BRETT STINSON - Mettle Projects

BUILT, CONSTRUCTION MANAGER / SENIOR
PROJECT MANAGER, 2009 - 2014
BRETT STINSON
SENIOR PROJECT MANAGER
QUALIFICATIONS
ƒƒ
ƒƒ
ƒƒ
ƒƒ
Diploma of Project Management, Australian Institute
of Management
Certificate IV in Building Construction, Boss Institute
Builder Open Site Supervisor Licence (QBSA)
Trade Certification in Shop Fitting and Detailed
Joinery (Cabinetmaking)
EMPLOYMENT SUMMARY
METTLE, SENIOR PROJECT MANAGER
2014 - PRESENT
ƒƒ
Aldi Clontarf Retail Precinct
Brett Stinson Curriculum Vitae
Bank of Queensland - $16m
5 x floor 12500m2 internal fitout of the new BOQ Head
Offices located at 100 Skyring Terrace Newstead. High
end design content including state of the art boardrooms,
premium workspace and breakout areas with an
architecturally designed atrium staircase spanning all 5
x levels.
Suncorp - $4.5m
Refurbishment of 5 x levels of existing office space
at 123 Albert St, Brisbane including new services
infrastructure, workstations upgrade, new joinery and
furniture replacement.
Bendigo Bank - $4.0
Fit out and refurbishment of 2 x Bendigo and Adelaide
Bank office fit outs located in Brisbane and Ipswich
including workstations, breakout spaces, reception areas
and services infrastructure.
Logan Hyperdome Refurbishment & Remixes - $7m
Refurbishment of a busy food area within the centre as
well as mall reconfiguration. The first stage of a much
larger project.
David Jones Indooroopilly - $14m
Construction Management of brand new David
Jones store at the heavily refurbished and extended
Indooroopilly Shopping Centre within an integrated
environment.
Coles Brookside Expansion - $2.0m
Construction of a new Coles Supermarket shell within a
busy community shopping complex in conjunction with
foodcourt works.
GBST - $1.0m
A one and half floor fitout for a technology firm in central
Brisbane at 410 Ann Street.
Arrow Energy, Brisbane - $30m
A fast track, high quality 10 floor fitout at the iconic new
building at 111 Eagle Street.
Jacobs Engineering, 410 Ann Street, Brisbane
Tenancy - $4.6m including base building upgrades
3500m2 internal fitout of 3 levels of new office space
including reception, boardrooms, meeting rooms and
open plan work areas.
121 Wharf Street, Brisbane - $9m
5500m2 refurbishment of base building elements of
existing office building.
APA Fitout - $1.2m
Commercial office fitout (1200m2) over 2 levels including
quiet rooms, open space work areas, kitchenette and
break-out areas.
CBRE Fitout - $0.5m
Ground floor commercial office fitout including meeting
rooms, break-out areas, amenities, reception and open
plan work areas.
Virgin Australia Lounge - $0.7m
Fitout of Virgin Australia Lounge at Mackay Domestic
Airport.
BHP Cannington, Townsville - $2.6m
Commercial office fitout spanning 1500m2 in Townsville
CBD.
ISIS HOTEL PROJECTS PTY LTD, SENIOR
PROJECT MANAGER
Holiday Inn, Townsville - $6.5m
Hard refurbishment of all guestrooms, Executive Suites,
Reception, Restaurant, Conference Rooms and Lounge
Bar.
Jupiter’s Hotel and Casino, Townsville - $6.2m
Hard refurbishment of 67 premium quality luxury hotel
guest rooms and soft refurbishment of 38 executive
standard hotel guest rooms.
Mercure Harbourside, Cairns - $2.7m
Soft refurbishment of 73 Guestrooms and Hard
Refurbishment of 100 Guestrooms, Executive Suites,
Conference Rooms and Restaurant.
Reef View Hotel, Hamilton Island - $9.5m
Refurbishment of 126 guest rooms split over 7 levels.
Complete strip out and new build of restaurant and
adjoining bar.
Peppers Resort, Magnetic Island - $3.7m
Fitout of public and administrative spaces including
reception, lobby, bar, restaurant, conference rooms,
admin offices, toilets, commercial kitchen and day spa.