WEEKLY PLAN LIST - Friday, October 10, 2014 www.bxofsf.com

THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363
WEEKLY PLAN LIST - Friday, October 10, 2014
(All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com
Bid Date
Plan # Bid Time Location
10/10/2014 425
2:00 PM
AUBURN
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
AMERICAN RIVER PUMP STATION
IMPROVEMENTS (ONLINE ONLY)
1
Div 1-5, 7-11 & 15-16. In accordance with Plans and Specifications prepared by
West Yost Associates, the Work includes the furnishing of all labor, materials, tax,
equipment and services for the construction and completion of improvements to the
American River Pump Station including installation of a 41 CFS pump and 1500 HP
motor provided by the Owner. The Work will include procurement and installation of
a variable frequency drive (VFD), construction of a new stand-alone concrete
masonry building to house the VFD, pump installation, connection to the discharge
header, isolation and check valves, and electrical power and controls modifications.
The Work also includes removing twelve fish screens at the river intake, rotating
180-degrees, and reinstalling all screens.
Online
This Project is available for viewing ONLINE ONLY!!!
490
2:30 PM
SAN MATEO
CHANNEL PILING AND NAVIGATION LIGHT
INSTALLATION PROJECT (ONLINE ONLY)
Project consists of driving a 14" square (normal size) concrete pile; installing a prefabricated galvanized steel platform (supplied by the Harbormaster); installing a prefabricated galvanized ladder (supplied by Harbormaster); and installing a
navigational light atop of the lantern stand (supplied by Harbormaster) on the
platform.
Online
Available for viewing ONLINE ONLY!!!
228
3:00 PM
SAN
FRANCISCO
OCEAN AVENUE CAMPUS ENTRANCE DOOR & Div 1-2 & 8. Project comprises of replacing existing exterior doors/storefront doors
HARDWARE REPLACEMENT - CCSF
at 12 locations within 5 buildings, at two of these locations replace overhead
transom and or storefront window systems.
Page 1 of 23
1
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/13/2014 426
2:00 PM
RODEO
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
COMPREHENSIVE WASTEWATER MASTER
PLAN NEAR TERM IMPROVEMENTS - SEWER
YEAR 1 IMPROVEMENTS (ONLINE ONLY)
Div 1-3, 5 & 15. Project consists of pipebursting rehabilitation of 2,400 lineal feet of 1
6-inch VCP sewer with same size or larger diameter HDPE SDR17 pipe; open-cut
replacement of 2,400 lineal feet of 6, 8, 10, and 15-inch VCP or PVC sewer with
larger diameter PVC SDR-26 sewer; open cut installation of 1,600 lineal feet of 6, 8,
and 12-inch PVC SDR-26 sewer; replacement of 19 existing manholes with new
manholes; installation of 14 new manholes; replacement and or reconnection of
approximately 110 building laterals; abandonment of approximately 1,700 lineal feet
of 6 and 8-inch VCP sewer; traffic control, SWPPP requirements, and
miscellaneous surface restoration work.
Online
This Project is available for viewing ONLINE ONLY!!!
10/14/2014 134
10:00 AM
SACRAMENT
O
FITNESS EVOLUTION - SACRAMENTO
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Planroom &
Online
Project consists of tenant improvement work to include demolition, concrete patch
back, masonry, structural steel, architectural carpentry, insulation, roofing, doors
and hardware, storefront/mirrors, metal stud/drywall, ceramic tile, acoustical ceiling,
sealed concrete, painting, toilet accessories, lockers, fire sprinklers, plumbing,
HVAC, and electrical.
135
10:00 AM
SAN JOSE
FITNESS EVOLUTION - SAN JOSE
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Planroom &
Online
Tenant improvement project which includes sawcut, demolition, concrete, structural
steel, millwork / finish carpentry, insulation, roofing (patch), doors / frames /
hardware, glazing / mirrors, drywall / metal framing, ceramic tile, resilient flooring,
concrete sealing, painting, toilet partitions / accessories, lockers, fire sprinklers,
plumbing, HVAC and electrical.
136
10:00 AM
RANCHO
CORDOVA
FITNESS EVOLUTION - RANCHO CORDOVA
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Planroom &
Online
Construct tenant improvements, including demolition, concrete patch back,
masonry, structural steel, architectural millwork / finish carpentry, insulation, roofing,
doors and hardware, storefront/mirrors, metal stud / drywall, ceramic tile, acoustical
ceiling, resilient flooring, sealed concrete, painting, toilet accessories, lockers, fire
sprinklers, plumbing, HVAC and electrical.
459
10:00 AM
SAUSALITO
FFIP ROSS SAUSALITO PIPELINE
REPLACEMENT PROJECT - MMWD (ONLINE
ONLY)
Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the
installation of 2,720 feet of 12, 8, 6, 4, and 2-inch welded steel pipe with valves,
fittings, and appurtenances. The Work to be done is located in the City of Sausalito
within the County of Marin, California.
Contact Elysha Anderson, Project Engineer, at (415) 945-1572 with any questions.
This Project is available for viewing ONLINE ONLY!!!
Page 2 of 23
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
10/14/2014 148
2:00 PM
SAN
FRANCISCO
JAMES LICK MIDDLE SCHOOL INTERIM
HOUSING PROJECT
Div 1-3, 6, 10, 16. The Project is generally described as: installation of (11) eleven
24x40 re-locatable classrooms and (1) one 12 x 40 re-locatable restroom including,
but not limited to, connection of utilities, providing temporary power infrastructure,
telecommunications work including tie in to existing systems at the main building,
asphalt at ramps for ADA Access, Fire/Life-Safety systems and miscellaneous site
work.
440
2:00 PM
FAIRFIELD
REPLACEMENT OF MEDIA IN FILTER #3 AT
NORTH BAY REGIONAL WTP (ONLINE ONLY)
Project consists of the removal and replacement of the sand and granular activated
carbon media in a two-bay filter at the North Bay Regional Water Treatment Plant.
CONTRACTOR is responsible for disposing of the existing media at
CONTRACTOR’S cost. CONTRACTOR is to remove and dispose of existing
nozzles at CONTRACTOR’S cost, and CONTRACTOR installs new City-provided
nozzles.
Planroom &
Online
2
Online
1
FILTER INFLUENT & WASTE GATE VALVE
Div 1, 5, 9-10 & 15. Project comprises of the removal of existing 30-inch Influent
REPLACEMENT AT NORTH BAY REGIONAL WTP Valves and 36-inch Waste Gate Valves for eight (8) filter bays and the installation of
(ONLINE ONLY)
new CONTRACTOR furnished valves and gaskets, along with the removal and
replacement of control rods, universal joints and stem guides. The Contract
includes any other work as specified in the Contract Documents, and as directed
by the Engineer.
Online
This Project is available for viewing ONLINE ONLY!!!
445
2:00 PM
FAIRFIELD
This Project is available for viewing ONLINE ONLY!!!
486
2:00 PM
MENLO PARK
BURGESS AQUATIC CENTER LAP AND
The Project consists of furnishing all labor, materials, equipment, and performing all 1
INSTRUCTIONAL POOLS VARIABLE
work necessary and incidental to install and startup of Variable Frequency Drive
FREQUENCY DRIVE UPGRADES (ONLINE ONLY) systems and install new impellers on each pump on the lap and instructional pools
at the Burgess Aquatic Center. The pools are located at 501 Laurel Street in the
City of Menlo Park.
Online
Any questions concerning the bid documents shall be addressed to Carl Thomas at
(650) 330-6797.
Available for viewing ONLINE ONLY!!!
