installation guide ILINE

installation guide
ILINE
Phase 1
Materials and Tools
ILINE Beam System Installation Guide
Top Cap
Post Side Covers
Foot SRE
Screen Clips
Fabric Screen
Foot SRC
Horizontal Beam
Vertical Post
OR
Foot DRE
Data Adaptor
Recpetacle
Cover
Junction Bracket
(3 circuit sys.)
Junction Bracket
(4 circuit sys.)
Bottom Beam Plate
Hex Nuts
Wire Tray
Base Plate Kit
Foot DRC
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P2
Phase 1
Footer & Base Plate Assembly
1
Insert a 3” bolt into each of the 2” compression
springs.
2
Insert the bolts and the compression springs
into the inner-corner holes of the base plate.
3
Screw the bolts into the coupling nuts until the
bolt tips are revealed.
4
Screw the foot assembly to the foot plate nuts.
5
Repeat Steps 1-4 for the all foot & base plates.
ILINE Beam System Installation Guide
- 4” x 3” Bolt (5/16” x 18)
1
- 4” x 2” Compression Spring
2
- Base Plate
3
- 4” x 3/4” Coupling Nut (5/16” x 18)
- Foot Plate Nut
4
- Foot Plate
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P1
Phase 1
6
Footer & Base Plate Assembly, cont.
ILINE Beam System Installation Guide
Place each foot assembly down based on
the pre-established design configuration.
- Completed Foot Plate
6
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P2
Phase 2
Beam Assembly
1
Place beam upside down on the floor to reveal the
beam canal.
2
Take a junction block and snap in 2 receptacles on
each side.
3
Lower the junction block assembly into the beam
canal with the receptacles facing up and then rotate in a clockwise direction to snap the receptacle
in to the receptacle cut outs.
4
Slide on the junction block brackets to each side
of the junction block assembly and fasten with
screws onto the beam assembly.
5
Repeat Steps 1-4 for all beam assemblies.
ILINE Beam System Installation Guide
4
1
2
3
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P3
Phase 2
Beam Assembly (for 8trac electrical system)
1
Place beam upside down on the floor to reveal
the beam canal.
2
Lower the 8trac-bracket and align its center
screw holes with the pilot holes in the center
of beam canal. Screw it down with the screws
provides in the package.
ILINE Beam System Installation Guide
1
2
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P4
Phase 3
Installing Post, Beam, and Base Feed
1
Once complete, lay each beam assembly
between each foot assembly.
2
Place (do not fasten) the vertical posts on
each of the footer assemblies.
3
Slide the beam assemblies onto each of
the vertical posts and fasten each side of
the beam using 2 screws.
4
Take the exposed end of the power entry
and feed through the desired end of the
beam and into the adjacent post-opening.
5
Continue to feed the power entry until
the exposed end is out through one of
the base plate’s openings.
6
Secure the post to the footer assembly
using a 7/16” spanner.
ILINE Beam System Installation Guide
1
2
3
4
5
* Use torx head screw to mount
beams on vertical posts.
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P5
Phase 4
STOP
Installing Jumpers
1
Connect power entry plug to the junction block.
2
Feed the jumper through the beam canal and
into the vertical post opening into the next beam
assembly.
3
Connect the jumper to each junction block.
4
Repeat Steps 1-3 until the last jumper is connected the last junction block.
ILINE Beam System Installation Guide
The remaining installation of electrical must
be installed by a professional electrician.
3
2
2
1
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P6
Phase 5
Installing Caps & Covers
1
Insert side covers into all exposed openings of each
vertical posts.
2
Place top caps on all vertical posts.
3
Take two data adapters and snap them onto each end
of the underside of the beam assembly.
4
Insert the wire holding plates between each data adapter on the underside of the beam assembly.
5
Repeat Steps 1-4 for all beam assemblies.
1
ILINE Beam System Installation Guide
2
4
3
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P7
Phase 6
Installing Screens
1
Place 2 screen clips on top of each
beam and loosely link both sides with
a screw and nut.
2
Insert plastic sleeves into the opening
of each screen clip.
3
Insert the screen into the screen clip.
4
Tightly screw the screen clips with #6
allen wrench to secure the screens in
place.
5
Repeat Steps 1-4 for each screen.
ILINE Beam System Installation Guide
5
Note: Pre-measuring each clip’s distance
from the beam ends before attaching will
ensure a centered and balanced appearance
to the installed screen. (Suggested distance
between clip and beam edge: 11 inches.)
3
1
2
4
* Angle-tip allen wrench #6 recommended.
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P8
Phase 7
Final Adjustments
1
Check the vertical and horizontal alignment
of the beams and screens.
2
If not aligned, use a 1/2” spanner to rotate the
coupling nuts on the base to change each
corner’s elevation until leveled.
ILINE Beam System Installation Guide
Note: Use a leveling guide for accuracy.
Vertical alignment
1
Hor
izon
tal
alig
nm
ent
2
* Adjust height of each coupling-nuts
to level the base plate of each post.
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P9
Phase 8
Completion
ILINE Beam System Installation Guide
....................................................................................................................................................................................................................................................
Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions.
P10
5 Day Open Plan we provide exceptional
experiences with reliable, easy interactions
and successfully fulfilled orders in only 5 days
915 Walsh Avenue / Santa Clara, CA 95050 (877) 801-0370 amqsolutions.com