WEEKLY PLAN LIST - Golden State Builders Exchanges

THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363
WEEKLY PLAN LIST - Friday, January 09, 2015
(All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com
Bid Date
1/9/2015
Plan # Bid Time Location
407
2:00 PM
PLEASANTO
N
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
ANNUAL CURB AND GUTTER REPLACEMENT
(ONLINE ONLY)
Work will consist of removing and replacing approximately 2,500 sq. ft. of damaged
concrete sidewalk, 2,100 linear feet of concrete curb and gutter, installing and
replacing 94 intersections access ramps as shown on the project Plans.
Online
Project is available for viewing ONLINE ONLY!!!
161
3:30 PM
NAPA
NAPA COUNTY ADMINISTRATION BUILDING
EARTHQUAKE REPAIRS
4
Div 1-2, 5-12, 22-23 & 26-27. Trades include selective demolition; cold-formed
metal framing; plastic-laminate-faced architectural cabinets; thermal insulation;
applied fireproofing; penetration firestopping; joint sealers; acoustical joint sealants;
hollow metal frames; flush wood doors, stile and rail wood doors; access doors and
panels; door hardware; automatic door operators; glazing; gypsum board; acoustical
panel ceilings; resilient base; resilient tile flooring; tile carpeting; wall coverings;
sound-absorbing wall units; painting; visual display units; motorized intelligent roller
shade systems; plumbing; HVAC; lighting; electrical work; audio/visual systems.
Planroom &
Online
PLEASE NOTE: All questions must be emailed to Dennis Kennedy at:
[email protected] by December 29, 2014 by 5 PM. No questions will be
accepted after this deadline.
1/12/2015
473
10:00 AM
WEST
SACRAMENT
O
RECREATION CENTER POOL DECK REPAIR
PROJECT (ONLINE ONLY)
Remove and install concrete flatwork and under concrete slab drainage system and 1
replace ceramic tiles and grout around existing swimming pool.
Online
Project is available for viewing ONLINE ONLY!!!
1/13/2015
475
10:00 AM
MILL VALLEY
TAMALPAIS AVENUE PIPELINE REPLACEMENT Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the
installation of 2,170 feet of 8 and 6-inch welded steel pipe with valves, fittings, and
PROJECT - MMWD (ONLINE ONLY)
appurtenances. The Work to be done is located in City of Mill Valley within the
County of Marin, California.
Contact Elysha Anderson, Project Engineer, at (415) 945-1572 with any questions.
Project is available for viewing ONLINE ONLY!!!
Page 1 of 30
Online
Bid Date
1/13/2015
Plan # Bid Time Location
476
10:30 AM
MILL VALLEY
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
FFIP MILL VALLEY PIPELINE REPLACEMENT
PROJECT - MMWD (ONLINE ONLY)
Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the
installation of 2,630 feet of 6 and 8-inch welded steel pipe with valves, fittings, and
appurtenances. The Work to be done is located in the City of Mill Valley within the
County of Marin, California.
Online
Project is available for viewing ONLINE ONLY!!!
470
11:00 AM
DAVIS
CNPRC FIELD CORRAL SHADE STRUCTURES
PHASE 2 - CNPRC CLEAN CAGE STORAGE AT
UC DAVIS (ONLINE ONLY)
Div 1-3, 5-10, 13, 26, 31 & 33. DESCRIPTION OF WORK: Provide all labor,
materials, equipment, tools, transportation, insurance, and services to construct the
following:
1
Online
3
COLLECTION SYSTEM REHABILITATION &
Project comprises of replacing approximately 12,100 LF of sewer mainlines in the
REPLACEMENT PROJECTS FY 2014-15 PHASE 1 streets of De Solo Drive, Montezuma Drive, Navarre Drive, Flore Drive, Noriega
(ONLINE ONLY)
Way, Peralta Road, Hermosa Avenue. Standish Road and Dell Road in the City of
Pacifica, California. The Work includes the replacement of approximately 233 LF of
6-inch vitrified clay pipe (VCP) sanitary sewer mainline with new 8-inch polyvinyl
chloride (PVC - SDR-26) pipe by open trench; replacement of approximately 11,870
LF of existing VCP that are between 6-inch to 12-inch pipes by new HDPE (SDR
17) using pipe bursting method; removal and installation of about 6 manholes and 4
lampholes.
Online
1. CNPRC FIELD CORAL SHADE STRUCTURE Phase 2: Provide three preengineered, metal free-span shade structures over existing animal field corrals.
Work includes concrete piers, underground branch electrical circuits and LED site
lighting.
2. CNPRC CLEAN CAGE STORAGE: Construct an approximately 1750 overall
gross square foot pre-engineered metal building. Work includes site grading,
concrete slab and apron, underground utilities, building power and lighting, and
steel roll-up and man doors.
Project is available for viewing ONLINE ONLY!!!
408
2:00 PM
PACIFICA
Project is available for viewing ONLINE ONLY!!!
418
2:00 PM
DAVIS
NEW AMERICAN WEST BANK - DAVIS (ONLINE ONLY) Project consists of interior wall demolition, drywall and metal stud framing,
acoustical ceilings, painting, ceramic tile, carpeting, millwork,
doors/frames/hardware, window coverings, mechanical, electrical, plumbing and
some fire sprinkler work.
Project is available for viewing ONLINE ONLY!!!
Page 2 of 30
Online
Bid Date
1/13/2015
Plan # Bid Time Location
447
2:00 PM
LOS ALTOS
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
PARKING AND CIRCULATION PHASE 3 LOT 1
STAIR AT FOOTHILL COLLEGE (ONLINE ONLY)
Div 1, 6-7, 9, 26 & 31-33. Trades include site finish carpentry; site water repellant; 1
site painting; exterior lighting and electrical; site preparation, earthwork and grading,
trenching, backfilling and compacting; landscape maintenance period, paving and
surfacing, site concrete, site sealants, pavement marking, restoration of surfaces,
soil preparation and mixes, planting area finish grading, grasses, site metalwork;
and storm drainage.
Online
PLEASE NOTE: All questions must be faxed to the District’s Purchasing Office at
(650) 948-5194, Attention: Annette Perez with a copy to Linda Mahi, or by email to:
[email protected] with a copy to Linda Mahi at: [email protected]. The
deadline to submit questions is Noon on 12/17/2014. A question form is included
herein, see Bid Document, 00 31 07. If you do not use the question form, you must
still include the same details in your question that are requested by the form.
Project is available for viewing ONLINE ONLY!!!
455
2:00 PM
MARTINEZ
MARINA VISTA PED/BIKE ACCESS
IMPROVEMENT PROJECT (ONLINE ONLY)
Project includes furnishing all labor, materials, equipment, and performing all work
necessary and incidental to the construction of the project known as the Marina
Vista Ped/Bike Access Improvement Project including, but not limited to, concrete
sidewalk, concrete driveway, curb, and curb ramp reconstruction, roadway
excavation, abandoned spur track removal and roadway reconstruction, adjustment
of pull boxes to grade, removal of roadside signs and railroad signal equipment,
construction of concrete pedestrian railroad crossing surface, storm drainage
improvements, coordination with local utility companies, slurry seal, traffic striping,
pavement markings and traffic signal improvements.
.
Project is available for viewing ONLINE ONLY!!!
495
2:00 PM
ANTIOCH
2015 PAVEMENT MAINTENANCE PROJECTRUBBERIZED CAPE SEAL (ONLINE ONLY)
This Project consists, in general, of traffic control, cape seal (slurry seal over
rubberized chip seal), storm water pollution control, pavement marking removal,
pavement marking installation and all other work as shown on the Plans.
Online
1
Online
Project is available for viewing ONLINE ONLY!!!
488
2:30 PM
MORGAN
HILL
CENTENNIAL RECREATION CENTER UV WATER The Scope of Work includes furnishing and installing a new ultraviolet water
TREATMENT SYSTEM FOR INDOOR POOL
treatment system for the indoor pool at the Morgan Hill Centennial Recreation
(ONLINE ONLY)
Center and relocation of the existing system to the Morgan Hill Aquatics Center.
Contact Kat Corrales at (408) 310-4672 or by email at:
[email protected]
Project is available for viewing ONLINE ONLY!!!
Page 3 of 30
Online
Bid Date
1/14/2015
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
303
11:00 AM
SAN RAFAEL
CREW LUNCH ROOM MODIFICATIONS
Div 1-2, 5-6, 8-9, 22-23 & 26. The Project work is generally described as the
remodeling of an existing crew lunch room located on the second floor of the
District’s Shop Building, including but not limited to, furnishing and installation of
miscellaneous accessories and
appliances.
Planroom &
Online
104-105
2:00 PM
SAN RAMON
DOUGHERTY VALLEY HIGH SCHOOL
CLASSROOM BUILDING ADDITION
PLANS & SPECS WILL BE POSTED ONLINE BY NOON ON TUESDAY, DEC
23RD
Planroom &
Online
Div 1-12, 21-23, 25-28 & 31-33. 2-Story addition of approximately 18,850 sq. ft. to
general classroom building “A”. Addition is approximately 9,200 sq. ft. per floor, E
Occupancy, Type V-B (sprinklered) construction. There are 3 labs, one general
education classroom and a CTE facility on the lower level; 4 labs and 2 two general
education classrooms on upper level. Also lab prep rooms on both levels, a janitor
closet on lower level and book storage room at upper level. There is an enclosed
outdoor area attached to the CTE facility and associated site work.
