Document 110785

Nishimatsu Construction Company wishes to sell the Movable
Scaffolding System (MSS) used on the Industrial Ring Road Project in
Bangkok Thailand.
Salient Features of the System
The MSS is capable of casting variable span lengths of from 40 m to 67.5 m (~70m) spans
(pier distance) of Bridge superstructure with width up to 30.5 m and web height of
structure 2.5 to 3.5 m. Total weight of the system is about 1780 tons.
The MSS can be adapted for different type of bridge superstructures. The system is
simple with few internal moveable parts and components, giving uncomplicated operation
with substantial reduction in span casting time. The equipment is extremely suitable for
bridges in the city (for traffic considerations), or for the long spans or for the bridges above
mushy land, where the ground can not be used for support of formwork. The MSS is also
useful for the bridge superstructures to be completed in short time.
MSS Specification : (Used on Industrial Ring Road Project, Bangkok, Thailand)
1. Dimensions:
3. Other Specifications at a glance :
¾ Overall length
¾ Main Girders (2Nos.)
¾
¾
¾
¾
147.50 m
2.50 m(w) x
5.15 m(h) x 70.50 m(l)
Nose (2 Nos.)
39.50 m each
Outer width Main Girders
21.30 m
(when concreting outer web)
Outer width of Brackets
32.00 m
Outer width top formwork 31.90 m
2. Bridge (Superstructure) details :
¾
¾
¾
¾
Width up to
Height
Weight
Pier (Span length)
30.5 m
2.5 /3.0/ 3.5 m
62.6 / 67.8 t/m
40.0 m to 67.5 m
¾
¾
¾
¾
¾
Type
Underslung twin cell
Max Span Length
67.5 m (~70m)
Total Weight approx 1,800 tons
Colour RAL 6002 (L549-Single green)
Wind Speeds (criteria)
• Concreting
22 m/s
• Launching
12 m/s
4. Operation History : (July 2006)
¾
¾
¾
¾
¾
First erection
Erection/dismantle
Spans Completed
Total Spans
Available date
May 2004
2/2 time
20 Nos.
20 Nos.
Any time
Contact : Mr. Narendra Bhagwat, General Manager Project Coordination, Nishimatsu Construction Co. Ltd., Bangkok Office,
Tel. +66- 2-258-9590, Fax. +66-2-258-9599, Mobile +66-8-1827-6963, Email : [email protected]