9th September 2013 To the Tenderers John Paul College Rotorua Notice to Tenderers #3 The following are clarifications to or changes to the tender documents: 1 Clarification: Rear wall of Gym (where works are to take place) is to be clad in PBS Eterpan (refined). Gym wall is to have approximately 120m² of cladding as shown on new drawing AL156. 2 Clarification: Security gate detail shown on drawing AA305 attached. 3 Change: Soffit to north and south elevations (two story block) are shown on updated detail 32 on drawing AA305 attached. 4 Clarification: Tanking membrane to be used is to be Sika blackseal SB spray applied tanking as described in the specification. 5 Clarification: Roof framing (timber trusses) over faculty office is to have a heal in the truss (420mm from underside of bottom chord to top of top chord) as shown on section C-C. 6 Change: Window W103 is to be a double hung window in lieu of the single slider as shown in tender documents. 7 Clarification: Top floor concrete nib is to be constructed as per BSK drawings using masonry block. 8 Change: External walls on top floor (running north to south) are to be 190x45mm SG8 H1.2 timber framing. Please acknowledge receipt of this notice in your tender submission. Yours faithfully Cameron Laing Architectural Graduate On behalf of Gisler Architects Ltd 59 Bank Street, P O Box 297, Te Awamutu 3840 Phone: 07 870 5200 Fax: 07 870 5300 Mobile: 029 839 9998 www.gisler-architects.co.nz PDF processed with CutePDF evaluation edition www.CutePDF.com 4. Demolition 4.01.01 QUALIFICATION: carry out demolition only under the supervision of a suitably experienced person and using only experienced operators and drivers. Obtain and pay for any required inspection which are additional to the building consent. Take all precautions necessary to minimise nuisance caused by dust, dirt, rubbish and water. SITE SAFETY: prevent access by unauthorised persons. Illuminate and protect all holes, unsafe buildings and other hazards. Leave site and building safe at the close of each days work. REINSTATE AND MAKE GOOD: reinstate and make good demolition damage to adjoining properties, existing work, services, or property. 4.01.02 Take necessary care when demolishing existing buildings of the existing storm water (SW) and sanitary sewer (SS) drains. Existing drains are approximately shown. Confirm positions on site prior to commencement of work. Trench around the new building as shown and re-route all existing drains from other buildings through this trench. Confirm on site the location and direction of flow of existing drains. Make good at completion of works where existing asphalt cut. Refer to Foundation Plan & Plumbing & Drainage Plan for further information. 4.01.03 4.01.04 4.01.08 4.01.09 4.01.10 4.01.11 4.01.12 Remove existing posts and verandah structure. Take extra care where the verandah (shown with zigzag line) is to be retained. Allow to make good to new exposed edge. Refer to roof plan for further information. Existing Sanitary Sewer Line Existing Storm Water Line New SW/SS trench Existing SW MH Existing SS MH Verandah to be removed Walls to be removed Stage 2 walls removed SS MH Retain existing wall/s. Weatherproof with suitable covers where existing internal wall/s will be exposed to exterior elements during construction indicated by wave line. Confirm configuration of existing wall once on site and report back to architect on this. Take care when operating on this wall that no items are damaged on the opposite side of the wall. Storm Water Man Hole Sanitary Sewer Man Hole NO WORK TO THIS AREA Stage 2 works - Existing art block is to be demolished (including floos slabs/foundations) at the completion of the new technology block. Allow to remove entire building including floor slab and adjacent concrete paths. Make good to area, back fill to voids (drainage/footings) with compacted hard fill and install new 30mm asphalt. Refer to site works plan for further information. Terminate and conceal all services and cap off below ground level or at source point. 4.01.09 NO WORK TO THIS AREA 4.01.13 4.01.03 4.01.12 CP Existing internal wall to become a new external wall. Remove internal wall linings and clad exterior with James Hardie Titan Board on a CLD cavity system. Install to manufacturers instructions. Cladding system to be installed over Thermakraft Coverup building wrap. All flashings to be in accordance with manufacturers documents and are to comply with NZBC. Install Autex Grenstuf R2.2 insulation into wall cavity and line with building wrap. Make good to roof and finish existing roof with a new verge flashing. Existing rain water head to remain. 