WEEKLY PLAN LIST - Friday, October 17, 2014 www.bxofsf.com

THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363
WEEKLY PLAN LIST - Friday, October 17, 2014
(All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com
Bid Date
Plan # Bid Time Location
10/17/2014 104
2:00 PM
REDWOOD
CITY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1090 MILLS MAINTENANCE & TRANSPORATION Div 1-3, 5-10, 12, 21-23, 26-27 & 32-33. Alten Construction is the selected General
FACILITY (LEASE/LEASEBACK PROJECT)
Contractor for this Lease/Leaseback project. Project includes conversion of existing
Office Space into the Maintenance and Transportation Facility for Sequoia Union
High School District. Prevailing Wage Required.
Planroom &
Online
Trades needed, but not limited to, Demolition; Earthwork; Erosion Control; Site
Drainage; Water Distribution; Sanitary Sewer; Asphalt Paving; Pavement Markings;
Site Signage; Fences and Gates; Concrete Reinforcement; Site and Structural
Concrete; Structural and Miscellaneous Steel; Rough and Finish Carpentry;
Cabinets; Waterproofing; Insulation; Roof Patching; Sheet Metal Flashing; Vapor
Control Systems; Joint Sealants; Doors, Frames and Hardware; Overhead Doors;
Storefront Systems; Glass and Glazing; Cement Plaster; Gypsum Board; Acoustical
Ceilings; Resilient Flooring; FRP Panels; Painting; Window Coverings; Fire
Sprinklers: Plumbing; HVAC; and Electrical.
208
2:00 PM
SAN
FRANCISCO
SAN FRANCISCO ROADWAY BRIDGES
REPLACEMENT PROJECT - CALTRAIN
Page 1 of 21
Div 2-3, 5, 9 & 16. San Francisco Roadway Bridges Replacement Project for 22nd 5
Street, 23rd Street, and Paul Avenue in San Francisco, California. This Public
Works Project will remove/replace existing two-span steel-through girder bridges
(22nd Street, 23rd Street, and Paul Avenue) due to deteriorated condition; and
remove/relocate/reconstruct existing utility lines; provide temporary support as
applicable at each bridge. The Work is more fully described in the Contract
Documents. Bidders and their proposed Subcontractors shall hold such licenses as
may be required by the laws of the State of California for the performance of the
Work specified in the Contract Documents. Bidders bidding as the Prime Contractor
shall possess a valid California General Engineering Contractor “A” License in the
State of California at the time of Contract award and throughout the contract term.
The Contractor will also be required to ensure that all Subcontractors working on the
project are holding valid licenses suitable for their trade. The Contractor shall
perform with its own organization work amounting to at least 40% of the Grand Total
Bid Price provided in the Contract. Prevailing wages shall apply. Bidder's Security,
Performance Bond and Payment Bond will be required.
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/20/2014 130
1:00 PM
NAPA
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
CAMP BERRYESSA IMPROVEMENT PROJECT
4
Div 1-11, 13 & 15-16. Project consists of the construction of an environmental
education camp, including grading; paving of roadways; parking lots and trails;
water system, water treatment, tank and distribution greywater system with
subsurface drip disposal; camp host site; tent cabins; combination restroom shower
building with composting toilets; covered activity areas; boat boarding dock;
electrical system with photovoltaic array, and miscellaneous other site
improvements/modifications. Permits for this work shall be secured by the District.
Planroom &
Online
All questions must be mailed, or emailed to Chris Cahill at: [email protected].
Napa County Regional Park and Open Space District, 1195 Third St., Second Floor,
Napa, CA 94559 by 4:45 PM on Friday, August 29, 2014.
115
2:00 PM
APTOS
APTOS PUMP STATION PROJECT
4
Div 1-9, 22, 26, 31-33, 40 & 43. The Project consists of constructing a booster
pump station at 9033 Soquel Drive in Aptos. The Contractor shall provide pumps
and associated facilities including, but not limited to, pumps, motors, pipes,
supports, gauges, MCC/MSB panel, miscellaneous electrical equipment and
conduits, concrete structures, CMU building, site grading, above and underground
pipes/appurtenances/connections, permanent fencing and other items as expressed
in the project Plans and Specifications, and construct approximately 150 LF of water
main with associated trenching and paving.
246
2:00 PM
SANTA ROSA
LAGUNA TREATMENT PLANT BELT PRESS
Div 1-2, 7, 9 & 23. Project includes mobilization and demobilization, demolition and
BUILDING REROOF AND HVAC IMPROVEMENTS disposal of existing roofing system, installation of roofing system and mechanical
ductwork improvements.
10/21/2014 427
2:00 PM
BERKELEY
SANITARY SEWER REHABILITATION HEARST
AVE FROM BONITA AVE TO SHATTUCK AVE
(ONLINE ONLY)
The Work to be done consists of, but is not limited to, the rehabilitation and
construction of 1001 linear feet of 8-inch diameter sanitary sewer pipe via
pipebursting (Method 'B'), manhole rehabilitation, excavation of approximately 821
linear feet of 4-inch and 6-inch diameter sanitary sewer laterals, and related work.
Planroom &
Online
Planroom &
Online
Online
Available for viewing ONLINE ONLY!!!
428
2:00 PM
BERKELEY
SANITARY SEWER REHABILITATION MARTIN
LUTHER KING JR. WAY, FIFTH ST AND CEDAR
ST (ONLINE ONLY)
The Work to be done consists, in general, of rehabilitation and construction of
approximately 4,036 linear feet of 8-inch diameter sanitary sewer, construction of
manholes, manhole rehabilitation, excavation, replacement of approximately 2,025
linear feet of 4-inch and 6-inch diameter sewer laterals, and related work.
Available for viewing ONLINE ONLY!!!
Page 2 of 21
Online
Bid Date
Plan # Bid Time Location
10/21/2014 451
2:00 PM
ALAMEDA
COUNTY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CALTRANS 04-1SS024 REPAIR LANDSLIDE ON Repair landslide on SR-13 at the Moraga Ave Northbound On Ramp in Alameda
SR-13 AT THE MORAGA AVE NORTHBOUND ON County in Oakland near Moraga Ave NB On Ramp. The Contractor must have
RAMP (ONLINE ONLY)
either a Class A License or any combination of the following Class C Licenses
which constitutes a majority of the work: C-8, C-10, C-12.
1
Online
This Project is available for viewing ONLINE ONLY!!!
461
2:00 PM
FAIRFIELD
LANDSCAPE MAINTENANCE DISTRICT NO. 15 - Landscape Maintenance consists of, but is not limited to, furnishing all labor,
GOLDRIDGE (ONLINE ONLY)
materials, equipment and other services necessary for the complete maintenance of
all the landscape areas, playgrounds, hardscapes, and irrigation in areas as
described in these Special Provisions, and as directed by the City Engineer.
Online
This Project is available for viewing ONLINE ONLY!!!
