NONEL System

®
Teknisk
Informasjon
AnB System
®
Above and
below ground
NONEL
Systemet
SnapDet
No.:SnapDet_sw
Utgave:
bodies. In other words, they consist of a truck chassis with a loading
or transport unit mounted on top, which contains the necessary
amount of prepared Anolit. An AnB production unit, which mixes
the raw materials on site just prior to the loading, may also be
used. The explosives are loaded through a loading hose into the
boreholes by use of compressed air. Loading of the whole blast can
generally be done from ground level, or from the existing access to
the pallet.
the customer along
with a deliveryoch fördröjning mellan raderna
ytkopplingsenhet.
Sammankoppling
acknowledgement. This type of
sker med NONEL Unidet εclip eller SnapLine. Salvan startas upp på
documentation allows the customer
konventionellt
sätt. loading, thus
to obtain optimal
Supplying Anolit directly to the boreholes offers a number of
advantages:
• High degree of safety
• No need to store explosives
• Pre-programmed amount of loaded Anolit per hole
• Large
capacity
NONEL
SnapDet
ärloading
en kombinationssprängkapsel
bestående av en
• Efficient loading
requiring
minimal
borrhålssprängkapsel
i ena änden
av slangen
ochlabour
en ytkopplingsen i den andra.
• No leftover explosives
het
•
Accurate
documentation
NONEL SnapDet
kompletterar
NONEL Unidet-systemet och förenklar
• No handling of packaging
uppkopplingsarbetet utan att ge avkall på möjligheten att ge varje
• Dewatering system
För att kunna dra fördelar av och utnyttja systemets möjligheter på
Theoptimalt
operator
controls
loading with the
a radio-operated
ett
sätt
krävs the
att arbetsplatsen
har aid
en of
standardiserad
arremote control system attached to the operator’s belt. One
betscykel med återkommande borr- ladd- och tändplaner.
person can therefore carry out the entire loading operation. It is
Lämpliga
arbetsplatser
är bergtäkter,
dagbrott
och stora
ovanjordsalso possible
to pre-program
the desired
amount
of explosive
per
entreprenader.
borehole. This is of course most useful in situations where there are
L® System
enskilt borrhål individuell upptändning.
Samtliga
i salvan
har samma typ av NONEL SnapDet sprängLoadinghål
control
– documentation
kapslar.
Fördröjningen
mellan
raderna åstadkoms
SnapDets
By using the AnB System,
a cost-conscious
customermed
will be
utilizing
minimizing cost. The printouts also
En
av fördelarna
med
NONEL SnapDet
serve
as valuable
documentation
in är att lagerhållningen kan hållas
på miniminivå.
av SnapDet och en sort av εclip
cases
where the Endast
blastingenis sort
being
carried
out on
behalf
of utföra
a thirdperfekta sprängningar.
eller
SnapLine
behövs
för att
party.
a large number of identical boreholes, and only one type of loading.
Observera!
ytfördröjningssprängkapseln
är sammankopplad
A PLC unitEftersom
mounted
on the loading unit records
the amount in
andborrhålssprängkapseln,
the number of each är
borehole.
We would
to emphasis
med
det av största
vikt attlike
ytkopplingsenthat the
system’s
products
are delivered
in accordance ex.vis
to the
heten
inte AnB
blir utsatt
för yttre
påverkan
under laddningsarbetet,
customer’s
specifications
wishes, and that it is the customer
vid
förflyttning
av utrustningand
på pallen.
who is responsible for the loading and blasting work. Orica Mining
Services wishes nevertheless to play an active supporting role.
Loading waterlogged holes
Waterlogged holes have previously presented difficulties for loading
with ANFO explosives. This problem has been (significantly) reduced
through AnB System’s dewatering technique. Each individual
The explosives are transported to a loading container mounted
Tekniske
spesifikasjoner
borehole can now dewatered immediately before loading. The water
on
load cells.
