THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363 WEEKLY PLAN LIST - Friday, January 09, 2015 (All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com Bid Date 1/9/2015 Plan # Bid Time Location 407 2:00 PM PLEASANTO N # of Addenda Plans Plan Name CSI Divisions / Job Description ANNUAL CURB AND GUTTER REPLACEMENT (ONLINE ONLY) Work will consist of removing and replacing approximately 2,500 sq. ft. of damaged concrete sidewalk, 2,100 linear feet of concrete curb and gutter, installing and replacing 94 intersections access ramps as shown on the project Plans. Online Project is available for viewing ONLINE ONLY!!! 161 3:30 PM NAPA NAPA COUNTY ADMINISTRATION BUILDING EARTHQUAKE REPAIRS 4 Div 1-2, 5-12, 22-23 & 26-27. Trades include selective demolition; cold-formed metal framing; plastic-laminate-faced architectural cabinets; thermal insulation; applied fireproofing; penetration firestopping; joint sealers; acoustical joint sealants; hollow metal frames; flush wood doors, stile and rail wood doors; access doors and panels; door hardware; automatic door operators; glazing; gypsum board; acoustical panel ceilings; resilient base; resilient tile flooring; tile carpeting; wall coverings; sound-absorbing wall units; painting; visual display units; motorized intelligent roller shade systems; plumbing; HVAC; lighting; electrical work; audio/visual systems. Planroom & Online PLEASE NOTE: All questions must be emailed to Dennis Kennedy at: [email protected] by December 29, 2014 by 5 PM. No questions will be accepted after this deadline. 1/12/2015 473 10:00 AM WEST SACRAMENT O RECREATION CENTER POOL DECK REPAIR PROJECT (ONLINE ONLY) Remove and install concrete flatwork and under concrete slab drainage system and 1 replace ceramic tiles and grout around existing swimming pool. Online Project is available for viewing ONLINE ONLY!!! 1/13/2015 475 10:00 AM MILL VALLEY TAMALPAIS AVENUE PIPELINE REPLACEMENT Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of 2,170 feet of 8 and 6-inch welded steel pipe with valves, fittings, and PROJECT - MMWD (ONLINE ONLY) appurtenances. The Work to be done is located in City of Mill Valley within the County of Marin, California. Contact Elysha Anderson, Project Engineer, at (415) 945-1572 with any questions. Project is available for viewing ONLINE ONLY!!! Page 1 of 30 Online Bid Date 1/13/2015 Plan # Bid Time Location 476 10:30 AM MILL VALLEY # of Addenda Plans Plan Name CSI Divisions / Job Description FFIP MILL VALLEY PIPELINE REPLACEMENT PROJECT - MMWD (ONLINE ONLY) Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of 2,630 feet of 6 and 8-inch welded steel pipe with valves, fittings, and appurtenances. The Work to be done is located in the City of Mill Valley within the County of Marin, California. Online Project is available for viewing ONLINE ONLY!!! 470 11:00 AM DAVIS CNPRC FIELD CORRAL SHADE STRUCTURES PHASE 2 - CNPRC CLEAN CAGE STORAGE AT UC DAVIS (ONLINE ONLY) Div 1-3, 5-10, 13, 26, 31 & 33. DESCRIPTION OF WORK: Provide all labor, materials, equipment, tools, transportation, insurance, and services to construct the following: 1 Online 3 COLLECTION SYSTEM REHABILITATION & Project comprises of replacing approximately 12,100 LF of sewer mainlines in the REPLACEMENT PROJECTS FY 2014-15 PHASE 1 streets of De Solo Drive, Montezuma Drive, Navarre Drive, Flore Drive, Noriega (ONLINE ONLY) Way, Peralta Road, Hermosa Avenue. Standish Road and Dell Road in the City of Pacifica, California. The Work includes the replacement of approximately 233 LF of 6-inch vitrified clay pipe (VCP) sanitary sewer mainline with new 8-inch polyvinyl chloride (PVC - SDR-26) pipe by open trench; replacement of approximately 11,870 LF of existing VCP that are between 6-inch to 12-inch pipes by new HDPE (SDR 17) using pipe bursting method; removal and installation of about 6 manholes and 4 lampholes. Online 1. CNPRC FIELD CORAL SHADE STRUCTURE Phase 2: Provide three preengineered, metal free-span shade structures over existing animal field corrals. Work includes concrete piers, underground branch electrical circuits and LED site lighting. 2. CNPRC CLEAN CAGE STORAGE: Construct an approximately 1750 overall gross square foot pre-engineered metal building. Work includes site grading, concrete slab and apron, underground utilities, building power and lighting, and steel roll-up and man doors. Project is available for viewing ONLINE ONLY!!! 408 2:00 PM PACIFICA Project is available for viewing ONLINE ONLY!!! 418 2:00 PM DAVIS NEW AMERICAN WEST BANK - DAVIS (ONLINE ONLY) Project consists of interior wall demolition, drywall and metal stud framing, acoustical ceilings, painting, ceramic tile, carpeting, millwork, doors/frames/hardware, window coverings, mechanical, electrical, plumbing and some fire sprinkler work. Project is available for viewing ONLINE ONLY!!! Page 2 of 30 Online Bid Date 1/13/2015 Plan # Bid Time Location 447 2:00 PM LOS ALTOS # of Addenda Plans Plan Name CSI Divisions / Job Description PARKING AND CIRCULATION PHASE 3 LOT 1 STAIR AT FOOTHILL COLLEGE (ONLINE ONLY) Div 1, 6-7, 9, 26 & 31-33. Trades include site finish carpentry; site water repellant; 1 site painting; exterior lighting and electrical; site preparation, earthwork and grading, trenching, backfilling and compacting; landscape maintenance period, paving and surfacing, site concrete, site sealants, pavement marking, restoration of surfaces, soil preparation and mixes, planting area finish grading, grasses, site metalwork; and storm drainage. Online PLEASE NOTE: All questions must be faxed to the District’s Purchasing Office at (650) 948-5194, Attention: Annette Perez with a copy to Linda Mahi, or by email to: [email protected] with a copy to Linda Mahi at: [email protected]. The deadline to submit questions is Noon on 12/17/2014. A question form is included herein, see Bid Document, 00 31 07. If you do not use the question form, you must still include the same details in your question that are requested by the form. Project is available for viewing ONLINE ONLY!!! 455 2:00 PM MARTINEZ MARINA VISTA PED/BIKE ACCESS IMPROVEMENT PROJECT (ONLINE ONLY) Project includes furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as the Marina Vista Ped/Bike Access Improvement Project including, but not limited to, concrete sidewalk, concrete driveway, curb, and curb ramp reconstruction, roadway excavation, abandoned spur track removal and roadway reconstruction, adjustment of pull boxes to grade, removal of roadside signs and railroad signal equipment, construction of concrete pedestrian railroad crossing surface, storm drainage improvements, coordination with local utility companies, slurry seal, traffic striping, pavement markings and traffic signal improvements. . Project is available for viewing ONLINE ONLY!!! 495 2:00 PM ANTIOCH 2015 PAVEMENT MAINTENANCE PROJECTRUBBERIZED CAPE SEAL (ONLINE ONLY) This Project consists, in general, of traffic control, cape seal (slurry seal over rubberized chip seal), storm water pollution control, pavement marking removal, pavement marking installation and all other work as shown on the Plans. Online 1 Online Project is available for viewing ONLINE ONLY!!! 488 2:30 PM MORGAN HILL CENTENNIAL RECREATION CENTER UV WATER The Scope of Work includes furnishing and installing a new ultraviolet water TREATMENT SYSTEM FOR INDOOR POOL treatment system for the indoor pool at the Morgan Hill Centennial Recreation (ONLINE ONLY) Center and relocation of the existing system to the Morgan Hill Aquatics Center. Contact Kat Corrales at (408) 310-4672 or by email at: [email protected] Project is available for viewing ONLINE ONLY!!! Page 3 of 30 Online Bid Date 1/14/2015 Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 303 11:00 AM SAN RAFAEL CREW LUNCH ROOM MODIFICATIONS Div 1-2, 5-6, 8-9, 22-23 & 26. The Project work is generally described as the remodeling of an existing crew lunch room located on the second floor of the District’s Shop Building, including but not limited to, furnishing and installation of miscellaneous accessories and appliances. Planroom & Online 104-105 2:00 PM SAN RAMON DOUGHERTY VALLEY HIGH SCHOOL CLASSROOM BUILDING ADDITION PLANS & SPECS WILL BE POSTED ONLINE BY NOON ON TUESDAY, DEC 23RD Planroom & Online Div 1-12, 21-23, 25-28 & 31-33. 2-Story addition of approximately 18,850 sq. ft. to general classroom building “A”. Addition is approximately 9,200 sq. ft. per floor, E Occupancy, Type V-B (sprinklered) construction. There are 3 labs, one general education classroom and a CTE facility on the lower level; 4 labs and 2 two general education classrooms on upper level. Also lab prep rooms on both levels, a janitor closet on lower level and book storage room at upper level. There is an enclosed outdoor area attached to the CTE facility and associated site work. Trades include demolition; concrete; thin brick veneer; structural steel; metal fabrications; steel stairs; rough carpentry; finish carpentry; interior architectural woodwork; site-applied water repellent; thermal building insulation; below-grade vapor retarder; water vapor emission control; aluminum plate wall panels; preformed metal roofing; flat seam metal wall panels; modified bitumen roofing; re-roofing; flashing and sheet metal work; penetration firestop systems and sealants; joint sealants; movement joint cover assemblies; steel doors and frames; flush wood doors; integrated door assemblies; flush FRP doors; access doors and panels; aluminum windows; door hardware; glass and glazing; louvers and vents; gypsum board shaftwall systems; ceiling and soffit suspension systems; lath and portland cement plaster; foam shapes in plaster surfaces; gypsum board; acosutical ceilings; resilient flooring; static dissipative tile flooring; carpeting; tackable wall surfaces; acoustic insulation and sealants; painting; markerboards; signage; HDPE toilet compartments and screens; accordion folding partitions; corner guards, toilet and bath accessories; fire protection specialties; steel lockers; projection screens; horizontal louver blinds; lab casework; fire protection; plumbing; HVAC; integrated automation; lighting; electrical; data networking; intrusion alarm; fire alarm; clearing and grubbing; trenching and backfilling; cement and concrete for exterior improvements; base courses; flexible paving; concrete curbs and gutters; fences and gates; irrigation; planting; and utilities. 