494
2:00 PM
DANVILLE
2014/15 PAVEMENT REHABILITATION PROJECT Project includes preparatory tree trimming; storm drain inlet relocation; removal and
(ONLINE ONLY)
replacement of existing storm drain pipe; removal and replacement of existing
Portland Cement concrete curb, sidewalk, curb ramp and valley gutter; subdrain
installation; removal and replacement of existing asphalt concrete pavement
(digouts); pavement cold planning; intsllation of paving mat; installation of asphalt
concrete overlay; removal and replacement of asphalt concrete speed lumps;
removal and replacement new traffic loop detectors; adjusting to grade of survey
monument castings; water valve castings; storm drain and sanitary sewer manhole
covers and other utility lids; removal and replacement of existing paving striping and
markers; traffic control.
Online
Available for viewing ONLINE ONLY!!!
499
2:00 PM
ANTIOCH
3
MAINTENANCE AND EMERGENCY EQUIPMENT The Project is located at the Delta Diablo Wastewater Treatment Plant in Antioch,
STORAGE STRUCTURE (ONLINE ONLY)
CA. The Work includes, but is not limited to, furnishing and installing a new 800 sq.
ft. semi-enclosed pre-engineered building and a new 1515 sq. ft. unenclosed preengineered building. This Project includes all ancillary concrete, coating, and site
improvements work to make a complete and operational project as intended by the
District.
This Project is available for viewing ONLINE ONLY!!!
Page 3 of 21
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
10/21/2014 116
2:30 PM
SAN MATEO
COYOTE POINT MARINA FUEL DOCK
IMPROVEMENTS
1
The Work to be done consists, in general, of replacement of Coyote Point Marina
(CPM) Fuel Dispensing Systems (including hoses and hose reels), Fuel Monitoring
System including Alarms and Sensors, Fuel System Piping, Fire Water Piping,
Potable Water Piping, and Electrical Distribution Panel and Power Lines. Removal
of the existing fuel dispensing system has already been accomplished with the
exception of the Underground Storage Tanks and appurtenances, which are to be
protected in place. Installation consists, in general, of (300± LF) Double Walled
Semi Rigid Gas and Diesel Fuel Piping, (2 EA) Fuel Dispensers with Hoses and
Hose Reels and Containment Sumps, (100± LF) SS Fire Water Piping, (100± LF)
SS Potable
Water Piping and Hose Bib, (300± LF) Plastic Coated Galv. Steel Electrical Conduit
for power supply and fuel system monitoring conductors, and all appurtenances and
hardware associated with these items, as well as any other items and details not
mentioned above but required by the project Plans, Standard Specifications and
these Special Provisions, permit requirements and conditions as attached in
Appendix E of these Special Provisions and as directed by the Engineer.
Planroom &
Online
10/22/2014 154
2:00 PM
EMERYVILLE
FIRE STATION IMPROVEMENTS
Div 1-12, 21-23 & 26. Project consists of, but is not limited to, Demolition of
standing seam metal roofing, and built-up roofing and sloped plywood and
2x sleepers, flashing, thin brick veneer, interior finishes, furnishings, equipment,
mechanical, electrical and plumbing as shown on drawings; Replacement of thin
brick veneer, glazing, standing seam metal and built-up roofing, flashing, gutters;
New accessible parking space; New interior finishes where designated; New
kitchens and toilet rooms and renovated toilet rooms; Repair and refinishing of
designated surface; New casework for reception area; New doors and hardware as
indicated; New mechanical (HVAC) equipment and distribution as indicated;
Extension of existing automatic fire sprinkler system; New electrical distribution as
indicated; New lighting as indicated; New fire alarm system detection and signal
components as indicated.
Planroom &
Online
159
2:00 PM
SAN
FRANCISCO
BUCHANAN PARK APARTMENTS
Div 1-3, 5-11, 13 & 15-16. Work of this Contract comprises of modifications and
rehabilitation to the existing four buildings, 68-unit residential low-income
apartments units located at 1150 Webster St., San Francisco, CA and associated
Work to the 67,563 sq. ft. site. The Project consists of four existing residential
buildings and one existing community building consisting of 65,580 sq. ft. of
residential area. Two buildings are 3-story walk up apartments and two buildings
are 2-story townhouse structures.
Trades needed, but not limited to, site work, concrete, metals, wood and plastics,
thermal and moisture protection, doors and windows, finishes, specialties,
equipment, special construction, plumbing, mechanical, electrical and hazmat.
Page 4 of 21
1
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/22/2014 411
2:00 PM
ARROYO
GRANDE
Plan Name
CSI Divisions / Job Description
ARROYO GRANDE SHOPPING CENTER SWC
EAST GRAND AVE & ELM STREET ARROYO
GRANDE (ONLINE ONLY)
Div 1-12, 21-23, 26-28 & 31-33. This Project consists of the development of
approximately 7 acre site, and about 16,000 sq. ft. of new building and remodeling
of existing buildings (see brief summary below).
# of
Addenda Plans
1
Online
CIVIL TRADES NEEDED: Survey, Erosion Control, Demolition, Grading, Paving,
Striping/Signage, Concrete, Utilities, Site Lighting, Detectable Warning Systems,
Fencing, Landscaping.
BUILDING TRADES NEEDED: Structural Shoring, Demolition, Concrete, Masonry,
Structural Steel, Rough Carpentry, Insulation, EIFS, Roofing, Sheet Metal,
Caulking/Sealants, Doors, Auto doors, Storefronts, Stucco, Metal Framing/Drywall,
Painting, Awnings, Loading dock equipment, Seismic, Fire Sprinklers, Plumbing,
HVAC, Electrical and Fire Alarm.
PLEASE NOTE: This Project is NOT Union and is NOT Prevailing Wage.
Available for viewing ONLINE ONLY!!!
498
2:30 PM
SAN
FRANCISCO
VARIOUS LOCATIONS PAVEMENT RENOVATION Div 1-3 & 31-33. The Work is located on Teresita Blvd between Portola Dr and
NO. 17 SEWER REPLACEMENT AND
Foerster St; Chaves Ave between Rockdale Dr and Evelyn Way; Del Sur Ave
WATERMAIN INSTALLATION (ONLINE ONLY)
between Juanita Way and Chaves Ave; 22nd St between Carolina St and
Wisconsin St; Carolina St between 22nd St and 23rd St; and on Visit.
Online
For more information, contact the Project Manager, Ramon Kong at (415)554-8280.
This Project is available for viewing ONLINE ONLY!!!
497
3:00 PM
SAN
FRANCISCO
ALDEA HOUSING GUTTER REPLACEMENT USCF (ONLINE ONLY)
Div 1, 7 & 9. Project consists of replacement of gutters and downspouts at (9) nine
buildings at the UCSF Aldea Housing Complex: 20 Adolph Sutro Court, 30 Adolph
Sutro Court, 75 Behr Avenue, 80 Behr Avenue, 85 Behr Avenue, 90 Behr Avenue,
95 Behr Avenue, 45 Johnstone Drive and 50 Johnstone Drive.
Online
For more information, contact the University's Project Manager, Julie Gallivan, at
(415) 476-2080.