487
2:00 PM
MENLO PARK
BELLE HAVEN POOL VARIABLE FREQUENCY
DRIVE UPGRADES (ONLINE ONLY)
The Project consists of furnishing all labor, materials, equipment, and performing all
work necessary and incidental to install and startup of Variable Frequency Drive
systems at the Belle Haven Pool. The pool is located at 100 Terminal Avenue.
Any questions concerning the bid documents shall be addressed to Carl Thomas at
(650) 330-6797.
Available for viewing ONLINE ONLY!!!
Page 3 of 23
Online
Bid Date
Plan # Bid Time Location
10/14/2014 472
2:30 PM
MORGAN
HILL
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
DEWITT AVENUE SIDEWALK EXTENSION
PROJECT (ONLINE ONLY)
The Scope of Work includes: constructing and installing an asphalt sidewalk,
constructing asphalt driveway approaches, and relocating signs and mailboxes per
the attached Plans and Specifications. This Project requires a valid California
Contractor’s License for the following classification(s): A-General Engineering
Contractor or C-12, Earthwork and Paving Contractor.
Online
This Project is available for viewing ONLINE ONLY!!!
474
3:00 PM
MOUNTAIN
VIEW
COAST CASEY STORM WATER PUMP STATION The Work to be performed under this Contract consists of, in general, the
ACCESS MANHOLE INSTALLATION (ONLINE
installation of three (3) access manholes at Coast Casey Storm Water Pump
ONLY)
Station. Contract work includes, but is not limited to, saw cutting the existing slab
over the existing wet well, installation of steel reinforcing, and placing forms and
concrete.
Online
This Project is available for viewing ONLINE ONLY!!!
10/15/2014 217
309
1:30 PM
OAKLAND
ADELINE MAINTENANCE CENTER COMPLEX
FIRE ALARM SYSTEM UPGRADE - EBMUD
11:00 AM
SAN RAFAEL NEW SHOP AND ADMIN BUILDING REMODEL 2014
Div 1-2, 7, 9, 26 & 28. Work includes the replacement of the existing fire alarm
system (FAS) for the six buildings at the Adeline Maintenance Center (AMC)
complex with a new FAS utilizing new fire alarm control units (FACU). The
Contractor shall demolish the existing FAS and furnish, install, test, and commission
the new FAS for the AMC complex buildings. Work includes, but is not limited to,
removing existing conduit and wiring, salvaging existing equipment (as noted),
providing fire alarm final design and permit ready submittals to the Oakland Fire
Department, obtaining fire alarm construction permits, furnishing new equipment as
indicated, installing new conduit and wiring, installing new equipment as noted,
testing wiring and new FAS equipment, coordinating and providing FAS training for
EBMUD staff, commissioning the new FAS with the Oakland Fire Department, and
associated ancillary work related to the tasks above.
Div 1-2, 5-6, 8-9, 23 & 26. The Project work is generally described as:
Planroom &
Online
1
Planroom &
Online
a. Remodeling of an existing crew lunch room located on the second floor of the
District’s Shop Building, including but not limited to, furnishing and installation of
miscellaneous accessories and appliances.
b. Modification of an existing office into two offices, including but not limited to,
furnishing and installation of miscellaneous appliances and accessories.
452
2:00 PM
NAPA
COUNTY
CALTRANS 04-3G7604 INSTALL HORIZONTAL
DRAINS, SLOPE INDICATORS, AND HIGHWAY
PLANTING (ONLINE ONLY)
Install horizontal drains, slope indicators, and highway planting in Napa County near 1
Capell Creek Bridge. The Contractor must have either a Class A License or Class
C-12 License.
This Project is available for viewing ONLINE ONLY!!!
Page 4 of 23
Online
Bid Date
Plan # Bid Time Location
10/15/2014 453
2:00 PM
SANTA
BARBARA
AND SAN
LUIS OBISPO
COUNTIES
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CALTRANS 05-0R8304 CONSTRUCT CONCRETE Construct concrete curb ramps, sidewalk and HMA pavement in Santa Barbara and 1
CURB RAMPS, SIDEWALK, AND HMA PAVEMENT San Luis Obispo Counties at various locations. The Contractor must have either a
(ONLINE ONLY)
Class A License or any combination of the following Class C Licenses which
constitutes a majority of the work: C-8, C-10.
Online
This Project is available for viewing ONLINE ONLY!!!
115
2:30 PM
APTOS
APTOS PUMP STATION PROJECT
2
Div 1-9, 22, 26, 31-33, 40 & 43. The Project consists of constructing a booster
pump station at 9033 Soquel Drive in Aptos. The Contractor shall provide pumps
and associated facilities including, but not limited to, pumps, motors, pipes,
supports, gauges, MCC/MSB panel, miscellaneous electrical equipment and
conduits, concrete structures, CMU building, site grading, above and underground
pipes/appurtenances/connections, permanent fencing and other items as expressed
in the project Plans and Specifications, and construct approximately 150 LF of water
main with associated trenching and paving.
Planroom &
Online
407
2:30 PM
SAN
FRANCISCO
PAVEMENT RENOVATION, SEWER
REPLACEMENT, AND WATERMAIN
INSTALLATION - HAIGHT ST & HAYES ST
(ONLINE ONLY)
5
Div 1-3, 5, 26 & 31-33. The Work is located on Haight St, from Ashbury St to
Laguna St, and on Hayes St from Clayton St to Market St / Larkin St and consists of
demolition, pavement renovation, curb ramp construction, sewer replacement and
drainage work, watermain installation, AWSS relocation traffic signal conduits,
audible pedestrian signal installation, traffic control, and all associated work.
Online
For more information, contact the Project Manager, Ramon Kong at (415) 554-8280.
This Project is available for viewing ONLINE ONLY!!!
10/16/2014 403
10:00 AM
CONCORD
NEW CONCORD BOULEVARD PAVING AND STRIPING The Work to be done, in general, consists of saw cut up to 7' from lip of gutter, dig
(FROM SIXTH ST TO FARM BUREAU ROAD) out existing pavement and base, reconstruct base, replace pavement and striping.
ONLINE ONLY
The width of te work varies as shown on the Plans. Necessary work to construct
these items shall include, but not limited to, clearing and grubbing, roadway
excavation, traffic control, and adjustment of valve box, and all other work as
specified in the Plans and Specifications.
For information regarding this project, contact Mark Migliore, PE, Project Manager,
at (925) 671-3422.
Available for viewing ONLINE ONLY!!!
Page 5 of 23
1
Online
Bid Date
Plan # Bid Time Location
10/16/2014 443
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
BOARDING AREA 'G' 400 HERTZ SYSTEM
INFRASTRUCTURE IMPROVEMENTS AT SFO
(ONLINE ONLY)
Div 1-2 & 26. This Project calls for the completion of upgrading the existing 400
Hertz system at Boarding Area 'G' by installing new equipment such as cables,
conduits, pantographs, circuit breakers, disconnect switches, and gate boxes.
# of
Addenda Plans
Online
Contact Tin Nguyen, Contract Manager, at 650-821-5540, or by email at:
[email protected] with any questions.
This Project is available for viewing ONLINE ONLY!!!
480
2:00 PM
SAN
LEANDRO
CALTRANS 04-2G8604 CONSTRUCT RETAINING Project consists of constructing a retaining wall, planting, and modifying lighting in
WALL, PLANTING, AND MODIFY LIGHTING
Alameda County in San Leandro at Bendict Drive Off-Ramp. The Contractor must
(ONLINE ONLY)
have either a Class A License or one of the following Class C Licenses: C-8, C-12,
C-27.
3
Online
2
Online
This Project is available for viewing ONLINE ONLY!!!
