SUPPLIER QUALITY MANUAL Valcor Engineering Corporation SQM-001

Valcor Engineering Corporation
SUPPLIER QUALITY MANUAL
SQM-001
August 20, 2014
Uncontrolled when printed. Verify document revision online at www.Valcor.com
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
Contents
1.0
Supplier Quality Visual Model ........................................................................................................... 4
2.0
Valcor’s Quality Policy ....................................................................................................................... 5
3.0
Introduction ...................................................................................................................................... 5
3.1
Precedence of documents ............................................................................................................ 5
3.2
Certificate of Conformance and Analysis ...................................................................................... 6
3.3
Record Retention .......................................................................................................................... 6
3.4
Flow-Down to Sub-Tier Suppliers.................................................................................................. 6
3.5
Foreign Object Damage (FOD) Prevention.................................................................................... 6
3.6
Right of Access .............................................................................................................................. 7
3.7
Export Control ............................................................................................................................... 7
4.0
Supplier Approval Process ................................................................................................................ 8
5.0
Supplier Audit Process .................................................................................................................... 10
6.0
Change Request .............................................................................................................................. 12
7.0
Non-Conformances ......................................................................................................................... 13
7.1
Supplier Deviation Flow Chart .................................................................................................... 13
7.2
Supplier Quality Escape Flow Chart ............................................................................................ 15
8.0
Supplier Corrective Action .............................................................................................................. 17
9.0
Delivery Requirements.................................................................................................................... 19
9.1
Packaging .................................................................................................................................... 19
9.2
Foreign Object Damage (FOD) .................................................................................................... 21
9.3
Labeling ....................................................................................................................................... 21
10.0
10.1
Supplier Performance ..................................................................................................................... 22
Overall Performance Rating ........................................................................................................ 24
11.0
Dock-to-Stock Authority.................................................................................................................. 25
12.0
Valcor Owned Property................................................................................................................... 26
13.0
Appendix A: Valcor Supplier Quality Survey SF1016A .................................................................... 27
14.0
Appendix B: Deviation/Change Request SF1019A .......................................................................... 32
15.0
Appendix C: Material Rejection Report SF-104/R.03/12 ................................................................ 34
16.0
Appendix D: Corrective Action Request/Report SF1018A .............................................................. 36
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 3 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
1.0 Supplier Quality Visual Model
Budget
Time
Cost
Supplier
Managment
Supplier
Collaboration
Supplier
Information
Customer Satisfaction
Potential Supplier
Deviation Request
ScoreCard
Real-time data driven
Decisions
Certificate
Management
SCAR
Reference
Documents
Supplier
Improvement
Performance Audit/
3rd Party Audit
Change Request
Valcor Documents
and Specifications
Dock-to-Stock
Risk Assesmnet
Certificate of
Analysis/
Conformance
Warranty and Cost
Recovery
Reduce Risk
Supplier Related
Customer Complaints
Engineering
Purchasing
Quality Inspection
Data
ESTITRACK
Quality Assurance
Information
Management
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 4 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
2.0 Valcor’s Quality Policy
Achieve total customer satisfaction by continuously improving all work
processes to satisfy our internal and external customers
3.0 Introduction
Valcor’s mission is to provide innovative, high quality, reliable fluid control components and systems to
customers in response to their specialty requirements. This supplier quality manual is based on
prevention and continuous improvement rather than defect detection. Valcor expects their suppliers to
aspire to zero defects, zero failures, and zero losses.
Valcor encourages all suppliers of components, materials, or services to institute a Quality Management
System that follows: AS9100 Quality Management System Requirements for Aviation, Space & Defense
Organizations and/or ISO 9001:2008 International Industry Quality Standards. The Nuclear division may
impose additional nuclear specific requirements depending on the nature of work. Valcor may choose to
conduct on-site assessment(s) to determine the supplier’s ability to meet Valcor’s requirements.
3.1 Precedence of documents
In the case of a conflict and between the requirements, the precedence of documents is as follows;
1.
2.
3.
4.
Purchase order
Terms and Conditions
Part Drawing
Supplier Quality Manual
3.2 Applicable Forms
The following forms are referenced within this manual and are available from
http://www.valcor.com/customer-product-support/suppliers/
Form Number Form Title
SF1016A Valcor Supplier Quality Survey
SF1019A Deviation/ Change Request
SF1018A Supplier Corrective Action Request
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 5 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
3.3 Certificate of Conformance and Analysis
All suppliers shall provide a Certificate of Conformance, Physical or Chemical Analysis, or Calibration,
when applicable. Each shipment must be certified by an authorized representative with their signature,
title, and date. The supplier shall verify and confirm compliance with the drawing, specification, and/or
any special processes as described on the Purchase Order. Without this documentation, Valcor cannot
receive the parts, and both the payment and parts will be placed on hold until resolution in
documentation can be provided.
The following information is required on the Certificate of Conformance at a minimum:




Supplier Name, address and contact information and manufacturer’s name (if different from
Supplier)
Purchase Order Number
Valcor part number, revision, lot, and quantity
Specification Number including revisions and amendments
Additional information may be required for parts returned for rework



Identify when parts have been reworked
Return Purchase Order Number
Non-conformance Deviation Number
3.4 Record Retention
Valcor shall identify supplier records requirements on the purchase order, drawing notes, or
procurement specifications. The delivered product’s records shall be maintained for a minimum of
fifteen (15) years at the supplier, unless otherwise specified. Upon request, the supplier shall provide
copies to Valcor.
3.5 Flow-Down to Sub-Tier Suppliers
Suppliers shall flow down applicable requirements noted on Valcor’s Purchase Order and Terms and
Conditions to all sub-tier suppliers.
3.6 Foreign Object Damage (FOD) Prevention
When applicable, noted on Valcor’s purchase order, the supplier shall establish, document, and maintain
a program to control and prevent FOD during manufacturing, assembly, test, inspection, and any subtier supplier operations. This program can follow NAS412 or be an otherwise approved control by
Valcor. The supplier shall maintain work areas and inspect for foreign objects/materials to reduce the
risk of FOD incidents.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 6 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
3.7 Right of Access
Suppliers shall allow Valcor, customers and regulatory agencies reasonable access to the applicable
areas of all facilities involved in fulfilling the purchase order requirements and to all applicable
documentations. Valcor has the right to conduct surveys, audits, inspections, and surveillance of
Supplier’s facilities and sub-tier suppliers with prior coordination to determine capability.
When required, source and/or government inspection will be noted on the purchase order. The supplier
shall ensure the product is not released until source and/or government inspection is completed.
3.8 Export and Import Compliance
The products, technical data and services produced and/or provided by Valcor Engineering Corporation
may be subject to the provisions of the Export Administration Act of 1979 (50 USC 2401-2420), the
Export Administration Regulations promulgated there under (15 CFR 730-774), and the International
Traffic in Arms Regulations (22 CFR 120-130). These statutes and regulations impose restrictions on
import, export, re-export and transfer to third countries of certain categories of hardware, data,
technical services and information, and that licenses from the U. S. Department of State and/or the U. S.
Department of Commerce may be required before such hardware, data, technical services and
information can be provided/disclosed hereunder, and that such licenses may impose further
restrictions on use and further disclosure of such data, technical services and information.
Disclosure of data, technical services and information to foreign persons, as defined at ITAR 120.16, and
at EAR 734.2(b), is subject to the above regulations regardless if the export occurs in the U.S. or
abroad. Violation of these export laws are subject to severe criminal penalties.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 7 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
4.0 Supplier Approval Process
This process applies to all new potential Valcor suppliers and defines Valcor’s criteria of selection and
assessment.
Flowchart
Potential
Supplier?
Supplier
Send survey to
Supplier
Supplier to fill out
Survey
Purchasing
Quality Assurance
Supplier to return
survey and other
required
documents
Review if Supplier
requirements
were met per
survey
Supplier
Approved?
YES
Approve Supplier
YES
NO
Determine if an
Audit is needed?
YES
Supplier Agrees to
an Audit?
NO
Disqualify Supplier
NO
NO
Accept CA?
Review Supplier CA
YES
Supplier to return
corrective Action
Perform Audit
NO
YES
Supplier
approved per
audit?
NO
Work with
Supplier?
YES
Request for Supplier
Corrective Action
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 8 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
Supplier Approval Process
Responsibility
All potential suppliers are required to fill out a quality survey (SF1016A) to collect general information
about the company and its products or services. This form will be used to indicate the standards of a
potential supplier and will be performed as a self evaluation survey.
Potential suppliers will be evaluated on their ability to provide a quality product based on the Supplier
Quality Survey Form and the Supplier’s quality system certifications.
Valcor recognizes all third –party certifications that are compliant to ISO-9001, AS9100, NADCAP, and/or
ISO 17025 accreditations which an onsite audit may be waived. The supplier quality survey form and
attached certifications will be assessed by Valcor’s Quality department and will reserve the right to
conduct an onsite audit when deemed necessary. Suppliers that meet all requirements will be placed on
the Approved Supplier List.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 9 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
5.0 Supplier Audit Process
The purpose of this procedure is to establish a process to evaluate the supplier’s quality system, control
of process and product quality, and the maintenance of product compliance.
Audit Flow Chart
Supplier
Quality Assurance
Audit is required
Purchasing
YES
Disqualify Supplier
NO
Supplier Agrees
to an Audit?
YES
YES
Determine if a
follow-up audit is
needed
NO
YES
Schedule Audit and
send the Audit
agenda to the
Supplier
NO
Accept CA?
Perform Audit
Review Supplier CA
Send Audit Report to
Supplier
Request for
Supplier Corrective
Action
YES
Supplier to return
corrective Action
NO
Supplier to Review
Audit Report and
send a response
when applicable
Review Audit Report
Response
Send Feedback to
the supplier
NO
Accept Supplier
Response?
YES
Update Supplier List
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 10 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
Supplier Audit Process
Procedure
Valcor may conduct an audit at the supplier to make a physical evaluation of the supplier’s quality
system. Audits performed at the supplier will be completed by the appointed lead auditor.
Non-conformities observed during Audit
Upon detection of a nonconformance, the auditor’s first concern will be to determine if any
work in process is affected and will verbally notify the supplier. The supplier will immediately
need to stop work on that item. In all cases of a non-conformance a quality audit report will be
sent to the supplier for the purpose of initiating a corrective action plan. The report shall be
submitted within a specific time period not exceeding 30 days.
Follow-up audit
A follow up audit at the supplier, when directed by Quality Assurance, will be performed to
assure effective action has been taken to correct the significant condition.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 11 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
6.0 Change Request
When required, the supplier shall not change the plans, drawings, designs, product definition, processes
or specifications associated with the parts referenced on the Purchase Order. If a change is needed, the
supplier and sub-supplier must receive prior written approval from Valcor.
Configuration Control Flow Chart
Change Request is
initiated
Supplier
Repeat
Request
YES
Purchasing
MRB Review
NO
Review Change
Request
Approve
Change
Request
NO
Update Request
database
YES
Make appropriate
changes and
update PO
Communicate
Y/N to supplier
Procedure
The supplier submits a Change Request form (SF1019A) and includes a complete description of the
proposed change to Valcor’s Purchasing Department. Based on the change request, it will be evaluated
by engineering, purchasing, and/or quality assurance. Once the Change Request is dispositioned, Valcor
will inform the Supplier.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 12 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
7.0 Non-Conformances
A non-conformance exists when a discrepancy is found in packaging, documentation, and/or quality
(defects in form, fit, or function) to the part or P.O. requirements.
Non-conformances will be identified:
 At supplier prior to shipping – Supplier Deviation Flow Chart – Section 7.1
 At Valcor – Quality Escape Flow Chart – Section 7.2
7.1 Supplier Deviation Flow Chart
Detect a quality
deviation
Supplier
Purchasing
Issue and forward
the Deviation
Request to Valcor
Receive Deviation
Form
MRB Review
Quality Assurance
Send Corrective
Action Request
to Supplier
Follow section
8.0
Recieving
YES
Corrective
Action
Required
NO
Approve
deviation
request?
YES
NO
Notify Supplier
of rejection
Parts need to be
replaced
Send Rejected
Deviation Report
to the Supplier
Notify Supplier of
approval
Annotate
Deviation # on
CofC
Receive parts
into inspection
Send parts and a
copy of an
approved
deviation to
Valcor
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 13 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
Non-Conformance: Supplier Deviation
Procedure
The supplier shall initiate and submit a formal Deviation/Change Request (SF1019A) to Valcor for
disposition (approval or rejection) of the non-conforming parts or process. The deviation form shall be
completed per the following:

Supplier and Part Information

Current Requirement: Fully describe the current part or process requirements and
specifications.

Request for Deviation: Fully describe the requested deviation from the current part or process
requirements and specification

Reason for Request: Describe the reason for the deviation.
And forwarded to Valcor’s Purchasing Department (use email unless not available, otherwise send as
facsimile). The Supplier shall provide any test and inspection data to support their request for approval
of the deviation. Purchasing will coordinate the disposition within Valcor and return a response to the
supplier within 72 hours.
Deviation Approval
If the deviation request is approved, Purchasing will inform the supplier of the disposition. The Supplier
is required to indicate the approved deviation number on their Certificate of Compliance/Conformance
and include an approved copy of the deviation with the parts. When all paperwork has been completed
and approved, the product may then be shipped. The parts or materials shipped under an approved
deviation request shall be tagged with the deviation number.
Deviation Rejection
In the case that the deviation request is rejected, Purchasing will notify the supplier and return the
rejected deviation form. The discrepant material and/or parts may not be shipped to Valcor. The
supplier will then need to replace the parts to fully meet the Purchase Order specifications.
Corrective Action
Valcor may issue a Supplier Corrective Action based on deviation request. Suppliers must follow
Corrective Action steps as identified in Section 8.0.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 14 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
7.2 Supplier Quality Escape Flow Chart
Non-conformance
detected
Supplier
Material Rejection
Report (MRR)
initiated and
reviewed
Send Corrective
Action Request to
Supplier
Follow Section 8.0
YES
Quality Assurance
MRB Review
Is a Corrective
Action Required
NO
Communicate and
send reports to
Supplier
Containment of
affected items
Use as is
Rework in house
Scrap, Rework, or
Replace
Return compliant parts
to Valcor
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 15 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
Non-Conformance: Supplier Quality Escape
Procedure
The discrepancies will be documented on a Material Rejection Report (MRR). The MRR will be evaluated
by Valcor’s Material Review Board (MRB) personnel who will determine the disposition of the discrepant
parts and a copy will be sent to the Supplier. The supplier may contest the quality escape with objective
evidence.
Valcor will disposition the supplier’s parts per the following:



Return to Supplier
Use as is
Rework in house
When returned, the supplier must have a method to distinguish on paper and clearly identify if each
shipped part has been:



reworked
replaced
left unchanged
If requested on the PO or drawing, the Supplier shall make Valcor aware of any processes that are
outside of the regular production procedures or controlled work conditions in critical processes (forging,
casting heat-treating, welding, stamping, and any other special processes).
Corrective Action
Valcor may issue a Supplier Corrective Action based on a quality escape. Suppliers must follow
Corrective Action steps as identified in Section 8.0.
Charges to Supplier
Valcor, at their discretion, may choose to rework or sort any non-conforming parts to prevent
interruption of the production line. Valcor reserves the right to charge the supplier for all costs
associated with the quality escape.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 16 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
8.0 Supplier Corrective Action
This process is to outline the Supplier’s submission of a Corrective Action report.
Corrective Action Flow Chart
Identify Corrective Action is
needed
Supplier
Quality Assurance
Send Correction
Action Request to
the Supplier
Contain defective
hardware
MRB Review
Determine Root
Cause
Develop a Corrective
Action Plan
Send Corrective
Action to Valcor
Communicate with
Supplier
Review CA Plans
NO
Approve CA?
Audit
Required?
YES
YES
Verify findings on
CA have been
adressed
Complete Audit at
Supplier
NO
Close Corrective
Action
CAR effectiveness
review
Closeout CAR
YES
Effective?
NO
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 17 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
Supplier Corrective Action
Procedure
A Supplier Corrective Action Request/Report (SF1018A) may be required when a nonconformance is
identified. Containment must be completed within 72 hours and the corrective action plan must be
submitted within 30 calendar days of the initial request.
Upon Supplier notification that a Corrective Action Request plan is approved, the supplier is expected to
complete all planned actions within 60 calendar days unless otherwise agreed to by Valcor. Valcor and
the supplier will verify and ensure that all findings on the Corrective Action have been addressed;
however they do not need to be closed at the same time. The effectiveness review due date will be
determined as appropriate and will conclude if the achieved results were met. A supplier corrective
action request form will stay open until the verification and effectiveness review have been validated by
Valcor.
An extension may be granted, only if the supplier made an initiative and periodic updates were provided
to Valcor. When there is no communication made between the supplier and Valcor, the request will be
denied and the supplier’s scorecard will be affected.
A repeated nonconformance is an indication of poor root cause analysis and/or corrective action. If such
a case arises, Valcor will pose rigid containment requirements based of the severity of the
nonconformance and re-assign a second corrective action request. Due to the risk it may present to
Valcor or its customers, an onsite supplier audit may be required.
If the Supplier does not know how to complete the corrective action request, it is the responsibility of
the Supplier to contact Valcor’s Supplier Quality Department for assistance.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 18 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
9.0 Delivery Requirements
The Supplier will inform Valcor of any delay in delivering the product and provide a new date. If the
Supplier ships non-conforming (quality escape) parts and materials to Valcor, the Supplier will be
responsible for the return expenses.
9.1 Packaging
Suppliers are responsible to ensure that parts meet same quality conditions as they were manufactured.
All supplier packaged shipments shall follow good commercial practice, unless otherwise stated on the
purchase order and/or drawings.
Piece part Cell Packaging
Acceptable Bulk Packaging
- Sub- assemblies
- Washers
- Critical parts*
- Nuts
- Tubes (non-raw material)
- Screws
- Seats
- Springs and Helicoils
- Seal discs
- O’Rings
- Machined threaded parts
- Bodies
- Filters
- Other parts will be noted on PO
*All items that have a 16 Ra surface finish or lower (defined on the drawing) are considered as “critical
parts”.
The shipping container and parts requirements are, but not limited to:





package each item separately to ensure adequate protection from physical contact with
other parts
packaging must be strong enough for the weight of the part for it to remain intact
parts are cushioned against impact from each other
parts are secured to prevent movement during shipment
package to provide enough clearance from the item and the external packaging
o To prevent product damage against shock and vibration there should be
cushioning placed away from the walls of the box.
Machined castings, forging parts, and other parts subject to corrosion shall be packaged with anticorrosive packaging such as capping, VCI anti-rust wrapping/bagging, plugging, covering, or any other
suitable methods to prevent against cosmetic and functional damage of the part.
Additional special packaging requirements will be identified on the Purchase Order or drawing.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 19 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
Packaging Requirements Examples
Acceptable Packaging
Suggestions
-Parts packaged in single tubes to protect ends
(size can vary).
-Cushioned from each other to prevent shock,
vibration, and damage
-Sub-assembly/valves protected and adequately
cushioned from the external walls
-Inlet/outlet ports capped and plugged
Unacceptable Packaging- will be written up on a
non-conformance
-Parts are able to move freely
-Not protected from each other
-Not enough clearance from external packaging
-Sub-assembly/ valves not protected from each
other.
-Threaded inlet/outlet ports not protected
Rust
-Parts not wrapped and subject to corrosion
-Parts wrapped in anti-corrosive bags
Further examples go to www.Valcor.com and click the “Supplier” link.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 20 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
9.2 Foreign Object Damage (FOD)
As defined on the purchase order, all parts with openings, internal and external threads shall be
protected from foreign object damage. Packaging materials that generate particles, fibers, or other
debris are not acceptable.
Any form of “free flow or loose fill” material (such as peanuts, popcorn, or similar) regardless of material
type is not acceptable as this will create a FOD hazard.
Example of Packaging a FOD prone item:
Example: Threaded part with caps and
plastic bag
Packaging Requirements
9.3 Labeling
Parts and material must be identified by the supplier with an identification label on each box, crate, or
container shipped to Valcor. When shipping a product, the Purchase order number must be referenced
on the UPS, FedEx, or other carrier shipping label.
An identification label at minimum should have the following information:



Purchase Order
Supplier name
Box X of Y (example “Box 2 of 3” if it is the second box of a total of 3).
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 21 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
10.0 Supplier Performance
Supplier performance will be monitored on a monthly basis through the purchasing and quality
departments and will be available quarterly to the supplier. The data will show comparative results and
will provide the strengths and weaknesses amongst individual suppliers.
The measurement for supplier performance will be evaluated on the following criteria; quality and
delivery.
Main Categories
Category
Total Points
Quality
100
Delivery
100
Sub-category
# Quality Escapes
# Deviations
Past due Corrective Actions
Accuracy of Paperwork/Documentation
% On time Delivery
Weight
60%
20%
10%
10%
100%
Sub-Categories
Main Category : Quality
Sub-category
# Quality Escapes
Total Weight : 100%
Weight
60%
Points
100
0-99
Evaluation Basis
0 quality escapes
Measures a supplier's quality impact at Valcor to meet
agreed specifications
.6 x (total lots -# quality escapes/ total lots ))x 100
100
# Deviations
20%
0-99
0 deviations
Measures a supplier's quality impact prior shipping to
Valcor to meet agreed specifications.
.2 x (total lots - # deviations/ total lots ))x 100
100
On time Corrective Actions
Accuracy of
Paperwork/Documentation
10%
10%
0-99
0-100
0 late Corrective Actions
Measure the responsiveness of a corrective action
.1 x (On time Corrective Actions/ Total Corrective Actions)
x 100
Measures errors that appear on the C of C (qty received
PO #, part number, revision, and/or missing special
processes)
.1 x (# accurate documents/ total lots received) x 100
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 22 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Main Category : Delivery
Sub-category
Supplier Quality Manual
Total Weight : 100%
Weight
Points
100%
0-100
Evaluation Basis
Measures the agreed delivery date on the PO
% On time Delivery
(on-time shipments/ total shipments received) x 100
Separate consideration will be given for low volume suppliers. Adjustments will be made as applicable to
the performance categories and their weights to reflect the different purchase order requirements.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 23 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
10.1 Overall Performance Rating
Valcor’s supplier rating system measures the performance of current suppliers and rates them based on
a supplier scale.
Performance
Rating
Supplier Classification
Description
95 - 100%
85 - 94%
Preferred
Acceptable


Meets all Valcor requirements in quality, cost, and delivery.
Meets minimum Valcor requirements.