Available for viewing ONLINE ONLY!!!
95
3:00 PM
SANTA CRUZ NEW MARINE MAMMAL POOLS RENOVATION PHASE Project consists of the renovation of mammal tanks, relocation of fiberglass pool
1 AT UC SANTA CRUZ
and shed, providing and installing new FRP metabolic tank, constructing new
ramps, bridges, gates, concrete curbs and associated work including utilities.
Page 5 of 21
5
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/23/2014 212
2:00 PM
BOULDER
CREEK
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
REGIONAL WATER SYSTEM EMERGENCY
INTERTIES NO. 2, 3 & 4
3
The Work covered under this Contract shall include the furnishing of all labor,
materials, tools, equipment and performing all work for the installation of
approximately 985 linear feet of 8-inch ductile iron potable water pipeline along
Skypark Drive and Lockewood Lane and crossing Mount Hermon Road;
Approximately 1,500 linear feet of 12-inch HDPE potable water pipeline along a
storage tank access road; Approximately 14,700 linear feet of 12-inch ductile iron
potable water pipeline along Graham Hill Road, Summit Avenue, Roaring Camp
Road, East Zayante Road and West Zayante Road; Approximately 420 linear feet of
12-inch steel potable water pipeline attached to the Conference Road Bridge; A 350gpm pump station adjacent to Skypark Drive near the intersection with Mt. Hermon
Road; and a 700-gpm pump station adjacent to Summit Avenue near the
intersection with Graham Hill Road.
Planroom &
Online
PLEASE NOTE: A hardcopy of 17x11" drawings are available for viewing at the San
Francisco Builders Exchange.
241
2:00 PM
MARSHALL
MARSHALL PHASE 2 COMMUNITY
WASTEWATER PROJECT
This Project involves the construction of on-lot septic tank and effluent pumping
systems, approximately one mile of collection force main, a secondary treatment
system at the existing Marshall Community Wastewater site, and addition of 600
lineal feet of standard gravity leaching trench to the existing leach field system
serving the community of Marshall, California.
Planroom &
Online
248
2:00 PM
VALLEJO
BLUE ROCK SPRINGS GOLF COURSE-CART
BARN PROJECT
Project consists of design, plan review process, procurement, fabrication, and
construction of a metal building system including all associated ventilation,
electrical, signage, doors, and hardware as specified in the Plans and Specifications.
Planroom &
Online
Contact Roland Rojas, Asst Maint Superintendent/Facilities, at (707) 548-4557, or
by email at: [email protected] with any questions.
405
2:00 PM
UNION CITY
WHIPPLE ROAD PAVEMENT REHABILITATION
PROJECT (ONLINE ONLY)
See specifications for complete Scope of Work.
1
Online
2
Online
Questions concerning the Project, based on the bid package, must be submitted by
fax to (510) 489-9468, or by email to: [email protected] to Michael Renk
or phone (510) 675-5303 at least five (5) working days before the time specified for
bid opening.
Available ONLINE ONLY!!!
492
2:00 PM
SONOMA
COUNTY
CALTRANS 04-1SS224 RETAINING WALL AND
SLOPE PROTECTION (ONLINE ONLY)
Retaining wall and slope protection in Sonoma County near Cloverdale 2.5 miles
west of Cloverdale Blvd and 2.3 miles west of Cloverdale Blvd. The Contractor
must have either a Class A License or a combination of Class C Licenses which
constitutes a majority of the work.
Available for viewing ONLINE ONLY!!!
Page 6 of 21
Bid Date
Plan # Bid Time Location
10/23/2014 493
2:00 PM
MERCED
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
HARTLEY SLOUGH SITE MITIGATION PROJECT The Work consists of furnishing all labor, materials and equipment necessary to
(ONLINE ONLY)
excavate and remove debris from the Hartley Slough project area, rebuild the bank
of the Slough, and construct an earthen cap over the consolidated and excavated
debris, in accordance with the Plans and the Specifications.
Online
Available for viewing ONLINE ONLY!!!
10/24/2014 437
3:00 PM
NAPA
NEW SOUTH NAPA EARTHQUAKE - WATER LEAK
The Work generally consists of trench paving at various locations within the City of
EXCAVATION PAVING PROJECT (ONLINE ONLY) Napa due to earthquake related water main breaks, including mobilization,
temporary traffic control, construction area signs, temporary pavement delineation,
dust control, hot mix asphalt.
Online
Available for viewing ONLINE ONLY!!!
10/28/2014 114
432
12:00 PM
CITRUS
HEIGHTS
2:00 PM
ORINDA
NEW SAM'S CLUB #4799-200 REMODEL
CAMINO PABLO PAVEMENT REHABILITATION
PROJECT (ONLINE ONLY)
Div 1-3, 5-11, 13 & 15-16. The Project consists of the construction to remodel an
existing open 131,320 sq. ft. store. Trades include aspalt overlay, striping,
demolition, concrete, polished concrete, structural and miscelleneous steel, rough
carpentry, finish carpentry/millwork, FRP, insulation, EIFS, metal roofing, roofing,
sheet metal, caulking, doors/frames/hardware, steel studs and drywall, tile,
acoustical ceilings, resilient flooring, painting, restroom accessories, vertical barrier
net system, fire sprinklers, plumbing, HVAC, EMS, refrigeration and electrical.
Planroom &
Online
Project consists of pavement rehabilitation, including base repairs, cold planing,
asphalt pavement, HMA overlay, concrete improvements, traffic signal modifications
and striping.
Online
Available for viewing ONLINE ONLY!!!
436
2:00 PM
VARIOUS
REPLACE GLASS PANELS AT COLISEUM, SAN Div 1-2 & 8. The Contractor shall provide all labor, equipment, materials and
LEANDRO, BAY FAIR AND SOUTH HAYWARD
services required for replacing nontempered glass panels with tempered glass ai
STATIONS PLATFORMS - BART (ONLINE ONLY) the platform level at the BART Coliseum, San Leandro, Bay Fair and South
Hayward Stations as specified in the contract requirements, Drawings and
Specifications.
Online
This Project is available for viewing ONLINE ONLY!!!
458
2:00 PM
MARTINEZ
NEW GENERATOR AT 2530 ARNOLD DRIVE,
MARTINEZ (ONLINE ONLY)
The Work includes the installation of a new emergency power generator and
associated work at an existing office building that will be occupied during
construction.
This Project is available for viewing ONLINE ONLY!!!
Page 7 of 21
2
Online
Bid Date
Plan # Bid Time Location
10/28/2014 491
2:00 PM
ALAMEDA
COUNTY
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
CALTRANS 04-4A3424 REPLACE GORE SIGNS
WITH OVERHEAD SIGNS (ONLINE ONLY)
Replace gore signs with overhead signs in Alameda County at various locations.