4.01.08 4.01.14 4.01.04 4.01.10 Existing concrete/asphalt to be cut and dig new sanitary sewer and storm water trench around the perimeter of the new build. Allow to connect new drainage lines (in new trench) prior to disconnecting existing sanitary and storm water drains. Refer to Foundation Plan & Plumbing & Drainage Plan for further information. SW MH 4.01.02 Existing tree is to be protected from construction works. Existing high level cladding to gym is asbestos. Remove existing cladding (asbestos and other) from high wall of gym, caution must be used. Make good ready for new cladding. Plastic drop sheets to be used for waste material with all waste to be disposed of at an approved site. A minimum P2 mask must be worn by all workers in the vicinity when dealing with asbestos. Work to comply with NZ OSH guidelines. http://www.osh.govt.nz/publications/booklets/asbestosmanagement-removal/guidelines.asp 4.01.13 Retain existing internal timber wall. Set height of wall to 2.7m and install new top plate. Weatherproof with suitable covers where existing internal wall/s will be exposed to exterior elements during construction indicated by wave line. 4.01.14 Existing internal wall to become a new external wall (to match existing & new cladding). Remove internal wall linings and clad exterior with James Hardie Titan Board to match existing with expressed joints on CLD cavity system and 70mm brick veneer. Install to manufacturers instructions. To be installed over Thermakraft Coverup building wrap. All flashings to be in accordance with manufacturers documents and are to comply with NZBC. Install Autex Grenstuf R2.2 insulation into wall cavity and line with building wrap. Make good to roof and finish existing roof with a new verge flashing. 4.01.15 Legend: Stage 2 works SW MH 4.01.01 4.01.03 SS MH 4.01.02 4.01.03 4.01.11 4.01.08 4.01.03 Man hole lid at this point TO to beTHIS set as datum. Refer to datum NO WORK AREA cross section for heights. Confirm heights on site prior to commencement to works. 4.01.10 4.01.01 MH 4.01.15 SS MH 33 300 CP CP SS MH Connects to council main at Corlett St PAGE SCALE KEY (mm): 0 PROJECT TITLE: John Paul College Rotorua Technology Block Tender Set 10 20 30 40 50 60 70 80 90 100 Contractor to verify and confirm on site all dimensions, levels, falls, heights, structure, services and notify Architect of any discrepancies in documents prior to commencement of works. REVISIONS: DRAWING TITLE: DRAWN: A Cladding Material clarified to 10/9/13 fitness centre Demolition Plan JOB NO.: SHEET: SCALE: 1:200 @A2 DATE: 20/08/2013 www.gisler-architects.co.nz CL 4874-11 CHECKED: MO FILE: 4874 JPC new tech block TS 28 8 13.pln REVISION: AL103 A 59 Bank Street, P O Box 297, Te Awamutu 3840 Phone: 07 870 5200 Fax: 07 870 5300 19,700 10.12.06 10.02.05 9.05.12 10.12.06 8,895 10.12.02 6,013 9.05.02 Gym Fitness Centre Applied Technology 10.01.04 5.01.05 Gym Wall Elevation 1. Important Notes 1.10.03 10.02.05 Existing high level cladding to gym is asbestos. Remove existing cladding (asbestos and other) from high wall of gym to this wall only, caution must be used. Make good ready for new cladding. Plastic drop sheets to be used for waste material with all waste to be disposed of at an approved site. A minimum P2 mask must be worn by all workers in the vicinity when dealing with asbestos. Work to comply with NZ OSH guidelines. http://www.osh.govt.nz/publications/booklets/as bestos-management-removal/guidelines.asp 10.12.02 9mm Eterpan Refined with expressed joints and concealed fixing on a XpressClad system. Install to manufacturers instructions. XpressClad system to be installed over Thermakraft Coverup building wrap. All flashings to be in accordance with manufacturers documents and are to comply with NZBC. 10.12.06 Take care when removing existing cladding from around grilles, keep all flashings/trims for re-use on new cladding. Allow to extend liners on grilles as new cladding is to be on a 20mm cavity. Area of new cladding to gym wall is approximately 120m². 5. Foundations 5.01.05 Paint base of existing Gym wall with Sika Blackseal SB spray applied tanking up wall 500mm. Run new claddingdown to 150mm from F.G.L. 9. Roofing 9.05.02 9.05.12 Colorsteel apron flashing to match roofing to dimensions shown or two rib min lap. Remove existing barge flashing and install a new Colorsteel barge flashing to match roofing to fit over new cladding to dimensions shown. 