Does not meet Valcor minimum requirements.
Required written corrective action.
Management approval to bid new work
On Probation unless documented evaluation justifies
continued use.
No new business and the existing business will be phased out.
Corrective Action Plan needs to be implemented and
“Acceptable” status within 60 days.
75 - 84%
Restricted
0 - 74%
Unacceptable


Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 24 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
11.0 Dock-to-Stock (DTS)
The DTS program exempts a supplier’s parts from routine incoming inspection at Valcor. Suppliers that
produce high quality parts and have an effective quality system can be considered a candidate for the
Dock-to-Stock program.
To become a DTS candidate, the supplier must achieve:





A performance level of 100% lot acceptance based on the most recent 12 months or 10 most
recent lots
98% or better piece count acceptance
An approved on-site surveillance (if appropriate) to assure that product quality will be
maintained
No open or late corrective actions for the part number (or family of parts)
Demonstrate certification and/or compliance to AS9100, ISO9000, or equivalent
The supplier’s part will continue to be put through a random inspection frequency determined by
Valcor.
Note: This program does NOT apply to Valcor Nuclear products.
Advantage of DTS:

Certified “Dock-to-Stock” suppliers will be considered ahead of non-DTS for additional business
Non-compliant part
If a deviation to the blueprint is found at the supplier’s facility follow Section 7.1 (Supplier Deviation).
However, when a nonconformance is identified at Valcor, the supplier’s part may be removed from
Dock-to-Stock authority, and will follow Section 7.2 (Supplier Quality Escape). In addition, suppliers
failing to maintain an overall score of 95% rating two consecutive quarters may be put on probation. A
supplier on probation may only be returned to the Dock-to-stock program when 10 consecutive lots
have been accepted without rejection or when the quarterly performance rating meets the 98%
requirement in two consecutive quarters.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 25 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
12.0 Valcor Owned Property
The supplier, at their facilities, is responsible for the maintenance and protection of Valcor owned
property. The supplier is required to establish control methods that will help prevent property loss,
damage, or mishandling.
Valcor owned products can consist of the following but not limited to:
 Re-usable packaging containers
 Tooling
 Gages
Inspection gages damaged or not sent to Valcor with the product will be considered as late, and result in
an on time delivery score reduction.
To protect Valcor’s investment, the supplier is responsible for the following furnished items:
 Raw material
 Partially process components
 Sub-assemblies
The supplier needs to notify Valcor immediately of a nonconformance, and if needed, a corrective action
will be requested. Liability for the occurrence, per case, shall be determined and discussed with the
supplier.
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 26 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
13.0 Appendix A: Valcor Supplier Quality Survey SF1016A
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 27 of 39
VALCOR SUPPLIER QUALITY SURVEY FORM
GENERAL INFORMATION
Street Address
Supplier’s Name
City
State
Zip
Phone
Fax
Website
Major Product/Process
CHECK APPLICABLE BOXES
SURVEY TYPE:
Self Evaluation
On-Site Evaluation
rd
3 Party
For VALCOR use Only
SURVEY CLASSIFICATION:
Distributer
Processor
Manufacturer
Other _________________________
# OF EMPLOYEES
Manufacturing
Engineering
Approved
Disapproved
Conditional
Approved By:__________________Date_________
KEY SUPPLIER MANAGEMENT PERSONNEL
President/ Owner
Quality Mgr. Name
Total Personnel
Sales/Service
Production
Quality Assurance
Engineering
Other
BUILDING/FACILITIES
Type:
Square Footage
Corporation
Partnership
Established since
Individual
% of Manufacturing Capacity Utilized
To whom does the Quality Organization report to?
Is a current organization chart available?
YES
NO
Quality Control Inspection
Is security clearance required?
YES
NAME OF MAJOR CUSTOMERS: THREE (3) MINIMUM
APPROVAL DATE CUSTOMER NAME
CUSTOMER NAME
NO
APPROVAL DATE
QUALITY PROGRAM
Do you have a written quality manual?
YES
NO
If yes, Title of Q.A. Manual_____________________________ Rev____________ Date _________________
Does your quality program meet the following (check all those applicable)
For suppliers ISO-9001, AS9100, NADCAP, and/or 17025 accredited: complete the above section only, and sign the last page.
Include a copy of your certificates and your Quality Assurance Manual.
MIL-Q-9858A
MIL-I-45208A
MIL-STD-45662
AS9001
ISO-9001
NQA-1
10CFR50, Appendix B
ANSI N45.2
ISO 17025
NADCAP
A2LA
If none of the above are applicable, describe the Quality Management System:
2 LAWRENCE ROAD ▪ SPRINGFIELD, NJ 07081
TELEPHONE: 973-467-8400 ▪ FAX: 973-467-9391
