Åpent informasjonsmøte om utviklingen av ny - Breeam

Protecting People, Property and the Planet
Åpent informasjonsmøte om
utviklingen av ny BREEAMNOR manual
Status i arbeidet så langt og hva vi skal fokusere på videre.
Anders Nohre-Walldén, Utviklingssjef, NGBC
Part of the BRE Trust
Protecting People, Property and the Planet
Litt om Norwegian Green Building
Council (NGBC)
NGBC anno 2014 - Hvem er vi?
Ansatte
Kjersti Folvik
Daglig leder (100 %)
Anders Nohre-Walldén
Utviklingssjef (60 %)
Innleide
Mari-Anne Mørk
Informasjpnskonsulent.
Kursadm.(100 %)
Katrine Øhrn
Økonomikonsulent,
Kursadm. (100 %)
Teresa Ribu
Teknisk BREEAM-koordinator (40 %)
Kristin Holthe
Sertifiseringssjef (70 %)
Eili Vigestad Berge
Communities (20 %)
Magnus Gevelt
In-Use (20 %)
Storfamilien
Revisorer
Bespoketeam
APer
Fageksperter
Medlemmer
BREEAM
Support
Rogaland,
Hordaland,
Trøndelag
NGBC
Kurs-holdere
Styret
BRE
-  BRE eier metoden og NGBC opererer på ”lisens”
-  Vi ”låner” BREs akkreditering for å utstede sertifikater.
-  NGBC må sørge for at alle prosedyrer følges og
kvaliteten opprettholdes
-  Årlig revisjon av NGBCs styringssystem
-  Innebærer risiko for BRE med tanke på akkreditering,
og ikke en varig løsning.
-  Jobber nå for å søke om egen akkreditering. Får vi til det,
vil det litt fram i tid bety:
-  QA på norsk i Norge
-  Sertifikater utstedt i Norge av NGBC
-  BRE vil fortsatt revidere oss årlig for å sikre at vi driver i
henhold til BREs kvalitetsstandarder.
Tallenes tale per februar 2014
–  234 medlemmer
–  170 registrerte prosjekter (inkl. 45 In-Use)
–  20 prosjekter har mottatt BREEAM-NOR-sertifikat (pluss 5 In-Use).
–  Mer enn 2400 personer har skolert seg innen BREEAM-NOR.
–  330 personer har utdannet seg til BREEAM-NOR AP
–  40 lisensierte BREEAM-NOR-revisorer.
Fokusområder i tiden framover
–  God drift og tilfredsstillende servicenivå.
–  BREEAM-NOR 2015 - ny versjon
–  BREEAM-NOR In-Use - utvikling
–  BREEAM Communities - utvikling
–  Videreutvikling av kursene våre
–  Ny avtale med BRE, og akkrediteringssøknad
–  Medlemsservice, formidling
–  Veiledning
Protecting People, Property and the Planet
BREEAM NOR 2015 Ny versjon
Viktige mekanismer ved utvikling av ny versjon
Viktige drivere for ny versjon av BREEAM-NOR?
Behov for endringer i dagens manual:
•  186 forespørsler til [email protected] i 2013
•  188 forespørsler så langt i 2014
•  Avvik i Norsk og engelsk utgave – BRE «pålagt» oss å rydde opp !
Markedet etterspør det
•  Revisorer har behov for en oppdatert versjon
•  Kundene (prosjektene) etterspør kvalitet i v. 1.0 og når BREEAM-NOR endres for å
ivareta endringer i regler
Endringer i TEK og lov-verk
•  Flere nye NS’er og andre regelverk
SRG og NGBC styret har foreslått endringer for ny versjon
Ny avtale med BRE (Framework agreement) vil muligens kreve det
Viktige standarder som styrer oppdateringen fra BRE
Kilde: BREEAM Standard 5201 Core Technical Standard for Buildings Issue 2 Final Draft Aug 2014
3 veier til ny versjon
–  versjoner 1.0, 1.1, 1.1 = re-issue
–  Ingen endring i stramhet
–  Kun språklige feil og andre uklarheter, feil/mangler
–  Scheme update – 2.0, 3.0
–  Nye standarder/regulatoriske krav
–  Oppdatering av tek
–  Endring i rammebetingelser
–  Ingen nye emner
–  Helt ny versjon
–  Helt ny manual
–  Endre/fjerne emner
–  Annen innretning etc.
Hvordan - Rollefordelinger
–  SRG / Strategisk
rådgivningsgruppe
–  To provide an impartial,
representative and objective
peer review of both the
underlying principles of the
scheme and the final scheme
documents in order to ensure
independent scientific rigour.
