Forms Manual Board Agenda — F2-2 Background and Recommendation FOR BOARD MEETING DATE: February 12. 2014 AGENDA ITEM: 201 3-14 School Closure Criteria Report BACKGROUND: Pembina Hills Regional Division No. 7 Administrative Procedure 20-9 Facility Closure School/Program requires the Superintendent to annually apply the school closure criteria to the Division’s schools and notify the Board in any year as to which schools meet the criteria for school closure. — The preliminary report was presented at the November 12, 2013 Regular Board Meeting. Four (4) schools were identified in this report under various criteria. Appended is the report on the outstanding items and recommendation from the Superintendent. RECOMMENDATION: See attached February 11.2014 Date Form 2-2 Received February 12, 2014 February 12, 2014 2013-2014 School Closure Criteria Report BACKGROUND Pembina Hills Regional Division No. 7 Administrative Procedure 20-9 Facility Closure – School/Program requires the Superintendent to annually apply the school closure criteria to the Division’s schools and notify the Board in any year as to which schools meet the criteria for school closure. The preliminary report was presented at the November 12, 2013 Regular Board Meeting. Four (4) schools were identified in this report under various criteria. 1. FORT ASSINIBOINE SCHOOL Background Fort Assiniboine School was identified under the following criteria: - Criteria 2.2 – Facility Space Utilization Rate < 50% - The school’s utilization rate at September 30, 2013 was 49.77%. - Criteria 2.6 – Grade 7-9 Enrolment < 40 students - The school had an enrolment of 20 Grade 7-9 students at September 30, 2013. Over the past two (2) years, Fort Assiniboine School has utilized creative ways to provide instruction to their students, including the use of video-conferencing for some junior high courses. This has enabled the school to maintain its financial viability as a K-9 school. The school is not projecting an operating deficit in the 2013-2014 school year. Recommendation That the Board maintain Fort Assiniboine School as a K-9 school for the 2014-2015 school year. Later this spring the Board will have a conversation with the Fort Assiniboine School Community regarding the high school program that was closed effective the 2011-2012 school year. 2. DAPP SCHOOL Background Dapp School was identified under Criteria 2.2 – Facility Space Utilization Rate < 50%. The school’s utilization rate at September 30, 2013 was 49.08%. At the February 27, 2013 Regular Board Meeting, the following motion was made: #5945/02/13 - Moved by Trustee Bokenfohr that Dapp School be designated as an elementary and junior high school effective September 1, 2014, subject to adequate learning spaces to accommodate the students from Westlock North. February 12, 2014 On January 30, 2014 the Province announced approval of modular classrooms and a major modernization of Dapp School. The costs of the modular classrooms and the modernization will be borne by the province. At the June 12, 2013 Regular Board Meeting the Board designated the name for the new school for the students of Westlock North “Pembina North Community School” and designated the school be a K-9 school. Recommendation No further action is required at this time. 3/4. JARVIE SCHOOL and W. R. FROSE SCHOOL Background Jarvie School and W. R. Frose School were both identified under the following criteria: - Criteria 2.2 - Facility Space Utilization Rate < 50% o Jarvie School’s utilization rate at September 30, 2013 was 41.84%. o W. R. Frose School’s utilization rate at September 30, 2013 was 34.00%. - Criteria 2.6 – Critical Minimum Enrolment o For stand-alone schools – minimum enrolment per Administrative Procedure 209 is 45 students. Jarvie School had 41 students in grades 7-9 at September 30, 2013. o For grade 7-9 – minimum enrolment per Administrative Procedure 20-9 is 20 students in grades 7-8. W. R. Frose