Valcor Supplier Quality Survey Form Revision Date: 21 November 2013
Form # SF1016A
Page 1 of 4
VALCOR SUPPLIER QUALITY SURVEY FORM
SPECIAL PROCESS
For each special process performed in-house and at sub-tier suppliers, list the processes and governing specifications
and standards (AWS D17.1, J-STD-001, AMS2700, etc.). Attach supporting evidence that substantiates process
approval.
Process
Specification(s)
Standard(s)
Expiration Date
Welding
Soldering
Plating
Painting
Surface
Finishing
Other
SUPPLIER SELF EVALUATION QUESTIONNAIRE
1.0 MANUFACTURING CONTROL & INSPECTION
A. Is there a definite training program for inspectors & other personnel whose job function
affects product quality?
On job training, Classroom
B. Are inspections documented and do records provide evidence of the following:
Lot quantity, Level of inspection, result of inspection
C. Are incoming parts/material inspected to verify compliance to PO requirements?
YES
NO
N/A
YES
NO
N/A
D. Are end products inspected/tested before delivery to customer?
E. Does the program provide provision of material traceability where applicable?
F. Do you use Statistical Process Control (SPC) to control major processes?
G. Is sampling inspection utilized?
Based on what plan? _________________________________________________________
H. Does the program address retention time of inspection records? __________months/years.
I.
Is software, when used in the manufacture and inspection of product, controlled?
2.0 CALIBRATION CONTROL
A. Is there a gauge calibration system?
B. Do you allow the use of personal gauges?
C. Are procedures in effect which describe the method and frequency of calibration?
D. Is measuring and test equipment marked to indicate calibration status and when next
calibration is due?
E. Is adequate measuring equipment available to inspection for verifying conformance of
supplies/materials?
2 LAWRENCE ROAD ▪ SPRINGFIELD, NJ 07081
TELEPHONE: 973-467-8400 ▪ FAX: 973-467-9391
Valcor Supplier Quality Survey Form Revision Date: 21 November 2013
Form # SF1016A
Page 2 of 4
VALCOR SUPPLIER QUALITY SURVEY FORM
F. Is there an evaluation recall and notification procedure of hardware inspected by a gauge
later found to be out of tolerance?
3.0 PROCUREMENT/ MATERIAL CONTROL
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
YES
NO
N/A
A. Are procurement sources controlled to assure that all procured material meets all imposed
requirements?
B. Is a list of approved sources maintained and periodically reviewed for status?
C. Are certifications/test reports of purchased material required?
4.0 EVALUATION OF SUBCONTRACTORS
A. Are the records of acceptable subcontractors such as an “Approved Supplier List” or other
such document?
B. Is there confirmation that the quality system controls are effective at the subcontractors?
5.0 DOCUMENT CONTROL POLICY
A. Has a process been established to control all documents, data, and engineering drawing
that relate to the purchase order, including to the extent applicable, external standards,
and customer drawings?
B. Is there a system for identification/ retrieval/ removal of obsolete documents from all
points of issue or use?
C. Are all inspection records being kept and maintained?
6.0 NON-CONFOROMANCE AND CORRECTIVE ACTION
A. Is control established to prevent nonconforming material from inadvertent use?
B. Does the Material Review Board consist of both Engineering and Quality Personnel?
C. Is corrective action obtained on significant or repetitive non-conformance?
D. Is customer authorization obtained before delivering items that deviate from contractual
requirements?
E. Do you perform Internal Audits?
7.0 PACKAGING/SHIPPING/STORAGE
A. Are procedures written controlling the preservation, packaging, and shipping processes?
B. Do you maintain in-house or subcontracted packaging facility to meet special customer
requirements?
C. Is material with life, age or other limitations controlled and identifiable to the limitation
and remaining usefulness?
8.0 HOUSEKEEPING/SAFTEY
A. Do you enforce 6S?
B. Are facilities equipped with automatic sprinkler system?
C. Does facility have well marked and well located fire protection equipment?
2 LAWRENCE ROAD ▪ SPRINGFIELD, NJ 07081
TELEPHONE: 973-467-8400 ▪ FAX: 973-467-9391
Valcor Supplier Quality Survey Form Revision Date: 21 November 2013
Form # SF1016A
Page 3 of 4
VALCOR SUPPLIER QUALITY SURVEY FORM
9.0 DO YOU HAVE A GOVERNMENT INSEPCTOR?
YES
NO
N/A
Resident
Itinerant:
Agency Name _________________
SELF-EVALUATION SURVEY PARTICIPANTS
I certify the above Self-Evaluation Survey has been completed in accordance with our Quality Assurance
procedures and is accurate and correct.
Surveys without a supplier signature will not be accepted.
Filled Out By: ____________________________________
(Print Name)
Signature:
Date: ___________________
____________________________________
2 LAWRENCE ROAD ▪ SPRINGFIELD, NJ 07081
TELEPHONE: 973-467-8400 ▪ FAX: 973-467-9391
Valcor Supplier Quality Survey Form Revision Date: 21 November 2013
Form # SF1016A
