HOME BASED DATA ENTRY IMAGE TO NOTEPAD TYPING Sample File PACKAGES DETAILS PLAN A B C D Application Fees 1500 Rs 2500 Rs 3500 Rs 4500 Rs Pages 25 PAGES 50 PAGES 100 PAGES 200 PAGES Time Period 3 Days 6 Days 10 Days 20 Days 75% 75% 75% 75% 90 Rs. 95 Rs. 100 Rs. 110 Rs. 6 MONTHS 6 MONTHS 9 MONTHS 9 MONTHS Min. Accuracy Per Page Prize Agreement DETAILS PLAN E F G H Application Fees 7500 Rs 9500 Rs 11500 Rs 13500 Rs Pages 300 PAGES 500 PAGES 700 PAGES 800 PAGES Time Period 25 Days 30 Days 45 Days 60 Days 75% 75% 75% 75% 120 Rs. 130 Rs. 135 Rs. 140 Rs. 9 MONTHS 9 MONTHS 9 MONTHS 9 MONTHS Min. Accuracy Per Page Prize Agreement PAYMENT ACCORDING TO ACCURACY Plan A B C D 100% 2,250 4,750 10,000 22,000 95% to 99.9% 1,550 3,500 8,500 20,000 90% to 94.9% 1,250 2,500 6,500 14,000 85% to 89.9% 1,050 1,900 4,500 12,000 80% to 84.9% 9,50 1,500 3,500 8,000 75% to 79.9% 7,50 1,200 2,200 4,500 Plan E F G H 100% 36,000 65,000 94,500 1,12,000 95% to 99.9% 25,000 55,000 80,000 90,000 90% to 94.9% 20,000 35,000 60,000 70000 85% to 89.9% 15,000 15,000 40,000 50000 80% to 84.9% 10,000 10,000 20,000 25000 75% to 79.9% 6,500 9,000 10,500 13000 NOTES: Plan-A 75% below No Payment Plan-B 75% below No Payment Plan-C 75% below No Payment Plan-D 75% below one time 3 day re-work chance Plan-E 75% below one time 3 day re-work chance Plan-F Plan-G Plan-H 75% below one time 3 day re-work chance 75% below one time 3 day re-work chance 75% below one time 3 day re-work chance After Rework Plan-D Plan-E Plan-F Plan-G Plan-H 85% 85% 85% 85% 85% below below below below below No No No No No Payment Payment Payment Payment Payment Your Agreement will be Reject How to write our work……??? 2.Write In Notepad 3.Font :- Times new roman 4.Size :- 12 5. Arbuda Info Services party will not be responsible for the problem at your premises such as hardware crash, virus, electricity, internet connectivity etc, no reason shall be entertained in non-completion of work data. If You Have Any Query You Can Contact Us Any Time. We Are Here To Help You. QC Report Sample QC report within 7 to 10 business days from the date of submission Page no. Line no. Error Correction Error type %ded 10 8 which which, punctuation 0.3 19 5 ine one spelling 0.6 22 35 the lamp the big lamp word missing 0.7 45 41 not not now extra space 0.8 now Total Deduction 2.4% Method Of Calculating Accuracy: Mistakes: % deduction From 100% Each punctuation mistakes (Extra/ Missing) 0.3% Each spelling error 0.6% Each extra word / word missing 0.7% Each extra space / space missing 0.8% Each extra enter / enter missing 0.9% Each extra line / line missing 1.0% Terms and Conditions TECHNICAL INSTRUCTIONS ₃ Every line should match with the corresponding line in the IMAGE; hence the pages shall automatically match with the IMAGE file pages. ₃ Font should be Times New Roman and font size 10. ₃ Justification of text is not required even if it is done in the IMAGE file. ₃ Paragraph spacing should be done by using paragraph spacing (before or after only) (Auto Spacing should not be used). ₃ If a word split in the IMAGE file then the same should be done in Notepad file. If a line ends in IMAGE file then the same should be done in Notepad file. ₃ Headers and Footers option should not be used. ₃ Color (if any in the IMAGE file) should be given in black color. ₃ Accent characters, if any, shall be converted and typed normal characters. Ex: ‘æ’ should be typed as ae, ‘ç’ to b e typed as c. ₃ Always type the text as normal text. Bold, italics in text part are not at all required. REJECTION CRITERIA ₃ File name of the converted Notepad file does not match with the corresponding image file name. ₃ Incomplete text files found. ₃ Any third party software used for text checking or conversion ₃ Should not type files in MS Office . ₃ Accent/jargon characters found in any file. ₃ Any images are found in the without Text document. as ₃ Text is in other than “Times New Roman” font. ₃ If colored text are found in any Text file. ₃ If hyper links are found in any of the Text file. ₃ Any other files are found in the zip folder except the text document. (Like temporary files or any other file types). ₃ If the completed Job files has not been submitted within the deadline mentioned by the company.
© Copyright 2024