489
2:00 PM
SAN
FRANCISCO
8-INCH DUCTILE IRON PIPE MAIN INSTALLATION Subcontracting opportunities may include, but not limited, to the following major
ON CLEMENT ST FROM ARGUELLO BLVD TO
types of work: trucking, hauling, shoring, pavement restoration, sawcutting, and
14TH AVE (ONLINE ONLY)
traffic control.
Trades include excavation & backfill, pavement restoration, ductile iron & fittings,
polythylene encasement of ductile iron pipe & fittings, removal ofd SFWD-owned
valve box & cover, installation of screw taps, service pipe & fittings, repair &
replacement of side sewer.
This Project is available for viewing ONLINE ONLY!!!
Page 6 of 23
Bid Date
Plan # Bid Time Location
10/16/2014 74-76
2:00 PM
LOS ALTOS
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
FOOTHILL COLLEGE LIBRARY AND LEARNING
CENTER RENOVATION (LEASE/LEASEBACK
PROJECT)
Div 1-3, 5-12, 14, 21-23, 25-28 & 31-33. This Project will be constructed utilizing
multiple trade contractors, each working under a separate Contract with Kitchell
CEM, who is the Lease/Lease Back Contractor for the new library modernization at
Foothill College.
Planroom &
Online
The Following is a list of various trade bid packages:
Trade Bid Package 00 44 01:Demolition
Trade Bid Package 00 44 02:Misc Trades
Trade Bid Package 00 44 03:Roofing
Trade Bid Package 00 44 04:Doors & Hardware
Trade Bid Package 00 44 05:Glazing
Trade Bid Package 00 44 06:Painting
Trade Bid Package 00 44 07:Framing, Insulation & GWB
Trade Bid package 00 44 08: Flooring
Trade Bid Package 00 44 09:Acoustical
Trade Bid Package 00 44 10:Mechanical, Plumbing & Fire Sprinkler
Trade Bid Package 00 44 11:Electrical
Trade Bid Package 00 44 12:Landscaping
NOTE: Bidders must be prequalified to submit a bid to Kitchell. The Prequalification
Application must be submiited to Kitchell no later than September 30, 2014.
469
2:30 PM
MORGAN
HILL
MAST STREET WATER MAIN INSTALLATION
PROJECT (ONLINE ONLY)
The Scope of Work includes: Perform all work associated with the installation of a
new 16" DIP water main along Mast Street and Railroad Avenue, including boring
and jacking under the UPRR tracks. Additional work includes; connections to
existing mains, transferring water services to new main, abandoning old main,
testing and chlorinating, and pavement restoration.
Online
This Project is available for viewing ONLINE ONLY!!!
181
3:00 PM
SAN JOSE
7749: FIRE STATION NO. 16 REPIPING,
RESTROOM & KITCHEN RENOVATION
Div 1-3, 6-10 & 15-16. Trades include drilling, sawcutting and removal of concrete,
minor demolition and remodeling, trenching and backfilling for utilities concrete,
rough carpentry, finish carpentry, custom cabinetwork, fiberglass reinforced plastic
panels, underslab vapor barrier, insulation, access panels, gypsum board, ceramic
tile, concrete polishing flooring and base, retro-plate special concrete floor finishes
with colored dye specifications, painting, toilet accessories and fixtures, plumbing,
mechanical, and electrical.
Contact Edwin Garcia, Project Manager, at (408) 975-7249 with any questions.
Page 7 of 23
2
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/16/2014 479
3:00 PM
SAN JOSE
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
6915 - RYEGATE COURT AND SCOTTSVILLE
COURT SANITARY SEWER (ONLINE ONLY)
Project consists of dust control, mobilization, water pollution control, clearing and
grubbing, watering, finishing roadway, aggregate bases, deep lift asphalt base,
asphalt concrete, concrete structures, reinforcement, concrete, curbs and
sidewalks, monuments, traffic stripes and pavement markings, signals, lighting and
electrical systems, asphaltic emulsions, pipes and structures, trench excavation,
bedding and backfill, pipe installation, sanitary sewer rehabilitation, cleaning
pipelines, and sanitary manhole rehabilitation
Online
Contact James Thompson, Project Manager, at (408) 535-5300 with any questions.
This Project is available for viewing ONLINE ONLY!!!
481
3:00 PM
SAN JOSE
7645 - MISCELLANEOUS SANITARY SEWER
REPAIRS FY 2014-2015 (PACKAGE II) - ONLINE
ONLY
Project consists of dust control, mobilization, water pollution control, clearing and
grubbing, watering, finishing roadway, aggregate bases, deep lift asphalt base,
asphalt concrete, concrete structures, reinforcement, concrete, curbs and
sidewalks, monuments, traffic stripes and pavement markings, signals, lighting and
electrical systems, asphaltic emulsions, pipes and structures, trench excavation,
bedding and backfill, pipe installation, sanitary sewer rehabilitation, cleaning
pipelines, and sanitary manhole rehabilitation.
Online
Contact Dustin Shitanishi, Project Manager, at (408) 793-5517 with any questions.
This Project is available for viewing ONLINE ONLY!!!
10/17/2014 104
2:00 PM
REDWOOD
CITY
1090 MILLS MAINTENANCE & TRANSPORATION Div 1-3, 5-10, 12, 21-23, 26-27 & 32-33. Alten Construction is the selected General
FACILITY (LEASE/LEASEBACK PROJECT)
Contractor for this Lease/Leaseback project. Project includes conversion of existing
Office Space into the Maintenance and Transportation Facility for Sequoia Union
High School District. Prevailing Wage Required.
Trades needed, but not limited to, Demolition; Earthwork; Erosion Control; Site
Drainage; Water Distribution; Sanitary Sewer; Asphalt Paving; Pavement Markings;
Site Signage; Fences and Gates; Concrete Reinforcement; Site and Structural
Concrete; Structural and Miscellaneous Steel; Rough and Finish Carpentry;
Cabinets; Waterproofing; Insulation; Roof Patching; Sheet Metal Flashing; Vapor
Control Systems; Joint Sealants; Doors, Frames and Hardware; Overhead Doors;
Storefront Systems; Glass and Glazing; Cement Plaster; Gypsum Board; Acoustical
Ceilings; Resilient Flooring; FRP Panels; Painting; Window Coverings; Fire
Sprinklers: Plumbing; HVAC; and Electrical.
Page 8 of 23
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/17/2014 208
2:00 PM
SAN
FRANCISCO
411
2:00 PM
ARROYO
GRANDE
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
SAN FRANCISCO ROADWAY BRIDGES
REPLACEMENT PROJECT - CALTRAIN
Div 2-3, 5, 9 & 16. San Francisco Roadway Bridges Replacement Project for 22nd 4
Street, 23rd Street, and Paul Avenue in San Francisco, California. This Public
Works Project will remove/replace existing two-span steel-through girder bridges
(22nd Street, 23rd Street, and Paul Avenue) due to deteriorated condition; and
remove/relocate/reconstruct existing utility lines; provide temporary support as
applicable at each bridge. The Work is more fully described in the Contract
Documents. Bidders and their proposed Subcontractors shall hold such licenses as
may be required by the laws of the State of California for the performance of the
Work specified in the Contract Documents. Bidders bidding as the Prime Contractor
shall possess a valid California General Engineering Contractor “A” License in the
State of California at the time of Contract award and throughout the contract term.
The Contractor will also be required to ensure that all Subcontractors working on the
project are holding valid licenses suitable for their trade. The Contractor shall
perform with its own organization work amounting to at least 40% of the Grand Total
Bid Price provided in the Contract. Prevailing wages shall apply. Bidder's Security,
Performance Bond and Payment Bond will be required.
