TV distributed through home
from Smart Wire Hub.
· TV Splitter.
· If more than one TV outlet is desired, it is
recommended a four-way passive splitter is
installed.
· TV Cable.
· It is recommended that RG6 quad shielded
coaxial cable be used for television cabling.
· Voice & Data cable.
· It is recommended that CAT5/6 cable is used for
telephone.
· It is recommended that CAT5e/6 cable is used
data/internet.
·
Communications pit in verge
To ensure your home is properly provisioned, please contact your builder or