The Contractor must have either a Class A License or any combination of the
following Class C Licenses which constitutes a majority of the work: C-10, C-12, C31.
Online
Available for viewing ONLINE ONLY!!!
91-94
10/29/2014 488
2:00 PM
SAN
FRANCISCO
JAMES LICK MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12 & 14-17. Project is generally described as school modernization
which includes, but is not limited to, construction of two elevators, replacement of
toilet rooms, renovation of classrooms, offices, and other interior spaces, partial
replacement of windows, doors, plumbing, mechanical, electrical, lighting, fire
alarm, new fire sprinklers, structural shear walls and foundation work, exterior
improvement to play yard, ramps, stairs, metal work, some exterior painting and
repair, fencing, roof equipment and patching, and hazardous materials abatement
as described in Appendix A of the Contract Documents.
10:30 AM
SAN
FRANCISCO
PORT SECURITY FENCES PHASE 4 (ONLINE
ONLY)
Planroom &
Online
The proposed Work will consist of installation of fences at: (1) Piers 94/96, (2) Piers 1
48/50, and (3) Roundhouse.
Online
For more information, contact the Project Engineer, Ken Chu, PE at 415-274-0593.
Available for viewing ONLINE ONLY!!!
86
10:30 AM
SAN
FRANCISCO
BELTLINE BUILDING PROJECT - PHASE I
The Project Scope of Work includes installation of public Men's and Women's
restrooms in the historic Beltline Building's 1944 addition. Work includes selective
demolition and hazardous material removal; installation of walls, doors, tile, flooring
and toilet partitions; installation and repairs of plumbing, mechanical, electrical,
fixtures and systems.
131
2:00 PM
SANTA ROSA
WATER PUMP STATION 3 MODIFICATIONS
Trades include water pollution control, traffic control, clearing and grubbing,
earthwork, roadway excavation (F), subgrade stabilization, stabilization fabric, class
2 aggregate base, slurry seal, asphalt concrete surface, concrete curb, pump station
addition concrete slab foundation, concrete apron, median curb, chain link fence,
gates, removal of existing fence and gate, asphalt concrete dike, generator building
concrete slab foundation, precast drainage structures, storm drain, pump station
water pipe and appurtenances, 100 HP booster pump, pump station building
addition and roof, miscellaneous electrical work, motor control center, PG&E meter
and main switchboard, antenna mast assembly and 230kw generator set.
Page 8 of 21
2
Planroom &
Online
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/29/2014 408
2:00 PM
BODEGA BAY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
BODEGA BAY AQUACULTURE REROOF FOR UC Div 1-2, 6-7 & 22. Provide all labor, materials, equipment, tools, transportation,
DAVIS (ONLINE ONLY)
insurance and services to remove the top layer existing Hypalon roofing material
and prepare the existing built-up roofing substrate to receive the new roofing
application; patch and repair with like materials any dryrotted existing roof decking
encountered; install sloping underlayment on low flat roof section, sloping to
existing roof drains; and reroof with a new fleece backed TPO roofing system,
approximately 15,825 sq. ft.
Online
Available for viewing ONLINE ONLY!!!
414
2:00 PM
MARTINEZ
ALHAMBRA VALLEY ROAD SIDEWALK GAP
CLOSURE (C2007) AND SHELL AVENUE
PEDESTRIAN/BICYCLE IMPROVEMENT
PROJECT (C2008) - ONLINE ONLY
The Project consists of the removal and replacement of approximately 1,400 linear
feet of existing sidewalk/pedestrian facilities and driveways at two locations (Shell
Avenue and Alhambra Valley Road) within the City of Martinez. The necessary
site work includes, but is not limited to, traffic control, utility adjustments, site
demolition and preparation, tree removal, tree installation, earthwork, retaining
walls, P.C.C. sidewalks, driveways, curb and gutter, A. C. paving, ADA curb ramps,
and miscellaneous items of work as specified and required by the Contract
Documents.
Online
Available for viewing ONLINE ONLY!!!
466
2:00 PM
SANTA
CLARA
COUNTY
CALTRANS 04-272044 REHABILITATE PCC & AC Rehabilitate PCC and AC pavements, upgrade guardrails and signs in Santa Clara
PAVEMENTS, UPGRADE GUARDRAILS & SIGNS County in Cupertino and Los Altos from Tantau Avenue Overcrossing to Foothill
(ONLINE ONLY)
Expressway Undercrossing. The Contractor must have either a Class A License or
one of the following Class C Licenses: C-8, C-12.
Online
This Project is available for viewing ONLINE ONLY!!!
468
2:00 PM
GILROY
CALTRANS 04-4C2004 COLD PLANE & OVERLAY, Project includes cold plane and overlay, pedestrian ramp, replace loop detector in
PEDESTRIAN RAMP, REPLACE LOOP
Santa Clara County in and near Gilroy at various locations from Route 101/152
DETECTOR (ONLINE ONLY)
Interchange to Route 152/156 Interchange. The Contractor must have either a
Class A License or any combination of the following Class C Licenses which
constitutes a majority of the work: C-12, C-10.
Online
This Project is available for viewing ONLINE ONLY!!!
406
2:30 PM
SAN PABLO
DAVIS PARK PLAY AREA RENOVATION (ONLINE This bid shall cover the furnishing of all labor, material, equipment, mechanical
ONLY)
workmanship, transportation and services which are required for: Replacement and
installation of a new play structure and surfacing at Davis Park.
Available for viewing ONLINE ONLY!!!
Page 9 of 21
Online
Bid Date
Plan # Bid Time Location
10/29/2014 245
3:00 PM
SEBASTOPO
L
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
SEBASTOPOL COMMUNITY CULTURAL CENTER Div 1, 3, 6-10 & 16. Trades include cast-in-place concrete; interior architectural
OFFICE REMODEL
woodwork; joint sealants; aluminum windows; door hardware; glazing; ceramic tile;
painting; sheet vinyl; door mat; microflex structures; toilet accessories; drinking
fountain; lighting; and electrical.
Planroom &
Online
Please direct all questions regarding the project Plans and specifications in writing
to the Architect, Alexis Persinger, with Persinger Architects and Associates, 5875
Ross Branch Road, Sebastopol, CA 95472, (707) 887-0700.
Questions regarding other contract provisions, bonding, and insurance may be
addressed to Susan Kelly, Engineering Director, at (707) 823-2151.
10/30/2014 215
1:30 PM
SAN RAFAEL
SLUDGE THICKENING SYSTEM REPLACEMENT Div 1-3, 5, 7, 9-11, 13 & 15-16. Project consists of demolishing the existing
Dissolved Air Flotation Thickeners (DAFT's) and associated equipment and piping;
Furnish and install two (2) Rotary Drum Thickeners; Furnish and install piping,
conduits, and other structural, mechanical, electrical, seismic, and
instrumentation/control equipment systems needed to provide a complete,
functional installation; Provide control integration of new equipment into the existing
Treatment Plant process control system; and test completed system to ensure
proper operation.
