4. Where do I get planning permission?

1 guide to planning new
3/21/03
6:29 PM
Page 1
This leaflet is a simple guide to understanding the planning
system. You may wish to build or extend your house, or a
neighbourhood development is taking place, which may
affect you. Either way, you want to know more about how
the planning system works.
This leaflet is intended as a practical guide. It is not a
definitive legal interpretation of planning law. For more
information, you should consult your local planning
authority.
1. When do I need planning permission?
Generally, you need planning permission for any
development of land or property unless the development is
specifically exempted from this need. Development includes
the carrying out of works (building, demolition, alteration)
on land or buildings and the making of a material (i.e.
significant) change of use of land or buildings.
2.
What is exempted development?
Exempted development is development for which planning
permission is not required. Categories of exempted
development are set out in planning law. There are usually
certain thresholds relating to, for example, size or height.
Where these thresholds are exceeded, the exemptions no
longer apply. The purpose of exemption is to avoid
controls on developments of a minor nature. Leaflets PL.5,
PL.6 and PL.7 give details of the main exemptions.
3.
Are there different types of permission?
4.
Where do I get planning permission?
From the planning authority for your area i.e. your local
County Council, Borough Council, City Council or Town
Council.
5.
The most common type of application made is for permission,
sometimes referred to as full permission. There are
circumstances when you may want to make an application for
outline permission. For example, you may want to see
whether the planning authority agrees with your proposal in
principle before you go to the trouble of making detailed plans.
If you obtain outline permission, you must obtain full
permission before starting work. In most cases, a subsequent
application for permission must be made within 3 years of the
date of grant of outline permission. However outline
permission cannot be sought for retention of a structure,
works to a protected structure or a proposed protected
structure or developments which require an environmental
impact assessment, integrated pollution control licence or a
waste licence.
7.
How much will this cost?
Can I consult the planning authority in advance?
A fee is payable with an application for planning permission.
Fees for the different classes of development are listed
with the application form. You must pay the correct fee
with your application as the planning application will be
returned to you if it is not paid. Voluntary organisations
may qualify for an exemption from the fee.
You do not have to consult the planning authority before
making a planning application, but it is often advisable to
do so where you are unsure of local planning policies, how
to apply, etc. Depending on the type of development, you
may need to discuss connections to the public water
supply, sewer etc. The larger the development proposal,
the greater the need for prior consultation.
6.
8.
How long will it take to get planning permission?
This will be affected by the completeness of the application
and by whether there is an appeal or not. Generally, a valid
application will be dealt with by a planning authority in 12
weeks from the date the application is made to the final
grant of a permission. However, the period can vary,
particularly if the planning authority seeks further
information from the applicant (which it should do within
the first 8 weeks). The planning authority then has 4 weeks
from the day the further information is received to make a
decision on the application. The following table illustrates
the timescale involved in most cases.
Timescale
Action
Start
Notice published in newspaper and
site notice erected
2 weeks later
Latest date for lodging application
Between 2 weeks
and 5 weeks
Application is validated by the
planning authority. Submissions or
objections are considered.
Yes. There are two types of planning permission. An
application may be made for:
• permission;
• outline permission;
An appeal may take longer than the application to decide but
An Bord Pleanála has an objective to decide appeals within 18
weeks of receipt of an appeal.
Between 5
and 8 weeks later
4 weeks after
issue of notice
of decision.
Planning authority issue notice of
their decision on the application.
(Alternatively, they may request
further information.)
If no appeal is made, the planning
authority will issue grant of
permission, or outline permission,
except where they have already
indicated a decision to refuse.
___________________________________________
Where can I find out about local planning policies?
The development policies and objectives of the planning
authority are in the local development plan. You can view
the plan at any time during office hours at the planning
authority offices and local libraries. Copies and extracts
from the plan are available at a reasonable cost from the
planning authority. For more information on the plan see
The Development Plan (PL.8).