This makes it possible to determine at any given
clearing is done by inserting a plastic hose with a rubber bellow on
time
what amount has been loaded. Not only does this system
Borrhålssprängkapsel
the end into the borehole. The hose and bellow is then subjected to
provide continuously updated information on the total amount
Sort
pressure, and the water is pressed out of the hole through a return
delivered,
but also information on the amount of explosives NPED*
in
each
borehole. A summary report containing this information500
is ms hose. A radio control unit attached to the operator’s belt operates
Fördröjningstid
the dewatering process. All of our loading units have AnB system’s
printed out immediately after finished loading, and is delivered to
Styrka
Nr. 8
dewatering equipment.
the most up-to-date loading control, which provides valuable and
necessary documentation.
Sprängämne
Product / colorcode on
Diameter
the bag
Användningstemperatur
Density kg/dm3
Volume
Ytkopplingsenhet
strenght approx. %
Sort
Energy MJ/kg
Fördröjningstid
Energy MJ/dm3
Detonation velocity m/s
Slangtyp
approx. confined
Kapacitet
Gasvolume l/kg
1 g PETN/RDX
Anolit
(standard)
Anolit Light 7,5 Anolit
mm Light
50%
30%
0,85
0,52
100
50
3,9
3,2
3,3
1,7
> 2400
2000
970
795
-35°C till0,40
+50°C
εclip eller SnapLine
30
Anolit Extra
Anolit A
Anolit Extra A
0,83
0,88
0,86
90
125
114
NPED* sprängämne ca 0,3 g PETN
2,5
3,6
4,7
4,4
0 - 285 ms
1,0
3,0
4,1
3,8
> 2400
> 2700
> 2700
985
895
920
Standard1300
3L röd
8 slangar
650
*Sprängkapseln
är av NPED-typ i vilken
vid
sprängämne. Detta
Water resistance
Poorprimär­sprängämnet
Poor (blyazid) har ersatts
Poor med ett sekundär­
Limited
Poorökar säkerheten
Limited
tillverkning och hantering. US patent No.4.727.808
Approval and classification
Proper shipping name
Explosive, Blasting, Type B / Ammoniumnitrate
UN-number
0082 / 1942
Transport class
1.1 D / 5.1
The manufacturer reserves the right to modify products without prior notice. © Dyno Nobel Sweden AB
Dyno Nobel Sweden AB
Gyttorp, 713 82 Nora, Sweden
Phone: +46 587 85000 - email:[email protected]
www.oricaminingservices.com
TD
Aug
®
AnB
System
NONEL Systemet®
Above and below ground
SnapDet
the customer along with a delivery
acknowledgement. This type of
documentation allows the customer
to obtain Färg
optimal loading, thus Borrhålssprängkapsel
minimizing cost. The printouts also Fördröjningstid (ms)
serve as valuable documentation in
Grön
500
cases where
the blasting is being
carried outGul
on behalf of a third
500
party.
bodies. In other words, they consist of a truck chassis with a loading
NONEL
ytkopplingsenhet
or
transport
unit mounted on top, which contains the necessary
amount of prepared Anolit. An AnB production
unit, which mixes
Ytkopplingsenhet
Beteckning
the raw materials
on site just prior to the
may also be
εcliploading,
eller SnapLine
SnapDet are loaded through a loading hose into the
used. The explosives
Fördröjningstid (ms)
boreholes by use of compressed air. Loading of the whole blast can
0 / 500
2
generally be done
from ground level, or from the existing
access to
the pallet. 17 / 500
17
25 / 500
25 a number of
Röd
500
Supplying Anolit
directly to the boreholes offers
The
operator
controls
the
loading
with
the
aid
of a radio-operated
advantages: 42 / 500
42
Vit
500
remote control system attached to the operator’s belt. One
• High degree of safety
67 /need
500to store explosives
67
500 operation. It is
person can Blå
therefore carry out the entire loading
• No
also
possible
to
pre-program
the
desired
amount
• 109
Pre-programmed
amount
of
loaded
Anolit
per
hole
/ 500
109
Svart
500 of explosive per
borehole. This is of course most useful in situations where there are
• Large loading capacity
176 / 500
176
Orange
500
a large number of identical boreholes, and only one type of loading.
