WEEKLY PLAN LIST - Friday, October 24, 2014 www.bxofsf.com

THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363
WEEKLY PLAN LIST - Friday, October 24, 2014
(All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com
Bid Date
Plan # Bid Time Location
10/24/2014 437
3:00 PM
NAPA
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
SOUTH NAPA EARTHQUAKE - WATER LEAK
The Work generally consists of trench paving at various locations within the City of
EXCAVATION PAVING PROJECT (ONLINE ONLY) Napa due to earthquake related water main breaks, including mobilization,
temporary traffic control, construction area signs, temporary pavement delineation,
dust control, hot mix asphalt.
Online
Available for viewing ONLINE ONLY!!!
10/27/2014 426
2:00 PM
RODEO
COMPREHENSIVE WASTEWATER MASTER
PLAN NEAR TERM IMPROVEMENTS - SEWER
YEAR 1 IMPROVEMENTS (ONLINE ONLY)
Div 1-3, 5 & 15. Project consists of pipebursting rehabilitation of 2,400 lineal feet of 4
6-inch VCP sewer with same size or larger diameter HDPE SDR17 pipe; open-cut
replacement of 2,400 lineal feet of 6, 8, 10, and 15-inch VCP or PVC sewer with
larger diameter PVC SDR-26 sewer; open cut installation of 1,600 lineal feet of 6, 8,
and 12-inch PVC SDR-26 sewer; replacement of 19 existing manholes with new
manholes; installation of 14 new manholes; replacement and or reconnection of
approximately 110 building laterals; abandonment of approximately 1,700 lineal feet
of 6 and 8-inch VCP sewer; traffic control, SWPPP requirements, and
miscellaneous surface restoration work.
This Project is available for viewing ONLINE ONLY!!!
Page 1 of 25
Online
Bid Date
Plan # Bid Time Location
10/28/2014 212
11:00 AM
BOULDER
CREEK
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
REGIONAL WATER SYSTEM EMERGENCY
INTERTIES NO. 2, 3 & 4
7
The Work covered under this Contract shall include the furnishing of all labor,
materials, tools, equipment and performing all work for the installation of
approximately 985 linear feet of 8-inch ductile iron potable water pipeline along
Skypark Drive and Lockewood Lane and crossing Mount Hermon Road;
Approximately 1,500 linear feet of 12-inch HDPE potable water pipeline along a
storage tank access road; Approximately 14,700 linear feet of 12-inch ductile iron
potable water pipeline along Graham Hill Road, Summit Avenue, Roaring Camp
Road, East Zayante Road and West Zayante Road; Approximately 420 linear feet of
12-inch steel potable water pipeline attached to the Conference Road Bridge; A 350gpm pump station adjacent to Skypark Drive near the intersection with Mt. Hermon
Road; and a 700-gpm pump station adjacent to Summit Avenue near the
intersection with Graham Hill Road.
Planroom &
Online
PLEASE NOTE: A hardcopy of 17x11" drawings are available for viewing at the San
Francisco Builders Exchange.
114
12:00 PM
CITRUS
HEIGHTS
SAM'S CLUB #4799-200 REMODEL
Div 1-3, 5-11, 13 & 15-16. The Project consists of the construction to remodel an
existing open 131,320 sq. ft. store. Trades include aspalt overlay, striping,
demolition, concrete, polished concrete, structural and miscelleneous steel, rough
carpentry, finish carpentry/millwork, FRP, insulation, EIFS, metal roofing, roofing,
sheet metal, caulking, doors/frames/hardware, steel studs and drywall, tile,
acoustical ceilings, resilient flooring, painting, restroom accessories, vertical barrier
net system, fire sprinklers, plumbing, HVAC, EMS, refrigeration and electrical.
1
Planroom &
Online
405
2:00 PM
UNION CITY
WHIPPLE ROAD PAVEMENT REHABILITATION
PROJECT (ONLINE ONLY)
See specifications for complete Scope of Work.
3
Online
Questions concerning the Project, based on the bid package, must be submitted by
fax to (510) 489-9468, or by email to: [email protected] to Michael Renk
or phone (510) 675-5303 at least five (5) working days before the time specified for
bid opening.
Available ONLINE ONLY!!!
432
2:00 PM
ORINDA
CAMINO PABLO PAVEMENT REHABILITATION
PROJECT (ONLINE ONLY)
Project consists of pavement rehabilitation, including base repairs, cold planing,
asphalt pavement, HMA overlay, concrete improvements, traffic signal modifications
and striping.
Available for viewing ONLINE ONLY!!!