498 2:00 PM PIEDMONT HIGHLAND AVE - PARK WAY DRAINAGE Project consists of the replacement of concrete sidewalks, curbs and gutters, IMPROVEMENTS - PHASE 1 PROJECT (ONLINE driveway aprons, curb ramps and minor asphalt concrete pavement repairs. ONLY) Project is available for viewing ONLINE ONLY!!! Page 4 of 30 1 Online Bid Date 1/14/2015 Plan # Bid Time Location # of Addenda Plans Plan Name CSI Divisions / Job Description 1 The Work to be performed includes the construction of reinforced concrete skateboard park improvements at an existing City park including removal of existing asphalt concrete pathway, clearing and grubbing of existing landscaping, removal/relocation of existing boulders, storm drain system modifications, irrigation system modifications, park lighting modifications, excavation/grading, reinforcing steel, forming and placing of skatepark concrete/shotcrete, fencing and landscaping. 81 2:00 PM EMERYVILLE JOSEPH EMERY PARK SKATE PARK 479 2:30 PM SAN FRANCISCO TWIN PEAKS BOULEVARD COLD-IN-PLACE Div 1-2 & 31-32. The Work is cold-in-place recycling pavement renovation, traffic RECYCLING PAVEMENT RENOVATION (ONLINE routing and all associated work along Twin Peaks Boulevard in San Francisco, CA. ONLY) Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions. 2 Planroom & Online Online Project is available for viewing ONLINE ONLY!!! 464 3:00 PM SAN FRANCISCO RICHMOND DISTRICT NEIGHBORHOOD CENTER Project consists of exterior imporvements, including site parking, playground and EXTERIOR IMPROVEMENTS (ONLINE ONLY) walkways; window repair/replacement at all buildings; no interior work; portions of existing walkways to be repaired as required to provide accessible path of travel; existing ramp and portion of landing and Building C to be replaced. Online Contact Charles Higgins at (415) 751-6600 with any questions. Project is available for viewing ONLINE ONLY!!! 228 3:30 PM PETALUMA ELLIS CREEK HEADWORKS SCREEN REPLACEMENT PROJECT Page 5 of 30 2 Div 1-2, 9-11 & 13-16. The WORK includes, but is not limited to, remove existing mechanical screens, washers/compactors, associated piping, supports, electrical equipment and controls, and appurtenances; drain and clean the screen channels; inspect, and install the City~f\rrnished mechanical screening equipment; furnish and install associated ancillary equipment and appurtenances including, but being not limited to, piping, pipe suppmis, electrical equipment and control, conduit and training; modify the existing structure and guardrails; investigate existing electrical installations including conduits and their locations; coordinate with requirements for new installation; modify the existing electrical power distribution system; provide test procedures, execute testing, and fUrnish test results for the complete interconnected system including receiving requirements from the City and the City's Programmer, and integrating with test requirements for the equipment and systems furnished and installed (The tests shall include, but are not limited to, mechanical startup and testing, operational readiness tests for electrical and controls, and functional acceptance testing on the system); perform all work necessary to complete the WORK as indicated in the Contract Document. Planroom & Online Bid Date 1/15/2015 Plan # Bid Time Location 158-160 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description # of Addenda Plans 1550 EVANS AVENUE TENANT IMPROVEMENTS THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. PROJECT JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! 3 Planroom 1 Online 3 NEW PHYSICAL SCIENCE EMERGENCY BRIDGE AND Div 1-3, 10, 13, 22-23, 26 & 31-33. In general, the Work consists of replacing two GUS MANOLIS PEDESTRIAN BRIDGE AT CSU bridges on the Chico State Campus. CHICO (ONLINE ONLY) 1. The Physical Science Emergency Vehicle Access Bridge that spans Big Chico Creek near the Physical Science Building. Demolish the existing foot bridge and install a new wider steel bridge to accommodate both pedestrian and vehicle access. The bridge is to be 21 ft. wide for emergency response vehicle access. The approximate 106 ft. free span over the waterway will be supported by bridge piles, 24 inch cast-in-drilled-hole (CIDH) concrete piles. The Project will also include the continuation of existing utilities across the creek, signage and new lighting. There will be modification of adjacent flatwork at each end as need to provide an ADAcompliant path of travel. Online Div 1-3, 5-13, 21-23,, 26-28 & 31-33. The objective of the Project is to renovate SFPUC facility at 1550 Evans Avenue to consolidate Sewer Collections Division in office space for 135 employees. The Work is to be performed in San Francisco, CA. 405 2:00 PM OAKLAND CALTRANS 04-4H2214 COLD PLANE AND HMA/RHMA OVERLAY, PCC SLAB AND GUARD RAIL REPLACE (ONLINE ONLY) Project consists of cold plane and HMA/RHMA overlay, PCC slab and guard rail replacement In Alameda County in Oakland from 0.1 mile east of Boston Ave Overcrossing to 0.2 mile west of the Route 80/580/880 Separation and at 0.2 mile West of Route 80/580/880 Separation. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-12, C-32. Project is available for viewing ONLINE ONLY!!! 411 2:00 PM CHICO 2. Replace the Gus Manolis Bridge that was recently removed after being damaged by a fallen tree. This bridge at Selvester’s Cafe is to be a 5.5 ft. pedestrian only access steel and concrete bridge. The Work shall include new railings, new concrete piles and modifications to existing ramp systems to provide an ADAcompliant path of travel. Work shall also include new lighting and signage. Project is available for viewing ONLINE ONLY!!! Page 6 of 30 Bid Date 1/15/2015 Plan # Bid Time Location 414 2:00 PM Plan Name CSI Divisions / Job Description NEW HILLPOINT REGIONAL PARK COLEMAN BLUFF SAN FRANCISCO PATH HUNTERS POINT SHIPYARD PARCEL A (ONLINE ONLY) # of Addenda Plans Div 1-5, 9 & 16. Work consists of the construction of various parks and open space 1 including but not limited to, mobilization, /demobilization, temporary site fencing, temporary tree protection, surveying, erosion control, earthwork, storm drainage, sanitary sewer, low pressure water, park lighting/electrical, various hardscaping, irrigation, landscaping, various concrete structures and site furnishings. Online Trades include mobilization and demobilization, demolition and deconstruction, salvage, recycling and reuse, earthwork, excavation, backfilling and compacting for utilities, tree protection and trimming, aggregate base, finish frading, structural soil, swale bioretention soil and check dams, street work not in contract by subcontractor, public storm drainage system, low pressure water system, reclaimed water system, private storm drainage system, sanitary sewer system, stone cobbles, irrigation system, site furnishings, soil preparation, lawns and grasses, planting, landscape maintenance, vehicular plant cell paving, concrete formwork, concrete reinforcement, cast-in-place concrete, architectural cast-in-place concrete, tile, site metal fabrications, graffiti resisitant coatings, lighting and electrical work. Project is available for viewing ONLINE ONLY!!! 419 2:00 PM CHICO NEW AMERICAN WEST BANK - CHICO (ONLINE ONLY) SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Online Project consists of interior wall demolition, drywall and metal stud framing, acoustical ceilings, painting, ceramic tile, carpeting, millwork, doors/frames/hardware, window coverings, mechanical, electrical, plumbing and some fire sprinkler work. Project is available for viewing ONLINE ONLY!!! 474 2:00 PM SAN MATEO WASTEWATER TREATMENT PLANT PRIMARY CLARIFIER 4 REHABILITATION PROJECT (ONLINE ONLY) Page 7 of 30 See Specifications for complete Scope of Work. Project is available for viewing ONLINE ONLY!!! Online Bid Date 1/15/2015 Plan # Bid Time Location 492 2:00 PM SANTA ROSA Plan Name CSI Divisions / Job Description # of Addenda Plans BAY AREA RIDGE TRAIL EXTENSION PROJECT The County of Sonoma is soliciting bids for the Bay Area Ridge Trail Extension LOS GUILICOS TO HIGHWAY 12 HWY - RD Project - Los Guilicos to Highway 12. Contractor's License required at time of (ONLINE ONLY) award is: A - General Engineering. A bid bond will be required. Additional information may be obtained from the Sonoma County Regional Parks Department at 707-565-2041. Online PLEASE NOTE: OPTIONAL PRE-BID MEETING AND SITE VISIT IS SCHEDULED FOR JANUARY 5,2015 AT 9:00AM. Prospective bidders are responsible for being aware of all site conditions. The Pre-Bid Site Visit will last approximately one (1) hour. The Work consists of construction of County’s Bay Area Ridge Trail Extension Project Los Guilicos to Hwy 12, Road Work, at 7425 Rancho Los Guilicos