–  Membership of the both the
Advisory Group and Working
Group is appropriate AND
SRG is able to provide a truly
representative and
independent peer review,
•  Working Groups /
Arbeidsgrupper
•  To develop the actual
technical scheme criteria.
•  Membership of the both the
Advisory Group and Working
Group is appropriate AND are
made up of members suitably
qualified to deliver the
respective work packages.
Se SRG og Arb.gr. på http://ngbc.no/breeam-nor-nye-tiltak-2015
Arbeidsgruppene
–  Management - encourages the sustainable management of design, construction,
commissioning and operational processes
–  Health and Wellbeing - addresses the comfort, health and safety of asset occupants,
visitors and others within the vicinity
–  Energy - encourages the sustainable use of energy in the asset
–  Transport - encourages sustainable means of transport for the users of the asset
–  Water - encourages the sustainable use of water in the asset
–  Materials - encourages the sustainable procurement and use of materials
–  Waste - encourages the sustainable management of construction and operational waste
–  Land Use and Ecology - encourages sustainable land use, habitat protection/creationn
and ecological improvement for the asset site and surrounding land
–  Pollution - addresses the prevention and control of pollution associated with the asset
location and use
–  Innovation - encourages the use of innovative solutions to improve the sustainability
performance of the asset
Arbeidsgruppeledere
Navn
Firma
Arbeidsgruppe
Kontaktinfo
Marie Inderlid Windsvold
Vedal Prosjekt
Ledelse og innovasjon
[email protected]
Marit Tyholt
Skanska Norge
Energi
[email protected]
Elisabeth Montgomerie
Multiconsult
Materialer
elisabeth.montgomerie@mul
ticonsult.no
Mari Smidrød
Erichsen & Horgen
Helse, inneklima og vann
[email protected]
Erlend Brørs
Insenti
Avfall og forurensning
[email protected]
Rune Tøndell
Rambøll Norge
Arealbruk, økologi og
transport
[email protected]
Ønsker du å bidra/har di innspill – ta kontakt med lederne
Arbeidsgruppes oppgave
– Working groups must ensure that the scheme’s
assessment issue criteria/requirements are
appropriate for the local context and are based
on robust science/evidence, as well as meeting
the fundamental principle of driving
performance beyond standard practice and/or
regulatory minimum requirements.
Arbeidsgruppens oppgave
BREEAM-NOR 2015
Fokus videre - Fremdrift
–  Fase 0: Etablere arbeidsgrupper (Jan 2015)
–  Fase 1: Definere omfang (feb 2015)
–  Fase 2: SAMT-skjema arbeidsgrupper (juni 2015)
–  Fase 3: BRE Global review (Juni-Aug 2015)
–  Fase 4: Lansere ny versjon (eng) (sept 2015)
–  Fase 5: Oversette til norsk (vinter 2015)
–  Fase 6: Norsk versjon (desember 2015)
–  Arbeidsgruppene vil frem til mai/juni arbeide frem forslag til
endringer for godkjennelse
Arbeidsgrupper - fremdrift
Des
2014
Jan
2015
Vår 2015
Juni - August
August/sept
Arbeidsgrupper 1-5
v. 1.1
Oppstart
Arbeidsmøt
er/
Høringer/
SRG
Engelsk
utgave
Godkjennelse av
endringer BRE
Involvering medlemmer/AP/Revisorer/marked
Framdrift
Høst 2014: Vedtak NGBCs styre: BREEAM-NOR skal utvikles
Sept 2014: Strategisk rådgivningsgruppe (SRG) velges av NGBC sitt styre – styremøte 7/14
Okt 2014: Analyse/sammenligning norsk vs. Eng. versjon av BEREAM NOR V 1.0
17. Nov 2014: Første møte SRG
End Nov 2014:
-  Arbeidsgrupper og -ledere rekruttering
-  innsamling og strukturering av alle behovene for oppdatering
Des 2014: Første steg på veien mot ny versjon blir versjon 1.1
Forskjellen mellom engelsk og norsk manual rettes opp.
Jan 2015: SRG anbefaling på omfang – styrebehandling 20.januar
1 Kvartal 2015
Arbeidsgrupper i gang - SRG/arbeidsgruppemøter
Vår/sommer 2015: Ferdig versjon BREEAM-NOR V 2.0 sendes BRE. Dialog med BRE.
Fremdriftsplan 2015
25.02: Infomøte
MARS
APRIL
MAI
LANSE
RING
AUG
TEKNSIK
MANUAL (ENG)
TILPASNING TIL
NORGE
REVISOR UTD.
OPPDATERING
FRA BRE
TILPASNING TIL
NORGE
Hvordan gikk dette ?