Stone Patio Pond with Illuminated Spillway AD95371W We hope

Stone Patio Pond with Illuminated Spillway
AD95371W
We hope you will find these instructions helpful in setting up your product.
If you have any issues with this item, DO NOT return the unit to place of purchase.
Please visit our web site www.angelodecor.com for assistance and warranty information.
Carefully unpack
and arrange all
parts.
Place the pump
inside the reservoir.
Pass the cord out
and down the back
of the reservoir.
Place the reservoir
Install the short
on a flat level
coping over the panel
surface.
and reservoir as
Set the front panel in
shown.
place.
Install the remaining sections
of coping over the lip of the
reservoir and panel edges as
shown above.
Locate the LED light Locate the back cover plate and pass the
and place it inside the LED light through it as shown above left.
reservoir. Pass the
Set the cover in place.
cord out the back of
the reservoir.
Slide the weir reservoir Install the LED light on
in to the housing. to the bracket over the
weir reservoir.
Align and lower the
upper housing on to
the cover plate.
Place the rear and
side panels in
place.
Install the cover
over the weir.
Carefully tilt the house Pass the tubing from
on its side and attach the weir in to the main
the black tubing to the reservoir through the
fitting underneath the
hole located in the
weir reservoir.
cover plate.
The final assembly
should look like this
Fill with clean water and plug into a grounded GFCI outlet.
The pump must be fully submersed at all times to avoid pump burnout.
Product must be properly stored for winter.
Locate the weir
housing. From the
underside of it, pass
the LED light up in to
the top.
Attach the tubing
to the pump.