Rd., Santa Rosa. The Work includes, construction of pedestrian ramps and road crossing and signal modification improvements at Pythian Rd and Hwy 12 intersection, and pedestrian ramp and street crossing improvements on Rancho Los Guilicos Rd. Project is available for viewing ONLINE ONLY!!! 497 2:00 PM BERKELEY 1 FY15 STORM DRAINAGE AND VALLEY GUTTER The Work done under these Specifications includes, but is not limited to, traffic IMPROVEMENTS (ONLINE ONLY) control, removal of existing asphalt concrete, removal of existing cross drains and salvaging of appurtenances, installation of cross drains and catch basins, regrading intersections, hot mix asphalt, aggregate base, concrete valley gutter, curb, sidewalk, and curb ramps, detectable warning surfaces, and pavement markings. All Work shall be performed in accordance wi.th these Plans and Specifications. Questions should be directed to Daniel Akagi at (510) 981-6394. Project is available for viewing ONLINE ONLY!!! Page 8 of 30 Online Bid Date 1/15/2015 Plan # Bid Time Location 409 3:00 PM LOS ALTOS Plan Name CSI Divisions / Job Description # of Addenda Plans HIGH-BAY LIGHTING UPGRADE AT GYMNASIUM Div 1 & 26. See Specifications for complete Scope of Work. BUILDINGS 2500 & 2600 AT FOOTHILL COLLEGE (ONLINE ONLY) Process and deadline for Bid Questions: All questions must be faxed to the District’s Purchasing Office at (650) 948-5194, Attention: Annette Perez with a copy to Linda Mahi or by email to: [email protected] with a copy to Linda Mahi at: [email protected]. The deadline to submit questions is 2:00 PM on January 8, 2015. A question form is included herein, see Bid Document, 00 31 07. If you do not use the question form, you must still include the same details in your question that are requested by the form. The District will issue written response(s) to the bid questions as Amendments to the bid documents. Do not direct questions to any other person associated with this project; such action will only slow the District’s ability to respond to your inquiry. Online Project is available for viewing ONLINE ONLY!!! 415 3:30 PM NAPA NEW NAPA COUNTY HOJ EARTHQUAKE EPOXY INJECTION REPAIRS (ONLINE ONLY) Work generally consists of, but is not limited to, epoxy injection of four (4) shear walls at the Hall of Justice. Online Project is available for viewing ONLINE ONLY!!! 420 4:00 PM SAN JOSE NEW TWIN CREEKS HOMES (ONLINE ONLY) The Project consists of 6 single family 2-story homes with 2-car tandem parking garages for each home. 2 Online 2 NEVIN AVENUE PEDESTRIAN IMPROVEMENTS In general, the Work to be performed under these Specifications includes the FROM 19TH TO 27TH ST (ONLINE ONLY) construction of roadway, sidewalk, landscaping, furnishings, and general infrastructure improvements along Nevin Avenue between 19th and 27th Street in the City of Richmond. To support the improvements, traffic control, temporary lighting, storm water pollution prevention, coordination with public utilities, sheeting and shoring, and dewatering will be necessary. In addition to standard asphalt and concrete finishes, textured asphalt pavement and enhanced concrete finishes are planned. Landscaping improvements include trees, shrubs, miscellaneous planting, and an irrigation system. Online Project is available for viewing ONLINE ONLY!!! 1/16/2015 471 2:00 PM RICHMOND Project is available for viewing ONLINE ONLY!!! Page 9 of 30 Bid Date 1/20/2015 Plan # Bid Time Location 153 2:00 PM HAYWARD Plan Name CSI Divisions / Job Description LKQ PICK YOUR PART PROJECT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! # of Addenda Plans Planroom & Online New One-Story Wood Frame Office Building 2,406 sq. ft; New One-Story PreEngineered Steel Process Building 19,500 sq. ft.; New CMU Trash Enclosure; New Wood Frame Scale Building 828 sq. ft.; and Sitework. Contact Bob Alton, Project Estimator, with any questions at: [email protected] 401 2:00 PM DANVILLE RAILROAD AVENUE IMPROVEMENTS (RE-BID) - THIS PROJECT IS A REBID!!! ONLINE ONLY The improvements include new curb, gutter, brick-banded sidewalks, street trees, curb bulb-outs, decorative crosswalks, asphalt concrete roadway resurfacing, biofiltration planters for stormwater treatment, antique-style LED street lights, traffic signal upgrades, road signs, pavement markings, and street furniture. The Work will occur on Railroad Avenue from Prospect Avenue to south of School Street in downtown Danville, California. Online Project is available for viewing ONLINE ONLY!!! (Previously scheduled bid date was 5/1/13. Old Plan #923) 412 2:00 PM NEW WINDOW REPLACEMENT - X01 UNIT LIVING SAN FRANCISCO ROOMS UNIVERSITY PARK NORTH AT SFSU (ONLINE ONLY) Div 1-2 & 8. In general, the Work consists of furnishing labor and material necessary to replace the X01 unit living room windows in Buildings 6, 7, 8 and 9 at University Park North on the campus of San Francisco State University. The Work is located at 225/235 (Building 6), 255/265 (Building 7), 285/295 (Building 8) and 325/335 (Building 9) Buckingham Way, San Francisco, California 94132. 2 Online Trades include selective demolition, lead related construction work, summary of hazardous materials work; aluminum windows and glazing. Project is available for viewing ONLINE ONLY!!! 421 2:00 PM SANTA ROSA NEW SCOTT ST SEWER, WATER AND STREET IMPROVEMENTS (ONLINE ONLY) Project consists of dust control, traffic control, earthwork, aggregate base, asphalt concrete, asphalt concrete trench paving, soil and ground disposal, sanitary sewer system, concrete curbs and sidewalks, traffic stripes and pavement markings, raised pavement markers, water system, tree surgert (sidewalk maintenance) and material recycling. Project is available for viewing ONLINE ONLY!!! Page 10 of 30 Online Bid Date 1/20/2015 Plan # Bid Time Location 490 2:00 PM SACRAMENT O Plan Name CSI Divisions / Job Description WINDSOR - ARDEN FAIR MALL (ONLINE ONLY) SPECIFICATIONS ARE ON THE FLOOR PLANS!!! # of Addenda Plans Online Demolish existing interior non-loading bearing walls and a part of the existing storefront display; New wall fixtures; Cashwrap and wall standards; New flooring and interior non-loading bearing walls; Refurbish existing T-Bar ceiling and walls to like-new condition; New VAV box connect to existing Landlord ductwork; Refurbish existing mechanical ducts and and registers in the front sales area; New exposed mechanical ducts and registers in the back sales area; Stock room and exit vestibule; New light fixtures per plan; Rebulb existing lighting fixtures with energy savings equivalents. Email bids to Lionel Cabral at Souki Construction at: [email protected] Project is available for viewing ONLINE ONLY!!! 496 2:00 PM ANTIOCH COMMUNITY DEVELOPMENT BLOCK GRANT DOWNTOWN ROADWAY PAVEMENT REHAB, PHASE 6 (ONLINE ONLY) Project includes roadway reconstruction, cold planing existing roadway sections, installing asphalt concrete plugs and roadway overlays. Online Project is available for viewing ONLINE ONLY!!! 499 2:00 PM ANTIOCH NINTH STREET ROADWAY IMPROVEMENTS (ONLINE ONLY) The Work shall generally consist of roadway reconstruction, cold planing existing roadway sections, installing asphalt concrete plugs and roadway overlays. Additional work shall include, but not be limited to, raising utilities to grade, placing pavement markings and markers, various concrete work, traffic control and erosion control. Project is available for viewing ONLINE ONLY!!! Page 11 of 30 Online Bid Date 1/20/2015 Plan # Bid Time Location 89-92 2:00 PM IONE Plan Name CSI Divisions / Job Description # of Addenda Plans HEALTH CARE FACILITY IMPROVEMENT Div 1-12, 21-23, 26-28 & 31-33. The Project at Mule Creek State Prison (MCSP) is 3 PROGRAM MULE CREEK STATE PRISON (MCSP) part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at MCSP is to remedy deficiencies in its existing health care components. The Project consists of five sub-projects, which includes one to three sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, renovation, building pad preparation, accessible paths of-travel and infrastructure upgrades. The Projects are located within the existing secure perimeter. The new buildings and additions will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new buildings, including communication/signal, electrical, storm drain, water, and sewer lines. All existing buildings are sprinklered with the exception of: SUB-PROJECT #2 (Primary Care Clinic Renovation). Automatic sprinkler systems will be installed for I-3 and B occupancy in new buildings in accordance with the requirements of the California Building Code. Paving and resurfacing work includes, but is not limited to, the following: new sidewalks and asphalt at accessible parking stalls, new concrete and asphalt at the new buildings, all sidewalks, and path-of-travel. The sub-projects are as follows: SUB-PROJECT #1 - Central Health Services Renovation. Approximately 5,000 sq. ft. of the existing Central Health Services Building will be renovated to provide appropriately sized Triage and Treatment Area (TTA), specialty care and clinical spaces. The renovated TT A will include two standard bays, one urgent bay, an observation room, a mental health treatment room, and one panorex room for Xrays. The Project will also include a physical therapy room, clean and soiled utility rooms and additional inmate-patient holding rooms. SUB-PROJECT #2 - Primary Care Clinic (PCC) Renovation at Yards A, B, and C; and New Clothing Exchange Buildings. The existing Primary Care Clinics at Yards A, B, and C will be reconfigured, renovated, and expanded into the