Trades include demolition; concrete; thin brick veneer; structural steel; metal
fabrications; steel stairs; rough carpentry; finish carpentry; interior architectural
woodwork; site-applied water repellent; thermal building insulation; below-grade
vapor retarder; water vapor emission control; aluminum plate wall panels; preformed
metal roofing; flat seam metal wall panels; modified bitumen roofing; re-roofing;
flashing and sheet metal work; penetration firestop systems and sealants; joint
sealants; movement joint cover assemblies; steel doors and frames; flush wood
doors; integrated door assemblies; flush FRP doors; access doors and panels;
aluminum windows; door hardware; glass and glazing; louvers and vents; gypsum
board shaftwall systems; ceiling and soffit suspension systems; lath and portland
cement plaster; foam shapes in plaster surfaces; gypsum board; acosutical
ceilings; resilient flooring; static dissipative tile flooring; carpeting; tackable wall
surfaces; acoustic insulation and sealants; painting; markerboards; signage; HDPE
toilet compartments and screens; accordion folding partitions; corner guards, toilet
and bath accessories; fire protection specialties; steel lockers; projection screens;
horizontal louver blinds; lab casework; fire protection; plumbing; HVAC; integrated
automation; lighting; electrical; data networking; intrusion alarm; fire alarm; clearing
and grubbing; trenching and backfilling; cement and concrete for exterior
improvements; base courses; flexible paving; concrete curbs and gutters; fences
and gates; irrigation; planting; and utilities.
498
2:00 PM
PIEDMONT
HIGHLAND AVE - PARK WAY DRAINAGE
Project consists of the replacement of concrete sidewalks, curbs and gutters,
IMPROVEMENTS - PHASE 1 PROJECT (ONLINE driveway aprons, curb ramps and minor asphalt concrete pavement repairs.
ONLY)
Project is available for viewing ONLINE ONLY!!!
Page 4 of 30
1
Online
Bid Date
1/14/2015
Plan # Bid Time Location
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
1
The Work to be performed includes the construction of reinforced concrete
skateboard park improvements at an existing City park including removal of existing
asphalt concrete pathway, clearing and grubbing of existing landscaping,
removal/relocation of existing boulders, storm drain system modifications, irrigation
system modifications, park lighting modifications, excavation/grading, reinforcing
steel, forming and placing of skatepark concrete/shotcrete, fencing and
landscaping.
81
2:00 PM
EMERYVILLE
JOSEPH EMERY PARK SKATE PARK
479
2:30 PM
SAN
FRANCISCO
TWIN PEAKS BOULEVARD COLD-IN-PLACE
Div 1-2 & 31-32. The Work is cold-in-place recycling pavement renovation, traffic
RECYCLING PAVEMENT RENOVATION (ONLINE routing and all associated work along Twin Peaks Boulevard in San Francisco, CA.
ONLY)
Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions.
2
Planroom &
Online
Online
Project is available for viewing ONLINE ONLY!!!
464
3:00 PM
SAN
FRANCISCO
RICHMOND DISTRICT NEIGHBORHOOD CENTER Project consists of exterior imporvements, including site parking, playground and
EXTERIOR IMPROVEMENTS (ONLINE ONLY)
walkways; window repair/replacement at all buildings; no interior work; portions of
existing walkways to be repaired as required to provide accessible path of travel;
existing ramp and portion of landing and Building C to be replaced.
Online
Contact Charles Higgins at (415) 751-6600 with any questions.
Project is available for viewing ONLINE ONLY!!!
228
3:30 PM
PETALUMA
ELLIS CREEK HEADWORKS SCREEN
REPLACEMENT PROJECT
Page 5 of 30
2
Div 1-2, 9-11 & 13-16. The WORK includes, but is not limited to, remove existing
mechanical screens, washers/compactors, associated piping, supports, electrical
equipment and controls, and appurtenances; drain and clean the screen channels;
inspect, and install the City~f\rrnished mechanical screening equipment; furnish and
install associated ancillary equipment and appurtenances including, but being not
limited to, piping, pipe suppmis, electrical equipment and control, conduit and
training; modify the existing structure and guardrails; investigate existing electrical
installations including conduits and their locations; coordinate with requirements for
new installation; modify the existing electrical power distribution system; provide
test procedures, execute testing, and fUrnish test results for the complete
interconnected system including receiving requirements from the City and the City's
Programmer, and integrating with test requirements for the equipment and systems
furnished and installed (The tests shall include, but are not limited to, mechanical
startup and testing, operational readiness tests for electrical and controls, and
functional acceptance testing on the system); perform all work necessary to
complete the WORK as indicated in the Contract Document.
Planroom &
Online
Bid Date
1/15/2015
Plan # Bid Time Location
158-160
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1550 EVANS AVENUE TENANT IMPROVEMENTS THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
PROJECT
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
3
Planroom
1
Online
3
NEW PHYSICAL SCIENCE EMERGENCY BRIDGE AND Div 1-3, 10, 13, 22-23, 26 & 31-33. In general, the Work consists of replacing two
GUS MANOLIS PEDESTRIAN BRIDGE AT CSU
bridges on the Chico State Campus.
CHICO (ONLINE ONLY)
1. The Physical Science Emergency Vehicle Access Bridge that spans Big Chico
Creek near the Physical Science Building. Demolish the existing foot bridge and
install a new wider steel bridge to accommodate both pedestrian and vehicle
access. The bridge is to be 21 ft. wide for emergency response vehicle access. The
approximate 106 ft. free span over the waterway will be supported by bridge piles,
24 inch cast-in-drilled-hole (CIDH) concrete piles. The Project will also include the
continuation of existing utilities across the creek, signage and new lighting. There
will be modification of adjacent flatwork at each end as need to provide an ADAcompliant path of travel.
Online
Div 1-3, 5-13, 21-23,, 26-28 & 31-33. The objective of the Project is to renovate
SFPUC facility at 1550 Evans Avenue to consolidate Sewer Collections Division in
office space for 135 employees. The Work is to be performed in San Francisco, CA.
405
2:00 PM
OAKLAND
CALTRANS 04-4H2214 COLD PLANE AND
HMA/RHMA OVERLAY, PCC SLAB AND GUARD
RAIL REPLACE (ONLINE ONLY)
Project consists of cold plane and HMA/RHMA overlay, PCC slab and guard rail
replacement In Alameda County in Oakland from 0.1 mile east of Boston Ave
Overcrossing to 0.2 mile west of the Route 80/580/880 Separation and at 0.2 mile
West of Route 80/580/880 Separation. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-12, C-32.
Project is available for viewing ONLINE ONLY!!!
411
2:00 PM
CHICO
2. Replace the Gus Manolis Bridge that was recently removed after being damaged
by a fallen tree. This bridge at Selvester’s Cafe is to be a 5.5 ft. pedestrian only
access steel and concrete bridge. The Work shall include new railings, new
concrete piles and modifications to existing ramp systems to provide an ADAcompliant path of travel. Work shall also include new lighting and signage.
Project is available for viewing ONLINE ONLY!!!
Page 6 of 30
Bid Date
1/15/2015
Plan # Bid Time Location
414
2:00 PM
Plan Name
CSI Divisions / Job Description
NEW HILLPOINT REGIONAL PARK COLEMAN BLUFF
SAN
FRANCISCO
PATH HUNTERS POINT SHIPYARD PARCEL A
(ONLINE ONLY)
# of
Addenda Plans
Div 1-5, 9 & 16. Work consists of the construction of various parks and open space 1
including but not limited to, mobilization, /demobilization, temporary site fencing,
temporary tree protection, surveying, erosion control, earthwork, storm drainage,
sanitary sewer, low pressure water, park lighting/electrical, various hardscaping,
irrigation, landscaping, various concrete structures and site furnishings.
Online
Trades include mobilization and demobilization, demolition and deconstruction,
salvage, recycling and reuse, earthwork, excavation, backfilling and compacting for
utilities, tree protection and trimming, aggregate base, finish frading, structural soil,
swale bioretention soil and check dams, street work not in contract by
subcontractor, public storm drainage system, low pressure water system, reclaimed
water system, private storm drainage system, sanitary sewer system, stone
cobbles, irrigation system, site furnishings, soil preparation, lawns and grasses,
planting, landscape maintenance, vehicular plant cell paving, concrete formwork,
concrete reinforcement, cast-in-place concrete, architectural cast-in-place concrete,
tile, site metal fabrications, graffiti resisitant coatings, lighting and electrical work.
Project is available for viewing ONLINE ONLY!!!
419
2:00 PM
CHICO
NEW AMERICAN WEST BANK - CHICO (ONLINE ONLY) SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Online
Project consists of interior wall demolition, drywall and metal stud framing,
acoustical ceilings, painting, ceramic tile, carpeting, millwork,
doors/frames/hardware, window coverings, mechanical, electrical, plumbing and
some fire sprinkler work.
Project is available for viewing ONLINE ONLY!!!
474
2:00 PM
SAN MATEO
WASTEWATER TREATMENT PLANT PRIMARY
CLARIFIER 4 REHABILITATION PROJECT
(ONLINE ONLY)
Page 7 of 30
See Specifications for complete Scope of Work. Project is available for viewing
ONLINE ONLY!!!
Online
Bid Date
1/15/2015
Plan # Bid Time Location
492
2:00 PM
SANTA ROSA
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
BAY AREA RIDGE TRAIL EXTENSION PROJECT The County of Sonoma is soliciting bids for the Bay Area Ridge Trail Extension
LOS GUILICOS TO HIGHWAY 12 HWY - RD
Project - Los Guilicos to Highway 12. Contractor's License required at time of
(ONLINE ONLY)
award is: A - General Engineering. A bid bond will be required. Additional
information may be obtained from the Sonoma County Regional Parks Department
at 707-565-2041.