• Efficient loading requiring minimal labour
A PLC unitBrun
mounted on the loading unit records
• 285
No leftover
/ 500 explosives
285
500 the amount in
and the number of each borehole. We would like to emphasis
• Accurate documentation
Borrhålssprängkapseln
även fås med 400, 425, 450 eller 475 millisekunders
grundfördröjning.
that the AnB
system’s products are delivered in accordance to the
• No handlingkan
of packaging
customer’s specifications and wishes, and that it is the customer
• Dewatering system
who is responsible for the loading and blasting work. Orica Mining
Services wishes nevertheless to play an active supporting role.
Loading control – documentation
By using the AnB System, a cost-conscious customer will be utilizing
Loading waterlogged holes
the most up-to-date loading control, which provides valuable and
Waterlogged holes have previously presented difficulties for loading
necessary documentation.
with ANFO explosives. This problem has been (significantly) reduced
through AnB System’s dewatering technique. Each individual
The explosives are transported to a loading container mounted
Uppkopplingsprincip
SnapDet
borehole can now dewatered immediately before loading. The water
on load cells. This
makes it possible to NONEL
determine
at any given
clearing is done by inserting a plastic hose with a rubber bellow on
time what amount has been loaded. Not only does this system
the end into the borehole. The hose and bellow is then subjected to
provide continuously updated information on the total amount
pressure, and the water is pressed out of the hole through a return
delivered, but also information on the amount of explosives in
hose. A radio control unit attached to the operator’s belt operates
each borehole. A summary report containing this information is
the dewatering process. All of our loading units have AnB system’s
printed out immediately after finished loading, and is delivered to
dewatering equipment.
Product / colorcode on
Anolit
Anolit Light
Total fördröjning
the bag
(standard)
50%
Density kg/dm3
0,85
0,52
Rekommenderade lagringsvillkor
Volume
50
Lagringstid
2 år100
från produktionsdatum.
strenght approx. %
Produkter i bruten förpackning bör
Energy MJ/kg
3,9
3,2
förbrukas inom 3 månader. Vid
3
Energy MJ/dm
3,3 hög fuktighet, 1 1,7
mycket
månad
Detonation
velocity
m/s
Luftfuktighet
Torrt
och
luftigt/svalt
> 2400
2000
approx. confined
Gasvolume l/kg
Water resistance
Destruktion av NONEL-slang
Anolit Light
30%
Anolit Extra
Anolit A
Anolit Extra A
0,40
0,83
0,88
0,86
Godkännande och klassificering
30
90
Notified
Body (Godkännande
Institut)
2,5
3,6
Godkännandenummer
1,0
3,0
Produktbeteckning/varunamn
1300
> 2400
UN-nummer
4,7
158401
4,1
1.1.B895
970
795
Transportklassificering985
650
Poor
Poor
Poor
Limited
125
0402 (SP, Sverige) 114
4,4
3,8
Sprängkapslar, icke-elektriska
> 2700
0360
Poor
> 2700
920
Limited
Approval and classification
Spräng ut det reaktiva materialet med DynoStart och sänd till: Återvinning - Soptipp - Brännplats
Proper shipping name
Explosive, Blasting, Type B / Ammoniumnitrate
UN-number
0082 / 1942
Transport class
1.1 D / 5.1
The manufacturer reserves the right to modify products without prior notice. © Dyno Nobel Sweden AB
Utgivaren reserverar sig för tryckfel, ändringar i lagar och föreskrifter samt eventuella produktändringar © Orica Norway AS
Dyno Nobel
Sweden
Orica
Norway
AS AB
Gyttorp,
713
82
Nora, Sweden
Postboks 614, 3412
Lierstranda Visitor address: Røykenveien 18, 3400 Lier
Phone: +46
85000
Telefon:
32 587
22 91
00 - email:[email protected]
email: [email protected]
www.oricaminingservices.com