9.
How do I make a planning application?
Forms and information are available from the planning
authority. For more information see Making a Planning
Application (PL.2).
10. I have lodged a valid planning application. Now
what?
Your application will be acknowledged and placed on the
planning register in the planning authority offices, for
public inspection. It will also be included on the lists of
planning applications displayed in council offices, public
libraries and circulated to certain interest groups. The
lists may also be available on the planning authority’s website. A planning authority official will usually inspect the
development site, and you may be asked to make an
appointment to allow access.
11. What if my application is incomplete?
If your application:
•
•
•
lacks any of the required documents;
lacks the appropriate fee or;
is in any other way inadequate ;
(e.g. does not meet the statutory requirements for public
notice of your application)
the application will be invalid and will be returned to you
with the fee. The statutory 8 week period for deciding
the application begins from the time you submit a valid
application with the required information in full, pay the
correct fee and give proper public notice of the
application.
12. Can other people comment on my application?
Yes. Any person can see a copy of your application and
make written submissions or observations, on payment of
the appropriate fee, to the planning authority on any
planning aspect of it. These must be considered by the
planning authority when determining your application. For
more information see Commenting on a Planning
Application (PL.3).
13. How is the decision made?
In making the decision, the planning authority takes a
number of matters into account, including:
• the proper planning and sustainable development of the
area (e.g. appropriate land use (zoning), road safety,
development density, size, location, adherence to
established planning and development practices);
• its own development plan;
• Government policy;
• the provision of a Special Amenity Area Order;
• any European site (eg. Special Areas of Conservation;
Special Protection Areas);
• submissions and observations made by members of the
public on the application.
It may not take non-planning issues into account e.g.
boundary or other disputes, questions more properly
resolved through legal means, etc.
14. How will I know permission has been granted or not?
The decision to grant permission, with or without
conditions, will be notified to you, and to anyone who
commented on the application. What you get is a notice
of intention to grant permission. During a period of 4
weeks beginning on the date of making of this decision,
you or anyone else who has made a submission or
observation on the application and has paid the
appropriate fee may appeal it to An Bord Pleanála. Where
there is no appeal, the planning authority will formally give
you the grant of permission at the end of the appeal
period. You must not commence work until you receive
this notification. If the decision is appealed, you will
receive from An Bord Pleanála either the grant of
permission, with or without whatever conditions the
Board considers appropriate, or if the Board decides,
refusal of permission.
Where the planning authority decide to refuse your
application, its reasons will be included in the notification
sent to you. The same period for appeal (4 weeks) will
apply.
15.Can conditions be attached to my permission?
Planning permission may be subject to certain conditions,
which will be listed on the decision. These may require
changes to your proposal (e.g. new arrangements for the
disposal of surface water, revised height/colour/material
for boundary walls, improved landscaping of the site).
You may also be required to make a contribution to the
local authority for services (e.g. water, sewerage). These
contributions differ from place to place and for different
types of development. You must comply with all of the
conditions attached to the permission and finish work in
accordance with them. Even if you have more than one
permission for a site, you cannot pick and choose the
conditions which suit you best.
16. How long does permission last?
The standard duration for planning permission
(permission or outline permission) is five years from the
date of the grant of the permission by the planning
authority or An Bord Pleanála. In certain circumstances
the planning authority may extend the life of a planning
permission but only where:
• substantial works have been carried out during the
lifetime of the permission and
• the planning authority is satisfied that the development
will be completed in reasonable time.
If a planning permission expires and you apply for a new
permission for the same development, the planning
authority may refuse permission or attach significantly
different conditions. This can happen if planning policies
or the requirements for the proper planning and
sustainable development of the area have changed in the
interim.
1 guide to planning new
3/21/03
6:29 PM
Page 2
17. Can I get copies of documents relating to a planning
application?