Online
PLEASE NOTE: OPTIONAL PRE-BID MEETING AND SITE VISIT IS SCHEDULED
FOR JANUARY 5,2015 AT 9:00AM. Prospective bidders are responsible for being
aware of all site conditions. The Pre-Bid Site Visit will last approximately one (1)
hour.
The Work consists of construction of County’s Bay Area Ridge Trail Extension
Project Los Guilicos to Hwy 12, Road Work, at 7425 Rancho Los Guilicos Rd.,
Santa Rosa. The Work includes, construction of pedestrian ramps and road
crossing and signal modification improvements at Pythian Rd and Hwy 12
intersection, and pedestrian ramp and street crossing improvements on Rancho Los
Guilicos Rd.
Project is available for viewing ONLINE ONLY!!!
497
2:00 PM
BERKELEY
1
FY15 STORM DRAINAGE AND VALLEY GUTTER The Work done under these Specifications includes, but is not limited to, traffic
IMPROVEMENTS (ONLINE ONLY)
control, removal of existing asphalt concrete, removal of existing cross drains and
salvaging of appurtenances, installation of cross drains and catch basins, regrading
intersections, hot mix asphalt, aggregate base, concrete valley gutter, curb,
sidewalk, and curb ramps, detectable warning surfaces, and pavement markings.
All Work shall be performed in accordance wi.th these Plans and Specifications.
Questions should be directed to Daniel Akagi at (510) 981-6394.
Project is available for viewing ONLINE ONLY!!!
Page 8 of 30
Online
Bid Date
1/15/2015
Plan # Bid Time Location
409
3:00 PM
LOS ALTOS
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
HIGH-BAY LIGHTING UPGRADE AT GYMNASIUM Div 1 & 26. See Specifications for complete Scope of Work.
BUILDINGS 2500 & 2600 AT FOOTHILL COLLEGE
(ONLINE ONLY)
Process and deadline for Bid Questions: All questions must be faxed to the District’s
Purchasing Office at (650) 948-5194, Attention: Annette Perez with a copy to Linda
Mahi or by email to: [email protected] with a copy to Linda Mahi at:
[email protected]. The deadline to submit questions is 2:00 PM on January 8,
2015. A question form is included herein, see Bid Document, 00 31 07. If you do
not use the question form, you must still include the same details in your question
that are requested by the form. The District will issue written response(s) to the bid
questions as Amendments to the bid documents. Do not direct questions to any
other person associated with this project; such action will only slow the District’s
ability to respond to your inquiry.
Online
Project is available for viewing ONLINE ONLY!!!
415
3:30 PM
NAPA
NEW NAPA COUNTY HOJ EARTHQUAKE EPOXY
INJECTION REPAIRS (ONLINE ONLY)
Work generally consists of, but is not limited to, epoxy injection of four (4) shear
walls
at the Hall of Justice.
Online
Project is available for viewing ONLINE ONLY!!!
420
4:00 PM
SAN JOSE
NEW TWIN CREEKS HOMES (ONLINE ONLY)
The Project consists of 6 single family 2-story homes with 2-car tandem parking
garages for each home.
2
Online
2
NEVIN AVENUE PEDESTRIAN IMPROVEMENTS In general, the Work to be performed under these Specifications includes the
FROM 19TH TO 27TH ST (ONLINE ONLY)
construction of roadway, sidewalk, landscaping, furnishings, and general
infrastructure improvements along Nevin Avenue between 19th and 27th Street in
the City of Richmond. To support the improvements, traffic control, temporary
lighting, storm water pollution prevention, coordination with public utilities, sheeting
and shoring, and dewatering will be necessary. In addition to standard asphalt and
concrete finishes, textured asphalt pavement and enhanced concrete finishes are
planned. Landscaping improvements include trees, shrubs, miscellaneous planting,
and an irrigation system.
Online
Project is available for viewing ONLINE ONLY!!!
1/16/2015
471
2:00 PM
RICHMOND
Project is available for viewing ONLINE ONLY!!!
Page 9 of 30
Bid Date
1/20/2015
Plan # Bid Time Location
153
2:00 PM
HAYWARD
Plan Name
CSI Divisions / Job Description
LKQ PICK YOUR PART PROJECT
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
# of
Addenda Plans
Planroom &
Online
New One-Story Wood Frame Office Building 2,406 sq. ft; New One-Story PreEngineered Steel Process Building 19,500 sq. ft.; New CMU Trash Enclosure; New
Wood Frame Scale Building 828 sq. ft.; and Sitework.
Contact Bob Alton, Project Estimator, with any questions at:
[email protected]
401
2:00 PM
DANVILLE
RAILROAD AVENUE IMPROVEMENTS (RE-BID) - THIS PROJECT IS A REBID!!!
ONLINE ONLY
The improvements include new curb, gutter, brick-banded sidewalks, street trees,
curb bulb-outs, decorative crosswalks, asphalt concrete roadway resurfacing,
biofiltration planters for stormwater treatment, antique-style LED street lights, traffic
signal upgrades, road signs, pavement markings, and street furniture. The Work
will occur on Railroad Avenue from Prospect Avenue to south of School Street in
downtown Danville, California.
Online
Project is available for viewing ONLINE ONLY!!!
(Previously scheduled bid date was 5/1/13. Old Plan #923)
412
2:00 PM
NEW WINDOW REPLACEMENT - X01 UNIT LIVING
SAN
FRANCISCO
ROOMS UNIVERSITY PARK NORTH AT SFSU
(ONLINE ONLY)
Div 1-2 & 8. In general, the Work consists of furnishing labor and material
necessary to replace the X01 unit living room windows in Buildings 6, 7, 8 and 9 at
University Park North on the campus of San Francisco State University. The Work
is located at
225/235 (Building 6), 255/265 (Building 7), 285/295 (Building 8) and 325/335
(Building 9) Buckingham Way, San Francisco, California 94132.
2
Online
Trades include selective demolition, lead related construction work, summary of
hazardous materials work; aluminum windows and glazing.
Project is available for viewing ONLINE ONLY!!!
421
2:00 PM
SANTA ROSA NEW SCOTT ST SEWER, WATER AND STREET
IMPROVEMENTS (ONLINE ONLY)
Project consists of dust control, traffic control, earthwork, aggregate base, asphalt
concrete, asphalt concrete trench paving, soil and ground disposal, sanitary sewer
system, concrete curbs and sidewalks, traffic stripes and pavement markings,
raised pavement markers, water system, tree surgert (sidewalk maintenance) and
material recycling.
Project is available for viewing ONLINE ONLY!!!
Page 10 of 30
Online
Bid Date
1/20/2015
Plan # Bid Time Location
490
2:00 PM
SACRAMENT
O
Plan Name
CSI Divisions / Job Description
WINDSOR - ARDEN FAIR MALL (ONLINE ONLY)
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
# of
Addenda Plans
Online
Demolish existing interior non-loading bearing walls and a part of the existing
storefront display; New wall fixtures; Cashwrap and wall standards; New flooring
and interior non-loading bearing walls; Refurbish existing T-Bar ceiling and walls to
like-new condition; New VAV box connect to existing Landlord ductwork; Refurbish
existing mechanical ducts and and registers in the front sales area; New exposed
mechanical ducts and registers in the back sales area; Stock room and exit
vestibule; New light fixtures per plan; Rebulb existing lighting fixtures with energy
savings equivalents.
Email bids to Lionel Cabral at Souki Construction at: [email protected]
Project is available for viewing ONLINE ONLY!!!
496
2:00 PM
ANTIOCH
COMMUNITY DEVELOPMENT BLOCK GRANT
DOWNTOWN ROADWAY PAVEMENT REHAB,
PHASE 6 (ONLINE ONLY)
Project includes roadway reconstruction, cold planing existing roadway sections,
installing asphalt concrete plugs and roadway overlays.
Online
Project is available for viewing ONLINE ONLY!!!
499
2:00 PM
ANTIOCH
NINTH STREET ROADWAY IMPROVEMENTS
(ONLINE ONLY)
The Work shall generally consist of roadway reconstruction, cold planing existing
roadway sections, installing asphalt concrete plugs and roadway overlays.
Additional work shall include, but not be limited to, raising utilities to grade, placing
pavement markings and markers, various concrete work, traffic control and erosion
control.
Project is available for viewing ONLINE ONLY!!!
Page 11 of 30
Online
Bid Date
1/20/2015
Plan # Bid Time Location
89-92
2:00 PM
IONE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
HEALTH CARE FACILITY IMPROVEMENT
Div 1-12, 21-23, 26-28 & 31-33. The Project at Mule Creek State Prison (MCSP) is 3
PROGRAM MULE CREEK STATE PRISON (MCSP) part of the Health Care Facility Improvement Program (HCFIP). The purpose of this
Project at MCSP is to remedy deficiencies in its existing health care components.
The Project consists of five sub-projects, which includes one to three sub-phases
within the sub-project. The Scope of Work includes, but is not limited to, demolition,
renovation, building pad preparation, accessible paths of-travel and infrastructure
upgrades. The Projects are located within the existing secure perimeter. The new
buildings and additions will be slab-on-grade with exterior fully grouted structural
concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully
adhered over rigid insulation roof assembly. Utility relocation will be necessary for
the construction of the new buildings, including communication/signal, electrical,
storm drain, water, and sewer lines. All existing buildings are sprinklered with the
exception of: SUB-PROJECT #2 (Primary Care Clinic Renovation). Automatic
sprinkler systems will be installed for I-3 and B occupancy in new buildings in
accordance with the requirements of the California Building Code. Paving and
resurfacing work includes, but is not limited to, the following: new sidewalks and
asphalt at accessible parking stalls, new concrete and asphalt at the new buildings,
all sidewalks, and path-of-travel. The sub-projects are as follows:
SUB-PROJECT #1 - Central Health Services Renovation. Approximately 5,000 sq.
ft. of the existing Central Health Services Building will be renovated to provide
appropriately sized Triage and Treatment Area (TTA), specialty care and clinical
spaces. The renovated TT A will include two standard bays, one urgent bay, an
observation room, a mental health treatment room, and one panorex room for Xrays. The Project will also include a physical therapy room, clean and soiled utility
rooms and additional inmate-patient holding rooms.