1
Planroom &
Online
Contact Brian Thomas, Engineering Manager, at (415) 459-1455, Ext. 121 with any
questions.
145
2:00 PM
DAVIS
CNPRC CAGE WASH FACILITY AT UC DAVIS
244
2:00 PM
SANTA CRUZ NEW MORAN PUMP STATION UPGRADE
Div 1, 3, 7, 9, 22-23, 26 & 31-33. Provide all labor, materials, equipment, tools,
transportation, insurance, and services required to install approximately 100 ft of
roof mounted steam and condensate piping, 400 ft of underground steam and
condensate piping, and general tenant improvements to an unimproved bay of the
CNPRC Shop Building for the purpose of serving a future cage wash machine. Site
work shall include excavation, installation of underground piping, poured in place
insulation and patching of asphalt roadway. Tenant improvements to the 2,200 sq.
ft. open bay shall include concrete slab, concrete flatwork, plumbing, steam fitting,
electrical, HVAC and architectural sheet metal improvements. Work will be
performed within the California National Primate Center and shall require health
screenings for all workers.
The Moran Pump Station Upgrade project will provide for removal of the existing
shaft driven pumps and installation of new 3 new pumps, concrete bases, valves
and associated piping, etc.
Contact Marcella Bailey, Project Mgr, at (831) 454-2803 with any questions.
Page 10 of 21
Planroom &
Online
1
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/30/2014 435
2:00 PM
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
SAN RAMON NEW CITYWIDE SCHOOL CROSSING ENHANCEMENT The work consists, in general, of enhancement of crosswalks with pedestrian
PROJECT (ONLINE ONLY)
activated in-pavement warning lights and installation of overhead signal heads and
poles at the locations designated on the Plans. Related items of work include, but
are not limited to, construction signage; removal and installation of signs and posts;
installation of LED enhanced signs and pedestrian pushbuttons on poles;
installation of controllers; pull boxes, conduit, and wiring; removal of pole and signal
heads; installation of pedestrian barricades; removal of existing striping; placement
of new striping; and all
other work necessary for a complete project in accordance with the Plans and
Specifications.
Online
Available for viewing ONLINE ONLY!!!
438
2:00 PM
SANTA ROSA NEW KING ST SEWER AND WATER IMPROVEMENTS - See Specifications for complete Scope of Work. Project is available for viewing
PHASE 2 (ONLINE ONLY)
ONLINE ONLY!!!
Online
439
2:00 PM
CUPERTINO NEW HYDE MIDDLE SCHOOL INTERIM HOUSING
PROJECT (ONLINE ONLY)
Online
2:00 PM
SOUTH SAN NEW TURBO BLOWER #2 AT WATER QUALITY
FRANCISCO
CONTROL PLANT (ONLINE ONLY)
The Project consists of providing all material, labor, equipment, and apparatus,
whether specifically mentioned or not, necessary to relocate storage sheds and
fence post and fabric, provide and install a new transformer and distribution panel,
install all low voltage wiring for Power, Fire Alarm, Clock\Bell Paging, Intercom
Phone, Data, and install new fence posts and fabric for the New Interim Housing
Portables at Hyde Middle School.
Available for viewing ONLINE ONLY!!!
442
Project consists of fabricating, assembling, testing and delivering of a 300 to 335
horsepower high speed motor driven turbo blower system, including specified spare
parts and providing field testing and start-up services.
Online
Available for viewing ONLINE ONLY!!!
800
2:00 PM
MILPITAS
MCCARTHY BLVD. LIGHTING & LANDSCAPE
IMPROVEMENTS PHASE I
Project includes demolition, lighting, refurbish existing fence/sign, paving, planting,
irrigation, water pollution control and traffic control.
Page 11 of 21
1
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/30/2014 433
3:00 PM
SAN JOSE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW 7458 - POLICE ADMINISTRATION AND
Furnish all labor, materials, tools, equipment, supervision, storage, coordination and
COMMUNICATION BUILDINGS (PAB/C) CHILLER any other associated resources necessary to design, furnish and install (including
REPLACEMENTS - ONLINE ONLY
any required demolition of existing systems), new cooling systems and all
appurtenances necessary to meet the requirements set forth in Attachment 6:
Project Definition Manual: Basis of Design of these Specifications for the PAB/C
Chiller Replacements Project. Trades include plumbing, HVAC, testing, adjusting
and balancing and electrical work.
Online
Contact Jim Wilson, Project Manager, at (408) 535-8441 with any questions.
Available for viewing ONLINE ONLY!!!
434
3:00 PM
SAN JOSE
NEW 7585 - DEMOLITION OF KELLEY HOUSE (ONLINE Trades include materials disposal, hazmat protection procedures, back fill and
ONLY)
demolition.
Online
Contact Raj Verma, Project Manager, at (408) 535-8443 with any questions.
Available for viewing ONLINE ONLY!!!
61
10/31/2014 106-107
3:00 PM
CUPERTINO
11:00 AM
LINCOLN
MILLER MIDDLE SCHOOL INTERIM HOUSING
PORTABLES
NEW LINCOLN CA STAKE MEETINGHOUSE NEW
CONSTRUCTION
The Project consists of providing all material, labor, equipment, and apparatus,
whether specifically mentioned or not, necessary to relocate storage sheds and
fence post and fabric, install new fire suppression line and hydrant, provide and
install a new transformer and distribution panel, install all low voltage wiring for
power, fire alarm, clock/bell paging, intercom phone, data, install new fence posts
and fabric, and miscellaneous site work for the New Interim Housing Portables at
Miller Middle School.
Planroom &
Online
Div 1, 3-12, 14, 21-23, 26-28 & 31-33. Ground up 24,811 sq. ft. Meeting House for
the LDS on a 5-acre newly developed site. The Scope will include earthwork,
utilities, paving, concrete flat work, landscaping, structural concrete, masonry,
structural steel, carpentry, casework, thermal insulation, roofing, doors, windows,
drywall, floor coverings, specialties, athletic equipment, baptismal, plumbing, HVAC
and electrical.
Planroom &
Online
PLEASE NOTE: Many of the major trades require a pre-qualification process for
Subcontractors, which will be announced by addendum prior to bid date.
229
12:00 PM
MENLO PARK NEW INFRASTRUCTURE ENGINEERING B136 AND
BSY PUMP STATION COOLING SYSTEM
This posting is for the addition of a Cooling System at Building 136 and at the Beam
Switch Yard Pump Station.
Page 12 of 21
Planroom &
Online
Bid Date
11/4/2014
Plan # Bid Time Location
447
10:00 AM
MARIN
COUNTY
Plan Name
CSI Divisions / Job Description
NEW MMWD SOUTH PIPELINE REPLACEMENT
PROJECT (ONLINE ONLY)
# of
Addenda Plans
Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the
installation of 6,020 feet of 12-, 8-, 6- and 4-inch welded steel and polyvinyl chloride
(PVC) pipe with valves, fittings and appurtenances. The work to be done is located
in San Anselmo, Ross, Tiburon and Belvedere within the County of Marin, California.