Yes. Planning authorities are required to sell, on
request, copies of any part of a planning application file at
a fee not exceeding the reasonable cost of making a copy,
this includes plans or other drawings or photographs. Any
documents for sale will be available while they are open
for public inspection.
€12,700,000 (€12,700 per day for continuing offences) and
up to 2 years imprisonment or both.
21. Can I rectify a planning error?
This is the responsibility of the planning authority, which
has wide enforcement powers to ensure development is
carried out in conformity with planning permission, and
to halt and rectify unauthorised development. Any legal
action must, however, be started within 7 years of the
breach of the planning laws taking place. Care should be
taken to ensure that each condition of a permission is
fully complied with in order to avoid incurring such
action, and also to avoid difficulties when the property is
being sold at a later date (see Question 21 below).
Genuine mistakes can be made about the need for
planning permission. If you undertake unauthorised
development you may apply for permission to retain it.
However, this approach should not be relied upon in
order to avoid seeking planning permission before
starting work as you may not necessarily be granted
permission for retention or you may be required to carry
out costly modifications. The application fee is also 3
times more than the fee for an application made before
development starts. Permission for retention does not
automatically absolve you from prosecution if
enforcement action has already been taken against you. If
you are buying property, check that the building itself and
any extensions or alterations to it have proper planning
permission or are exempt from planning permission, since
you, as the new owner, may be liable to enforcement
action.
19. How can I stop unauthorised development?
22. Do I need any other type of permission?
18. Who enforces planning decisions?
If you think somebody is developing or using land
without, or contrary to, a planning permission, you
should contact the planning authority, in writing, who will
issue a warning letter to the person carrying out the
development. The planning authority will investigate the
matter to determine if an enforcement notice should
issue. Any person may apply in either the Circuit or High
Courts for an order restraining unauthorised
development or use of land, or requiring compliance with
a planning permission. Court orders can, depending on
the circumstances, be obtained at extremely short notice
and the Courts will ensure compliance with any order
made.
20. Are there penalties for breaches of planning law?
Yes. It is an offence to undertake any work needing
permission without that permission. Planning authorities
have powers to stop unauthorised development and this
can be a costly experience for the offender. You may be
required to rectify any unauthorised works and will have to
pay whatever costs are involved. On conviction in the
District Court, fines of up to €1905 can be imposed
together with fines of up to €507 per day for continuing
offences or to a term of imprisonment of 6 months. On
conviction in the Higher Courts, the maximum fine is
The leaflets in this series are:
A Guide to Planning Permission
Making a Planning Application
Commenting on a Planning Application
Building A House - The Planning Issues
Doing Work around the House The Planning Issues
Agriculture and Farm Development The Planning Issues
Planning for the Business Person
The Development Plan
Environmental Impact Assessment
Making a Planning Appeal
A Guide to the Building Regulations
A Guide to Architectural Heritage
PL.1
PL.2
PL.3
PL.4
PL.5
PL.6
PL.7
PL.8
PL.9
PL.10
PL.11
PL.12
Tá leagan Gaeilge den bhileog seo ar fáil.
You will not be entitled solely by reason of a planning
permission to carry out your proposed development. You
may need other approvals, depending on the type of
development. For example, all new buildings, extensions,
alterations and certain changes of use of existing buildings
must comply with building regulations, which set out basic
design and construction requirements. Developments
other than residential, will probably require a fire safety
certificate under the regulations. See A Guide to the
Building Regulations, PL.11 for more details. Further
information may be obtained from your local authority.
You may also need permission if making a connection to a
public water main or sewer.
PL 1 - A Guide to
Planning Permission
The law governing the planning system is set out in the
Planning and Development Acts 2000 and 2001 and the
Planning and Development Regulations 2001 to 2002.
These may be purchased from the Government
Publications Sales Office, Sun Alliance House, Molesworth
Street, Dublin 2. Telephone (01) 6476995/4
PL. 1
October, 2002.
Printed on recycled paper