Works to the flyover embankment on-going N7 Newlands Cross Upgrade Issue 3 (N7), May 2014 We at BAM are delighted to have been appointed by the National Roads Authority to design, build, finance, operate and maintain the N7 Newlands Cross free-flow junction and a 50km section of the N11 road network in Wicklow and Wexford. What is happening now? Over the winter and spring months, construction activities have progressed well. The switching of the main N7 traffic in January and February onto the temporary road went very smoothly and traffic is moving well through the junction. Works to divert underground services is on-going on a phased basis. The construction of the new flyover commenced in mid February and the progress we have made with the construction of the approach embankment is visible for all to see. The works along the northern end of the site Thank You BAM would like to thank all motorists, road users and local residents and businesses in the vicinity of Newlands Cross for their continued cooperation and patience during the construction of this essential piece of national infrastructure. Temporary Speed Limits (along the old service road) have also progressed well and are due for completion at the end of May. This will allow for the next traffic switch to be carried out. The next traffic switch will see the N7 outbound traffic remain in its current layout. There will be some changes to the N7 inbound traffic lanes, which will are outlined later in the newsletter. Construction of new stone walls at the rear of some of the properties along Newlands Road residents has commenced in conjunction with the service diversions in this area. Your cooperation and patience is greatly appreciated and we hope the fact that real progress is being made on the ground CONTACT US There is a mandatory 60kph speed shows our committment to Planned Completion of Works limit in place on all approaches to completing the project in as Newlands Cross. These reduced short a timeframe as possible. N11 Arklow - Rathnew PPP Kildare National Roads Office in the interests of safety of all We are always pleased to hear road users and the construction from members of the public and We are currently well on schedule operatives. We would ask you to a member of our team will be E: [email protected] W:www.n7n11.ie T: (01) 485 3357 Emergency No: 1800 989 088 E: [email protected] W:www.kildare.ie/countycouncil/ nationalroadsoffice/ T: (045) 988 900 to complete the works by Spring please obey these reduced speed happy to speak to you if you have National Roads Authority South Dublin Co. Co. of 2015, with completion of the limits, which are being enforced with a query in relation to the project; flyover by the end of 2014. the assistance of An Garda Siochana. please see contact details below. E: [email protected] W:www.nra.ie T: (01) 660 2511 E: [email protected] W:www.sdcc.ie T: (01) 414 9000 speed limits have been introduced Kildare County Council Current Layout N7 Outbound Traffic Management New Layout N7 Outbound Newlands Golf Club N7 Dublin N7 Dublin N7 Naas N7 Naas Following on from the traffic switches on the N7 in late January and early February 2014, works have progressed New Layout N7 Inbound to the north of the new flyover to construct the permanent Bewleys Hotel Newlands Golf Club inbound slip lanes off and on to the N7. It is planned to switch traffic onto these slip lanes for N7 city bound traffic at the end of May. While the N7 outbound traffic will remain in its N7 Naas current layout, there will be changes to the inbound traffic layout from Boot Road to the M50, where the traffic will split either side of the new approach embankment. The images below show the planned layout to be put in place at the Dublin /Belgard Road N7 Dublin /Fonthill Road end of May. There will be advance warning signage in place in ad- vance of this change in layout and we urge all road users to take care and to reduce their speed on approach to New Layout N7 Inbound Newlands Cross during this phase of the works. This traffic management layout is required in order for us to complete the flyover embankment on the Naas side of the junction. The planned traffic switches will be carried out at night N7 Naas Dublin /Belgard Road N7 Dublin /Fonthill Road time in order to minimise traffic disruption and ensure teams. Local residents will be notified in advance of What happens next? Construction Works any night time works at the junction. Traffic signals The following activities will progress over the summer months, hopefully with the help of some good will be relocated to account for the revised layout. weather and the lighter traffic volumes associated with the summer holiday period: the safety of road users and our construction and traffic New Layout N7 Inbound New Layout N7 Inbound N7 Naas Dublin /Belgard Road • Boundary Wall construction to rear • Belgard Road reconfiguration • New public lighting • Fonthill Road reconfiguration • Road surfacing works to the new flyover • Embankment construction on • Environmental barrier installation currently planned for mid-July Joels/Esso Bewleys Hotel • Bridge construction across the junction, N7 Naas both sides of the junction N7 Dublin of Newlands Road properties • Sign gantry installation
© Copyright 2024