Measurement & Verification Pte Ltd Measurement & Verification Pte Ltd An Accredited Energy Services Company Professional Sharing Series Airside Optimization Steven Kang [email protected] 30-Mar-2015 Proprietary Information of Measurement & Verification Pte Ltd 1 Lesson from the richest man on earth Measurement & Verification Pte Ltd In the past year, I have been struck by how important measurement is to improving the human condition. You can achieve incredible progress if you set a clear goal and find a measure that will drive progress toward that goal Bill Gates, Gates Foundation Annual Letter 2013 Proprietary Information of Measurement & Verification Pte Ltd 2 Where does it really count for a building? Cost: S$ / pax / day 160 Measurement & Verification Pte Ltd 150 140 120 100 Make sure your building IEQ is conducive for high performance. 80 60 40 20 1.3 Aircon system energy cost 10 Office rent Median employee salary Proprietary Information of Measurement & Verification Pte Ltd 3 Goals for Good Air Quality (IAQ) Temperature 23 to 25 C Measurement & Verification Pte Ltd CO2 concentration <1000ppm Air movement 0.1 to 0.3 m/s Respirable suspended particles (10 m) < 50 g/m3 RH < 65% Proprietary Information of Measurement & Verification Pte Ltd 4 Some energy cost saving strategies at the expense of IEQ Measurement & Verification Pte Ltd • Raise room temperature • Reduce airflow • • • • Use low rating filters Reduce outside air Minimize maintenance services Squeeze all M&E equipment above ceiling Proprietary Information of Measurement & Verification Pte Ltd 5 Air conditioning system perspective Measurement & Verification Pte Ltd Whole system KW/RT Chiller plant KW/RT Outdoor Consider whole system energy efficiency and cost Chiller Cooling cap (RT) Efficiency (KW/RT) Power input (KW) Evap PD (kpa) Budget price (S$) CHW: 6.7/12.2 C 600 0.530 318 45.0 305,000 CHW: 8.0/15.0 C 600 0.516 310 31.3 305,000 AHU CHW temp (C) Airflow (CMH) Total cooling capacity (RT) Air On coil (DB/WB) ESP (pa) Cooling coil Rows & Fin per Ft Coil Air DP (pa) Coil water DP (Kpa) Power input (KW) Budget price (S$) CHW: 6.7/12.2 C 18000 30 26.7 / 19.4 500 4 / 135 112.6 15.2 6.82 10,000 CHW: 8.0/15.0 C 18000 30 26.7 / 19.4 500 6 / 127 155.5 11.4 7.09 11,000 CHWP Pipe & fitting DP Total DP Flow rate (l/s) Power input (KW) Budget price (S$) CHW: 6.7/12.2 C 150 210.2 91.7 25.0 9,200 CHW: 8.0/15.0 C 92.6 135.3 72.0 12.6 8,500 1x 600RT Chiller + 20 x 30RT AHUs + 1 x CHWP CHW: 6.7/12.2 C Total cost (S$) 514,200 Total power input (KW) 479.4 Operating hours / year 2860.0 Electricity tariff ($/KWH) 0.22 Energy cost per year 301,616 Additional cost Base Energy cost savings per year Base Simple payback Base Measurement & Verification Pte Ltd CHW: 8.0/15.0 C 533,500 464.2 2860.0 0.22 292,050 19,300 9,565 2.0 7 Goals for good airside efficiency Measurement & Verification Pte Ltd Total Pressure W CMH Types of air system = 3600 x Ƞfan x Ƞmotor Green Mark (W/CMH) Green Mark (KW/RT) Excellent class (W/CMH) Excellent class (KW/RT) Constant Volume AHU Motor ≥ 4KW 0.42 0.29 0.20 0.14 Variable Volume AHU Motor ≥ 4KW 0.58 0.39 0.20 0.14 AHU/FCU Motor < 4KW 0.17 0.12 0.10 0.07 KW/RT = W/CMH * 680 CMH/RT /1000 Proprietary Information of Measurement & Verification Pte Ltd 8 Accurate measurement is the essential to “drive towards our goals” Measurement & Verification Pte Ltd T T DP F T Coil Filter CO2 RA T SP M F AHU OA F T VSD CHW p VAV box T Proprietary Information of Measurement & Verification Pte Ltd T RH 9 Creative but inefficient ways to move air Measurement & Verification Pte Ltd W CMH Patented Total Pressure = 3600 x Ƞfan x Ƞmotor duct Rocket launcher Traffic lights needed Proprietary Information of Measurement & Verification Pte Ltd 10 Creative but wrong way to save space for AHU Measurement & Verification Pte Ltd Sorry, we can’t hire fat technicians Proprietary Information of Measurement & Verification Pte Ltd 11 Example of inefficiencies Proprietary Information of Measurement & Verification Pte Ltd Measurement & Verification Pte Ltd 12 Example of inefficiencies Proprietary Information of Measurement & Verification Pte Ltd Measurement & Verification Pte Ltd 13 Example of inefficiencies Measurement & Verification Pte Ltd Ideas to improve Measurement & Verification Pte Ltd Ideas to improve Measurement & Verification Pte Ltd Example of inefficiencies Measurement & Verification Pte Ltd AHU with multiple discharge Proprietary Information of Measurement & Verification Pte Ltd 17 Ideas to improve Measurement & Verification Pte Ltd Plenum Fan Proprietary Information of Measurement & Verification Pte Ltd 18 Ideas to improve: Electronic Air Filters Traditional Passive Filters Mid-life Pressure Drop: 100 – 200pa Proprietary Information of Measurement & Verification Pte Ltd Measurement & Verification Pte Ltd Electronic Air Cleaners Mid-life Pressure Drop: 30 – 70pa 19 Ideas to improve: Intelligent Control Valve Measurement & Verification Pte Ltd Conventional Set up Belimo Energy Valve BTU meter Temperature sensor BELIMO Energy ValveTM Flowmeter Valve & Actuator CHWR CHWS CHWR CHWS Manaul Balancing Valve Proprietary Information of Measurement & Verification Pte Ltd 20 Ideas to improve: Intelligent Control Valve Measurement & Verification Pte Ltd Belimo Energy Valve - Five Functions in One Valve Dynamic Balancing Modulating & Shut-off Control Flow & Temp Measurement F Delta T Manager & Power Control Algorithms Live Monitoring, Data Logging, BACnet Interface T T Key element for improvement DN15…50 DN65…150 The energy efficiency story of Tien Wah Press Measurement & Verification Pte Ltd Company business: Printing Factory Location: Pandan Crescent Gross floor area: 48,000 sqm Project start date: 01 Feb 2013 Project completion date: 15 Dec 2013 Proprietary Information of Measurement & Verification Pte Ltd 22 The energy efficiency story of Tien Wah Press Measurement & Verification Pte Ltd Before 2006 Chiller plant Chiller plant 0.96 0.58 0.60 2007-2013 Proprietary Information of Measurement & Verification Pte Ltd Funded by NEA’s GREET Fund 0.80 KW/RT Chiller plant Airside 0.58 1.18 KW/RT Airside Airside 1.54 KW/RT 0.24 0.56 After 2013 23 Issues with heat rejection Measurement & Verification Pte Ltd Restrictive louvers starve cooling towers of inlet air CW piping has too high pressure loss Cooling towers infills damaged and clogged 3 cooling towers are squeezed too closely together Proprietary Information of Measurement & Verification Pte Ltd 24 Uncommon common-sense solutions Remove alternate louvers to free up inlet air to cooling towers Straighten out CW piping to reduce pressure loss Proprietary Information of Measurement & Verification Pte Ltd Measurement & Verification Pte Ltd Install 2 new high efficiency cooling towers Space out the new cooling towers for better heat rejection 25 Uncommon common-sense solutions Measurement & Verification Pte Ltd Your teeth if you only brush once a year Auto tube cleaners for chillers Proprietary Information of Measurement & Verification Pte Ltd 26 Annual energy saved from ECMs for chiller plant Measurement & Verification Pte Ltd 141,248 KWH Equivalent to annual energy consumed by 31 nos of 4-rm HDB flat Proprietary Information of Measurement & Verification Pte Ltd 27 Energy efficiency measures for AHUs Measurement & Verification Pte Ltd - New accurate, real-time and web-based EMS is introduced to the air handling units system. - Variable speed fans - High efficiency backward curve fans - Reduce pressure loss - Low face velocity AHU coil (1.25 m/s) - Low air and water pressure drop coil design - Low pressure drop disposable filters - Straighten fan discharge duct - Deletion of unnecessary return air duct Proprietary Information of Measurement & Verification Pte Ltd 28 Energy efficiency measures for AHUs New accurate, real-time and web-based EMS to monitor and optimize all AHUs Temp %RH DP KW Measurement & Verification Pte Ltd Data stored at 1 min interval at client site VSD Internet for 24 nos for AHUs 29 Annual energy saved from ECMs for AHUs Measurement & Verification Pte Ltd 927,891 KWH Equivalent to annual energy consumed by 203 nos of 4-rm HDB flat Proprietary Information of Measurement & Verification Pte Ltd 30 Energy efficiency measures for extractor fans Post retrofit duct has good entry into main duct Measurement & Verification Pte Ltd Pre-retrofit duct has poor entry into main duct Video of extractor bin Proprietary Information of Measurement & Verification Pte Ltd 31 Energy efficiency measures for extractor fans Preretrofit extractor fans are belt driven Measurement & Verification Pte Ltd Extractor fans are directly coupled to motor. Proprietary Information of Measurement & Verification Pte Ltd 32 Energy efficiency measures for extractor fans Measurement & Verification Pte Ltd New accurate, realtime and web-based EMS to monitor and optimize all extractor fan operation. Pre-retrofit extractor fans operate continuously . Post-retrofit extractor fans operate only when cutter machines operate. Proprietary Information of Measurement & Verification Pte Ltd 33 Annual energy saved from ECMs for extractor fans Measurement & Verification Pte Ltd 148,744 KWH Equivalent to annual energy consumed by 33 nos of 4-rm HDB flat Proprietary Information of Measurement & Verification Pte Ltd 34 Conclusions Measurement & Verification Pte Ltd Measurement and Goals are vital for improvement Optimal IEQ is where the rubber meets the road Optimize the entire air con system (air + water) and adopt continuous optimization and M&V Proprietary Information of Measurement & Verification Pte Ltd 35 Thank you for your attention Proprietary Information of Measurement & Verification Pte Ltd Measurement & Verification Pte Ltd 36
© Copyright 2024