NEW ARROYO GRANDE SHOPPING CENTER SWC
EAST GRAND AVE & ELM STREET ARROYO
GRANDE (ONLINE ONLY)
Div 1-12, 21-23, 26-28 & 31-33. This Project consists of the development of
approximately 7 acre site, and about 16,000 sq. ft. of new building and remodeling
of existing buildings (see brief summary below).
CIVIL TRADES NEEDED: Survey, Erosion Control, Demolition, Grading, Paving,
Striping/Signage, Concrete, Utilities, Site Lighting, Detectable Warning Systems,
Fencing, Landscaping.
BUILDING TRADES NEEDED: Structural Shoring, Demolition, Concrete, Masonry,
Structural Steel, Rough Carpentry, Insulation, EIFS, Roofing, Sheet Metal,
Caulking/Sealants, Doors, Auto doors, Storefronts, Stucco, Metal Framing/Drywall,
Painting, Awnings, Loading dock equipment, Seismic, Fire Sprinklers, Plumbing,
HVAC, Electrical and Fire Alarm.
PLEASE NOTE: This Project is NOT Union and is NOT Prevailing Wage.
Available for viewing ONLINE ONLY!!!
Page 9 of 23
Planroom &
Online
Online
Bid Date
Plan # Bid Time Location
10/20/2014 130
1:00 PM
NAPA
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
CAMP BERRYESSA IMPROVEMENT PROJECT
3
Div 1-11, 13 & 15-16. Project consists of the construction of an environmental
education camp, including grading; paving of roadways; parking lots and trails;
water system, water treatment, tank and distribution greywater system with
subsurface drip disposal; camp host site; tent cabins; combination restroom shower
building with composting toilets; covered activity areas; boat boarding dock;
electrical system with photovoltaic array, and miscellaneous other site
improvements/modifications. Permits for this work shall be secured by the District.
Planroom &
Online
All questions must be mailed, or emailed to Chris Cahill at: [email protected].
Napa County Regional Park and Open Space District, 1195 Third St., Second Floor,
Napa, CA 94559 by 4:45 PM on Friday, August 29, 2014.
246
2:00 PM
SANTA ROSA NEW LAGUNA TREATMENT PLANT BELT PRESS
Div 1-2, 7, 9 & 23. Project includes mobilization and demobilization, demolition and
BUILDING REROOF AND HVAC IMPROVEMENTS disposal of existing roofing system, installation of roofing system and mechanical
ductwork improvements.
10/21/2014 427
2:00 PM
BERKELEY
NEW SANITARY SEWER REHABILITATION HEARST
AVE FROM BONITA AVE TO SHATTUCK AVE
(ONLINE ONLY)
The Work to be done consists of, but is not limited to, the rehabilitation and
construction of 1001 linear feet of 8-inch diameter sanitary sewer pipe via
pipebursting (Method 'B'), manhole rehabilitation, excavation of approximately 821
linear feet of 4-inch and 6-inch diameter sanitary sewer laterals, and related work.
Planroom &
Online
Online
Available for viewing ONLINE ONLY!!!
428
2:00 PM
BERKELEY
NEW SANITARY SEWER REHABILITATION MARTIN
LUTHER KING JR. WAY, FIFTH ST AND CEDAR
ST (ONLINE ONLY)
The Work to be done consists, in general, of rehabilitation and construction of
approximately 4,036 linear feet of 8-inch diameter sanitary sewer, construction of
manholes, manhole rehabilitation, excavation, replacement of approximately 2,025
linear feet of 4-inch and 6-inch diameter sewer laterals, and related work.
Online
Available for viewing ONLINE ONLY!!!
451
2:00 PM
ALAMEDA
COUNTY
CALTRANS 04-1SS024 REPAIR LANDSLIDE ON Repair landslide on SR-13 at the Moraga Ave Northbound On Ramp in Alameda
SR-13 AT THE MORAGA AVE NORTHBOUND ON County in Oakland near Moraga Ave NB On Ramp. The Contractor must have
RAMP (ONLINE ONLY)
either a Class A License or any combination of the following Class C Licenses
which constitutes a majority of the work: C-8, C-10, C-12.
Online
This Project is available for viewing ONLINE ONLY!!!
461
2:00 PM
FAIRFIELD
LANDSCAPE MAINTENANCE DISTRICT NO. 15 - Landscape Maintenance consists of, but is not limited to, furnishing all labor,
GOLDRIDGE (ONLINE ONLY)
materials, equipment and other services necessary for the complete maintenance of
all the landscape areas, playgrounds, hardscapes, and irrigation in areas as
described in these Special Provisions, and as directed by the City Engineer.
This Project is available for viewing ONLINE ONLY!!!
Page 10 of 23
Online
Bid Date
Plan # Bid Time Location
10/21/2014 494
2:00 PM
DANVILLE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2014/15 PAVEMENT REHABILITATION PROJECT Project includes preparatory tree trimming; storm drain inlet relocation; removal and
(ONLINE ONLY)
replacement of existing storm drain pipe; removal and replacement of existing
Portland Cement concrete curb, sidewalk, curb ramp and valley gutter; subdrain
installation; removal and replacement of existing asphalt concrete pavement
(digouts); pavement cold planning; intsllation of paving mat; installation of asphalt
concrete overlay; removal and replacement of asphalt concrete speed lumps;
removal and replacement new traffic loop detectors; adjusting to grade of survey
monument castings; water valve castings; storm drain and sanitary sewer manhole
covers and other utility lids; removal and replacement of existing paving striping and
markers; traffic control.
Online
Available for viewing ONLINE ONLY!!!
499
2:00 PM
ANTIOCH
2
MAINTENANCE AND EMERGENCY EQUIPMENT The Project is located at the Delta Diablo Wastewater Treatment Plant in Antioch,
STORAGE STRUCTURE (ONLINE ONLY)
CA. The Work includes, but is not limited to, furnishing and installing a new 800 sq.
ft. semi-enclosed pre-engineered building and a new 1515 sq. ft. unenclosed preengineered building. This Project includes all ancillary concrete, coating, and site
improvements work to make a complete and operational project as intended by the
District.
Online
This Project is available for viewing ONLINE ONLY!!!
800
2:00 PM
MILPITAS
MCCARTHY BLVD. LIGHTING & LANDSCAPE
IMPROVEMENTS PHASE I
116
2:30 PM
SAN MATEO NEW COYOTE POINT MARINA FUEL DOCK
IMPROVEMENTS
Project includes demolition, lighting, refurbish existing fence/sign, paving, planting,
irrigation, water pollution control and traffic control.
Planroom &
Online
The Work to be done consists, in general, of replacement of Coyote Point Marina
(CPM) Fuel Dispensing Systems (including hoses and hose reels), Fuel Monitoring
System including Alarms and Sensors, Fuel System Piping, Fire Water Piping,
Potable Water Piping, and Electrical Distribution Panel and Power Lines. Removal
of the existing fuel dispensing system has already been accomplished with the
exception of the Underground Storage Tanks and appurtenances, which are to be
protected in place. Installation consists, in general, of (300± LF) Double Walled
Semi Rigid Gas and Diesel Fuel Piping, (2 EA) Fuel Dispensers with Hoses and
Hose Reels and Containment Sumps, (100± LF) SS Fire Water Piping, (100± LF)
SS Potable
Water Piping and Hose Bib, (300± LF) Plastic Coated Galv. Steel Electrical Conduit
for power supply and fuel system monitoring conductors, and all appurtenances and
hardware associated with these items, as well as any other items and details not
mentioned above but required by the project Plans, Standard Specifications and
these Special Provisions, permit requirements and conditions as attached in
Appendix E of these Special Provisions and as directed by the Engineer.