adjacent clothing exchange areas, and new buildings at each yard will be constructed for clothing exchanges. The renovated clinics will include primary care exam rooms, multi use exam rooms, medication distribution rooms, clean and soiled utility rooms, and clinic support space. Three new stand-alone pre-engineered buildings will be constructed to replace the three existing clothing distribution facilities being vacated to allow the expansion ofthe clinics. The PCC area of renovation is approximately 5,357 sq. ft. at each Yard and the new clothing exchange buildings are approximately 1 ,200 sq. ft. each. SUB-PROJECT #3 - New ASU Primary Care (PC) and ASU-EOP Mental Health Page 12 of 30 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans Clinic. A new Primary Care and Mental Health Clinic will be constructed for ASU and ASU-EOP inmate-patientshoused in Yard C. It will include two primary care exam rooms, one dental operatory, mental health clinician treatment rooms, clean and soiled utility rooms and clinic support spaces. The area of new construction is approximately 6,111 sq. ft. SUB-PROJECT #4 - New Pharmacy and Laboratory Building. A New Pharmacy and Laboratory Building will be constructed central to Yards A, B, and C, and the Central Health Services Building. It will include a shipping, receiving, and manifesting area, an order entry area, an authorization/verification area, a dual filling station, an IV preparation room with anteroom, a service vestibule, a Pharmacist office, a narcotic station, and a laboratory. The area of new construction is approximately 2,471 sq. ft. SUB-PROJECT #5 - Health Care Administration Renovation Vacated Program Space in the Prison Industry Authority Building at Facility A will be renovated for Health Care Administration services and will include office spaces, support spaces such as a copy room, break room, conference room and toilet rooms. The total area of renovation is approximately 8,098 sq. ft. 402 3:00 PM PALO ALTO SANITARY SEWER REHABILITATION PROJECT The City of Palo Alto Utilities Department is seeking bids from qualified firms to 24/25/26 (ONLINE ONLY) provide installation of sanitary sewer mains, laterals, manholes and appurtenances, perform system tie-ins, performance of required testing, and excavation, recycling and surface restoration. The required services are described in the IFB Technical Specifications. Online Contact Robert Item, Project Manager, at: [email protected] with any questions. Project is available for viewing ONLINE ONLY!!! 1/21/2015 422 2:00 PM SAN MATEO NEW 2014-2015 STREET REHABILITATION PHASE I (ONLINE ONLY) Project includes off-haul material, removal and disposal of gutter key, conform and full width grinding material, removal and disposal of concrete curb, driveway, sidewalk, gutters and access ramps, excavation, adjustment of manhole frame and cover sets to grade, spreading aggregate base, base failure repair, asphalt concrete overlay, asphalt concrete plug, asphalt concrete distribution, concrete structures. Project is available for viewing ONLINE ONLY!!! Page 13 of 30 Online Bid Date 1/21/2015 Plan # Bid Time Location 428 2:00 PM NAPA COUNTY Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 04-4A0904 BRIDGE REPLACEMENT Bridge replacement in Napa County about 6 miles north of Calistoga at Troutdale (ONLINE ONLY) Creek Bridge. The Contractor must have either a Class A License or one of the following Class C Licenses: C-8, C-50, C-27. 2 Online 2 Online 1 Planroom & Online Project is available for viewing ONLINE ONLY!!! 468 2:00 PM FAIRFIELD CALTRANS 04-1SS574 REPAIR DRAINAGE SYSTEM (ONLINE ONLY) Repair drainage system in Solano County in Fairfield at 0.2 mile east of Waterman Boulevard. The Contractor must have either a Class A License or one of the following Class C Licenses: C-12. Project is available for viewing ONLINE ONLY!!! 174 2:30 PM SAN FRANCISCO SAN FRANCISCO GENERAL HOSPITAL PLANT Div 1-3, 5-10, 21-23 & 26. The Work to be done under this Contract is located at SERVICES BUILDING NPC - 4 SEISMIC UPGRADE 1001 Potrero Avenue, San Francisco, CA 94110 and consists of tenant improvement, under OSHPD jurisdiction, consisting of seismic and architectural Scope of Work. SEISMIC: NPC-4 seismic anchoring of existing equipment and seismic bracing of existing ducting, conduit and piping. ARCHITECTURAL: New walls, ceilings, finishes and signage. MECHANICAL: Upgrade / extension of the existing HVAC, plumbing and fire suppression systems and all appurtenant work in accordance with Drawings and Specifications. Contact Marilyn Thompson, Project Manager, at (415) 557-4681 with any questions. 404 2:30 PM SAN FRANCISCO SLOAT BOULEVARD PEDESTRIAN SAFETY IMPROVEMENTS II (ONLINE ONLY) Div 1-3 & 31-34. The Work located at the intersections of Sloat Blvd / Everglade Dr 1 and Sloat Blvd / 23rd Ave and includes pedestrian hybrid beacons and countdown signals, pavement renovation, curb ramp and bulb-out construction, sewer replacement, traffic routing and all associated work. Online Project is available for viewing ONLINE ONLY!!! 74-75 2:30 PM NEW SFGH BUILDING 5 GROUND FLOOR AND SAN FRANCISCO SECOND FLOOR REMODELS AT TUNNEL AND BRIDGE CONNECTIONS Div 1-2, 6-10, 21-23 & 26-28. The Work is located at the San Francisco General Hospital, Building 5 and includes the demolition, relocation and replacement of walls, ceiling, floor, electrical, mechanical and plumbing required to provide the connections between two buildings at two locations: (i) the ground floor tunnel, and (ii) the second floor bridge. Contact Marilyn Thompson, Project Manager, at (415) 557-4681 with any questions. Page 14 of 30 Planroom & Online Bid Date 1/22/2015 Plan # Bid Time Location 103 11:00 AM LODI # of Addenda Plans Plan Name CSI Divisions / Job Description CITY HALL ANNEX 1ST FLOOR PHASE 2 INTERIOR REMODEL PROJECT Div 1-3, 5-12, 21-23, 25-27, 31 & 33. Project consists of remodeling areas of the existing building to provide office space for Fire Administration and Parks Recreation divisions. The Project also includes a new chiller to serve campus buildings, relocation of the City telecommunications and data network rooms, new electrical service and emergency generator. The building also houses Fire Station #1, the City communications and data network hubs; supplies utilities to the adjacent Finance Department and other functions to surrounding facilities. Adjacent facilities, functions serving adjacent facilities and Fire Station #1 will remain in operation during construction. The Contractor will be required to phase construction to accommodate the operations of and access to the areas serving facilities outside of the Project area. Contractor must provide a schedule and work plan showing phased work, protection of all utilities and public access to the adjacent areas, which is acceptable to the Owner. Final cut-over of electrical system, telecommunications system, data network, chiller, etc., may only occur after the new system has been installed and tested to verify it is operational and will require very detailed transition planning. Cut-overs will typically occur outside normal City business hours so that City operations are not impacted. A method of procedure (Section 013513) will be required for each of these items. Trades include selective demolition; temporary storm water pollution control; cast-inplace concrete; hydraulic cement skim coat; metal fabrications; architectural wood casework; thermal insulation; clay tile roofing; sheet metal flashing and trim; penetration firestopping; joint sealants; hollow metal doors and frames; prefinished flush wood doors; aluminum windows; door hardware; glazing; fire rated glazing; metal furring; non-structural metal framing; gypsum board; tiling; suspended acoustical ceilings; resilient base and accessories; resilient tile flooring; bonded terrazzo repair; tile carpeting; painting (Kelly Moore); linoleum bulletin board; signage; metal toilet compartments; toilet accessories; fire extinguishers and cabinets; specialties; kitchen appliances; roller window shades; flooding fire suppression system; plumbing; HVAC, testing; adjusting and balancing; controls and instrumentation; lighting control; above-ground fuel storage tanks for emergency generator; voice and data system; trenching; backfilling and compacting; and storm drainage. Page 15 of 30 Planroom & Online Bid Date 1/22/2015 Plan # Bid Time Location # of Addenda Plans Plan Name CSI Divisions / Job Description Div 1, 3, 5, 9 & 15-16. Construct a temporary hypochlorite storage and handling containment area, temporarily relocate existing hypochlorite storage system tanks and appurtenances into the temporary containment area, connect to temporary chemical feed system constructed by Owner, demolish existing hypochlorite piping and appurtenances, demolish existing tank and pump pads, and demolish top portion of concrete in hypochlorite containment area. Install temporary chemical feed system to maintain hypochlorite delivery into the treatment process during construction. Furnish and install structural repair concrete and non-skid epoxy coating to repair and protect containment area. Reinstall tanks, pumps, and appurtenances and furnish and install new pipes to match existing configuration except as shown on the contract drawings. Provide all other appurtenances and incidentals necessary to furnish a complete and operating system. 