School had 15 students in grades 7-8 at September 30, 2013. In early 2014, Administration was to present the remaining components of the School Closure Criteria Report: - Criteria 2.1 – 5-Year Enrolment Projections, and - Criteria 2.5 – The continued operation of the school will create excessive costs to the School Division, along with recommendations. Recommendations 5-Year Enrolment Projections Appended are the 5-year enrolment projections for each of Dapp, Jarvie, and W. R. Frose Schools, as well as the combined enrolments of all 3 schools. The projections are based on existing enrolments at the schools, rolled forward on an annual basis. Based on existing and previous data, it is projected that Jarvie School will continue to be under the facility space utilization rate of 50% for the following five (5) years and under the critical minimum enrolment of 45 students for stand-alone schools, with projected enrolments of 39,43,43,40 and 39 respectively. Based on existing and previous data, it is projected that W. R. Frose School will continue to be under the facility space utilization rate of 50% for the following five (5) years. It is also projected that the school will be: February 12, 2014 - under the critical minimum enrolment of 20 students in K-3 in two (2) of the next five (5) years (2017-18 and 2018-19); - under the critical minimum enrolment of 20 students in grades 4-6 in two (2) of the next five (5) years (2014-15 and 2016-17); and - under the critical minimum enrolment of 20 students in grades 7-8 in five (5) of the next five (5) years, with projected enrolments of 19, 16, 15, 12, and 12 respectively. Conversely, combining the enrolments of all three (3) schools – Dapp, Jarvie, and W. R. Frose will result in enrolments that are sustainable and provide educational opportunities for all students. The continued operation of the school will create excessive costs to the School Division Based on the Pembina Hills allocation formula, Jarvie School is projecting an instructional deficit in their 2013-2014 school operating budget of $12,995. Based on the current Pembina Hills allocation formula, the projected instructional deficit for the school in 2014-2015 will be $22,775. Given the projected continual enrolment decline, it is likely that Jarvie School will continue to experience operating deficits for the four (4) years following 2014-15. As of September 1, 2013, Jarvie School had $52,863 in their operating reserve plus a further $5,000 in their technology operating reserve, for total reserves of $57,863. Their projected total reserve balance at the end of the 2013-14 school year is $44,868. While Jarvie School has sufficient funds to cover their 2013-2014 projected deficit the reserve fund will likely be depleted within the next two (2) school years and the school will begin to experience operating debt, compounded by annual operating deficits. Based on the Pembina Hills allocation formula, W. R. Frose School is projecting an instructional deficit in their 2013-2014 school operating budget of $11,479. Based on the current Pembina Hills allocation formula, the school will have slightly more revenue in 2014-15, given the current size of the Kindergarten class. However, the projected instructional deficit for the following year will increase to approximately $42,000, given the projected loss in enrolment of six (6) students. The enrolment is expected to decline further in the following three (3) years. Therefore, it is likely that W. R. Frose School will continue to experience operating deficits for the three (3) years following 2015-16. As of September 1, 2013, W. R. Frose School had $42,248 in their operating reserve plus a further $11,900 in their technology operating reserve, for total reserves of $54,148. Their projected total reserve balance at the end of the 2013-14 school year is $42,669. While W. R. Frose School has sufficient funds to cover their 