"Top Ten" Challenges and Opportunities Opportunities State of the SNETT/2014 9. Franklin: Grading, parking and information signs 2. Douglas: Route 96 to Monroe Street - 2.65 miles of grading and drainage improvements, 2014 1. Douglas: Morse Pond east and Coffeehouse Loop, Beaver impacts (2 sites) Coffeehouse Loop grading 10: upgrades, Coffeehouse and drainage 2014 5. Blackstone: Seven Arches-Blackstone Viaduct Trail gap Concurrent with with 3.7-mile 3.7-mile Blackstone Blackstone River River Bikeway Bikeway Concurrent construction underway 2014 4. Uxbridge: Chocolog Road east Wet and overgrown 8. Franklin: Prospect Street and east Trail gap; drainage in below-grade cuts Tunnel identified as preferred option at Prospect Street 6. Blackstone: Castle Way to Farm Street east Public access constraints 3. Uxbridge: Routes 146 and 146A Trail gaps Rerouteproposed proposed by byMA MADOT DOT Reroute Southern New England Trunkline Trail (SNETT) Blackstone River Bikeway (MA) Blackstone River Bikeway-Greenway (RI) Midstate Trail (MA) Ü 0 North-South Trail (RI) 7. Bellingham: Trail damage; Drainage and wetness at Route 126 1.5 miles of drainage and treadway improvements scheduled as part of water line project 10. Regional Connections: Blackstone River Bikeway; Midstate Trail; Mid-State Trail; Airline Trail State Park Airline Trail State Park (CT) 1 2 3 4 5 Miles Trail line data from MA DCR except: Airline Trail (CT DEEP), North-South Trail and Blackstone River Bikeway-Greenway (RIGIS) Base Map data - National Geographic Map for Seven Oaks Consulting October 2014, Redstart Inc. (d. ruddell)
© Copyright 2024