10. Claddings 10.01.04 Cavity closure to bottom of cladding including anywhere where the cladding is to stop (apron). PAGE SCALE KEY (mm): 0 PROJECT TITLE: 20 30 40 50 60 70 80 90 100 Contractor to verify and confirm on site all dimensions, levels, falls, heights, structure, services and notify Architect of any discrepancies in documents prior to commencement of works. REVISIONS: DRAWING TITLE: John Paul College Rotorua Technology Block Tender Set 10 1.10.03 DRAWN: Gym Wall Elevation JOB NO.: SHEET: SCALE: 1:50 @A2 DATE: 20/08/2013 www.gisler-architects.co.nz CL 4874-11 CHECKED: MO FILE: 4874 JPC new tech block TS 28 8 13.pln REVISION: AL156 59 Bank Street, P O Box 297, Te Awamutu 3840 Phone: 07 870 5200 Fax: 07 870 5300 SEE BSK DRAWINGS FOR DETAIL OF ROOF AND FLOOR STRUCTURES 9.05.04 9.02.01 21.02.01 9.09.02 5.05.01 9.09.02 100 7.10.06 10.12.02 10.12.02 7.01.05 6.09.03 6.09.03 7.01.04 7.01.06 21.02.01 7.01.04 8.05.01 15.04.03 15.04.03 8.04.01 32 204 31 204 Edge of 1st Floor- Top scale 1:10 21.02.01 1,350 1,350 2. Site 65 895 65 Gate position closed 2.06.05 2,800 750 2.06.04 2.06.06 2.06.02 65 2.06.03 2.06.03 2.06.02 895 2.06.05 2.06.01 Gate position open 2.06.05 104 Security Gate scale 1:5 65 33 33 Security Gate scale 1:20 104 PAGE SCALE KEY (mm): 0 PROJECT TITLE: 65x65 SHS posts - Refer to Engineers drawings for further details. 20 30 40 50 60 70 80 90 100 7.01.04 Colorsteel apron flashing to match roofing to dimensions shown. Flashing is to be 35mm min from bottom of cladding and is to have 75mm cover by cladding. Install additional flashing tape over top edge of flashing and building paper, with roofing underlay to fold up and behind flashing. To comply with NZBC/E2 Contractor to verify and confirm on site all dimensions, levels, falls, heights, structure, services and notify Architect of any discrepancies in documents prior to commencement of works. REVISIONS: DRAWING TITLE: John Paul College Rotorua Technology Block Tender Set 10 9.09.02 90x45 SG8 H3.1 timber stringer fixed at 400mm crs through structural bracket and M12 bolts set into concrete plinth. 90x45mm H3.1 timber framing to be secured with 2 x BS15 one each side 2.06.02 270° openable hinge for bottom of stair access. 4 of timber hanger and 5/M12 bolts (4/M12 x hinges to gate door to all cross members. Hinge chemset into concrete plinth). Timber stringer to available from Heritage gates. Contact Dave Cox have DPC under. 0800 428 379 for further information. Hinge to 10. Claddings 7.01.05 M12 dyna bolt chemset into concrete plinth at be welded to cross members. 400mm crs max. Bolt to go through timber packer 10.12.02 9mm Eterpan Refined with expressed joints and concealed fixing on a XpressClad system. Install to and DPC. 2.06.03 3mm SS perforated sheet welded to upright manufacturers instructions. XpressClad system to members. 7.01.06 18mm plywood to be fixed to underside of timber be installed over Thermakraft Coverup building hangers (stringer) with tek screws and 2/M10 wrap. All flashings to be in accordance with 2.06.04 100x65mm RHS stainless steel 316 stiles to both bolts & BS50 structural bracket to one side of manufacturers documents and are to comply with sides of gate. Door hardware to be fitted to hanger only.Wrap building paper over top of NZBC. openable side of gate. Door hardware to comply plywood. with fire egress rules (cannot lock from inside). 7.10.06 190x45mm SG8 timber fixed to ends of cranked 15. Ceilings PFC's with 4xM12 bolts fixed through cleats 2.06.05 65x65mm RHS stainless steel 316 cross welded to ends of PFC. Refer to engineers 15.04.03 Eurocoustic'a Acoustichoc 25mm 1200x600mm members to gate. Allow to weld hinges to all 4 documents for further information. tiles in Rondo Duo two way exposed suspended grid cross members. system with anti-lift clips. To be hung underside of roof structure and raking/flat as shown on ceiling 2.06.06 Gate to have LW 3572Z SC lockset woth LG alpha 8. Insulation plan/finishes schedule. Allow for two colours as 702 & 712 furniture attached. Allow to install shown on ceiling plan. 8.04.01 Autex Greenstuf R2.2 insulation pads (90mm) to all sopers SPDH extended pedestal latch. All new exterior wall cavities. hardware to be fitted to both doors. 8.05.01 Autex Greenstuf R3.2 ceiling insulation pads 21. Windows (180mm) to all new ceiling cavities. 21.02.01 Exterior powder-coated aluminium window joinery 5. Foundations (refer to schedules). 9. Roofing 5.05.01 Flatdeck suspended floor system with reinforcing as per engineers drawings. Concrete slab to be 9.02.01 0.55 gauge trapeziodal Colorsteel Endura roofing 30MPa and water cured for a minimum 3 days. fixed with colour matched tek-screws over Thermakraft Covertek403 absorbent breathable synthetic non-woven roofing underlay and wire mesh. 6. Wall Structure 9.05.04 Colorsteel cap flashing to parapet to match roofing 6.09.03 Steel portal frame (refer to engineers documents to dimensions shown in detail. for size and fixings). 2.06.03 2.06.01 7. Roof Structure 2.06.01 2.06.05 2.06.03 Edge of 1st Floor- Bottom scale 1:10 A Fixings for soffit & Security gate shown Details 31 - 33 DRAWN: 10/9/13 JOB NO.: SHEET: SCALE: 1:10, 1:5, 1:20 @A2 DATE: 20/08/2013 www.gisler-architects.co.nz CL 4874-11 CHECKED: MO FILE: 4874 JPC new tech block TS 28 8 13.pln REVISION: AA305 A 59 Bank Street, P O Box 297, Te Awamutu 3840 Phone: 07 870 5200 Fax: 07 870 5300
© Copyright 2024