Planroom &
Online
Page 11 of 23
Bid Date
Plan # Bid Time Location
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
FIRE STATION IMPROVEMENTS
Div 1-12, 21-23 & 26. Project consists of, but is not limited to, Demolition of
standing seam metal roofing, and built-up roofing and sloped plywood and
2x sleepers, flashing, thin brick veneer, interior finishes, furnishings, equipment,
mechanical, electrical and plumbing as shown on drawings; Replacement of thin
brick veneer, glazing, standing seam metal and built-up roofing, flashing, gutters;
New accessible parking space; New interior finishes where designated; New
kitchens and toilet rooms and renovated toilet rooms; Repair and refinishing of
designated surface; New casework for reception area; New doors and hardware as
indicated; New mechanical (HVAC) equipment and distribution as indicated;
Extension of existing automatic fire sprinkler system; New electrical distribution as
indicated; New lighting as indicated; New fire alarm system detection and signal
components as indicated.
Planroom &
Online
Div 1-3, 5-11, 13 & 15-16. Work of this Contract comprises of modifications and
rehabilitation to the existing four buildings, 68-unit residential low-income
apartments units located at 1150 Webster St., San Francisco, CA and associated
Work to the 67,563 sq. ft. site. The Project consists of four existing residential
buildings and one existing community building consisting of 65,580 sq. ft. of
residential area. Two buildings are 3-story walk up apartments and two buildings
are 2-story townhouse structures.
Planroom &
Online
10/22/2014 154
2:00 PM
EMERYVILLE
159
2:00 PM
NEW BUCHANAN PARK APARTMENTS
SAN
FRANCISCO
Trades needed, but not limited to, site work, concrete, metals, wood and plastics,
thermal and moisture protection, doors and windows, finishes, specialties,
equipment, special construction, plumbing, mechanical, electrical and hazmat.
498
2:30 PM
NEW VARIOUS LOCATIONS PAVEMENT RENOVATION Div 1-3 & 31-33. The Work is located on Teresita Blvd between Portola Dr and
SAN
FRANCISCO
NO. 17 SEWER REPLACEMENT AND
Foerster St; Chaves Ave between Rockdale Dr and Evelyn Way; Del Sur Ave
WATERMAIN INSTALLATION (ONLINE ONLY)
between Juanita Way and Chaves Ave; 22nd St between Carolina St and
Wisconsin St; Carolina St between 22nd St and 23rd St; and on Visit.
Online
For more information, contact the Project Manager, Ramon Kong at (415)554-8280.
This Project is available for viewing ONLINE ONLY!!!
497
3:00 PM
SAN
FRANCISCO
ALDEA HOUSING GUTTER REPLACEMENT USCF (ONLINE ONLY)
Div 1, 7 & 9. Project consists of replacement of gutters and downspouts at (9) nine
buildings at the UCSF Aldea Housing Complex: 20 Adolph Sutro Court, 30 Adolph
Sutro Court, 75 Behr Avenue, 80 Behr Avenue, 85 Behr Avenue, 90 Behr Avenue,
95 Behr Avenue, 45 Johnstone Drive and 50 Johnstone Drive.
For more information, contact the University's Project Manager, Julie Gallivan, at
(415) 476-2080.
Available for viewing ONLINE ONLY!!!
Page 12 of 23
Online
Bid Date
Plan # Bid Time Location
10/23/2014 212
2:00 PM
BOULDER
CREEK
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
REGIONAL WATER SYSTEM EMERGENCY
INTERTIES NO. 2, 3 & 4
The Work covered under this Contract shall include the furnishing of all labor,
materials, tools, equipment and performing all work for the installation of
approximately 985 linear feet of 8-inch ductile iron potable water pipeline along
Skypark Drive and Lockewood Lane and crossing Mount Hermon Road;
Approximately 1,500 linear feet of 12-inch HDPE potable water pipeline along a
storage tank access road; Approximately 14,700 linear feet of 12-inch ductile iron
potable water pipeline along Graham Hill Road, Summit Avenue, Roaring Camp
Road, East Zayante Road and West Zayante Road; Approximately 420 linear feet of
12-inch steel potable water pipeline attached to the Conference Road Bridge; A 350gpm pump station adjacent to Skypark Drive near the intersection with Mt. Hermon
Road; and a 700-gpm pump station adjacent to Summit Avenue near the
intersection with Graham Hill Road.
Planroom &
Online
PLEASE NOTE: A hardcopy of 17x11" drawings are available for viewing at the San
Francisco Builders Exchange.
241
2:00 PM
MARSHALL
248
2:00 PM
VALLEJO
MARSHALL PHASE 2 COMMUNITY
WASTEWATER PROJECT
NEW BLUE ROCK SPRINGS GOLF COURSE-CART
BARN PROJECT
This Project involves the construction of on-lot septic tank and effluent pumping
systems, approximately one mile of collection force main, a secondary treatment
system at the existing Marshall Community Wastewater site, and addition of 600
lineal feet of standard gravity leaching trench to the existing leach field system
serving the community of Marshall, California.
Planroom &
Online
Project consists of design, plan review process, procurement, fabrication, and
construction of a metal building system including all associated ventilation,
electrical, signage, doors, and hardware as specified in the Plans and Specifications.
Planroom &
Online
Contact Roland Rojas, Asst Maint Superintendent/Facilities, at (707) 548-4557, or
by email at: [email protected] with any questions.
405
2:00 PM
UNION CITY NEW WHIPPLE ROAD PAVEMENT REHABILITATION
PROJECT (ONLINE ONLY)
See specifications for complete Scope of Work.
Questions concerning the Project, based on the bid package, must be submitted by
fax to (510) 489-9468, or by email to: [email protected] to Michael Renk
or phone (510) 675-5303 at least five (5) working days before the time specified for
bid opening.
Available ONLINE ONLY!!!
Page 13 of 23
1
Online
Bid Date
Plan # Bid Time Location
10/23/2014 484
2:00 PM
MOUNTAIN
VIEW
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2012-2013 MISCELLANEOUS WATER AND
The Work to be performed under this Contract includes the replacement of water
SEWER MAIN REPLACEMENTS (ONLINE ONLY) and sanitary sewer mains. Contract work includes abandonment or removal of
existing facilities, replacement of new pipelines by both open trench and pipe
bursting methods, replacement of water service line and sewer lateral, reconnection
to existing pipelines, sidewalk, and other miscellenous work.
Online
This Project is available for viewing ONLINE ONLY!!!
492
2:00 PM
SONOMA
COUNTY
CALTRANS 04-1SS224 RETAINING WALL AND
SLOPE PROTECTION (ONLINE ONLY)
Retaining wall and slope protection in Sonoma County near Cloverdale 2.5 miles
west of Cloverdale Blvd and 2.3 miles west of Cloverdale Blvd. The Contractor
must have either a Class A License or a combination of Class C Licenses which
constitutes a majority of the work.
1
Online
Available for viewing ONLINE ONLY!!!
493
2:00 PM
MERCED
HARTLEY SLOUGH SITE MITIGATION PROJECT The Work consists of furnishing all labor, materials and equipment necessary to
(ONLINE ONLY)
excavate and remove debris from the Hartley Slough project area, rebuild the bank
of the Slough, and construct an earthen cap over the consolidated and excavated
debris, in accordance with the Plans and the Specifications.
Online
Available for viewing ONLINE ONLY!!!