SUB-PROJECT #2 - Primary Care Clinic (PCC) Renovation at Yards A, B, and C;
and New Clothing Exchange Buildings. The existing Primary Care Clinics at Yards
A, B, and C will be reconfigured, renovated, and expanded into the adjacent
clothing exchange areas, and new buildings at each yard will be constructed for
clothing
exchanges. The renovated clinics will include primary care exam rooms, multi use
exam rooms, medication distribution rooms, clean and soiled utility rooms, and clinic
support space. Three new stand-alone pre-engineered buildings will be constructed
to replace the three existing clothing distribution facilities being vacated to allow the
expansion ofthe clinics. The PCC area of renovation is approximately 5,357 sq. ft.
at each Yard and the new clothing exchange buildings are approximately 1 ,200 sq.
ft. each.
SUB-PROJECT #3 - New ASU Primary Care (PC) and ASU-EOP Mental Health
Page 12 of 30
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
Clinic. A new Primary Care and Mental Health Clinic will be constructed for ASU
and ASU-EOP inmate-patientshoused in Yard C. It will include two primary care
exam rooms, one dental operatory, mental health clinician treatment rooms, clean
and soiled utility rooms and clinic support spaces. The area of new construction is
approximately 6,111 sq. ft.
SUB-PROJECT #4 - New Pharmacy and Laboratory Building. A New Pharmacy
and Laboratory Building will be constructed central to Yards A, B, and C, and the
Central
Health Services Building. It will include a shipping, receiving, and manifesting area,
an order entry area, an authorization/verification area, a dual filling station, an IV
preparation room with anteroom, a service vestibule, a Pharmacist office, a narcotic
station, and a laboratory. The area of new construction is approximately 2,471 sq. ft.
SUB-PROJECT #5 - Health Care Administration Renovation Vacated Program
Space in the Prison Industry Authority Building at Facility A will be renovated for
Health Care Administration services and will include office spaces, support spaces
such as a copy room, break room, conference room and toilet rooms. The total
area of renovation is approximately 8,098 sq. ft.
402
3:00 PM
PALO ALTO
SANITARY SEWER REHABILITATION PROJECT The City of Palo Alto Utilities Department is seeking bids from qualified firms to
24/25/26 (ONLINE ONLY)
provide installation of sanitary sewer mains, laterals, manholes and appurtenances,
perform system tie-ins, performance of required testing, and excavation, recycling
and surface restoration. The required services are described in the IFB Technical
Specifications.
Online
Contact Robert Item, Project Manager, at: [email protected] with any
questions.
Project is available for viewing ONLINE ONLY!!!
1/21/2015
422
2:00 PM
SAN MATEO NEW 2014-2015 STREET REHABILITATION PHASE I
(ONLINE ONLY)
Project includes off-haul material, removal and disposal of gutter key, conform and
full width grinding material, removal and disposal of concrete curb, driveway,
sidewalk, gutters and access ramps, excavation, adjustment of manhole frame and
cover sets to grade, spreading aggregate base, base failure repair, asphalt concrete
overlay, asphalt concrete plug, asphalt concrete distribution, concrete structures.
Project is available for viewing ONLINE ONLY!!!
Page 13 of 30
Online
Bid Date
1/21/2015
Plan # Bid Time Location
428
2:00 PM
NAPA
COUNTY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CALTRANS 04-4A0904 BRIDGE REPLACEMENT Bridge replacement in Napa County about 6 miles north of Calistoga at Troutdale
(ONLINE ONLY)
Creek Bridge. The Contractor must have either a Class A License or one of the
following Class C Licenses: C-8, C-50, C-27.
2
Online
2
Online
1
Planroom &
Online
Project is available for viewing ONLINE ONLY!!!
468
2:00 PM
FAIRFIELD
CALTRANS 04-1SS574 REPAIR DRAINAGE
SYSTEM (ONLINE ONLY)
Repair drainage system in Solano County in Fairfield at 0.2 mile east of Waterman
Boulevard. The Contractor must have either a Class A License or one of the
following Class C Licenses: C-12.
Project is available for viewing ONLINE ONLY!!!
174
2:30 PM
SAN
FRANCISCO
SAN FRANCISCO GENERAL HOSPITAL PLANT Div 1-3, 5-10, 21-23 & 26. The Work to be done under this Contract is located at
SERVICES BUILDING NPC - 4 SEISMIC UPGRADE 1001 Potrero Avenue, San Francisco, CA 94110 and consists of tenant
improvement, under OSHPD jurisdiction, consisting of seismic and architectural
Scope of Work.
SEISMIC: NPC-4 seismic anchoring of existing equipment and seismic bracing of
existing ducting, conduit and piping.
ARCHITECTURAL: New walls, ceilings, finishes and signage.
MECHANICAL: Upgrade / extension of the existing HVAC, plumbing and fire
suppression systems and all appurtenant work in accordance with Drawings and
Specifications.
Contact Marilyn Thompson, Project Manager, at (415) 557-4681 with any questions.
404
2:30 PM
SAN
FRANCISCO
SLOAT BOULEVARD PEDESTRIAN SAFETY
IMPROVEMENTS II (ONLINE ONLY)
Div 1-3 & 31-34. The Work located at the intersections of Sloat Blvd / Everglade Dr 1
and Sloat Blvd / 23rd Ave and includes pedestrian hybrid beacons and countdown
signals, pavement renovation, curb ramp and bulb-out construction, sewer
replacement, traffic routing and all associated work.
Online
Project is available for viewing ONLINE ONLY!!!
74-75
2:30 PM
NEW SFGH BUILDING 5 GROUND FLOOR AND
SAN
FRANCISCO
SECOND FLOOR REMODELS AT TUNNEL AND
BRIDGE CONNECTIONS
Div 1-2, 6-10, 21-23 & 26-28. The Work is located at the San Francisco General
Hospital, Building 5 and includes the demolition, relocation and replacement of
walls, ceiling, floor, electrical, mechanical and plumbing required to provide the
connections
between two buildings at two locations: (i) the ground floor tunnel, and (ii) the
second floor bridge.
Contact Marilyn Thompson, Project Manager, at (415) 557-4681 with any questions.
Page 14 of 30
Planroom &
Online
Bid Date
1/22/2015
Plan # Bid Time Location
103
11:00 AM
LODI
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
CITY HALL ANNEX 1ST FLOOR PHASE 2
INTERIOR REMODEL PROJECT
Div 1-3, 5-12, 21-23, 25-27, 31 & 33. Project consists of remodeling areas of the
existing building to provide office space for Fire Administration and Parks
Recreation divisions. The Project also includes a new chiller to serve campus
buildings, relocation of the City telecommunications and data network rooms, new
electrical service and emergency generator. The building also houses Fire Station
#1, the City
communications and data network hubs; supplies utilities to the adjacent Finance
Department and other functions to surrounding facilities. Adjacent facilities,
functions serving adjacent facilities and Fire Station #1 will remain in operation
during construction. The Contractor will be required to phase construction to
accommodate the operations of and access to the areas serving facilities outside of
the Project area. Contractor must provide a schedule and work plan showing
phased work, protection of all utilities and public access to the adjacent areas,
which
is acceptable to the Owner. Final cut-over of electrical system, telecommunications
system, data network, chiller, etc., may only occur after the new system has been
installed and tested to verify it is operational and will require very detailed transition
planning. Cut-overs will typically occur outside normal City business hours so that
City operations are not impacted. A method of procedure (Section 013513) will be
required for each of these items.
Trades include selective demolition; temporary storm water pollution control; cast-inplace concrete; hydraulic cement skim coat; metal fabrications; architectural wood
casework; thermal insulation; clay tile roofing; sheet metal flashing and trim;
penetration firestopping; joint sealants; hollow metal doors and frames; prefinished
flush wood doors; aluminum windows; door hardware; glazing; fire rated glazing;
metal furring; non-structural metal framing; gypsum board; tiling; suspended
acoustical ceilings; resilient base and accessories; resilient tile flooring; bonded
terrazzo repair; tile carpeting; painting (Kelly Moore); linoleum bulletin board;
signage; metal toilet compartments; toilet accessories; fire extinguishers and
cabinets; specialties; kitchen appliances; roller window shades; flooding fire
suppression system; plumbing; HVAC, testing; adjusting and balancing; controls
and instrumentation; lighting control; above-ground fuel storage tanks for
emergency generator; voice and data system; trenching; backfilling and
compacting; and storm drainage.
Page 15 of 30
Planroom &
Online
Bid Date
1/22/2015
Plan # Bid Time Location
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
Div 1, 3, 5, 9 & 15-16. Construct a temporary hypochlorite storage and handling
containment area, temporarily relocate existing hypochlorite storage system tanks
and appurtenances into the temporary containment area, connect to temporary
chemical feed system constructed by Owner, demolish existing hypochlorite piping
and appurtenances, demolish existing tank and pump pads, and demolish top
portion of concrete in hypochlorite containment area. Install temporary chemical
feed system to maintain hypochlorite delivery into the treatment process during
construction. Furnish and install structural repair concrete and non-skid epoxy
coating to repair and protect containment area. Reinstall tanks, pumps, and
appurtenances and furnish and install new pipes to match existing configuration
except as shown on the contract drawings. Provide all other appurtenances and
incidentals necessary to furnish a complete and operating system.
