installation guide ILINE Phase 1 Materials and Tools ILINE Beam System Installation Guide Top Cap Post Side Covers Foot SRE Screen Clips Fabric Screen Foot SRC Horizontal Beam Vertical Post OR Foot DRE Data Adaptor Recpetacle Cover Junction Bracket (3 circuit sys.) Junction Bracket (4 circuit sys.) Bottom Beam Plate Hex Nuts Wire Tray Base Plate Kit Foot DRC .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P2 Phase 1 Footer & Base Plate Assembly 1 Insert a 3” bolt into each of the 2” compression springs. 2 Insert the bolts and the compression springs into the inner-corner holes of the base plate. 3 Screw the bolts into the coupling nuts until the bolt tips are revealed. 4 Screw the foot assembly to the foot plate nuts. 5 Repeat Steps 1-4 for the all foot & base plates. ILINE Beam System Installation Guide - 4” x 3” Bolt (5/16” x 18) 1 - 4” x 2” Compression Spring 2 - Base Plate 3 - 4” x 3/4” Coupling Nut (5/16” x 18) - Foot Plate Nut 4 - Foot Plate .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P1 Phase 1 6 Footer & Base Plate Assembly, cont. ILINE Beam System Installation Guide Place each foot assembly down based on the pre-established design configuration. - Completed Foot Plate 6 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P2 Phase 2 Beam Assembly 1 Place beam upside down on the floor to reveal the beam canal. 2 Take a junction block and snap in 2 receptacles on each side. 3 Lower the junction block assembly into the beam canal with the receptacles facing up and then rotate in a clockwise direction to snap the receptacle in to the receptacle cut outs. 4 Slide on the junction block brackets to each side of the junction block assembly and fasten with screws onto the beam assembly. 5 Repeat Steps 1-4 for all beam assemblies. ILINE Beam System Installation Guide 4 1 2 3 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P3 Phase 2 Beam Assembly (for 8trac electrical system) 1 Place beam upside down on the floor to reveal the beam canal. 2 Lower the 8trac-bracket and align its center screw holes with the pilot holes in the center of beam canal. Screw it down with the screws provides in the package. ILINE Beam System Installation Guide 1 2 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P4 Phase 3 Installing Post, Beam, and Base Feed 1 Once complete, lay each beam assembly between each foot assembly. 2 Place (do not fasten) the vertical posts on each of the footer assemblies. 3 Slide the beam assemblies onto each of the vertical posts and fasten each side of the beam using 2 screws. 4 Take the exposed end of the power entry and feed through the desired end of the beam and into the adjacent post-opening. 5 Continue to feed the power entry until the exposed end is out through one of the base plate’s openings. 6 Secure the post to the footer assembly using a 7/16” spanner. ILINE Beam System Installation Guide 1 2 3 4 5 * Use torx head screw to mount beams on vertical posts. .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P5 Phase 4 STOP Installing Jumpers 1 Connect power entry plug to the junction block. 2 Feed the jumper through the beam canal and into the vertical post opening into the next beam assembly. 3 Connect the jumper to each junction block. 4 Repeat Steps 1-3 until the last jumper is connected the last junction block. ILINE Beam System Installation Guide The remaining installation of electrical must be installed by a professional electrician. 3 2 2 1 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P6 Phase 5 Installing Caps & Covers 1 Insert side covers into all exposed openings of each vertical posts. 2 Place top caps on all vertical posts. 3 Take two data adapters and snap them onto each end of the underside of the beam assembly. 4 Insert the wire holding plates between each data adapter on the underside of the beam assembly. 5 Repeat Steps 1-4 for all beam assemblies. 1 ILINE Beam System Installation Guide 2 4 3 .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P7 Phase 6 Installing Screens 1 Place 2 screen clips on top of each beam and loosely link both sides with a screw and nut. 2 Insert plastic sleeves into the opening of each screen clip. 3 Insert the screen into the screen clip. 4 Tightly screw the screen clips with #6 allen wrench to secure the screens in place. 5 Repeat Steps 1-4 for each screen. ILINE Beam System Installation Guide 5 Note: Pre-measuring each clip’s distance from the beam ends before attaching will ensure a centered and balanced appearance to the installed screen. (Suggested distance between clip and beam edge: 11 inches.) 3 1 2 4 * Angle-tip allen wrench #6 recommended. .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P8 Phase 7 Final Adjustments 1 Check the vertical and horizontal alignment of the beams and screens. 2 If not aligned, use a 1/2” spanner to rotate the coupling nuts on the base to change each corner’s elevation until leveled. ILINE Beam System Installation Guide Note: Use a leveling guide for accuracy. Vertical alignment 1 Hor izon tal alig nm ent 2 * Adjust height of each coupling-nuts to level the base plate of each post. .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P9 Phase 8 Completion ILINE Beam System Installation Guide .................................................................................................................................................................................................................................................... Please contact [email protected] if you are missing any parts, have difficulty with assembly, or have any product related questions. P10 5 Day Open Plan we provide exceptional experiences with reliable, easy interactions and successfully fulfilled orders in only 5 days 915 Walsh Avenue / Santa Clara, CA 95050 (877) 801-0370 amqsolutions.com
© Copyright 2024