Online
Trades include earthwork, asphaltic concrete paving and resurfacing, cathodic
protection magnesium anodes, distribution piping system, concrete, field applied
tape coating systems and environmental protection.
Contact Jake Miller, Project Engineer, at (415) 945-1580.
Available for viewing ONLINE ONLY!!!
87
2:00 PM
STOCKTON
ELEVATOR ALTERATIONS PROJECT AT SAN
JOAQUIN DELTA COLLEGE
1
Div 1, 5, 7-9 & 14-16. The Project was reviewed and approved by the Division of
State Architect (DSA) and it consists of: Repair and renovation of 10 elevators
including HVAC, fire alarm and hardware upgrades; maintenance of all elevators
included in this project during the construction phase and as more specifically
defined in the elevator specifications. There is also an additive alternate for an
extended (5 year) maintenance contract after the completion of this Project, but this
will not be a part of the basis of award.
Planroom &
Online
Technical and general questions must be submitted in writing no later than 3:00 PM
on Monday, October 27, 2014, to Darrin Cline by email at: [email protected],
with a courtesy copy to Maria G. Bernardino, Director of Purchasing and Contracts,
at: [email protected]
11/5/2014
448
10:00 AM
SAN
ANSELMO
NEW 2014-2015 ELDA DRIVE TANK COATING
PROJECT - MMWD (ONLINE ONLY)
Div 1, 9, 13 & 18. This Contract is for furnishing all necessary and required
materials, equipment and labor for completing tank modifications and preparing
surfaces and applying protective coatings to all interior and exterior surfaces of one
(1) 150,000 gallon, 32 ft. diameter, 28 ft. high welded steel water storage tank - Elda
Drive Tank.
Contact Gary Andersen, Project Engineer, at (415) 945-1581 with any questions.
Available for viewing ONLINE ONLY!!!
Page 13 of 21
Online
Bid Date
11/5/2014
Plan # Bid Time Location
431
2:00 PM
FAIRFIELD
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
UTILITY INFRASTRUCTURE UPGRADE
(ENERGY) HVAC/EMS EFFICIENCY PROJECT
ASBESTOS ABATEMENT (ONLINE ONLY)
The Work under this Contract will be in 2 phases. First Phase (Buildings 800 &
1500) will be performed during Winter break of 2014 and Second Phase (Buildings
100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which
includes, but not limited to, the removal of existing HVAC unit at Building 1600, Dry
Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2’x4’ False Ceiling
Panels. Demolition, removal, and disposal of all asbestos containing materials
detailed in the Asbestos Abatement Specifications for Solano Community College,
and as indicated on HMS front end documents, and HMS and Kleinfelder Reports.
All Work to be performed is under a single Prime Contract.
Online
Available for viewing ONLINE ONLY!!!
450
2:00 PM
SAN LUIS
OBISPO
COUNTY
CALTRANS 05-1A7004 CONSTRUCT SOLDIER
PILE RETAINING WALL (ONLINE ONLY)
Construct soldier pile retaining wall in San Luis Obispo County about 19 miles north
of San Simeon from 0.7 mile to 1.0 mile north of Ragged Point Viaduct. The
Contractor must have either a Class A License or any combination of the following
Class C Licenses which constitutes a majority of the work: C-12, C-61D09.
Online
This Project is available for viewing ONLINE ONLY!!!
484
2:00 PM
MOUNTAIN
VIEW
1
2012-2013 MISCELLANEOUS WATER AND
The Work to be performed under this Contract includes the replacement of water
SEWER MAIN REPLACEMENTS (ONLINE ONLY) and sanitary sewer mains. Contract work includes abandonment or removal of
existing facilities, replacement of new pipelines by both open trench and pipe
bursting methods, replacement of water service line and sewer lateral, reconnection
to existing pipelines, sidewalk, and other miscellenous work.
Online
This Project is available for viewing ONLINE ONLY!!!
444
2:30 PM
NEW VARIOUS LOCATIONS PAVEMENT
SAN
FRANCISCO
PRESERVATION FY 2014-2015 NO. 2 (ONLINE
ONLY)
Div 1 & 32. The Work is located on various streets thoughout San Francisco and
consists of pavement preservation using Type 2 and Type 3 micro-surfacing,
traffic routing, temporary pavement markings and all associated work.
Online
Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions.
Available for viewing ONLINE ONLY!!!
446
2:30 PM
NEW PROPOSITION K CURB RAMPS FISCAL YEAR
SAN
FRANCISCO
2013-2014 (ONLINE ONLY)
Div 1 & 31-33. The Work is located at various intersections in San Francisco,
California and consists of curb ramp construction, sewer replacement, traffic routing
and striping, and all associated work.
Contact Amy Lam, Project Manager, at (415) 437-7048 with any questions.
Available for viewing ONLINE ONLY!!!
Page 14 of 21
Online
Bid Date
11/6/2014
Plan # Bid Time Location
400
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
REPLACEMENT OF EMBARCADERO BRIDGE
OVER LAKE MERRITT CHANNEL - REBID
(ONLINE ONLY)
THIS PROJECT IS A REBID!!!
# of
Addenda Plans
Online
The proposed Work consists, in general, of the bridge replacement. Said work
consists of, but is not limited to, bridge removal, structural excavation and backfill,
grading, structural concrete, furnishing and driving cast-in-drilled hole concrete
piles, reinforcement steel and miscellaneous metal work, new restroom building,
environmental protection, traffic control and other work specifically shown on the
Plans or included in the Specifications and these Special Provisions.
For more information, contact Nader Rabahat, Project Manager, at (510) 238-6605.
Available for viewing ONLINE ONLY!!!
(Previously scheduled bid date was 5/22/14. Old Plan #494)
421
2:00 PM
OAKLAND
THE REHABILITATION OF SANITARY SEWERS
AT LAKESIDE PARK PUMP STATION (ONLINE
ONLY)
The proposed Work consists, in general, of the removal of existing sanitary sewer
pumps, excavation, dewatering, shoring and installation of a pre-engineered and
pre-fabricated complete pump station system with associated electrical and alarm
systems, install precast holding tank, and other items of work stated in the Special
Provisions and the Project Plans or as required for a fully functional sanitary sewer
pump station.
1
Online
1
THE REHABILITATION OF SANITARY SEWERS IN The proposed Work consists, in general, of rehabilitating approximately 2,953
THE AREA BOUNDED BY PARK, BOULEVARD, linear feet of existing 6” diameter sewer pipes and approximately 13,774 linear feet
HOLLYWOOD AVE, SUNNYHILLS ROAD AND
of existing 8” diameter sewer pipes by pipe-expanding method; rehabilitating sewer
BRIGHTON AVE (SUBBASIN 54-16) - ONLINE
structures; reconnecting house connection sewers; rehabilitating house connections
ONLY
sewers, and other related works as indicated on the Plans and Specifications.