246
11:00 AM
SAN RAFAEL
CHEMICAL STORAGE ROOM REHABILITATION
PROJECT
199
2:00 PM
NAPA
BASIN “L” PIPELINE REHABILITATION PROJECT Div 1-2 & 15. The general Scope of Work for this project includes a base bid and
#4
bid alternate that consists of rehabilitation of 6”, 8”, or 10” sewer main by the
following methods:
Planroom &
Online
1
Planroom &
Online
• 14,200 LF by pipe bursting
• 6,470 LF by cast in place pipe (CIPP) lining
• 1,750 LF by open cut and replace
427
2:00 PM
SACRAMENT NEW CALTRANS 03-4M7204 REHABILITATE BRIDGE
DECKS (ONLINE ONLY)
O AND YOLO
COUNTIES
Rehabilitate bridge decks in Sacramento and Yolo Counties at various locations
from West Sacramento off-ramp separation to Howe Avenue Overcrossing. The
Contractor must have either a Class A License or one of the following Class C
Licenses: C-8, C-61D06.
Online
Project is available for viewing ONLINE ONLY!!!
43
2:00 PM
WALNUT
CREEK
NEW WALGREENS STORE #15078 CONSTRUCTION
OF NEW PHARMACY
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Construction of a new Walgreens store in an existing shopping center. Sub-bids
requested for Concrete, CMU, Thin-Brick Veneer, Structural Steel, Metal
Fabrications, Rough Carpentry, Finish Carpentry, Waterproofing, Insulation, Nichiha
and Fiber Cement Siding, Single Ply PVC Roofing, Metal Roofing, Sheet Metal,
Doors and Hardware, OH Doors, Aluminum Storefront and Automatic Entry Doors,
Glazing, Drywall, Stucco, Tile, Rubber Flooring, Vinyl Base, Acrovyn & FRP Wall
Panels, Vinyl Wallcovering, Acoustic Ceiling, Painting, Signage, Dock Equipment,
Compactor, Fire Sprinklers, Plumbing, HVAC, Electrical with Security System,
Ethernet, Phone, Fire Alarm and Satellite System Rough-In.
PLEASE NOTE: Some GC's are requesting bids on an earlier date. Please confirm
with each GC prior to submitting your bid.
Page 16 of 30
Planroom &
Online
Bid Date
1/22/2015
Plan # Bid Time Location
446
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
8-INCH DUCTILE IRON WATER MAIN
Div 1 & 31-33. The objective of the Project is to install 8 inch ductile iron pipe and
INSTALLATION ON MCALLISTER, FULTON AND copper services on McAllister, Fulton and Grove Streets. The Work is to be
GROVE STREETS (ONLINE ONLY)
performed in San Francisco, California.
1
Online
4
Planroom &
Online
1
The proposed Work consists, in general, of streetscape improvements, plaza
improvements, and roadway realignment of the area around the Latham Square
Plaza in downtown Oakland, California. The Project area consists of Telegraph
Avenue from Broadway to 17th Street, Broadway from 14th Street to 17th Street,
and 16th Street from Telegraph Avenue to San Pablo Avenue. The Project location
is unique in that it is in downtown Oakland in a heavily traveled corridor. There are
basements adjacent to the project site and under sidewalks within the right-of-way,
and there are historic landmarks adjacent to and within the Project area. The Project
includes typical streetscape improvements in addition to specialty plaza paving,
bioinfiltration areas (rain gardens), fountain mechanical system and historical
fountain conservation and restoration.
Planroom &
Online
Project is available for viewing ONLINE ONLY!!!
71
2:00 PM
PLEASANT
HILL
D-1037 LIBRARY CLASSROOM PROJECT AT
DIABLO VALLEY COLLEGE
Div 1-3, 5-10, 12 & 15-16. In general, the Work consists of interior improvements
and modifications to existing computer labs and ancillary spaces, construction of
two (2) new classrooms within the existing Media Center area, and various ADArelated site improvements. Other Work includes, but is not limited to, hazardous
materials abatement and demolition in preparation for improvements.
All questions related to this Project must be in writing and directed to: Jovan Esprit,
Contracts Manager, Contra Costa Community College District, 500 Court St.,
Martinez, CA 94553. Email: [email protected]. Fax: 925-370-7512
79
2:00 PM
OAKLAND
LATHAM SQUARE STREETSCAPE
IMPROVEMENTS PROJECT
Contact Nick Cartagena, Project Engineer. at (510) 238-2139, or by email at:
[email protected] with any questions.
Page 17 of 30
Bid Date
1/22/2015
Plan # Bid Time Location
148
5:00 PM
PLEASANTO
N
Plan Name
CSI Divisions / Job Description
AXIS HACIENDA CLINIC
Div 1-2, 5-10, 21-23, 26-28 & 31-32. This Project is the TI of an existing tilt up
building shell to provide 24,000 sq. ft. of new medical clinic space for Axis
Community Health. All Work will be in accordance with OSHPD 3 requirements.
# of
Addenda Plans
Planroom &
Online
Scope of Work includes miscellaneous metals, metal stud framing,
casework/countertops, FRP paneling, insulation, repairs to (E) built up roofing,
door/frames/hardware, windows, interior storefront, skylights, sheetrock/taping, tile,
acoustical ceilings, resilient/carpet flooring, interior/exterior painting, signage,
toilet/medical accessories, wall/corner guards, window coverings, modifications to
(E) fire sprinkler system and all new MEP systems (plumbing, HVAC, electrical and
fire alarm). There will also be limited exterior improvements: demolition/clearing,
earthwork, grading, site concrete, asphalt paving, and landscaping/irrigation.
Payment of prevailing wages and submission of certified payroll is a requirement for
this project. Prevailing wages to be the more stringent of Federal Davis-Bacon and
State of California.
416
5:00 PM
VALLEJO
NEW HVAC MECHANICAL UPGRADES AT SOUTH
Project consists of removing existing single package zoned system and install three
VALLEJO COMMUNITY CENTER (ONLINE ONLY) (3) new roof top HVAC units.
Online
RFP is available for viewing ONLINE ONLY!!!
1/23/2015
52
2:00 PM
FREMONT
NEW KIDANGO WARM SPRINGS EXPANSION
PROJECT
The Project consists of the interior development of approximately 1h industrial
kitchen and lh offices/conference room. Construction will take place in an occupied
building so special measures must be taken to protect the safety and security of the
construction areas, the cleanliness and security of adjacent areas occupied by the
Owner. The Project is more specifically defined in the Contract Documents, but
generally includes the following work:
a. Demolition of existing walls.
b. Demolition as required to provide connection to sewer, stub out of plumbing for
sinks, dishwasher, floor drains, trash enclosure drain and connection to grease trap.
c. Complete all architectural improvements to the kitchen and office areas, including
millwork, ceilings, flooring, electrical, lighting and plumbing fixtures, drains, doors,
frames and hardware.
d. Install new ventilation systems in kitchen and offices.
e. Make necessary adjustments to tie in needed fire and intruder alarm
system changes.
f. List bid alternate to install fire sprinkler system per City of Fremont
standards.
Page 18 of 30
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1/23/2015
45
4:00 PM
PLEASANTO NEW BERNAL COMMUNITY PARK PHASE 2
N
The construction of a community park and Oak Woodland area, all within the vacant
land directly across from the Alameda County Fairground generally bounded within
Bernal Avenue, Oak Vista Way, Valley Ave and the SPRR track. Park features
three synthetic multi-purpose fields, turf areas, group picnic areas, area for future
children's play equipment, drinking fountains, two-lane access road, parking lot,
concrete walkways, decomposed granite paving, concrete site walls, concrete
steps, grandstand, granite pavers, granite benches, shade structures, aluminum
bleachers, chain link fencing and gates, sports lighting pathway lighting, premanufactured restroom, storage building, and trash enclosure, site furniture,
signage, planting, site grading and drainage. Synthetic field turf will be supplied by
the City and installed and warranted by a City selected vendor. Bidder will
coordinate installation with the city. The Oak Woodland area includes asphalt and
decomposed granite walkways, concrete paving concrete split rail fencing, boulders,
granite benches, site furniture, boardwalk, planting, site grading, drainage and
signage.
Planroom &
Online
1/27/2015
120
12:00 PM
SACRAMENT
O
Div 1-3, 5-12, 22-23, 26-27 & 32. Prevailing wages applied. In general, the work
consists of the remodel of an Organic Chemistry Laboratory Classroom 538 and
support spaces 538A, B and C on the fifth floor of the Sequoia Hall building. The
remodel includes removal and replacement of flooring, ceilings, casework
and mechanical and electrical systems. There will be limited work on the fourth
floor of Sequoia to reroute new electrical and mechanical systems. The
construction period for this project is 120 calendar days.
Planroom &
Online
SEQUOIA HALL ORGANIC CHEMISTRY LAB
REMODEL AT CSU SACRAMENTO
A pre-bid walkthrough and conference will be held on January 6, 2015 at 10:00 a.m.
The meeting will be held at Facilities Management. It is strongly recommended that
both general contractors and subcontractors attend the walkthrough, as it will be the
only time bidders can visit the site with the Design Architect.
41-42
2:00 PM
OAKLAND
NEW 1110 JACKSON STREET MIXED USE PROJECT
Div 1-12, 14, 21-23, 26-28 & 31-33. This Project is a 71 unit multi-family apartment,
affordable housing project scheduled to begin construction on or about March 2015.
The street level shall be a combination of common area residential, commercial
“cold shell” and parking. The structure shall be slab on grade with thickened
footings, grade beams with the second level post-tensioned concrete and 4 levels of
type V-A wood framing above the 2nd level of concrete.