246 11:00 AM SAN RAFAEL CHEMICAL STORAGE ROOM REHABILITATION PROJECT 199 2:00 PM NAPA BASIN “L” PIPELINE REHABILITATION PROJECT Div 1-2 & 15. The general Scope of Work for this project includes a base bid and #4 bid alternate that consists of rehabilitation of 6”, 8”, or 10” sewer main by the following methods: Planroom & Online 1 Planroom & Online • 14,200 LF by pipe bursting • 6,470 LF by cast in place pipe (CIPP) lining • 1,750 LF by open cut and replace 427 2:00 PM SACRAMENT NEW CALTRANS 03-4M7204 REHABILITATE BRIDGE DECKS (ONLINE ONLY) O AND YOLO COUNTIES Rehabilitate bridge decks in Sacramento and Yolo Counties at various locations from West Sacramento off-ramp separation to Howe Avenue Overcrossing. The Contractor must have either a Class A License or one of the following Class C Licenses: C-8, C-61D06. Online Project is available for viewing ONLINE ONLY!!! 43 2:00 PM WALNUT CREEK NEW WALGREENS STORE #15078 CONSTRUCTION OF NEW PHARMACY SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Construction of a new Walgreens store in an existing shopping center. Sub-bids requested for Concrete, CMU, Thin-Brick Veneer, Structural Steel, Metal Fabrications, Rough Carpentry, Finish Carpentry, Waterproofing, Insulation, Nichiha and Fiber Cement Siding, Single Ply PVC Roofing, Metal Roofing, Sheet Metal, Doors and Hardware, OH Doors, Aluminum Storefront and Automatic Entry Doors, Glazing, Drywall, Stucco, Tile, Rubber Flooring, Vinyl Base, Acrovyn & FRP Wall Panels, Vinyl Wallcovering, Acoustic Ceiling, Painting, Signage, Dock Equipment, Compactor, Fire Sprinklers, Plumbing, HVAC, Electrical with Security System, Ethernet, Phone, Fire Alarm and Satellite System Rough-In. PLEASE NOTE: Some GC's are requesting bids on an earlier date. Please confirm with each GC prior to submitting your bid. Page 16 of 30 Planroom & Online Bid Date 1/22/2015 Plan # Bid Time Location 446 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description # of Addenda Plans 8-INCH DUCTILE IRON WATER MAIN Div 1 & 31-33. The objective of the Project is to install 8 inch ductile iron pipe and INSTALLATION ON MCALLISTER, FULTON AND copper services on McAllister, Fulton and Grove Streets. The Work is to be GROVE STREETS (ONLINE ONLY) performed in San Francisco, California. 1 Online 4 Planroom & Online 1 The proposed Work consists, in general, of streetscape improvements, plaza improvements, and roadway realignment of the area around the Latham Square Plaza in downtown Oakland, California. The Project area consists of Telegraph Avenue from Broadway to 17th Street, Broadway from 14th Street to 17th Street, and 16th Street from Telegraph Avenue to San Pablo Avenue. The Project location is unique in that it is in downtown Oakland in a heavily traveled corridor. There are basements adjacent to the project site and under sidewalks within the right-of-way, and there are historic landmarks adjacent to and within the Project area. The Project includes typical streetscape improvements in addition to specialty plaza paving, bioinfiltration areas (rain gardens), fountain mechanical system and historical fountain conservation and restoration. Planroom & Online Project is available for viewing ONLINE ONLY!!! 71 2:00 PM PLEASANT HILL D-1037 LIBRARY CLASSROOM PROJECT AT DIABLO VALLEY COLLEGE Div 1-3, 5-10, 12 & 15-16. In general, the Work consists of interior improvements and modifications to existing computer labs and ancillary spaces, construction of two (2) new classrooms within the existing Media Center area, and various ADArelated site improvements. Other Work includes, but is not limited to, hazardous materials abatement and demolition in preparation for improvements. All questions related to this Project must be in writing and directed to: Jovan Esprit, Contracts Manager, Contra Costa Community College District, 500 Court St., Martinez, CA 94553. Email: [email protected]. Fax: 925-370-7512 79 2:00 PM OAKLAND LATHAM SQUARE STREETSCAPE IMPROVEMENTS PROJECT Contact Nick Cartagena, Project Engineer. at (510) 238-2139, or by email at: [email protected] with any questions. Page 17 of 30 Bid Date 1/22/2015 Plan # Bid Time Location 148 5:00 PM PLEASANTO N Plan Name CSI Divisions / Job Description AXIS HACIENDA CLINIC Div 1-2, 5-10, 21-23, 26-28 & 31-32. This Project is the TI of an existing tilt up building shell to provide 24,000 sq. ft. of new medical clinic space for Axis Community Health. All Work will be in accordance with OSHPD 3 requirements. # of Addenda Plans Planroom & Online Scope of Work includes miscellaneous metals, metal stud framing, casework/countertops, FRP paneling, insulation, repairs to (E) built up roofing, door/frames/hardware, windows, interior storefront, skylights, sheetrock/taping, tile, acoustical ceilings, resilient/carpet flooring, interior/exterior painting, signage, toilet/medical accessories, wall/corner guards, window coverings, modifications to (E) fire sprinkler system and all new MEP systems (plumbing, HVAC, electrical and fire alarm). There will also be limited exterior improvements: demolition/clearing, earthwork, grading, site concrete, asphalt paving, and landscaping/irrigation. Payment of prevailing wages and submission of certified payroll is a requirement for this project. Prevailing wages to be the more stringent of Federal Davis-Bacon and State of California. 416 5:00 PM VALLEJO NEW HVAC MECHANICAL UPGRADES AT SOUTH Project consists of removing existing single package zoned system and install three VALLEJO COMMUNITY CENTER (ONLINE ONLY) (3) new roof top HVAC units. Online RFP is available for viewing ONLINE ONLY!!! 1/23/2015 52 2:00 PM FREMONT NEW KIDANGO WARM SPRINGS EXPANSION PROJECT The Project consists of the interior development of approximately 1h industrial kitchen and lh offices/conference room. Construction will take place in an occupied building so special measures must be taken to protect the safety and security of the construction areas, the cleanliness and security of adjacent areas occupied by the Owner. The Project is more specifically defined in the Contract Documents, but generally includes the following work: a. Demolition of existing walls. b. Demolition as required to provide connection to sewer, stub out of plumbing for sinks, dishwasher, floor drains, trash enclosure drain and connection to grease trap. c. Complete all architectural improvements to the kitchen and office areas, including millwork, ceilings, flooring, electrical, lighting and plumbing fixtures, drains, doors, frames and hardware. d. Install new ventilation systems in kitchen and offices. e. Make necessary adjustments to tie in needed fire and intruder alarm system changes. f. List bid alternate to install fire sprinkler system per City of Fremont standards. Page 18 of 30 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 1/23/2015 45 4:00 PM PLEASANTO NEW BERNAL COMMUNITY PARK PHASE 2 N The construction of a community park and Oak Woodland area, all within the vacant land directly across from the Alameda County Fairground generally bounded within Bernal Avenue, Oak Vista Way, Valley Ave and the SPRR track. Park features three synthetic multi-purpose fields, turf areas, group picnic areas, area for future children's play equipment, drinking fountains, two-lane access road, parking lot, concrete walkways, decomposed granite paving, concrete site walls, concrete steps, grandstand, granite pavers, granite benches, shade structures, aluminum bleachers, chain link fencing and gates, sports lighting pathway lighting, premanufactured restroom, storage building, and trash enclosure, site furniture, signage, planting, site grading and drainage. Synthetic field turf will be supplied by the City and installed and warranted by a City selected vendor. Bidder will coordinate installation with the city. The Oak Woodland area includes asphalt and decomposed granite walkways, concrete paving concrete split rail fencing, boulders, granite benches, site furniture, boardwalk, planting, site grading, drainage and signage. Planroom & Online 1/27/2015 120 12:00 PM SACRAMENT O Div 1-3, 5-12, 22-23, 26-27 & 32. Prevailing wages applied. In general, the work consists of the remodel of an Organic Chemistry Laboratory Classroom 538 and support spaces 538A, B and C on the fifth floor of the Sequoia Hall building. The remodel includes removal and replacement of flooring, ceilings, casework and mechanical and electrical systems. There will be limited work on the fourth floor of Sequoia to reroute new electrical and mechanical systems. The construction period for this project is 120 calendar days. Planroom & Online SEQUOIA HALL ORGANIC CHEMISTRY LAB REMODEL AT CSU SACRAMENTO A pre-bid walkthrough and conference will be held on January 6, 2015 at 10:00 a.m. The meeting will be held at Facilities Management. It is strongly recommended that both general contractors and subcontractors attend the walkthrough, as it will be the only time bidders can visit the site with the Design Architect. 