10/28/2014 432
2:00 PM
ORINDA
NEW CAMINO PABLO PAVEMENT REHABILITATION
PROJECT (ONLINE ONLY)
Project consists of pavement rehabilitation, including base repairs, cold planing,
asphalt pavement, HMA overlay, concrete improvements, traffic signal modifications
and striping.
Online
Available for viewing ONLINE ONLY!!!
436
2:00 PM
VARIOUS
REPLACE GLASS PANELS AT COLISEUM, SAN Div 1-2 & 8. The Contractor shall provide all labor, equipment, materials and
LEANDRO, BAY FAIR AND SOUTH HAYWARD
services required for replacing nontempered glass panels with tempered glass ai
STATIONS PLATFORMS - BART (ONLINE ONLY) the platform level at the BART Coliseum, San Leandro, Bay Fair and South
Hayward Stations as specified in the contract requirements, Drawings and
Specifications.
Online
This Project is available for viewing ONLINE ONLY!!!
458
2:00 PM
MARTINEZ
NEW GENERATOR AT 2530 ARNOLD DRIVE,
MARTINEZ (ONLINE ONLY)
The Work includes the installation of a new emergency power generator and
associated work at an existing office building that will be occupied during
construction.
This Project is available for viewing ONLINE ONLY!!!
Page 14 of 23
1
Online
Bid Date
Plan # Bid Time Location
10/28/2014 491
2:00 PM
ALAMEDA
COUNTY
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
CALTRANS 04-4A3424 REPLACE GORE SIGNS
WITH OVERHEAD SIGNS (ONLINE ONLY)
Replace gore signs with overhead signs in Alameda County at various locations.
The Contractor must have either a Class A License or any combination of the
following Class C Licenses which constitutes a majority of the work: C-10, C-12, C31.
Online
Available for viewing ONLINE ONLY!!!
91-94
10/29/2014 488
2:00 PM
NEW JAMES LICK MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12 & 14-17. Project is generally described as school modernization
SAN
FRANCISCO
which includes, but is not limited to, construction of two elevators, replacement of
toilet rooms, renovation of classrooms, offices, and other interior spaces, partial
replacement of windows, doors, plumbing, mechanical, electrical, lighting, fire
alarm, new fire sprinklers, structural shear walls and foundation work, exterior
improvement to play yard, ramps, stairs, metal work, some exterior painting and
repair, fencing, roof equipment and patching, and hazardous materials abatement
as described in Appendix A of the Contract Documents.
10:30 AM
SAN
FRANCISCO
PORT SECURITY FENCES PHASE 4 (ONLINE
ONLY)
The proposed Work will consist of installation of fences at: (1) Piers 94/96, (2) Piers
48/50, and (3) Roundhouse.
Planroom &
Online
Online
For more information, contact the Project Engineer, Ken Chu, PE at 415-274-0593.
Available for viewing ONLINE ONLY!!!
86
10:30 AM
NEW BELTLINE BUILDING PROJECT - PHASE I
SAN
FRANCISCO
The Project Scope of Work includes installation of public Men's and Women's
restrooms in the historic Beltline Building's 1944 addition. Work includes selective
demolition and hazardous material removal; installation of walls, doors, tile, flooring
and toilet partitions; installation and repairs of plumbing, mechanical, electrical,
fixtures and systems.
Planroom &
Online
131
2:00 PM
SANTA ROSA NEW WATER PUMP STATION 3 MODIFICATIONS
Trades include water pollution control, traffic control, clearing and grubbing,
earthwork, roadway excavation (F), subgrade stabilization, stabilization fabric, class
2 aggregate base, slurry seal, asphalt concrete surface, concrete curb, pump station
addition concrete slab foundation, concrete apron, median curb, chain link fence,
gates, removal of existing fence and gate, asphalt concrete dike, generator building
concrete slab foundation, precast drainage structures, storm drain, pump station
water pipe and appurtenances, 100 HP booster pump, pump station building
addition and roof, miscellaneous electrical work, motor control center, PG&E meter
and main switchboard, antenna mast assembly and 230kw generator set.
Planroom &
Online
Page 15 of 23
Bid Date
Plan # Bid Time Location
10/29/2014 408
2:00 PM
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
BODEGA BAY NEW BODEGA BAY AQUACULTURE REROOF FOR UC Div 1-2, 6-7 & 22. Provide all labor, materials, equipment, tools, transportation,
DAVIS (ONLINE ONLY)
insurance and services to remove the top layer existing Hypalon roofing material
and prepare the existing built-up roofing substrate to receive the new roofing
application; patch and repair with like materials any dryrotted existing roof decking
encountered; install sloping underlayment on low flat roof section, sloping to
existing roof drains; and reroof with a new fleece backed TPO roofing system,
approximately 15,825 sq. ft.
Online
Available for viewing ONLINE ONLY!!!
414
2:00 PM
MARTINEZ
NEW ALHAMBRA VALLEY ROAD SIDEWALK GAP
CLOSURE (C2007) AND SHELL AVENUE
PEDESTRIAN/BICYCLE IMPROVEMENT
PROJECT (C2008) - ONLINE ONLY
The Project consists of the removal and replacement of approximately 1,400 linear
feet of existing sidewalk/pedestrian facilities and driveways at two locations (Shell
Avenue and Alhambra Valley Road) within the City of Martinez. The necessary
site work includes, but is not limited to, traffic control, utility adjustments, site
demolition and preparation, tree removal, tree installation, earthwork, retaining
walls, P.C.C. sidewalks, driveways, curb and gutter, A. C. paving, ADA curb ramps,
and miscellaneous items of work as specified and required by the Contract
Documents.
Online
Available for viewing ONLINE ONLY!!!
466
2:00 PM
SANTA
CLARA
COUNTY
CALTRANS 04-272044 REHABILITATE PCC & AC Rehabilitate PCC and AC pavements, upgrade guardrails and signs in Santa Clara
PAVEMENTS, UPGRADE GUARDRAILS & SIGNS County in Cupertino and Los Altos from Tantau Avenue Overcrossing to Foothill
(ONLINE ONLY)
Expressway Undercrossing. The Contractor must have either a Class A License or
one of the following Class C Licenses: C-8, C-12.
Online
This Project is available for viewing ONLINE ONLY!!!
468
2:00 PM
GILROY
CALTRANS 04-4C2004 COLD PLANE & OVERLAY, Project includes cold plane and overlay, pedestrian ramp, replace loop detector in
PEDESTRIAN RAMP, REPLACE LOOP
Santa Clara County in and near Gilroy at various locations from Route 101/152
DETECTOR (ONLINE ONLY)
Interchange to Route 152/156 Interchange. The Contractor must have either a
Class A License or any combination of the following Class C Licenses which
constitutes a majority of the work: C-12, C-10.
Online
This Project is available for viewing ONLINE ONLY!!!
406
2:30 PM
SAN PABLO
NEW DAVIS PARK PLAY AREA RENOVATION (ONLINE This bid shall cover the furnishing of all labor, material, equipment, mechanical
ONLY)
workmanship, transportation and services which are required for: Replacement and
installation of a new play structure and surfacing at Davis Park.
Available for viewing ONLINE ONLY!!!
Page 16 of 23
Online
Bid Date
Plan # Bid Time Location
10/29/2014 245
3:00 PM
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
SEBASTOPO NEW SEBASTOPOL COMMUNITY CULTURAL CENTER Div 1, 3, 6-10 & 16. Trades include cast-in-place concrete; interior architectural
L
OFFICE REMODEL
woodwork; joint sealants; aluminum windows; door hardware; glazing; ceramic tile;
painting; sheet vinyl; door mat; microflex structures; toilet accessories; drinking
fountain; lighting; and electrical.