PLEASE NOTE: This is a Prevailing Wage project and Certified Payroll job with
Oakland Local Hire Requirements.
Page 19 of 30
Planroom &
Online
Bid Date
1/28/2015
Plan # Bid Time Location
423
11:00 AM
LODI
Plan Name
CSI Divisions / Job Description
NEW FIRE STATION NO. 3 BUILDING REPAIRS
(ONLINE ONLY)
# of
Addenda Plans
The Work generally consist of replacing the exterior wood tile siding, repairing a
section of the soffit, replacing the wood paneling above and below the wood tile
siding, repainting the exterior (except bricks), replacing a chain link fence section,
and replacing chain link slats. All repairs and/or replacements will be done in kind
or as described in these specifications. The Work also includes other incidental and
related work, all as shown on the Plans and Specifications for the above Project
and/or as necessary to complete the Project.
Online
Project is available for viewing ONLINE ONLY!!!
424
11:00 AM
LODI
NEW WELL 6R PUMP REPLACEMENT PROJECT
(ONLINE ONLY)
The Work consists of furnishing and installing a deep well turbine pump and other
incidental and related work, all shown on the Plans and Specifications for the above
Project.
Online
Project is available for viewing ONLINE ONLY!!!
244
2:00 PM
SACRAMENT
O
CDPH - ALTERATIONS IN A STATE-OWNED
FACILITY - SACRAMENTO
Div 1-2, 7-10, 23 & 26-27. Project comprises labor, material and services
necessary for major components of Project. Work consists of demolition, new wall
construction, mechanical, electrical raceway, wiring, cable and related work.
Planroom &
Online
467
2:00 PM
NAPA
COUNTY
CALTRANS 04-259404 OVERLAY, ROADWAY
WIDENING AND CONSTRUCT TWO-WAY LEFTTURN LANES (ONLINE ONLY)
Project consists of overlay, roadway widening and construct two-way left-turn lanes
in Napa County in and near St. Helena from Mee Lane to 0.1 mile South of Sulphur
Creek Bridge. The Contractor must have either a Class A License or any
combination of the following Class C Licenses which constitutes a majority of the
work: C-8, C-12, C-42.
Online
Project is available for viewing ONLINE ONLY!!!
500
2:00 PM
SAN MATEO
COUNTY
TVM STATION SITE PREPARATION (TICKET
VENDING MACHINE)
This Public Works Project will be replacing the Ticket Vending Machines (TVM) in
the future. To prepare for the new TVMs, this Project will replace the
communications and electrical power cables at nearly all the stations. The
communications cables from the communication room/cabinet all the way to the
inside of the TVMs will be replaced with new fiber optic cables. In addition, this
Project will relocate or reorient some TVMs at the stations.
Planroom &
Online
PLEASE NOTE: A HARDCOPY OF FULL SIZE DRAWINGS IS AVAILABLE FOR
VIEWING AT THE SAN FRANCISCO BUILDERS EXCHANGE.
20
2:30 PM
NEW UNION SQUARE ADA ENHANCEMENT PROJECT Div 1-5, 7, 22, 26 & 32. The Work to be done under this Contract is located at 333
SAN
FRANCISCO
Post Street, San Francisco Union Square and consists of selective demolition; new
granite and concrete paving; metal work; electrical; related waterproofing and all
appurtenant work in accordance with Drawings and Specifications.
Contact Paulina Araica, Project Manager, at (415) 581-2558 with any questions.
Page 20 of 30
Planroom &
Online
Bid Date
1/28/2015
Plan # Bid Time Location
494
3:00 PM
REDWOOD
CITY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2014-2015 SANITARY SEWER REHABILITATION Project consists of furnishing labor, materials, tools, equipment, incidentals for
PROJECT (ONLINE ONLY)
rehabilitation of existing VCP sanitary sewer mains using a tight fitting liner system,
cured-in-place pipe (CIPP) lining method. It includes traffic controls, mobilization
and demobilization; locating and potholing all existing utilities; locate house laterals
and cleanouts; removal of existing VCP sewer laterals; site investigations; cleaning
and closed circuit television (CClV) inspection of sewer main pipes and laterals;
verification of the exact location and size of each lateral for each property prior to
installation of new lateral; furnishing and installing new tight fitting liner system,
cured-in-place pipe (CIPP) inside existing VCP sewer mains; furnishing and
installing new HOPE SOR 17 sewer laterals by pipe bursting method; furnishing and
installing new SOR 26 PVC sewer laterals using open cut method; furnishing all
pipes and fittings to install lateral connection; furnishing and installing new sewer
laterals and cleanouts per City standard detail; connection of new sanitary sewer
lateral to newly
rehabilitated mainline using strapped-on wye rubber saddle with stainless steel
straps; connection of new 6 inch diameter sanitary sewer lateral to the existing 6
inch diameter sanitary sewer main using a new 6D diameter VCP full wye with
rubber couplings and short pipes prior to CIPP lining; connection of new sanitary
sewer lateral to existing point of connection at existing cleanout located at property
owner's right-of-way using flexible nonshear rubber coupling with stainless steel
shear band as per City standard detail; connection of new sanitary sewer lateral to a
specific point of connection as directed by the City; removal of existing cleanout and
clean out box; installation of new cleanout and new cleanout box in the sidewalk or
at City's right of way per City standard detail; point repairs; installation of concrete
cap; provision of controlled density fill (COF) on mainline and lateral trenches with
pipes that are 30" deep or less as measured from the top of pipe to existing
pavement
surface; provision of controlled density fill (COF) at sewer lateral point of connection
to provide concrete support for strap on wye saddle connection; provision of root
barrier when installing sewer laterals near tree roots; installation and removal of
temporary sewer bypass system for both mains and laterals; rehabilitation of
existing manhole; replacement of existing lamp hole with new manhole; perform all
necessary testing of newly rehabilitated/installed sanitary sewer pipes; saw-cutting;
pavement removal and trenching; sheeting, shoring and bracing; dewatering;
backfill; base compaction; AC pavement restoration; sidewalk restoration; driveway
restoration; immediate restoration of lateral trenches in order to be flushed to
existing ground; landscape restoration inclUding but not limited to grass lawn,
plants, pavers, bricks, decorative stones, washed stones, wood headers etc.;
removal and replacement of all property fences including concrete footings as
required to properly install the laterals and cleanouts; connection work; and
vehicular and pedestrian safety and convenience and other related work.
Page 21 of 30
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
Project is available for viewing ONLINE ONLY!!!
1/29/2015
113-114
2:00 PM
GILROY
PLANT MAINTENANCE PROJECTS PRE-ANOXIC Div 1-5, 7-11 & 15-17. The Work will consist of the construction in three primary
BASINS, AERATION SYSTEM, AND SECONDARY areas of the plant including the construction of additional Pre-Anoxic Basins, Blower
CLARIFIER
and Aeration improvements to the oxidation ditch systems, and construction of a
third secondary clarifier and RAS pump station.
PRE-ANOXIC BASINS: Two additional, 30’ by 30’ Pre-Anoxic basins will be added
to both the north and the south oxidation ditch system trains. These basins will be
open topped and mixed by means of floor mounted mixers. Stainless steel gates
will be installed to facilitate operation.
AERATION SYSTEM: Two blower buildings with two high speed turbo blowers each
will be added to the oxidation ditch system. Fine bubble diffusers will be added to
the floor of the existing oxidation ditch system to replace the existing surface
aerators. The existing surface aerators will be operated to create the recirculation
flow required in the ditches. Aeration piping will convey the aeration air from the
blowers to the diffusers. Switchgear will be to provide the power required at the
blowers.
CLARIFIER: The Work also includes construction of a 130’ diameter secondary
clarifier to operate in parallel with the plants two existing secondary clarifiers. This
clarifier will be supported with the construction of a Return Activated Sludge (RAS)
pump station and supporting electrical.
The Work will also include integration of the above construction into the Wastewater
Treatment Plant communications network.
Page 22 of 30
Planroom &
Online
Bid Date
1/29/2015
Plan # Bid Time Location
157
2:00 PM
ELK GROVE
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
BUFFERLANDS BUILDING PROJECT
Div 1, 3-12, 21-23, 26-28, 31-33 & 40. Project consists of the construction of a new, 1
single story 5,020 sq. ft. office building and the surrounding site improvements
including earthwork, grading; paving, landscaping, utility connection and relocation
and storm drainage.
Planroom &
Online
Trades include concrete formwork and accessories; reinforcing steel; cast-in-place
concrete; mortar and grout, concrete unit masonry; structural steel, metal decking;
cold-formed metal framing; rough carpentry; finish carpentry; interior architectural
woodwork, solid surfacing fabrications; thermal insulation; roof and deck insulation;
weather barriers; metal wall panels; thermoplastic membrane roofing; sheet metal
flashing and trim; roof hatch; joint protection; hollow metal doors and frames; wood
doors, access doors and frames; overhead coiling doors; aluminum-framed
entrances and storefronts; door hardware, glazing, louvers and vents; non-structural
metal framing; gypsum board; tiling; acoustical ceiling suspension assemblies;
resilient tile flooring; painting and coating; visual display units; signage,
compartments and cubicles; folding panel partitions; fiberglass reinforced protective
wall covering; toilet accessories; fire protection specialties; lockers and benches;
audio-visual equipment; horizontal louver blinds; floor grates and frames; bicycle
racks; fire suppression sprinkler system; plumbing; HVAC; lighting; electrical; public
address system, electronic access control and intrusion detection; fire detection and
alarm; site clearing; earth moving; lime stabilization treatment; shoring; asphalt
paving; decomposed granite and gravel paving; chain link fences and gates,
irrigation; planting; manholes; and piping system.
Contact James Morris, Project Manager, at (707) 875-9168 with any questions.