41-42 2:00 PM OAKLAND NEW 1110 JACKSON STREET MIXED USE PROJECT Div 1-12, 14, 21-23, 26-28 & 31-33. This Project is a 71 unit multi-family apartment, affordable housing project scheduled to begin construction on or about March 2015. The street level shall be a combination of common area residential, commercial “cold shell” and parking. The structure shall be slab on grade with thickened footings, grade beams with the second level post-tensioned concrete and 4 levels of type V-A wood framing above the 2nd level of concrete. PLEASE NOTE: This is a Prevailing Wage project and Certified Payroll job with Oakland Local Hire Requirements. Page 19 of 30 Planroom & Online Bid Date 1/28/2015 Plan # Bid Time Location 423 11:00 AM LODI Plan Name CSI Divisions / Job Description NEW FIRE STATION NO. 3 BUILDING REPAIRS (ONLINE ONLY) # of Addenda Plans The Work generally consist of replacing the exterior wood tile siding, repairing a section of the soffit, replacing the wood paneling above and below the wood tile siding, repainting the exterior (except bricks), replacing a chain link fence section, and replacing chain link slats. All repairs and/or replacements will be done in kind or as described in these specifications. The Work also includes other incidental and related work, all as shown on the Plans and Specifications for the above Project and/or as necessary to complete the Project. Online Project is available for viewing ONLINE ONLY!!! 424 11:00 AM LODI NEW WELL 6R PUMP REPLACEMENT PROJECT (ONLINE ONLY) The Work consists of furnishing and installing a deep well turbine pump and other incidental and related work, all shown on the Plans and Specifications for the above Project. Online Project is available for viewing ONLINE ONLY!!! 244 2:00 PM SACRAMENT O CDPH - ALTERATIONS IN A STATE-OWNED FACILITY - SACRAMENTO Div 1-2, 7-10, 23 & 26-27. Project comprises labor, material and services necessary for major components of Project. Work consists of demolition, new wall construction, mechanical, electrical raceway, wiring, cable and related work. Planroom & Online 467 2:00 PM NAPA COUNTY CALTRANS 04-259404 OVERLAY, ROADWAY WIDENING AND CONSTRUCT TWO-WAY LEFTTURN LANES (ONLINE ONLY) Project consists of overlay, roadway widening and construct two-way left-turn lanes in Napa County in and near St. Helena from Mee Lane to 0.1 mile South of Sulphur Creek Bridge. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-42. Online Project is available for viewing ONLINE ONLY!!! 500 2:00 PM SAN MATEO COUNTY TVM STATION SITE PREPARATION (TICKET VENDING MACHINE) This Public Works Project will be replacing the Ticket Vending Machines (TVM) in the future. To prepare for the new TVMs, this Project will replace the communications and electrical power cables at nearly all the stations. The communications cables from the communication room/cabinet all the way to the inside of the TVMs will be replaced with new fiber optic cables. In addition, this Project will relocate or reorient some TVMs at the stations. Planroom & Online PLEASE NOTE: A HARDCOPY OF FULL SIZE DRAWINGS IS AVAILABLE FOR VIEWING AT THE SAN FRANCISCO BUILDERS EXCHANGE. 20 2:30 PM NEW UNION SQUARE ADA ENHANCEMENT PROJECT Div 1-5, 7, 22, 26 & 32. The Work to be done under this Contract is located at 333 SAN FRANCISCO Post Street, San Francisco Union Square and consists of selective demolition; new granite and concrete paving; metal work; electrical; related waterproofing and all appurtenant work in accordance with Drawings and Specifications. Contact Paulina Araica, Project Manager, at (415) 581-2558 with any questions. Page 20 of 30 Planroom & Online Bid Date 1/28/2015 Plan # Bid Time Location 494 3:00 PM REDWOOD CITY Plan Name CSI Divisions / Job Description # of Addenda Plans 2014-2015 SANITARY SEWER REHABILITATION Project consists of furnishing labor, materials, tools, equipment, incidentals for PROJECT (ONLINE ONLY) rehabilitation of existing VCP sanitary sewer mains using a tight fitting liner system, cured-in-place pipe (CIPP) lining method. It includes traffic controls, mobilization and demobilization; locating and potholing all existing utilities; locate house laterals and cleanouts; removal of existing VCP sewer laterals; site investigations; cleaning and closed circuit television (CClV) inspection of sewer main pipes and laterals; verification of the exact location and size of each lateral for each property prior to installation of new lateral; furnishing and installing new tight fitting liner system, cured-in-place pipe (CIPP) inside existing VCP sewer mains; furnishing and installing new HOPE SOR 17 sewer laterals by pipe bursting method; furnishing and installing new SOR 26 PVC sewer laterals using open cut method; furnishing all pipes and fittings to install lateral connection; furnishing and installing new sewer laterals and cleanouts per City standard detail; connection of new sanitary sewer lateral to newly rehabilitated mainline using strapped-on wye rubber saddle with stainless steel straps; connection of new 6 inch diameter sanitary sewer lateral to the existing 6 inch diameter sanitary sewer main using a new 6D diameter VCP full wye with rubber couplings and short pipes prior to CIPP lining; connection of new sanitary sewer lateral to existing point of connection at existing cleanout located at property owner's right-of-way using flexible nonshear rubber coupling with stainless steel shear band as per City standard detail; connection of new sanitary sewer lateral to a specific point of connection as directed by the City; removal of existing cleanout and clean out box; installation of new cleanout and new cleanout box in the sidewalk or at City's right of way per City standard detail; point repairs; installation of concrete cap; provision of controlled density fill (COF) on mainline and lateral trenches with pipes that are 30" deep or less as measured from the top of pipe to existing pavement surface; provision of controlled density fill (COF) at sewer lateral point of connection to provide concrete support for strap on wye saddle connection; provision of root barrier when installing sewer laterals near tree roots; installation and removal of temporary sewer bypass system for both mains and laterals; rehabilitation of existing manhole; replacement of existing lamp hole with new manhole; perform all necessary testing of newly rehabilitated/installed sanitary sewer pipes; saw-cutting; pavement removal and trenching; sheeting, shoring and bracing; dewatering; backfill; base compaction; AC pavement restoration; sidewalk restoration; driveway restoration; immediate restoration of lateral trenches in order to be flushed to existing ground; landscape restoration inclUding but not limited to grass lawn, plants, pavers, bricks, decorative stones, washed stones, wood headers etc.; removal and replacement of all property fences including concrete footings as required to properly install the laterals and cleanouts; connection work; and vehicular and pedestrian safety and convenience and other related work. Page 21 of 30 Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans Project is available for viewing ONLINE ONLY!!! 1/29/2015 113-114 2:00 PM GILROY PLANT MAINTENANCE PROJECTS PRE-ANOXIC Div 1-5, 7-11 & 15-17. The Work will consist of the construction in three primary BASINS, AERATION SYSTEM, AND SECONDARY areas of the plant including the construction of additional Pre-Anoxic Basins, Blower CLARIFIER and Aeration improvements to the oxidation ditch systems, and construction of a third secondary clarifier and RAS pump station. PRE-ANOXIC BASINS: Two additional, 30’ by 30’ Pre-Anoxic basins will be added to both the north and the south oxidation ditch system trains. These basins will be open topped and mixed by means of floor mounted mixers. Stainless steel gates will be installed to facilitate operation. AERATION SYSTEM: Two blower buildings with two high speed turbo blowers each will be added to the oxidation ditch system. Fine bubble diffusers will be added to the floor of the existing oxidation ditch system to replace the existing surface aerators. The existing surface aerators will be operated to create the recirculation flow required in the ditches. Aeration piping will convey the aeration air from the blowers to the diffusers. Switchgear will be to provide the power required at the blowers. CLARIFIER: The Work also includes construction of a 130’ diameter secondary clarifier to operate in parallel with the plants two existing secondary clarifiers. This clarifier will be supported with the construction of a Return Activated Sludge (RAS) pump station and supporting electrical. The Work will also include integration of the above construction into the Wastewater Treatment Plant communications network. Page 22 of 30 Planroom & Online Bid Date 1/29/2015 Plan # Bid Time Location 157 2:00 PM ELK GROVE # of Addenda Plans Plan Name CSI Divisions / Job Description BUFFERLANDS BUILDING PROJECT Div 1, 3-12, 21-23, 26-28, 31-33 & 40. Project consists of the construction of a new, 1 single story 5,020 sq. ft. office building and the surrounding site improvements including earthwork, grading; paving, landscaping, utility connection and relocation and storm drainage. Planroom & Online Trades include concrete formwork and accessories; reinforcing steel; cast-in-place concrete; mortar and grout, concrete unit masonry; structural steel, metal decking; cold-formed metal framing; rough carpentry; finish carpentry; interior architectural woodwork, solid surfacing fabrications; thermal insulation; roof and deck insulation; weather barriers; metal wall panels; thermoplastic membrane roofing; sheet metal flashing and trim; roof hatch; joint protection; hollow metal doors and frames; wood doors, access doors and frames; overhead coiling doors; aluminum-framed entrances and storefronts; door hardware, glazing, louvers and vents; non-structural metal framing; gypsum board; tiling; acoustical ceiling suspension assemblies; resilient tile flooring; painting and coating; visual display units; signage, compartments and cubicles; folding panel partitions; fiberglass reinforced protective wall covering; toilet accessories; fire protection specialties; lockers and benches; audio-visual equipment; horizontal louver blinds; floor grates and frames; bicycle racks; fire suppression sprinkler system; plumbing; HVAC; lighting; electrical; public address system, electronic access control and intrusion detection; fire detection and alarm; site clearing; earth moving; lime stabilization treatment; shoring; asphalt paving; decomposed granite and gravel paving; chain link fences and gates, irrigation; planting; manholes; and piping system. Contact James Morris, Project Manager, at (707) 875-9168 with any questions. 