Planroom &
Online
Please direct all questions regarding the project Plans and specifications in writing
to the Architect, Alexis Persinger, with Persinger Architects and Associates, 5875
Ross Branch Road, Sebastopol, CA 95472, (707) 887-0700.
Questions regarding other contract provisions, bonding, and insurance may be
addressed to Susan Kelly, Engineering Director, at (707) 823-2151.
10/30/2014 215
1:30 PM
SAN RAFAEL
SLUDGE THICKENING SYSTEM REPLACEMENT Div 1-3, 5, 7, 9-11, 13 & 15-16. Project consists of demolishing the existing
Dissolved Air Flotation Thickeners (DAFT's) and associated equipment and piping;
Furnish and install two (2) Rotary Drum Thickeners; Furnish and install piping,
conduits, and other structural, mechanical, electrical, seismic, and
instrumentation/control equipment systems needed to provide a complete,
functional installation; Provide control integration of new equipment into the existing
Treatment Plant process control system; and test completed system to ensure
proper operation.
Planroom &
Online
Contact Brian Thomas, Engineering Manager, at (415) 459-1455, Ext. 121 with any
questions.
NEW CNPRC CAGE WASH FACILITY AT UC DAVIS
145
2:00 PM
DAVIS
61
3:00 PM
CUPERTINO NEW MILLER MIDDLE SCHOOL INTERIM HOUSING
PORTABLES
Div 1, 3, 7, 9, 22-23, 26 & 31-33. Provide all labor, materials, equipment, tools,
transportation, insurance, and services required to install approximately 100 ft of
roof mounted steam and condensate piping, 400 ft of underground steam and
condensate piping, and general tenant improvements to an unimproved bay of the
CNPRC Shop Building for the purpose of serving a future cage wash machine. Site
work shall include excavation, installation of underground piping, poured in place
insulation and patching of asphalt roadway. Tenant improvements to the 2,200 sq.
ft. open bay shall include concrete slab, concrete flatwork, plumbing, steam fitting,
electrical, HVAC and architectural sheet metal improvements. Work will be
performed within the California National Primate Center and shall require health
screenings for all workers.
Planroom &
Online
The Project consists of providing all material, labor, equipment, and apparatus,
whether specifically mentioned or not, necessary to relocate storage sheds and
fence post and fabric, install new fire suppression line and hydrant, provide and
install a new transformer and distribution panel, install all low voltage wiring for
power, fire alarm, clock/bell paging, intercom phone, data, install new fence posts
and fabric, and miscellaneous site work for the New Interim Housing Portables at
Miller Middle School.
Planroom &
Online
Page 17 of 23
Bid Date
11/4/2014
Plan # Bid Time Location
87
2:00 PM
STOCKTON
Plan Name
CSI Divisions / Job Description
NEW ELEVATOR ALTERATIONS PROJECT AT SAN
JOAQUIN DELTA COLLEGE
# of
Addenda Plans
Div 1, 5, 7-9 & 14-16. The Project was reviewed and approved by the Division of
State Architect (DSA) and it consists of: Repair and renovation of 10 elevators
including HVAC, fire alarm and hardware upgrades; maintenance of all elevators
included in this project during the construction phase and as more specifically
defined in the elevator specifications. There is also an additive alternate for an
extended (5 year) maintenance contract after the completion of this Project, but this
will not be a part of the basis of award.
Planroom &
Online
Technical and general questions must be submitted in writing no later than 3:00 PM
on Monday, October 27, 2014, to Darrin Cline by email at: [email protected],
with a courtesy copy to Maria G. Bernardino, Director of Purchasing and Contracts,
at: [email protected]
11/5/2014
431
2:00 PM
FAIRFIELD
NEW UTILITY INFRASTRUCTURE UPGRADE
(ENERGY) HVAC/EMS EFFICIENCY PROJECT
ASBESTOS ABATEMENT (ONLINE ONLY)
The Work under this Contract will be in 2 phases. First Phase (Buildings 800 &
1500) will be performed during Winter break of 2014 and Second Phase (Buildings
100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which
includes, but not limited to, the removal of existing HVAC unit at Building 1600, Dry
Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2’x4’ False Ceiling
Panels. Demolition, removal, and disposal of all asbestos containing materials
detailed in the Asbestos Abatement Specifications for Solano Community College,
and as indicated on HMS front end documents, and HMS and Kleinfelder Reports.
All Work to be performed is under a single Prime Contract.
Online
Available for viewing ONLINE ONLY!!!
450
2:00 PM
SAN LUIS
OBISPO
COUNTY
CALTRANS 05-1A7004 CONSTRUCT SOLDIER
PILE RETAINING WALL (ONLINE ONLY)
Construct soldier pile retaining wall in San Luis Obispo County about 19 miles north
of San Simeon from 0.7 mile to 1.0 mile north of Ragged Point Viaduct. The
Contractor must have either a Class A License or any combination of the following
Class C Licenses which constitutes a majority of the work: C-12, C-61D09.
This Project is available for viewing ONLINE ONLY!!!
Page 18 of 23
Online
Bid Date
11/6/2014
Plan # Bid Time Location
400
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
NEW REPLACEMENT OF EMBARCADERO BRIDGE
OVER LAKE MERRITT CHANNEL - REBID
(ONLINE ONLY)
# of
Addenda Plans
THIS PROJECT IS A REBID!!!
Online
The proposed Work consists, in general, of the bridge replacement. Said work
consists of, but is not limited to, bridge removal, structural excavation and backfill,
grading, structural concrete, furnishing and driving cast-in-drilled hole concrete
piles, reinforcement steel and miscellaneous metal work, new restroom building,
environmental protection, traffic control and other work specifically shown on the
Plans or included in the Specifications and these Special Provisions.
For more information, contact Nader Rabahat, Project Manager, at (510) 238-6605.
Available for viewing ONLINE ONLY!!!
(Previously scheduled bid date was 5/22/14. Old Plan #494)
421
2:00 PM
OAKLAND
NEW THE REHABILITATION OF SANITARY SEWERS
AT LAKESIDE PARK PUMP STATION (ONLINE
ONLY)
1
Online
1
NEW THE REHABILITATION OF SANITARY SEWERS IN The proposed Work consists, in general, of rehabilitating approximately 2,953
THE AREA BOUNDED BY PARK, BOULEVARD, linear feet of existing 6” diameter sewer pipes and approximately 13,774 linear feet
HOLLYWOOD AVE, SUNNYHILLS ROAD AND
of existing 8” diameter sewer pipes by pipe-expanding method; rehabilitating sewer
BRIGHTON AVE (SUBBASIN 54-16) - ONLINE
structures; reconnecting house connection sewers; rehabilitating house connections
ONLY
sewers, and other related works as indicated on the Plans and Specifications.
Online
The proposed Work consists, in general, of the removal of existing sanitary sewer
pumps, excavation, dewatering, shoring and installation of a pre-engineered and
pre-fabricated complete pump station system with associated electrical and alarm
systems, install precast holding tank, and other items of work stated in the Special
Provisions and the Project Plans or as required for a fully functional sanitary sewer
pump station.
Contact Gunawan Santoso, PE (Project Manager) at 510-238-7260, or by email at:
[email protected] with any questions.
Available for viewing ONLINE ONLY!!!
422
2:00 PM
OAKLAND
Contact David Ng, Project Manager, at (510) 238-7267, or by email at:
[email protected] with any questions.
Available for viewing ONLINE ONLY!!!
Page 19 of 23
Bid Date
11/6/2014
Plan # Bid Time Location
986
2:00 PM
SAN MATEO
Plan Name
CSI Divisions / Job Description
REGIONAL GROUNDWATER STORAGE AND
RECOVERY
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
# of
Addenda Plans
Planroom
PLEASE NOTE: This Contract requires bidder pre-qualification by the SFPUC.