400
2:00 PM
PLEASANTO
N
R200 SECURITY FENCE INSTALLATION (ONLINE Project consists of installing a 1-inch (Base Bid) or 2-inch (Bid Alternate 1) mesh
ONLY)
chain link fence and pedestrian gate around our existing underground reservoir and
PRV valve pit (R200). The reservoir and PRV valve pit is located in the City of San
Ramon. The Work includes installation of approximately 995 linear feet of chain link
fence, pedestrian access gate and barbed wire with a portion that will go up a steep
hill to the top of the reservoir. Removal of approximately 164 linear feet of existing
fence and a pedestrian gate after the new fence has been installed. The existing
entry vehicle gate and fence facing the street shall be used and connected to the
new fence installed.
Project is available for viewing ONLINE ONLY!!!
Page 23 of 30
Online
Bid Date
1/29/2015
Plan # Bid Time Location
403
2:00 PM
LAFAYETTE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
LAFAYETTE TOWN CENTER PHASE III (ONLINE This is a NON-Prevailing Wage project. Contact Ben Honsvick, Project Estimator,
ONLY)
at (707) 559-2336 or by email at: [email protected] with any
questions.
2
Online
Trades include concrete; concrete unit masonry; simulated stone; structural steel
framing; cold-formed metal framing; metal fabrications; metal stairs; ornamental
metal; rough carpentry; laminated veneer lumber; wood I-Joists; shop-fabricated
wood trusses; glue-laminated construction; finish carpentry; self adhered
underlayment and flashings; membrane (below grade) waterproofing; building
insulation; concrete roofing tile; preformed exterior siding; built-up (cool roof)
roofing; sheet metal; firestopping; caulking and sealants; hollow metal doors; wood
doors and frames; fiberglass French glass doors; special doors; access doors;
sectional overhead doors; aluminum storefront windows; fiberglass windows; finish
hardware (pending); glass and glazing; louvers and vents; metal support systems;
lath and plaster; gypsum wallboard; tile masonry; resilient flooring; carpet; painting;
building specialties; bath accessories; mirrored wardrobe doors; kitchen and laundry
equipment; site furnishings; elevators; trash chute; plumbing; HVAC; electrical;
exterior improvements; and utilities (civil work).
Project is available for viewing ONLINE ONLY!!!
406
2:00 PM
SANTA ROSA
MEDICAL OFFICE BUILDING FOR DIALYSIS
CLINIC (ONLINE ONLY)
The Work consists of construction of a shell building without mechanical systems.
The Project includes cast-in-place concrete, masonry, steel, and fiber cement wall
panel construction. Electrical systems are limited to site, building exterior, and
minimal/temporary building interior lighting and power. Plumbing systems are
limited to those required for site features and stubs to the shell building. The site is
to be fully landscaped.
Online
This Project is NOT Subject to Prevailing Wages.
Project is available for viewing ONLINE ONLY!!!
417
2:00 PM
NEW SITE REMEDIATION AT 520 JOHN MUIR DRIVE
SAN
FRANCISCO
(ONLINE ONLY)
The Work mainly consists of excavating and removing and replacing soil. Major
types of work include: grubbing, excavation, dirt import, grading, fence installation,
wetland restoration and hydroseeding.
Project is available for viewing ONLINE ONLY!!!
Page 24 of 30
Online
Bid Date
1/29/2015
Plan # Bid Time Location
431
2:00 PM
FREMONT
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
CALTRANS 04-0J9404 INSTALL WASH RACKS
(ONLINE ONLY)
2
Install wash racks in Alameda County in Fremont at the Fremont Maintenance
Station at 2045 Mowry Avenue. The Contractor must have either a Class A License
or Class B License or a combination of Class C Licenses which constitutes a
majority of the work.
Online
Project is available for viewing ONLINE ONLY!!!
477
2:00 PM
SAN CARLOS
BAYSHORE STATION PAINTING PROJECT CALTRAIN (ONLINE ONLY)
Div 1-2, 4-5, 7-10 & 14. This public works construction project consists of furnishing 1
all labor and materials required for the removal and replacement of the existing
coatings on the steel surfaces of the pedestrian bridge, stairwells and elevator
towers at the Caltrain Bayshore Station in San Mateo County. All wire mesh panels
will be replaced under this Contract as well. The Scope of Work also includes the
preparation and painting of Pedestrian and Ticket Vending Machine shelters along
the platforms. The Engineer’s Estimate for this Project is over $500,000.
Online
Project is available for viewing ONLINE ONLY!!!
482
2:00 PM
DIXON
WASTEWATER TREATMENT FACILITY WATER
SUPPLY WELL PROJECT (ONLINE ONLY)
Project consists of drilling an approximately 930 foot deep borehole and completing
it as a water supply well with an estimated depth of 910 feet.
Project is available for viewing ONLINE ONLY!!!
Page 25 of 30
Online
Bid Date
1/29/2015
Plan # Bid Time Location
493
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
BURK HALL ELEVATOR NO. 3 MODERNIZATION Div 1-2, 7, 9 & 14. Work consists of furnishing all labor and materials, equipment
AT SFSU (ONLINE ONLY)
and tools necessary for the complete modernization of a Otis traction passenger
elevator located in the Burk Hall building. The intent is to provide the University a
“turnkey” project. All related work will be the responsibility of the Contractor. The
Contractor is to provide Interim Full Maintenance Service from the Date of Award to
Final Acceptance of the entire Project by the University’s representative. The
Contractor shall include 12-months of Full Warranty Maintenance Service under the
terms of the University’s maintenance agreement following final acceptance of the
modernized elevator. The Contractor shall provide deferred approval and design
build for any modifications required to the Fire Alarm System, and submit complete
drawings to the State Fire Marshal for approval. Contractor to install and assume
full responsibility for the system, device quantity and location, wiring, conduit,
programming and control panels. All new devices shall be compatible with the
existing Simplex alarm system and match existing devices in the building.
Online
Contact Wes Reynolds (Simplex 925-337-1962 or 925-273-1215) to obtain Shop
Drawings, product cutsheets, CSFM listing sheets for submittal to CSFM for
approval prior to installation. Provide alteration to existing machine room chainlink
enclosure and handrail for proper installation of controller cabinet with integral
HVAC. Estimated construction cost is $265,000.00. Bidder must possess a valid
Class C-11 Contractor License and also a California certified qualified Conveyance
Company License (or list a subcontractor who possesses the CQCC License).
Project is available for viewing ONLINE ONLY!!!
1/30/2015
131
2:00 PM
DUBLIN
2/3/2015
86-87
2:00 PM
NEW MCKINLEY ELEMENTARY SCHOOL
SAN
FRANCISCO
MODERNIZATION PROJECT
SANTA RITA JAIL (SRJ) CONDENSER WATER
SYSTEM UPGRADE
1
The Work of this Contract consists of replacing all condenser water system
equipment that serves a chilled water plant located in the Santa Rita Jail chiller
refrigeration room #322 at 5325 Broder Boulevard. The Scope of Work includes the
demolition and installation of two 800-ton cooling towers, two condenser water
pumps and pump motors equipped with new variable frequency drives, central
plant water softener, the installation of a new water filtration system, the installation
of a chemical treatment system, and all ancillary equipment and controls.
Planroom &
Online
Div 1-3, 5-12 & 15-16. General School Modernization and reconstruction including,
but not limited to, ADA Access and Fire/Life-Safety upgrades, Painting, New
Building Addition, Fire Alarm and Fire Sprinkler Modifications, Miscellaneous Site
Work, Installation of Interim Housing, Hazardous Material Remediation and other
Miscellaneous Interior Renovation Work.
Planroom &
Online
Page 26 of 30
Bid Date
2/4/2015
Plan # Bid Time Location
410
1:30 PM
ALAMEDA
Plan Name
CSI Divisions / Job Description
NEW ALAMEDA INTERCEPTOR REHABILITATION EBMUD (ONLINE ONLY)
# of
Addenda Plans
Div 1-3 & 31-33. Work includes rehabilitation of seventeen manholes, demolition
and replacement of one manhole, slip lining of approximately 4,525 feet of pipe,
CIPP of approximately 120 feet of pipe, and performance of related required work
complete as shown on the Drawings and specified. The Work is located in
Clement, Grand, and Buena Vista Avenues, and Constitution Way in the City of
Alameda, California.
Online
Contact Pam Hopkins, Project Engineer, at (510) 287-1326 with any questions.
Project is available for viewing ONLINE ONLY!!!
462
2:00 PM
SAN
FRANCISCO
AND
ALAMEDA
COUNTIES
CALTRANS 04-013524 REMOVE BRIDGE
Remove bridge (portion) and salvage bridge elements in the City and County of San 3
(PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8
ONLINE ONLY
mile west of the Toll Plaza. The Contractor must have either a Class A License or a
combination of Class C Licenses which constitutes a majority of the work.
Online
This Project is available for viewing ONLINE ONLY!!!
2/5/2015
27
2:00 PM
SANTA CRUZ
426
2:00 PM
ALAMEDA
COUNTY
14TH AND 16TH AVENUE PUMP STATION
ABANDONMENT PROJECT
Upgrade the existing sanitary sewer pump station on 15th Avenue, install a new
sewer force main from the pump station to East Cliff Drive, install new sewer gravity
lines using pilot tube microtunneling and trenching from the existing 14th and 16th
Avenue pump stations to the 15th Avenue pump station and abandon and demolish
these two pump stations. Work will take place within the public right of ways of
14th, 15th and 16th Avenues and Geoffroy Drive and East Cliff Drive. Work will
also take place in Black Point Lane and within 5 private property easements in the
area.