Page 4 of 4
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
14.0 Appendix B: Deviation/Change Request SF1019A
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 32 of 39
DEVIATION/CHANGE REQUEST FORM
SUPPLIER INFORMATION
PART INFORMATION
Date:
Part Number:
Supplier Name:
Part Description:
Supplier Code:
Revision Level:
Contact:
DCR #
Phone #:
Quantity:
PO Number:
DESCRIPTION
st
1 Time
Repeat, DCR#______________
Product Related
Process Related
Current Requirement:
DEVIATION REQUEST
Request for Deviation:
Reason for Request:
CHANGE REQUEST
Request for Change:
Reason for Request:
Acknowledgment (Departments to sign when needed)
Date
Approve/Disapprove
Purchasing:
YES
NO
Engineering:
YES
NO
Manufacturing:
YES
NO
Quality Assurance:
YES
NO
Comments
VALCOR DISPOSITION
Drawing/Spec Change Required?
YES
NO
If Yes, ECO#
__________________
Corrective Action Required?
YES
NO
If Yes, CAR#
__________________
Final Disposition and Comments:
Supplier Note: If deviation is approved, a copy of this form shall be included inside the shipping container with each affected
shipment.
Form # SF1019 Rev. A
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
15.0 Appendix C: Material Rejection Report SF-104/R.03/12
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 34 of 39
®
Valcor Engineering Corporation
2 Lawrence Road, Springfield, NJ 07081
CAGE Code 96487
Supplier Quality Manual
16.0 Appendix D: Corrective Action Request/Report SF1018A
Unauthorized use, manufacture or reproduction in whole or in part is
prohibited. Drawing, design and other disclosures are property of
Valcor Engineering Corporation®.
Copyright © 2014, Valcor Engineering Corporation®.
Uncontrolled when printed. Verify document revision online at www.Valcor.com
SQM-001
Revision Sheet 36 of 39
SF1018A
Supplier Corrective Action Request
CAR Number 4
Date Defined / /
Status Open
Defined by 1111 TEST USER
Nonconformance
Serial No
Inventory Number
Part Number
Operation No 0
Customer Valcor Engineering Corporation
Supplier
P.O No
Workcenter
Department
Standard
1. Problem Description
What, Where, and When? Include evidence observed.
2. Team Members
Establish a team of people with product/process knowledge.
Responsible:
Date Completed:
/ /
Status:
3. Containment Actions / Reinspection Findings
Define and execute actions to isolate discrepant and/or potentially discrepant materials/parts until corrections have
been implemented and verified.
Define the action(s) taken to eliminate the existing situation at each manufacturing phase (ex. Shipped, Raw Material,
Finished Goods, WIP, etc.).
Responsible:
08/11/2014 08:40:30 AM
Date Completed:
/ /
Valcor Engineering Corporation
Status:
Page 1
SF1018A
Supplier Corrective Action Request
CAR Number 4
Date Defined / /
Status Open
Defined by 1111 TEST USER
Nonconformance
Serial No
Inventory Number
Part Number
Operation No 0
Customer Valcor Engineering Corporation
Supplier
P.O No
Workcenter
Department
Standard
4. Root Cause(s)
Determine and verify what caused the defect to be produced. Support with evidence by using root cause analysis
(Recommended Tools: 8D, 5 Whys, Fishbone, Flowchart, etc.)
Responsible:
Date Completed:
/ /
Status:
5. Select / Verify Corrective Actions
Describe all planned and completed actions which address the root cause and prevent recurrence of the nonconformance.
Approvals - Supplier
Signature confirms accuracy of, and commitment to the corrective action.
Management Signature: ____________________________________________
Date: __________________
Printed Name:
Title:
Note: If Supplier, then forward to Valcor.
Responsible:
08/11/2014 08:40:30 AM
Date Completed:
/ /
Valcor Engineering Corporation
Status:
Page 2
SF1018A
Supplier Corrective Action Request
CAR Number 4
Date Defined / /
Status Open
Defined by 1111 TEST USER
Nonconformance
Serial No
Department
Standard
Inventory Number
Part Number
Operation No 0
Customer Valcor Engineering Corporation
Supplier
P.O No
Workcenter
6. Implement Corrective Actions
Provide objective evidence (photos, training records, work instructions, ECOs, and etc.) to verify that all findings have
been addressed.
Responsible:
Date Completed:
Status:
/ /
7. Verification
Determine and provide objective evidence that a change has occurred and that the product and process achieved
desired results.
Responsible:
Date Completed:
Status:
/ /
8. Congratulate Team
Preventative Actions: Determine and implement actions to prevent the recurrence of this root cause and all similar
problems.
Responsible:
Date Completed:
Status:
/ /
Approvals - For Valcor QA use only
Acceptance of Corrective Action:
Acceptable
Not Acceptable for reasons noted below, resubmit a corrective action by: ________________
Notes:
Follow up Audit is required?
Yes
No
Attach audit results of Corrective Action and Closeout, if required.
Nuclear Items only: Is evaluation for 10CFR21 per S2110 required?
Yes
Management Signature: ____________________________________________
08/11/2014 08:40:30 AM
Valcor Engineering Corporation
No
Date: __________________
Page 3