Online
Contact Gunawan Santoso, PE (Project Manager) at 510-238-7260, or by email at:
[email protected] with any questions.
Available for viewing ONLINE ONLY!!!
422
2:00 PM
OAKLAND
Contact David Ng, Project Manager, at (510) 238-7267, or by email at:
[email protected] with any questions.
Available for viewing ONLINE ONLY!!!
Page 15 of 21
Bid Date
11/6/2014
Plan # Bid Time Location
74-76
2:00 PM
LOS ALTOS
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
FOOTHILL COLLEGE LIBRARY AND LEARNING
CENTER RENOVATION (LEASE/LEASEBACK
PROJECT)
Div 1-3, 5-12, 14, 21-23, 25-28 & 31-33. This Project will be constructed utilizing
multiple trade contractors, each working under a separate Contract with Kitchell
CEM, who is the Lease/Lease Back Contractor for the new library modernization at
Foothill College.
1
Planroom &
Online
The Following is a list of various trade bid packages:
Trade Bid Package 00 44 01:Demolition
Trade Bid Package 00 44 02:Misc Trades
Trade Bid Package 00 44 03:Roofing
Trade Bid Package 00 44 04:Doors & Hardware
Trade Bid Package 00 44 05:Glazing
Trade Bid Package 00 44 06:Painting
Trade Bid Package 00 44 07:Framing, Insulation & GWB
Trade Bid package 00 44 08: Flooring
Trade Bid Package 00 44 09:Acoustical
Trade Bid Package 00 44 10:Mechanical, Plumbing & Fire Sprinkler
Trade Bid Package 00 44 11:Electrical
Trade Bid Package 00 44 12:Landscaping
NOTE: Bidders must be prequalified to submit a bid to Kitchell. The Prequalification
Application must be submiited to Kitchell no later than September 30, 2014.
986
2:00 PM
SAN MATEO
REGIONAL GROUNDWATER STORAGE AND
RECOVERY
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
PLEASE NOTE: This Contract requires bidder pre-qualification by the SFPUC.
Div 1-3, 5-11, 13 & 15-16. The objective of this Project is to drill, install, and
construct 13 groundwater well facilities, including site preparation; clearing/grubbing
and grading; various work on existing groundwater wells; building foundations,
temporary shoring and retaining walls; new pumps, motors and related
appurtenances; ventilation system; trenching and pipeline and conduit construction;
cathodic protection system; chemical treatment equipment, tanks and pumping
systems; electrical power distribution systems, SCADA and I&C control systems;
perimeter security fence; security monitoring and control systems; final grading and
drainage; landscape and irrigation systems; sanitary and storm drain piping and
connections to municipal systems; paving and various other site improvements;
construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water
transmission pipeline. The Work is to be performed in San Mateo, California. The
Engineer's Estimate is approximately between $47 to $50 million. The Contract will
be awarded to the lowest responsible and responsive bidder.
Page 16 of 21
Planroom
Bid Date
Plan # Bid Time Location
11/10/2014 449
2:00 PM
CONCORD
Plan Name
CSI Divisions / Job Description
NEW FARM BUREAU ROAD SAFE ROUTES TO
SCHOOL PROJECT (ONLINE ONLY)
# of
Addenda Plans
The Work to be done, in general, consists of mobilization, traffic control, storm water
pollution control, open trench construction of storm drain, street pavement, concrete
curb and gutter construction, concrete sidewalk construction, concrete ADA ramp
construction, tree removal, potholing of existing utilities, traffic striping and
markings, street lighting, landscape and irrigation construction and all other work as
shown on the Plans and as specified in these Special Provisions.
Online
Available for viewing ONLINE ONLY!!!
931
11/11/2014 110-111
2:00 PM
MOUNTAIN
VIEW
1
LIGHT RAIL EFFICIENCY PROJECT: MOUNTAIN Div 1-3, 10, 26 & 31-34. The Project will add a second light rail track over a
VIEW PHASE 2 - VTA
distance of approximately 3,000 feet, including closure and removal of the existing
Evelyn Light Rail Station, installation of light rail support systems, and modifications
to the municipal drain system.
10:00 AM
GREENFIELD NEW MAGNOLIA PLACE SENIOR APARTMENTS
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Project consists of the construction of a 32-unit, 26,220 sq. ft. building complete with
architectural, civil, electrical, landscaping, plumbing, mechanical and structural
trades.
Page 17 of 21
Planroom &
Online
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/12/2014 210-211
1:30 PM
CASTRO
VALLEY,
ALAMO AND
LAFAYETTE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
EDEN RESERVOIR REPLACEMENT AND ROUND Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33, 40 & 43. Work includes the following:
HILL RESERVOIR REHABILITATION - EBMUD
1). At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million
gallon bolted steel temporary tank, foundation, related piping, and appurtenances;
demolish existing 1.6-MG welded steel Eden Reservoir including the exterior
wooden architectural screen; construct two, 0.45 million gallon welded steel
reservoirs with aluminum geodesic dome roofs, foundations, piping, valve
structures, coatings, and appurtenances; disassemble and store 0.28 million gallon
bolted steel temporary tank, restore temporary tank site, pave reservoir site, install
irrigation and landscaping, install fencing and perform related work as specified in
the Contract Documents at Eden Reservoir, located near the intersection of
Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda
County), California.
Planroom &
Online
2). At Round Hill Reservoir: Construct radio communication towers and related
cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted
steel temporary tank, foundation, piping, and appurtenances; remove exterior
wooden architectural screen from existing Round Hill Reservoir; abrasive blast and
recoat tank interior; low-pressure water clean, prime and top coat tank exterior;
disassemble and store 0.16 million gallon bolted steel temporary tank, pave
reservoir site, install fencing; and perform related work as specified in the Contract
Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place
in Alamo (Unincorporated Contra Costa County), California.
3). At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank,
deliver to Eden Reservoir, remove and replace fencing, restore site, and perform
related work as specified in the Contract Documents at Hink No. 2 Reservoir located
at the end of Vista Bella Drive, Lafayette, California.
454
2:00 PM
SAUSALITO
NEW MISCELLANEOUS UPGRADES PROJECT
(ONLINE ONLY)
This project consists of 6 tasks:
1. Exterior painting of several small buildings.
2. Structural improvements to foundation supports.
3. Replacement of 4 air relief valves on the District’s sewer force main.
4. Collector system modifications to two sewer sediment tanks.
5. One sewer pump replacement.
6. Modifications to a pump station wet well.
Available for viewing ONLINE ONLY!!!
