Upcoming Roadworks on Barnet Highway and Pinetree Way and

April 2, 2015
CONSTRUCTION AND TRAFFIC BULLETIN
Coquitlam
Upcoming Roadworks on Barnet Highway and
Pinetree Way and Lougheed Highway
As part of Evergreen Line construction, permanent road improvements including turning lane restoration, paving,
traffic line painting, electrical and signal work are required at the intersection of Barnet Highway and Pinetree Way
and Lougheed Highway.
Work will begin the week of April 6 and continue intermittently for approximately two months. Paving requires
warm, dry weather conditions, so this work is weather dependent and the schedule is subject to change.
WHAT TO EXPECT

Lane closures on Barnet Highway and Pinetree Way and Lougheed Highway will be implemented during offpeak hours, Monday to Sunday from 7 p.m. to 6 a.m. Nighttime work is required due to high volumes of
daytime traffic in the area.

Crews will work intermittently during daytime hours only if required.

Work will start on the northwest corner of Barnet Highway and Pinetree Way then crews will move to the
southwest corner of Barnet Highway and Lougheed Highway. Work will include construction of the
permanent dedicated right-hand turn and a mulit-use path on the west side of Lougheed Highway between
Barnet Highway and the entrance to the West Coast Express passenger pick-up/drop-off area.

Intermittent lane closures may be implemented as follows as part of this work:
o
o
o

On Barnet Highway near the work area.
On Pinetree Way between Guildford Way and Barnet Highway.
On Lougheed Highway between Barnet Highway and the entrance to the West Coast
Express passenger pick-up and drop-off.
Temporary pedestrian detours in all directions will be implemented while this work is underway. For the
safety of all pedestrians, please follow posted signs and the instructions of traffic control personnel. The
temporary detour route will be clearly marked.
(Continued on page two)
ABOUT EGRT CONSTRUCTION
CONTACT US
EGRT Construction has been awarded the contract to design
and build the Evergreen Line.
To find out more, or to receive traffic updates:
For more information about the Evergreen Line Project, please
visit www.evergreenline.gov.bc.ca.
Traffic Information Line (available 24 hours, 7 days a week):
604-927-2080
Email: [email protected]
Facebook: www.facebook.com/evergreenline
Page 1 of 2
April 2, 2015
CONSTRUCTION AND TRAFFIC BULLETIN
Coquitlam
(Continued from page one)

All traffic pattern changes will be well-signed and traffic control personnel will be on-site to assist drivers
and pedestrians. Please follow the directions of traffic control personnel and posted signs while
construction is underway.

Access to the West Coast Express and Coquitlam Central bus loop will remain open at all times.

Nearby businesses and residents can expect noise related to construction activities, including the use of
heavy machinery. Every effort will be made to minimize noise and disruptions when possible.
When permanent roadworks on the northwest corner of Pinetree Way and Barnet Highway and the southwest
corner of Barnet Highway and Lougheed Highway are complete, crews will remove the temporary crosswalk on
Barnet Highway to the west of Pinetree Way. Pedestrian movements will be returned to their normal configuration
at the intersection of Barnet Highway and Pinetree Way/Lougheed Highway and all movements will be available by
the end of May 2015.
To contact EGRT Construction, the contractor who is building the Evergreen Line, please call 604-927-2080,
available 24 hours a day, 7 days a week. If you have comments or questions about the Evergreen Line Rapid Transit
Project, please call the Evergreen Project Office at 604-927-4452 or email [email protected].
ABOUT EGRT CONSTRUCTION
CONTACT US
EGRT Construction has been awarded the contract to design
and build the Evergreen Line.
To find out more, or to receive traffic updates:
For more information about the Evergreen Line Project, please
visit www.evergreenline.gov.bc.ca.
Traffic Information Line (available 24 hours, 7 days a week):
604-927-2080
Email: [email protected]
Facebook: www.facebook.com/evergreenline
Page 2 of 2