2013-2014 projected deficit, the reserve fund will likely be depleted within the next two (2) school years and the school will begin to experience operating debt, compounded by annual operating deficits. The above is based on the current Pembina Hills allocation formula for distributing resources to schools. As noted in the Business Case for the consolidation of Westlock North Schools, it is estimated that Pembina Hills’ instructional expenses will be reduced by approximately $320,000 per year as a result of consolidating the three existing Westlock North Schools into one school. Also noted in the Business Case, the net annual savings, after factoring the change in funding from Alberta Education, will be $140,000 for facilities. February 12, 2014 Conversely, if all three schools remain operational beyond September 1, 2014, major facility work will need to be completed at W. R. Frose School. Upon closer examination of the proposed transportation system for the attendance area to be served by Pembina North Community School, $79,295 in cost savings will be achieved. In addition, Pembina Hills will be eligible for a further $30,000 in transportation funding from Alberta Education, for a net annual savings over the current model of $109,295, versus $80,000 as noted in the Business Case. RECOMMENDATIONS That the Board consider a notice of motion to commence the process to consider closure of Jarvie School effective September 1, 2014, pursuant to Pembina Hills Policy 200-5 and Administrative Procedure 20-9, directing the students residing in the attendance area to Pembina North Community School in Dapp, Alberta. That the Board consider the appended timelines to consider closure of Jarvie School effective September 1, 2014. That the Board consider a notice of motion to commence the process to consider closure of W.R. Frose School effective September 1, 2014, pursuant to Pembina Hills Policy 200-5 and Administrative Procedure 20-9, directing the students residing in the attendance area to Pembina North Community School in Dapp, Alberta. That the Board consider the appended timelines to consider closure of W. R. Frose School effective September 1, 2014. JARVIE SCHOOL Timelines to Consider Closure Consider closure at May 14, 2014 Regular Board Meeting 1. March 3, 2014 – Send letters to parents of all students in the Jarvie attendance area. (S.4 of AP209; S.4(2) A/R 238/97) 2. March 25 and April 1, 2014 issues of the Westlock News / Town & County – Advertise public meeting. (S.5 AP20-9; S.5(2)(b) A/R 238/97 3. Prior to March 24, 2014 – Post notice of public meeting in five (5) conspicuous places in the Jarvie attendance area. (S.5 AP20-9; S.5(2)(a) A/R 238/97) 4. Prior to March 24, 2014 – Write a letter to Westlock County, providing an opportunity for the council to provide a statement to the Board of the impact the closure may have on the community. (S.7 AP20-9; S.5(1)(b) A/R 238/97) 5. April 8, 2014 – 7:00 p.m. – Hold a public meeting at Jarvie School. (S.5 AP20-9; S.5(1)(a), S.5(3) & S.5(4) A/R 238/97) 6. April 15, 2014 – 6:30 p.m. – Hold a meeting at Jarvie School to provide individuals or groups an opportunity to make presentations directly to the Board of Trustees (by appointment). Appointments will be in 15 minute intervals. If no appointments are made by April 11, 2014, the meeting will be cancelled. 