Project Arna – Bergen Head Project Manager Hans-Egil Larsen Railway Tender Conference Bergen, 5 October 2016 Norwegian National Rail Administration Infrastructure Construction East Construction Arna - Bergen Ass. Director General Project Director UØ Governance/Support UØ Head Project Manager UAB Head of Head of Governance Team Specialist Support Team Project Manager Project Manager Project Manager Project Manager Project Manager Tunnel Arna Station Railworks Signalling Planning and engineering Construction Arna - Bergen Gunnar G. Løvås Ass. jernbanedirektør Styringsstab Erik Krogseth - Elisabeth Folkestad, spor- og togfrem.korr. - Pro Invenia AS, grunnerverv - Inglin L. Arnesen, prosjektstyrer - Henning Skeie, prosjektstyrer - Julieta M. D. Lassen, prosjektstyrer - Ingvild Eikeland, kommunikasjonsrådgiver - Siri Osnes, prosjektsekretær - Stian Ekornaas, leder strategi og kontrakt - Hege Eeg, kontraktrådgiver - Kerstin Christine Volkmer, fremdriftsplanlegger Prosjektdirektør UØ Felles stab/støtte UØ Hans-Egil Larsen Prosjektsjef UAB Stedfortreder: Johan Kråkenes Samarbeidsråd Vest Fagstab - John I. Økland, KP/Norconsult - Astri Huse, KP/Cowi - Kjartan F. Madsen, SHA-rådgiver/KU/VO - Mats A. Lilletvedt, SHA-rådgiver/KU/HSV - Ole Frode Michaelsen, RAMS-leder - Jan Runar Tangstad, RAMS-rådgiver - Marte H. Thorsen, ytre miljørådgiver - Marit Espeland, kvalitetsrådgiver - Heidi Hofstad, dokumenstyrer - Therese Eriksen, dokumentkontroller - Exact Geo Survey AS, oppmåling -------------------------------------- Lars Chr. Stendal Tony Dæmring Tom K. Dahle Jørgen K. Rydheim Katrine S. Erstad Johan Kråkenes S. Subramaniam Jostein Heimark Prosjektleder Prosjektering Prosjektleder Tunnel Prosjektleder Arna stasjon Prosjektleder Jernbaneteknikk Prosjektleder Signal Jostein Fjøsne Hovedbyggeleder Tunnel JBV Fagressurser Torstein Standal Marianne Nyebak Sondre K. Bø Prosjekteringsleder Underbygning Prosjekteringsleder JBT Prosjekteringsleder Signal Tine Sørbye Sigurdur Einarsson Bengt Wihlborg Trainee Prosjektledelse Prosjekteringsleder Underbygning Prosjekteringsleder JBT Hilde S. Skeie Trainee Prosjektledelse Prosjektering Norconsult Prosjektering Cowi Nils B. Bø Byggeleder Tele/HSV Byggeleder Signal Helge Tjelmeland Norvald J. Skjoldli Prosjekteringsleder Signal Byggeleder konstruksjoner Kristine H. Kjeilen Guro Isachsen Åsmund Ryningen Runar Kristensen N.N. Jesús M. L. Gonzàlez Cato Andreassen Kontrollingeniør Byggeleder Overbygning Byggeleder Signal Entreprise Arna stasjon Byggeleder JBT Entreprise Signal Entreprise Leon N. R. Eide Entreprise - Tunnel - Riving - Rehab N.N. Fløen antikv. hus Kontrollingeniører Prosjektering Cowi Beate H. Huus BL/Fagansv. ing.geolog Svein Are Orheim Fagansvarlig Signal Prosjekting. Signal N.N. Byggeleder Byggeleder TBM Kåre B. Solhaug Teknisk Byggeleder TBM KL Elkraft Spor Tele Total entreprise Signal Date: 3.10.2016/HEL Arna-Bergen - Double track Scope of work • New Ulriken tunnel (started) • Upgrade of Arna station • Railway work • Upgrade of existing Ulriken tunnel • New interlocking system, class B • New bridges in Fløen (started) Bergen station Overview contracts Total estimated cost approx. 1,5 billion NOK Name Area Arna - Fløen UUT 23 Existing Ulriken tunnel Arna - Fløen UUT 25 Arna Station Arna - Fløen UUT 31 Railway technical work Bergen - Fløen UBF 33 Civil works Bergen - Fløen UBF 34 Catenary, tracks etc. Bergen - Fløen UBF 35 High voltage/ Low voltage/Telecom Bergen - Fløen UBF 42 Interlocking System Overview Arna site Storelva Arna Station – Finish 2021 New Ulriken tunnel • Approx. 7800 m. in total • 7000 m. with TBM and 800 m. with drill & blast • 16 cross sections and 10 technical rooms • Slab track in the TBM-part and ballasted track in the D&B part • Catenary, signalling system, telecommunication etc. • Evacuation lights, low voltage system, 11 kV supply etc. New Ulriken Tunnel JBV Energy Supply Project Arna Converter Station Arna Bergen To Bergen – Startup tunnel TBM and diagonal tunnel Diagonal tunnel to Arna 16 cross sections and 10 technical rooms Techical data TBM • TBM incl. cutterhead: 950 tons, length 22 m. • Back-rig: 850 tons, length 130 m. • Diameter 9,33 m. • Cutterhead delivered i 5 parts; 1 part 108 tons and 4 parts 32 tons • Cutters 19 ’’ • Numbers of cutters: 62. (54 single and 4 twins) • 5250 kW, 80% is for the cutterhead (12 engines x 350 kW) • Equipment: ̶ bolting ̶ injection ̶ probe drilling ̶ shotcrete TBM work Breakthrough area in Fløen Fløen Fløen – Ongoing civil work New bridge Access tunnels Access tunnels - Fløen To Arna Existing Ulriken tunnel – UUT 23 • Fire protection/Water- and frost protection • Detail finish of the diagonal tunnels • Detail finish of the crossections • Some work on technical systems – TETRA • Some work on ventilation Bergen - Fløen Track solution Ballast track. D&B section Gotthard tunnel Bærum tunnel Slab track. TBM section Many challenges Assistentkirkegården 1854 Bones from the old cemetery HSE - Health, Safety and Environment HES Health, Environment and Safety Focus area Social dumping Many interests and stakeholders Not possible to solve all problems for everyone! Co-operation is important! Goal: Solve this together with you!! Q & A?
© Copyright 2024