400 2:00 PM PLEASANTO N R200 SECURITY FENCE INSTALLATION (ONLINE Project consists of installing a 1-inch (Base Bid) or 2-inch (Bid Alternate 1) mesh ONLY) chain link fence and pedestrian gate around our existing underground reservoir and PRV valve pit (R200). The reservoir and PRV valve pit is located in the City of San Ramon. The Work includes installation of approximately 995 linear feet of chain link fence, pedestrian access gate and barbed wire with a portion that will go up a steep hill to the top of the reservoir. Removal of approximately 164 linear feet of existing fence and a pedestrian gate after the new fence has been installed. The existing entry vehicle gate and fence facing the street shall be used and connected to the new fence installed. Project is available for viewing ONLINE ONLY!!! Page 23 of 30 Online Bid Date 1/29/2015 Plan # Bid Time Location 403 2:00 PM LAFAYETTE Plan Name CSI Divisions / Job Description # of Addenda Plans LAFAYETTE TOWN CENTER PHASE III (ONLINE This is a NON-Prevailing Wage project. Contact Ben Honsvick, Project Estimator, ONLY) at (707) 559-2336 or by email at: [email protected] with any questions. 2 Online Trades include concrete; concrete unit masonry; simulated stone; structural steel framing; cold-formed metal framing; metal fabrications; metal stairs; ornamental metal; rough carpentry; laminated veneer lumber; wood I-Joists; shop-fabricated wood trusses; glue-laminated construction; finish carpentry; self adhered underlayment and flashings; membrane (below grade) waterproofing; building insulation; concrete roofing tile; preformed exterior siding; built-up (cool roof) roofing; sheet metal; firestopping; caulking and sealants; hollow metal doors; wood doors and frames; fiberglass French glass doors; special doors; access doors; sectional overhead doors; aluminum storefront windows; fiberglass windows; finish hardware (pending); glass and glazing; louvers and vents; metal support systems; lath and plaster; gypsum wallboard; tile masonry; resilient flooring; carpet; painting; building specialties; bath accessories; mirrored wardrobe doors; kitchen and laundry equipment; site furnishings; elevators; trash chute; plumbing; HVAC; electrical; exterior improvements; and utilities (civil work). Project is available for viewing ONLINE ONLY!!! 406 2:00 PM SANTA ROSA MEDICAL OFFICE BUILDING FOR DIALYSIS CLINIC (ONLINE ONLY) The Work consists of construction of a shell building without mechanical systems. The Project includes cast-in-place concrete, masonry, steel, and fiber cement wall panel construction. Electrical systems are limited to site, building exterior, and minimal/temporary building interior lighting and power. Plumbing systems are limited to those required for site features and stubs to the shell building. The site is to be fully landscaped. Online This Project is NOT Subject to Prevailing Wages. Project is available for viewing ONLINE ONLY!!! 417 2:00 PM NEW SITE REMEDIATION AT 520 JOHN MUIR DRIVE SAN FRANCISCO (ONLINE ONLY) The Work mainly consists of excavating and removing and replacing soil. Major types of work include: grubbing, excavation, dirt import, grading, fence installation, wetland restoration and hydroseeding. Project is available for viewing ONLINE ONLY!!! Page 24 of 30 Online Bid Date 1/29/2015 Plan # Bid Time Location 431 2:00 PM FREMONT # of Addenda Plans Plan Name CSI Divisions / Job Description CALTRANS 04-0J9404 INSTALL WASH RACKS (ONLINE ONLY) 2 Install wash racks in Alameda County in Fremont at the Fremont Maintenance Station at 2045 Mowry Avenue. The Contractor must have either a Class A License or Class B License or a combination of Class C Licenses which constitutes a majority of the work. Online Project is available for viewing ONLINE ONLY!!! 477 2:00 PM SAN CARLOS BAYSHORE STATION PAINTING PROJECT CALTRAIN (ONLINE ONLY) Div 1-2, 4-5, 7-10 & 14. This public works construction project consists of furnishing 1 all labor and materials required for the removal and replacement of the existing coatings on the steel surfaces of the pedestrian bridge, stairwells and elevator towers at the Caltrain Bayshore Station in San Mateo County. All wire mesh panels will be replaced under this Contract as well. The Scope of Work also includes the preparation and painting of Pedestrian and Ticket Vending Machine shelters along the platforms. The Engineer’s Estimate for this Project is over $500,000. Online Project is available for viewing ONLINE ONLY!!! 482 2:00 PM DIXON WASTEWATER TREATMENT FACILITY WATER SUPPLY WELL PROJECT (ONLINE ONLY) Project consists of drilling an approximately 930 foot deep borehole and completing it as a water supply well with an estimated depth of 910 feet. Project is available for viewing ONLINE ONLY!!! Page 25 of 30 Online Bid Date 1/29/2015 Plan # Bid Time Location 493 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description # of Addenda Plans BURK HALL ELEVATOR NO. 3 MODERNIZATION Div 1-2, 7, 9 & 14. Work consists of furnishing all labor and materials, equipment AT SFSU (ONLINE ONLY) and tools necessary for the complete modernization of a Otis traction passenger elevator located in the Burk Hall building. The intent is to provide the University a “turnkey” project. All related work will be the responsibility of the Contractor. The Contractor is to provide Interim Full Maintenance Service from the Date of Award to Final Acceptance of the entire Project by the University’s representative. The Contractor shall include 12-months of Full Warranty Maintenance Service under the terms of the University’s maintenance agreement following final acceptance of the modernized elevator. The Contractor shall provide deferred approval and design build for any modifications required to the Fire Alarm System, and submit complete drawings to the State Fire Marshal for approval. Contractor to install and assume full responsibility for the system, device quantity and location, wiring, conduit, programming and control panels. All new devices shall be compatible with the existing Simplex alarm system and match existing devices in the building. Online Contact Wes Reynolds (Simplex 925-337-1962 or 925-273-1215) to obtain Shop Drawings, product cutsheets, CSFM listing sheets for submittal to CSFM for approval prior to installation. Provide alteration to existing machine room chainlink enclosure and handrail for proper installation of controller cabinet with integral HVAC. Estimated construction cost is $265,000.00. Bidder must possess a valid Class C-11 Contractor License and also a California certified qualified Conveyance Company License (or list a subcontractor who possesses the CQCC License). Project is available for viewing ONLINE ONLY!!! 1/30/2015 131 2:00 PM DUBLIN 2/3/2015 86-87 2:00 PM NEW MCKINLEY ELEMENTARY SCHOOL SAN FRANCISCO MODERNIZATION PROJECT SANTA RITA JAIL (SRJ) CONDENSER WATER SYSTEM UPGRADE 1 The Work of this Contract consists of replacing all condenser water system equipment that serves a chilled water plant located in the Santa Rita Jail chiller refrigeration room #322 at 5325 Broder Boulevard. The Scope of Work includes the demolition and installation of two 800-ton cooling towers, two condenser water pumps and pump motors equipped with new variable frequency drives, central plant water softener, the installation of a new water filtration system, the installation of a chemical treatment system, and all ancillary equipment and controls. Planroom & Online Div 1-3, 5-12 & 15-16. General School Modernization and reconstruction including, but not limited to, ADA Access and Fire/Life-Safety upgrades, Painting, New Building Addition, Fire Alarm and Fire Sprinkler Modifications, Miscellaneous Site Work, Installation of Interim Housing, Hazardous Material Remediation and other Miscellaneous Interior Renovation Work. Planroom & Online Page 26 of 30 Bid Date 2/4/2015 Plan # Bid Time Location 410 1:30 PM ALAMEDA Plan Name CSI Divisions / Job Description NEW ALAMEDA INTERCEPTOR REHABILITATION EBMUD (ONLINE ONLY) # of Addenda Plans Div 1-3 & 31-33. Work includes rehabilitation of seventeen manholes, demolition and replacement of one manhole, slip lining of approximately 4,525 feet of pipe, CIPP of approximately 120 feet of pipe, and performance of related required work complete as shown on the Drawings and specified. The Work is located in Clement, Grand, and Buena Vista Avenues, and Constitution Way in the City of Alameda, California. Online Contact Pam Hopkins, Project Engineer, at (510) 287-1326 with any questions. Project is available for viewing ONLINE ONLY!!! 462 2:00 PM SAN FRANCISCO AND ALAMEDA COUNTIES CALTRANS 04-013524 REMOVE BRIDGE Remove bridge (portion) and salvage bridge elements in the City and County of San 3 (PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8 ONLINE ONLY mile west of the Toll Plaza. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. Online This Project is available for viewing ONLINE ONLY!!! 2/5/2015 27 2:00 PM SANTA CRUZ 426 2:00 PM ALAMEDA COUNTY 14TH AND 16TH AVENUE PUMP STATION ABANDONMENT PROJECT Upgrade the existing sanitary sewer pump station on 15th Avenue, install a new sewer force main from the pump station to East Cliff Drive, install new sewer gravity lines using pilot tube microtunneling and trenching from the existing 14th and 16th Avenue pump stations to the 15th Avenue pump station and abandon and demolish these two pump stations. Work will take place within the public right of ways of 14th, 15th and 16th Avenues and Geoffroy Drive and East Cliff Drive. Work will also take place in Black Point Lane and within 5 private property easements in the area. NEW CALTRANS 04-4A4804 REPLACE GUARDRAIL, Replace guardrail, restore portal building, install CCTV in Alameda County in RESTORE PORTAL BUILDING & INSTALL CCTV Alameda and Oakland at Posey Tube and Webster Street Tube. The Contractor (ONLINE ONLY) must have either a Class A License or one of the following Class C licenses: C-10, C-29. Planroom & Online Online Project is available for viewing ONLINE ONLY!!! 484 2:00 PM SAN FRANCISCO YERBA BUENA RECONFIGURE OFFICES (ONLINE ONLY) Project includes material testing, site demolition, hazmat testing, asbestos abatement, PCB removal, rough carpentry, HM doors and frames, wood doors, door hardware, tubular daylighting devices, gypsum wallboard, ceramic tile, resilient flooring, carpet, painting, toilet and bath accessories, window treatments, manufactured casework, solid surface countertops, plumbing, HVAC, electrical, public address and fire alarm. Project is available for viewing ONLINE ONLY!!! Page 27 of 30 Online Bid Date 2/5/2015 Plan # Bid Time Location 486 2:00 PM ELK GROVE Plan Name CSI Divisions / Job Description # of Addenda Plans 1 FLOW EQUALIZATION PROJECT (ONLINE ONLY) Div 1, 3, 5, 7-10, 22-23, 26-27 & 31-33. Project consists of increasing the storage capacity of the existing Emergency Storage Basins (ESBs) at the Sacramento Regional Wastewater Treatment Plant (SRWTP) by approximately 110 million gallons. This will involve deepening of ESB-B and ESB-C by approximately 8 feet. Additionally, operational flexibility will be increased through the addition of berms in ESB-C to divide this basin into three sub-basins. Piping and gates shall be installed to allow flow into each of the basins and drainage from each of the basins. Basin floors will be lined with roller compacted concrete (RCC) and basin berms will be lined with shotcrete. An underdrain system and associated pumping station will be constructed to relieve hydrostatic pressure from the groundwater beneath the basins. A permanent washdown system consisting of both manual and motorized water monitors (cannons) shall be installed to clean the basins. Mass preexcavation for the Biological Nutrient Removal (BNR) project will also be performed as part of this Project. Online There will be a Mandatory Pre Bid Conference and Walk-Through at 2:00 PM, Tuesday January 6, 2015 (unless changed by addendum) at the SRWTP Commons Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email Kathy Martin at: [email protected] with attendee names prior to the meeting. A general engineering contractor, Class A License is required as well as prequalification for the general contractors, roller compacted concrete subcontractors, electrical subcontractors, and instrumentation and control subcontractors. Additional project information and the prequalification list for the trades listed above can be found at: www.regionalsan.com/business-opportunities Contact Christina R. Brown, Project Manager, at (916) 875-9455, or by email at: [email protected]. Project is available for viewing ONLINE ONLY!!! 2/11/2015 413 1:30 PM EMERYVILLE NEW EAST BAYSHORE RECYCLED WATER PIPELINE - Div 1-3, 5, 9, 26, 31-33 & 40. Work includes furnishing and installing approximately 2,305 ft of 12-inch diameter PVC pipe, 115 ft of 12-in painted MLS and 85 ft of 12-in PHASE 1A - EBMUD (ONLINE ONLY) ML&PCS pipe that crosses Temescal Creek, and installing 2,695 ft of Districtfurnished 12-in ML&PCS pipe from IKEA continuing onto Shellmound Street, Shellmound Way to tie-in with Christie Avenue; then continuing on Christie towards 65th in the City of Emeryville. Project is available for viewing ONLINE ONLY!!! Page 28 of 30 Online Bid Date 2/11/2015 Plan # Bid Time Location 466 2:00 PM MARIN AND SONOMA COUNTIES Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 04-264094 REALIGN HIGHWAY AND Realign highway and construct new bridge In Marin and Sonoma Counties near CONSTRUCT NEW BRIDGE (ONLINE ONLY) Petaluma from 0.8 mile south to 2.0 miles north of the Marin-Sonoma County Line. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-32. Online Available for viewing ONLINE ONLY!!! 487 2:00 PM SAN DIEGO HEALTH CARE FACILITY IMPROVEMENT PROGRAM AT RICHARD J. DONOVAN CORRECTIONAL FACILITY (ONLINE ONLY) Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The Project at RJD is part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at RJD is to remedy deficiencies in its existing health care components. Online The Project consists of two sub-projects, which includes one to two sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, building pad preparation, new construction, accessible paths-of-travel, and infrastructure upgrades. The Projects are located within and outside the existing secure perimeter. The new Administration Building will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new building, including communications/signal, electrical, storm drain, water and sewer lines. This Project is available ONLINE ONLY!!! 2/12/2015 200 2:00 PM NAPA LOS CARNEROS WATER DISTRICT (LCWD) RECYCLED WATER PIPELINE 425 2:00 PM SAN MATEO NEW CALTRANS 04-1J5204 INSTALL SIDEWALK, SITE FURNISHINGS, SIGNS, NATIVE PLANTING & AND IRRIGATION (ONLINE ONLY) ALAMEDA COUNTIES Div 1-3, 5, 9, 13 & 15-16. See specifications for complete Scope of Work. Install sidewalk, site furnishings, signs, native planting, irrigation in San Mateo and Alameda Counties in Menlo Park and Fremont at PM 29.3 and PM 0.5. The Contractor must have either a Class A License or one of the following Class C Licenses: C-27, C-13. 1 Planroom & Online Online Project is available for viewing ONLINE ONLY!!! 44 2:00 PM EL CERRITO NEW EL CERRITO VETERAN’S HALL ACCESSIBILITY The Work includes accessibility improvements including a new exterior ramp, IMPROVEMENTS renovation of an existing exterior stairway, and construction of an interior ramp. PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be open for inspection by bidders on Tuesday, January 20, 2015. Inspection tours will be conducted on this date by a representative of the County's Capital Projects Management Division. Tour will begin promptly at 9:00 AM, starting at the front entrance of the Veteran's Memorial Building, 6401 Stockton Avenue, El Cerrito. Page 29 of 30 Planroom & Online Bid Date 2/12/2015 Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 46 2:00 PM NEW STORM DRAIN PUMP STATIONS SDPS-1B AND PLANS & SPECS WILL BE POSTED ONLINE SOON!!! SAN FRANCISCO SDPS-1C IMPROVEMENTS AT SFO Div 1-2, 5, 9, 23, 26 & 31-34. This Project will replace pumps, outfall pipes, Pumps controls, SCADA system and electrical equipment for storm drain pump stations SDPS-1B and SDPS-1C to ensure a reliable and robust drainage system for major airport runways. Planroom & Online 82 2:00 PM RICHMOND Planroom & Online SENIOR CENTER ADA RESTROOMS IMPROVEMENTS Div 1-4, 6-11 & 15-16. Project consists of performing ADA restrooms improvements and relocation of kitchen and for all other Work, items or details not mentioned above that are required by the Drawings, Standard Specifications, or these Special Provisions. Trades include site concrete; concrete; CMU construction; rough carpentry; finish carpentry; architectural woodwork; building insulation; flashing and sheet metal; firestopping; joint sealers; steel doors and frames; access doors and panels; door hardware; portland cement plaster; gypsum board assemblies; tile, resinous kitchen flooring; fiberglass wall panels; paints and coatings; quartz surfacing countertops; fire extinguisher cabinets; toilet accessories; food service equipment; appliances; plumbing; HVAC; lighting; and electrical. All questions regarding bid documents, construction Plans and Specifications must be submitted by email to Yader Bermudez, Project Manager, at: [email protected] no later than 5 PM, on February 5, 2015. Questions will be answered in a written response and will be available to bidders on the City’s website at www.ci.richmond.ca.us/bids no later than three (3) working days prior to the bid opening deadline. 2/17/2015 35 3:00 PM SAN CARLOS INDUSTRIAL ROAD PARALLEL SANITARY SEWER PROJECT 1 Div 1-3, 5 & 15. Project consists of dewatering, mobilization, demolition, abandonement and removal, sewage flow control, earthwork, soil stabilization, steel casing pipe, sanitary sewer rehabilitation using CIPP method, excavation support shoring and bracing, steel sheet pile shafts, secant pile shafts, instrumentation and monitoring, asphalt concrete paving, shaft construction, microtunneling, precast concrete structures, carrier pipe installation into casing, fused PVC sewer pipe, sanitary sewer system testing and cleaning, CCTV inspection of sanitary sewer system, building sewer (lateral) construction and reinstatement, traffic stripes and pavement markings, traffic control, traffic loops, adjust incidental structures to grade, controlled low strength material, concrete reinforcement, cast-in-place concrete, concrete cylinder pipe, backfill grout, casing pipe annular backfill grouting, grout, ground pre-treatment, manhole and below grade vault rehab, manhole frames and covers, and general piping. Page 30 of 30 Planroom & Online
© Copyright 2024