7. April 15 to May 13, 2014 – Comment period for parents and community members to present to the Board of Trustees further written responses to the proposed closure. (S.8 & 9 AP20-9; S.6(1) & (2) A/R 238/97) 8. Prior to April 25, 2014 – Completion of minutes of the public meeting. (S.5 AP20-9; S.5(4) A/R 238/97) 9. May 14, 2014 – Motion to consider closure of Jarvie School effective the 2014-2015 school year. (S.10 AP20-9; S.6(3) A/R 238/97) 10. May 15, 2014 – Notify the Minister of Education if the Board votes to close Jarvie School. (S.10 AP20-9; S.6(3)(b) A/R 238/97) W.R. FROSE SCHOOL Timelines to Consider Closure Consider closure at May 14, 2014 Regular Board Meeting 1. March 3, 2014 – Send letters to parents of all students in the W. R. Frose attendance area. (S.4 of AP20-9; S.4(2) A/R 238/97) 2. March 25 and April 1, 2014 issues of the Westlock News / Town & County – Advertise public meeting. (S.5 AP20-9; S.5(2)(b) A/R 238/97 3. Prior to March 24, 2014 – Post notice of public meeting in five (5) conspicuous places in the W. R. Frose attendance area. (S.5 AP20-9; S.5(2)(a) A/R 238/97) 4. Prior to March 24, 2014 – Write letters to Westlock County / MD of Lesser Slave River, providing an opportunity for the council to provide a statement to the Board of the impact the closure may have on the community. (S.7 AP20-9; S.5(1)(b) A/R 238/97) 5. April 7, 2014 – 7:00 p.m. – Hold public meeting at W. R. Frose School. (S.5 AP20-9; S.5(1)(a), S.5(3) & S.5(4) A/R 238/97) 6. April 15, 2014 – 8:00 p.m. – Hold meeting at W. R. Frose School to provide individuals or groups an opportunity to make presentations directly to the Board of Trustees (by appointment). Appointments will be in 15 minute intervals. If no appointments are made by April 11, 2014, the meeting will be cancelled. 7. April 15 to May 13, 2014 – Comment period for parents and community members to present to the Board of Trustees further written responses to the proposed closure. (S.8 & 9 AP20-9; S.6(1) & (2) A/R 238/97) 8. Prior to April 25, 2014 – Completion of minutes of the public meeting. (S.5 AP20-9; S.5(4) A/R 238/97) 9. May 14, 2014 – Motion to consider closure of W. R. Frose School effective the 2014-2015 school year. (S.10 AP20-9; S.6(3) A/R 238/97) 10. May 15, 2014 – Notify the Minister of Education if the Board votes to close W. R. Frose School. (S.10 AP20-9; S.6(3)(b) A/R 238/97) ENROLMENT Projected - Pembina North Community School Dapp School 09/10 Total 1-6 Total ECS-6 12/13 11/12 13/14 0 26 26 3 15 18 4 12 16 3 14 17 14 13 20 15 17 18 97 123 22 18 14 19 15 16 104 122 12 21 18 13 19 13 96 112 16 11 20 20 12 18 97 114 Early Entry ECS Regular ECS Total ECS GR. 1 GR. 2 GR. 3 GR. 4 GR. 5 GR. 6 10/11 Projected 14/15 15/16 16/17 17/18 18/19 0 3 0 0 0 0 15 15 7 6 12 6 18 15 7 6 12 6 12 15 10 20 19 12 88 106 Jarvie School 09/10 GR. 7 GR. 8 GR. 9 10/11 19 24 17 60 Total 7-9 11/12 13 21 26 60 12/13 14 11 22 47 13/14 12 13 10 35 17 11 13 41 W.R. Frose School 15 11 14 9 19 17 85 100 15 15 11 14 9 19 83 90 7 15 15 11 14 9 71 77 6 7 15 15 11 14 68 80 12 6 7 15 15 11 66 72 Projected 14/15 15/16 16/17 17/18 18/19 14 11 15 17 8 17 8 17 11 15 17 11 17 11 15 39 43 43 40 39 1 7 8 1 4 5 2 11 13 7 6 13 Projected 14/15 15/16 16/17 17/18 18/19 3 0 0 0 0 0 4 12 5 4 5 4 4 4 15 5 4 5 Total 1-6 9 10 13 8 9 11 60 9 9 10 13 7 9 57 5 8 8 9 11 7 48 9 4 8 7 9 11 48 5 8 5 8 7 9 42 10 6 8 4 8 7 43 5 10 6 8 4 8 41 4 5 10 6 8 4 37 4 4 5 10 6 8 37 4 4 4 5 10 6 33 Total 7-9 Total ECS-9 14 8 12 34 102 9 12 0 21 83 9 6 0 15 76 7 9 0 16 77 10 5 0 15 72 9 10 0 19 67 7 9 0 16 61 8 7 0 15 57 4 8 0 12 53 8 4 0 12 49 09/10 Early Entry ECS Regular ECS Total ECS GR. 1 GR. 2 GR. 3 GR. 4 GR. 5 GR. 6 GR. 7 GR. 8 GR. 9 10/11 11/12 12/13 13/14 Combined Projected 09/10 10/11 11/12 12/13 13/14 14/15 15/16 16/17 17/18 18/19 Early Entry ECS 1 4 6 10 6 0 0 0 0 0 11 16 10 11 Regular ECS 33 19 23 20 27 20 Total ECS 34 23 29 30 33 20 11 11 16 10 23 23 33 23 26 29 31 27 24 32 22 25 17 29 26 22 30 20 25 15 28 27 21 29 17 23 15 28 26 21 25 17 22 13 27 24 20 25 17 22 13 27 11 20 25 17 22 13 10 11 20 25 17 22 16 10 11 20 25 17 Total 1-6 157 161 144 145 130 128 124 108 105 99 Total 7-9 33 32 29 94 22 33 26 81 23 17 22 62 19 22 10 51 27 16 13 56 20 27 16 63 22 20 27 69 25 22 20 67 12 25 22 59 22 12 25 59 251 285 242 265 206 235 196 226 186 219 191 211 193 204 175 186 164 180 158 168 GR. 1 GR. 2 GR. 3 GR. 4 GR. 5 GR. 6 GR. 7 GR. 8 GR. 9 Total 1-9 Total ECS - 9 Note: for PNCS calc, WRF 9's are counted starting 2014-15 12-Feb-14
© Copyright 2024