Page 18 of 21
Online
Bid Date
Plan # Bid Time Location
11/12/2014 205
3:00 PM
PETALUMA
Plan Name
CSI Divisions / Job Description
NEW VICTORIA LIFT STATION UPGRADES
# of
Addenda Plans
Div 1, 9, 11, 13 & 15-16. The Work includes modifications to the existing pump
station including, but not limited to, forcemain tie-in, dry pit valve replacement,
removal and replacement of submersible pumps, wet well top replacements,
electrical equipment, controls and instrumentation, bypass pumping during
construction,
site work, and related work as shown in the Contract Documents. Work also
includes
electrical improvements at the La Cresta Water Tanks for SCADA upgrades.
Planroom &
Online
SITE OF WORK: The site of the WORK is located at City of Petaluma Victoria Lift
Station, Intersection of Windsor and West Haven, 1001 Windsor Dr. Petaluma CA
and
La Cresta Water Tanks at the end of Hayes Lane, Petaluma CA.
247
3:00 PM
LOS ALTOS
SMITHWICK THEATER HARDWARE
IMPROVEMENTS AT FOOTHILL COLLEGE
Div 1 & 8-9. Trades include wood doors, FRP doors, door hardware and painting.
Planroom &
Online
All questions must be sent to the District’s Purchasing Office, Attention: Annette
Perez with a copy to Linda Mahi by email to: [email protected] with a copy
to Linda Mahi at: [email protected], or by fax to (650) 948-5194. The deadline
to submit questions is Noon on October 28, 2014. A question form is included
herein, see Bid
Document, 00 31 07. If you do not use the question form, you must still include the
same details in your question that are requested by the form. The District will issue
written response(s) to the bid questions as Amendments to the bid documents. Do
not direct questions to any other person associated with this Project. Such action
will only slow the District’s ability to respond to your inquiry.
11/13/2014 429
2:00 PM
LAFAYETTE
CALTRANS 04-3G1604 CONSTRUCT MULTITIRED SLOPE STRESSING SYSTEM (ONLINE
ONLY)
Construct multi-tired slope stressing system in Contra Costa County in Lafayette 0.6
miles west of Happy Valley Road. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-8, C-12, C-27.
Available for viewing ONLINE ONLY!!!
Page 19 of 21
Online
Bid Date
Plan # Bid Time Location
11/14/2014 441
2:00 PM
RICHMOND
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW RICHMOND PARKWAY INTERCONNECT WIRE Project consists of removal and installation of 275 (200 Base Bid + 75 Alternate)
AND PULLBOX REPLACEMENT (ONLINE ONLY) new traffic rated boxes and construction of reinforced concrete pads around the
boxes in accordance to City Standards, removal of asphalt concrete and concrete
sidewalk as required, and the complete re-wire of the traffic signal interconnect
system along the Richmond Parkway (Base Bid) from San Pablo Avenue to I-580
and Castro Street (Alternate Bid). (See Plans Attached), and for all other work,
items or details not mentioned above that are required by the Drawings, Standard
Specifications, or these Special Provisions.
Online
Available for viewing ONLINE ONLY!!!
11/18/2014 196
2:00 PM
OAKLAND
BART EARTHQUAKE SAFETY PROGRAM
1-7, 9, 20 & 32. The Work in this Contract is part of the BART Earthquake Safety
SEISMIC RETROFIT AND REPAIRS AT VARIOUS Program (the Program). The Program includes construction of structural
LOCATIONS
modifications to the existing system to provide adequate resistance to forces of a
major seismic event. The result will reduce the risk to, and improve the safety of,
patrons and personnel during an earthquake. The Work included in this Contract
includes construction of structural modifications to improve seismic safety of Districtowned structures as described in the Contract Documents. Work includes, but is
not limited to the following:
EMBARCADERO STATION: Removal of existing granite curb and fabrication and
installation of new concrete curb at radial crossover at six (6) station entrance
locations.
DALY CITY STATION and NORTH OAKLAND AERIALS including ROCKRIDGE
STATION PARKING LOT: Removal of existing fire protective coating and
installation of new fire protective coating and painting over existing fiber reinforced
polymer (FRP) wrapped casings at various locations.
SAN FRANCISCO TRANSITION STRUCTURE (SFTS): Fabricate and install
stainless steel fence panels, install tamper proof screws, install walkway markings,
replace light fixture, install pushbutton signage, and repair leak(s) at planter.
Page 20 of 21
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/18/2014 209
2:00 PM
FREMONT
Plan Name
CSI Divisions / Job Description
NEW WARM SPRINGS EXTENSION WETLAND
MITIGATION SITE - BART
# of
Addenda Plans
Div 1-3, 5-7, 10 & 31-33. The Work includes furnishing all labor, equipment,
materials, except for District-Furnished plants and cuttings, and services to
construct a wetland mitigation site adjacent to the Warm Springs Extension
trackway in the City of Fremont, CA as described in Contract Specification Section
01 11 00 Summary of Work.
Planroom &
Online
Prospective Bidders are requested to make every effort to attend the one and only
scheduled pre-Bid meeting and site tour as the majority of the Jobsite is a BART
construction site. Cameras will be allowed at the job site tour. Interested
prospective Bidders are requested to confirm their intention to attend by notifying
Contract Administrator, Sunni Gunawardena, telephone (510) 464-6550 prior to the
date of the
scheduled pre-bid meeting and site tour.
416
2:00 PM
DALY CITY
REPLACE GLASS PANELS AT DALY CITY
STATION PLATFORM - BART (ONLINE ONLY)
Contractor shall provide all labor, equipment, materials and services required for
replacing non-tempered glass panels with tempered glass at the platform level at
the BART Daly City Station.
Online
Contact Anita Maynar at (510) 464-6543 with any questions.
Available for viewing ONLINE ONLY!!!
462
2:00 PM
SAN
FRANCISCO
AND
ALAMEDA
COUNTIES
CALTRANS 04-013524 REMOVE BRIDGE
Remove bridge (portion) and salvage bridge elements in the City and County of San
(PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8
ONLINE ONLY
mile west of the Toll Plaza. The Contractor must have either a Class A License or a
combination of Class C Licenses which constitutes a majority of the work.
Online
This Project is available for viewing ONLINE ONLY!!!
478
2:00 PM
CUPERTINO
MOT RESTROOM REMODEL AT OPERATION
CENTER (ONLINE ONLY)
The Project consists of all materials, labor, equipment, and apparatus, whether
specifically mentioned or not, necessary to remodel MOT Department’s women’s
and men’s restrooms per McKim Architect’s Plans and Specifications. The
restrooms are located in CUSD’s facilities building at Operations Center.
1
Online
This Project is available for viewing ONLINE ONLY!!!
11/20/2014 430
2:00 PM
SAN
FRANCISCO
SCHWERIN STREET SEWER SYSTEM
IMPROVEMENT (ONLINE ONLY)
Div 1-3, 5 & 9. The objective of the Project Installation of new auxiliary wet weather
sewer by means of microtunneling and replacement of existing local sewers. The
Work is to be performed in San Francisco, California.
Available for viewing ONLINE ONLY!!!
Page 21 of 21
Online