Johan Sverdrup – The North Sea giant Stillasdagene Stavanger, 9. september 2015 Located at Utsira High – 160 km west of Stavanger 2 Classification: Internal 2015-09-03 Johan Sverdrup - the giant value creator TOP 5 One of the largest oil fields ever on the NCS 3 70 % Ambition recovery 50 YRS. 170-220 bln. 51.000 Production horizon Investment estimate for full field development** Norwegian man years during development Johan Sverdrup - long-term resource management Establishment of field centre and infrastructure Investment phase 1 NOK 117 billion * Estimated annual operating costs, phase 1 NOK 3-5 billion Estimated production phase 1 315,000-380,000 boe/d Start-up late 2019 4 Future phases - further development of Johan Sverdrup in its entirety Johan Sverdrup is a multi-phase development • Production from part areas • Further development of field centre area • Separate PDO 170-220 bln. 4-7 bln. 2022 550,000 + boe Investment estimate for full field development** Estimated annual operating costs for the whole field Expected startup, next phase Plateau production for the fully developed field: 550,000 – 650,000 boe 5 Link til stortingsproposisjonen 6 Classification: Confidential The Johan Sverdrup field affecting the Norwegian industry, execution phase Main contracts Verdal Equipment contracts Trondheim Sweden Molde Midsund Ålesund Mongstad Frekhaug Søreidgrend Ågotnes Godvik Straume Stord Mollier Flatøy Bergen Laksevåg Nesttun Seimsfoss Onarheim Sandvika Hvalstad Fornebu Billingstad Asker Kongsberg Horten Lørenskog Oslo Langhus Vestby Moss Råde Haugesund The Johan Sverdrup field Kårstø Sola Randaberg Stavanger Røyneberg Sandnes Tananger Kleppe Porsgrunn Tvedestrand Arendal Øyestranda Kristiansand 7 Tjodalyng Larvik Bodø Field development – first building blocks Construction work started at Kværner Verdal • 26 500 tonnes riser platform jacket, biggest in Europe • To be installed 2017 Pre-drilling template installed • Pre-drilled wells ready for production start-up • Efficient utilisation of production capacity • Pre-drilling start from March 2016 8 Pioneering Spirit – to be used on 3 platform top sides 9 JS DG3 | Phase 1 execution schedule 2015 DG3 2016 2017 PUD 2018 Tieback 2019 2020 DG4 ENG & PROC Riser Platform (FC) Process Platform (FC) Drilling Platform (EPC) Living Quarter (EPC) T&I and Compl. RP offshore HU DP single lift Off Compl. SURF, POWER, EXPORT DRILLING & WELL Pre-drilling temp 10 P1 single lift LQ single lift Building on 40 years of experience
© Copyright 2024