NEW CALTRANS 04-4A4804 REPLACE GUARDRAIL, Replace guardrail, restore portal building, install CCTV in Alameda County in
RESTORE PORTAL BUILDING & INSTALL CCTV Alameda and Oakland at Posey Tube and Webster Street Tube. The Contractor
(ONLINE ONLY)
must have either a Class A License or one of the following Class C licenses: C-10,
C-29.
Planroom &
Online
Online
Project is available for viewing ONLINE ONLY!!!
484
2:00 PM
SAN
FRANCISCO
YERBA BUENA RECONFIGURE OFFICES
(ONLINE ONLY)
Project includes material testing, site demolition, hazmat testing, asbestos
abatement, PCB removal, rough carpentry, HM doors and frames, wood doors, door
hardware, tubular daylighting devices, gypsum wallboard, ceramic tile, resilient
flooring, carpet, painting, toilet and bath accessories, window treatments,
manufactured casework, solid surface countertops, plumbing, HVAC, electrical,
public address and fire alarm.
Project is available for viewing ONLINE ONLY!!!
Page 27 of 30
Online
Bid Date
2/5/2015
Plan # Bid Time Location
486
2:00 PM
ELK GROVE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1
FLOW EQUALIZATION PROJECT (ONLINE ONLY) Div 1, 3, 5, 7-10, 22-23, 26-27 & 31-33. Project consists of increasing the storage
capacity of the existing Emergency Storage Basins (ESBs) at the Sacramento
Regional Wastewater Treatment Plant (SRWTP) by approximately 110 million
gallons. This will involve deepening of ESB-B and ESB-C by approximately 8 feet.
Additionally, operational flexibility will be increased through the addition of berms in
ESB-C to divide this basin into three sub-basins. Piping and gates shall be installed
to allow flow into each of the basins and drainage from each of the basins. Basin
floors will be lined with roller compacted concrete (RCC) and basin berms will be
lined with shotcrete. An underdrain system and associated pumping station will be
constructed to relieve hydrostatic pressure from the groundwater beneath the
basins. A permanent washdown system consisting of both manual and motorized
water monitors (cannons) shall be installed to clean the basins. Mass preexcavation for the Biological Nutrient Removal (BNR) project will also be performed
as part of this Project.
Online
There will be a Mandatory Pre Bid Conference and Walk-Through at 2:00 PM,
Tuesday January 6, 2015 (unless changed by addendum) at the SRWTP Commons
Room at 8521 Laguna Station Road, Elk Grove, CA, 95758. Attendees must email
Kathy Martin at: [email protected] with attendee names prior to the
meeting. A general engineering contractor, Class A License is required as well as
prequalification for the general contractors, roller compacted concrete
subcontractors, electrical subcontractors, and instrumentation and control
subcontractors. Additional project information and the prequalification list for the
trades listed above can be found at: www.regionalsan.com/business-opportunities
Contact Christina R. Brown, Project Manager, at (916) 875-9455, or by email at:
[email protected].
Project is available for viewing ONLINE ONLY!!!
2/11/2015
413
1:30 PM
EMERYVILLE NEW EAST BAYSHORE RECYCLED WATER PIPELINE - Div 1-3, 5, 9, 26, 31-33 & 40. Work includes furnishing and installing approximately
2,305 ft of 12-inch diameter PVC pipe, 115 ft of 12-in painted MLS and 85 ft of 12-in
PHASE 1A - EBMUD (ONLINE ONLY)
ML&PCS pipe that crosses Temescal Creek, and installing 2,695 ft of Districtfurnished 12-in ML&PCS pipe from IKEA continuing onto Shellmound Street,
Shellmound Way to tie-in with Christie Avenue; then continuing on Christie towards
65th in the City of Emeryville.
Project is available for viewing ONLINE ONLY!!!
Page 28 of 30
Online
Bid Date
2/11/2015
Plan # Bid Time Location
466
2:00 PM
MARIN AND
SONOMA
COUNTIES
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CALTRANS 04-264094 REALIGN HIGHWAY AND Realign highway and construct new bridge In Marin and Sonoma Counties near
CONSTRUCT NEW BRIDGE (ONLINE ONLY)
Petaluma from 0.8 mile south to 2.0 miles north of the Marin-Sonoma County Line.
The Contractor must have either a Class A License or any combination of the
following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-32.
Online
Available for viewing ONLINE ONLY!!!
487
2:00 PM
SAN DIEGO
HEALTH CARE FACILITY IMPROVEMENT
PROGRAM AT RICHARD J. DONOVAN
CORRECTIONAL FACILITY (ONLINE ONLY)
Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The Project at RJD is part of the Health
Care Facility Improvement Program (HCFIP). The purpose of this Project at RJD is
to remedy deficiencies in its existing health care components.
Online
The Project consists of two sub-projects, which includes one to two sub-phases
within the sub-project. The Scope of Work includes, but is not limited to, demolition,
building pad preparation, new construction, accessible paths-of-travel, and
infrastructure upgrades. The Projects are located within and outside the existing
secure perimeter.
The new Administration Building will be slab-on-grade with exterior fully grouted
structural concrete masonry unit walls, metal framed interior walls, and a single-ply
type, fully adhered over rigid insulation roof assembly. Utility relocation will be
necessary for the construction of the new building, including communications/signal,
electrical, storm drain, water and sewer lines.
This Project is available ONLINE ONLY!!!
2/12/2015
200
2:00 PM
NAPA
LOS CARNEROS WATER DISTRICT (LCWD)
RECYCLED WATER PIPELINE
425
2:00 PM
SAN MATEO NEW CALTRANS 04-1J5204 INSTALL SIDEWALK, SITE
FURNISHINGS, SIGNS, NATIVE PLANTING &
AND
IRRIGATION (ONLINE ONLY)
ALAMEDA
COUNTIES
Div 1-3, 5, 9, 13 & 15-16. See specifications for complete Scope of Work.
Install sidewalk, site furnishings, signs, native planting, irrigation in San Mateo and
Alameda Counties in Menlo Park and Fremont at PM 29.3 and PM 0.5. The
Contractor must have either a Class A License or one of the following Class C
Licenses: C-27, C-13.
1
Planroom &
Online
Online
Project is available for viewing ONLINE ONLY!!!
44
2:00 PM
EL CERRITO NEW EL CERRITO VETERAN’S HALL ACCESSIBILITY The Work includes accessibility improvements including a new exterior ramp,
IMPROVEMENTS
renovation of an existing exterior stairway, and construction of an interior ramp.
PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be
open for inspection by bidders on Tuesday, January 20, 2015. Inspection tours will
be conducted on this date by a representative of the County's Capital Projects
Management Division. Tour will begin promptly at 9:00 AM, starting at the front
entrance of the Veteran's Memorial Building, 6401 Stockton Avenue, El Cerrito.
Page 29 of 30
Planroom &
Online
Bid Date
2/12/2015
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
46
2:00 PM
NEW STORM DRAIN PUMP STATIONS SDPS-1B AND PLANS & SPECS WILL BE POSTED ONLINE SOON!!!
SAN
FRANCISCO
SDPS-1C IMPROVEMENTS AT SFO
Div 1-2, 5, 9, 23, 26 & 31-34. This Project will replace pumps, outfall pipes, Pumps
controls, SCADA system and electrical equipment for storm drain pump stations
SDPS-1B and SDPS-1C to ensure a reliable and robust drainage system for major
airport runways.
Planroom &
Online
82
2:00 PM
RICHMOND
Planroom &
Online
SENIOR CENTER ADA RESTROOMS
IMPROVEMENTS
Div 1-4, 6-11 & 15-16. Project consists of performing ADA restrooms improvements
and relocation of kitchen and for all other Work, items or details not mentioned
above that are required by the Drawings, Standard Specifications, or these Special
Provisions.
Trades include site concrete; concrete; CMU construction; rough carpentry; finish
carpentry; architectural woodwork; building insulation; flashing and sheet metal;
firestopping; joint sealers; steel doors and frames; access doors and panels; door
hardware; portland cement plaster; gypsum board assemblies; tile, resinous kitchen
flooring; fiberglass wall panels; paints and coatings; quartz surfacing countertops;
fire extinguisher cabinets; toilet accessories; food service equipment; appliances;
plumbing; HVAC; lighting; and electrical.
All questions regarding bid documents, construction Plans and Specifications
must be submitted by email to Yader Bermudez, Project Manager, at:
[email protected] no later than 5 PM, on February 5, 2015.
Questions will be answered in a written response and will be available to bidders on
the City’s website at www.ci.richmond.ca.us/bids no later than three (3) working days
prior to the bid opening deadline.
2/17/2015
35
3:00 PM
SAN CARLOS
INDUSTRIAL ROAD PARALLEL SANITARY
SEWER PROJECT
1
Div 1-3, 5 & 15. Project consists of dewatering, mobilization, demolition,
abandonement and removal, sewage flow control, earthwork, soil stabilization, steel
casing pipe, sanitary sewer rehabilitation using CIPP method, excavation support
shoring and bracing, steel sheet pile shafts, secant pile shafts, instrumentation and
monitoring, asphalt concrete paving, shaft construction, microtunneling, precast
concrete structures, carrier pipe installation into casing, fused PVC sewer pipe,
sanitary sewer system testing and cleaning, CCTV inspection of sanitary sewer
system, building sewer (lateral) construction and reinstatement, traffic stripes and
pavement markings, traffic control, traffic loops, adjust incidental structures to
grade, controlled low strength material, concrete reinforcement, cast-in-place
concrete, concrete cylinder pipe, backfill grout, casing pipe annular backfill grouting,
grout, ground pre-treatment, manhole and below grade vault rehab, manhole frames
and covers, and general piping.
Page 30 of 30