Div 1-3, 5-11, 13 & 15-16. The objective of this Project is to drill, install, and
construct 13 groundwater well facilities, including site preparation; clearing/grubbing
and grading; various work on existing groundwater wells; building foundations,
temporary shoring and retaining walls; new pumps, motors and related
appurtenances; ventilation system; trenching and pipeline and conduit construction;
cathodic protection system; chemical treatment equipment, tanks and pumping
systems; electrical power distribution systems, SCADA and I&C control systems;
perimeter security fence; security monitoring and control systems; final grading and
drainage; landscape and irrigation systems; sanitary and storm drain piping and
connections to municipal systems; paving and various other site improvements;
construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water
transmission pipeline. The Work is to be performed in San Mateo, California. The
Engineer's Estimate is approximately between $47 to $50 million. The Contract will
be awarded to the lowest responsible and responsive bidder.
11/10/2014 931
2:00 PM
MOUNTAIN
VIEW
1
LIGHT RAIL EFFICIENCY PROJECT: MOUNTAIN Div 1-3, 10, 26 & 31-34. The Project will add a second light rail track over a
distance of approximately 3,000 feet, including closure and removal of the existing
VIEW PHASE 2 - VTA
Evelyn Light Rail Station, installation of light rail support systems, and modifications
to the municipal drain system.
Page 20 of 23
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/12/2014 210-211
1:30 PM
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW EDEN RESERVOIR REPLACEMENT AND ROUND Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33, 40 & 43. Work includes the following:
CASTRO
HILL RESERVOIR REHABILITATION - EBMUD
VALLEY,
ALAMO AND
1). At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million
LAFAYETTE
gallon bolted steel temporary tank, foundation, related piping, and appurtenances;
demolish existing 1.6-MG welded steel Eden Reservoir including the exterior
wooden architectural screen; construct two, 0.45 million gallon welded steel
reservoirs with aluminum geodesic dome roofs, foundations, piping, valve
structures, coatings, and appurtenances; disassemble and store 0.28 million gallon
bolted steel temporary tank, restore temporary tank site, pave reservoir site, install
irrigation and landscaping, install fencing and perform related work as specified in
the Contract Documents at Eden Reservoir, located near the intersection of
Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda
County), California.
Planroom &
Online
2). At Round Hill Reservoir: Construct radio communication towers and related
cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted
steel temporary tank, foundation, piping, and appurtenances; remove exterior
wooden architectural screen from existing Round Hill Reservoir; abrasive blast and
recoat tank interior; low-pressure water clean, prime and top coat tank exterior;
disassemble and store 0.16 million gallon bolted steel temporary tank, pave
reservoir site, install fencing; and perform related work as specified in the Contract
Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place
in Alamo (Unincorporated Contra Costa County), California.
3). At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank,
deliver to Eden Reservoir, remove and replace fencing, restore site, and perform
related work as specified in the Contract Documents at Hink No. 2 Reservoir located
at the end of Vista Bella Drive, Lafayette, California.
247
3:00 PM
LOS ALTOS
NEW SMITHWICK THEATER HARDWARE
IMPROVEMENTS AT FOOTHILL COLLEGE
Div 1 & 8-9. Trades include wood doors, FRP doors, door hardware and painting.
All questions must be sent to the District’s Purchasing Office, Attention: Annette
Perez with a copy to Linda Mahi by email to: [email protected] with a copy
to Linda Mahi at: [email protected], or by fax to (650) 948-5194. The deadline
to submit questions is Noon on October 28, 2014. A question form is included
herein, see Bid
Document, 00 31 07. If you do not use the question form, you must still include the
same details in your question that are requested by the form. The District will issue
written response(s) to the bid questions as Amendments to the bid documents. Do
not direct questions to any other person associated with this Project. Such action
will only slow the District’s ability to respond to your inquiry.
Page 21 of 23
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/13/2014 429
2:00 PM
Plan Name
CSI Divisions / Job Description
LAFAYETTE NEW CALTRANS 04-3G1604 CONSTRUCT MULTITIRED SLOPE STRESSING SYSTEM (ONLINE
ONLY)
# of
Addenda Plans
Construct multi-tired slope stressing system in Contra Costa County in Lafayette 0.6
miles west of Happy Valley Road. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-8, C-12, C-27.
Online
Available for viewing ONLINE ONLY!!!
11/18/2014 196
2:00 PM
OAKLAND
1-7, 9, 20 & 32. The Work in this Contract is part of the BART Earthquake Safety
BART EARTHQUAKE SAFETY PROGRAM
SEISMIC RETROFIT AND REPAIRS AT VARIOUS Program (the Program). The Program includes construction of structural
modifications to the existing system to provide adequate resistance to forces of a
LOCATIONS
major seismic event. The result will reduce the risk to, and improve the safety of,
patrons and personnel during an earthquake. The Work included in this Contract
includes construction of structural modifications to improve seismic safety of Districtowned structures as described in the Contract Documents. Work includes, but is
not limited to the following:
Planroom &
Online
EMBARCADERO STATION: Removal of existing granite curb and fabrication and
installation of new concrete curb at radial crossover at six (6) station entrance
locations.
DALY CITY STATION and NORTH OAKLAND AERIALS including ROCKRIDGE
STATION PARKING LOT: Removal of existing fire protective coating and
installation of new fire protective coating and painting over existing fiber reinforced
polymer (FRP) wrapped casings at various locations.
SAN FRANCISCO TRANSITION STRUCTURE (SFTS): Fabricate and install
stainless steel fence panels, install tamper proof screws, install walkway markings,
replace light fixture, install pushbutton signage, and repair leak(s) at planter.
416
2:00 PM
DALY CITY
NEW REPLACE GLASS PANELS AT DALY CITY
STATION PLATFORM - BART (ONLINE ONLY)
Contractor shall provide all labor, equipment, materials and services required for
replacing non-tempered glass panels with tempered glass at the platform level at
the BART Daly City Station.
Contact Anita Maynar at (510) 464-6543 with any questions.
Available for viewing ONLINE ONLY!!!
Page 22 of 23
Online
Bid Date
Plan # Bid Time Location
11/18/2014 462
2:00 PM
SAN
FRANCISCO
AND
ALAMEDA
COUNTIES
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CALTRANS 04-013524 REMOVE BRIDGE
Remove bridge (portion) and salvage bridge elements in the City and County of San
(PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8
ONLINE ONLY
mile west of the Toll Plaza. The Contractor must have either a Class A License or a
combination of Class C Licenses which constitutes a majority of the work.
Online
This Project is available for viewing ONLINE ONLY!!!
478
2:00 PM
CUPERTINO
MOT RESTROOM REMODEL AT OPERATION
CENTER (ONLINE ONLY)
The Project consists of all materials, labor, equipment, and apparatus, whether
specifically mentioned or not, necessary to remodel MOT Department’s women’s
and men’s restrooms per McKim Architect’s Plans and Specifications. The
restrooms are located in CUSD’s facilities building at Operations Center.
1
Online
This Project is available for viewing ONLINE ONLY!!!
11/20/2014 430
2:00 PM
NEW SCHWERIN STREET SEWER SYSTEM
SAN
FRANCISCO
IMPROVEMENT (ONLINE ONLY)
Div 1-3, 5 & 9. The objective of the Project Installation of new auxiliary wet weather
sewer by means of microtunneling and replacement of existing local sewers. The
Work is to be performed in San Francisco, California.
Available for viewing ONLINE ONLY!!!
Page 23 of 23
Online