Page 2 of 25
Online
Bid Date
Plan # Bid Time Location
10/28/2014 436
2:00 PM
VARIOUS
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
REPLACE GLASS PANELS AT COLISEUM, SAN Div 1-2 & 8. The Contractor shall provide all labor, equipment, materials and
LEANDRO, BAY FAIR AND SOUTH HAYWARD
services required for replacing nontempered glass panels with tempered glass ai
STATIONS PLATFORMS - BART (ONLINE ONLY) the platform level at the BART Coliseum, San Leandro, Bay Fair and South
Hayward Stations as specified in the contract requirements, Drawings and
Specifications.
Online
This Project is available for viewing ONLINE ONLY!!!
458
2:00 PM
MARTINEZ
NEW GENERATOR AT 2530 ARNOLD DRIVE,
MARTINEZ (ONLINE ONLY)
The Work includes the installation of a new emergency power generator and
associated work at an existing office building that will be occupied during
construction.
3
Online
This Project is available for viewing ONLINE ONLY!!!
491
2:00 PM
ALAMEDA
COUNTY
CALTRANS 04-4A3424 REPLACE GORE SIGNS
WITH OVERHEAD SIGNS (ONLINE ONLY)
Replace gore signs with overhead signs in Alameda County at various locations.
The Contractor must have either a Class A License or any combination of the
following Class C Licenses which constitutes a majority of the work: C-10, C-12, C31.
1
Online
494
2:00 PM
DANVILLE
2014/15 PAVEMENT REHABILITATION PROJECT Project includes preparatory tree trimming; storm drain inlet relocation; removal and 1
(ONLINE ONLY)
replacement of existing storm drain pipe; removal and replacement of existing
Portland Cement concrete curb, sidewalk, curb ramp and valley gutter; subdrain
installation; removal and replacement of existing asphalt concrete pavement
(digouts); pavement cold planning; intsllation of paving mat; installation of asphalt
concrete overlay; removal and replacement of asphalt concrete speed lumps;
removal and replacement new traffic loop detectors; adjusting to grade of survey
monument castings; water valve castings; storm drain and sanitary sewer manhole
covers and other utility lids; removal and replacement of existing paving striping and
markers; traffic control.
Online
Available for viewing ONLINE ONLY!!!
Available for viewing ONLINE ONLY!!!
91-94
2:00 PM
SAN
FRANCISCO
JAMES LICK MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12 & 14-17. Project is generally described as school modernization
which includes, but is not limited to, construction of two elevators, replacement of
toilet rooms, renovation of classrooms, offices, and other interior spaces, partial
replacement of windows, doors, plumbing, mechanical, electrical, lighting, fire
alarm, new fire sprinklers, structural shear walls and foundation work, exterior
improvement to play yard, ramps, stairs, metal work, some exterior painting and
repair, fencing, roof equipment and patching, and hazardous materials abatement
as described in Appendix A of the Contract Documents.
Page 3 of 25
1
Planroom &
Online
Bid Date
Plan # Bid Time Location
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
2
Trades include water pollution control, traffic control, clearing and grubbing,
earthwork, roadway excavation (F), subgrade stabilization, stabilization fabric, class
2 aggregate base, slurry seal, asphalt concrete surface, concrete curb, pump station
addition concrete slab foundation, concrete apron, median curb, chain link fence,
gates, removal of existing fence and gate, asphalt concrete dike, generator building
concrete slab foundation, precast drainage structures, storm drain, pump station
water pipe and appurtenances, 100 HP booster pump, pump station building
addition and roof, miscellaneous electrical work, motor control center, PG&E meter
and main switchboard, antenna mast assembly and 230kw generator set.
10/29/2014 131
2:00 PM
SANTA ROSA
WATER PUMP STATION 3 MODIFICATIONS
408
2:00 PM
BODEGA BAY
BODEGA BAY AQUACULTURE REROOF FOR UC Div 1-2, 6-7 & 22. Provide all labor, materials, equipment, tools, transportation,
DAVIS (ONLINE ONLY)
insurance and services to remove the top layer existing Hypalon roofing material
and prepare the existing built-up roofing substrate to receive the new roofing
application; patch and repair with like materials any dryrotted existing roof decking
encountered; install sloping underlayment on low flat roof section, sloping to
existing roof drains; and reroof with a new fleece backed TPO roofing system,
approximately 15,825 sq. ft.
Planroom &
Online
1
Online
The Project consists of the removal and replacement of approximately 1,400 linear 1
feet of existing sidewalk/pedestrian facilities and driveways at two locations (Shell
Avenue and Alhambra Valley Road) within the City of Martinez. The necessary
site work includes, but is not limited to, traffic control, utility adjustments, site
demolition and preparation, tree removal, tree installation, earthwork, retaining
walls, P.C.C. sidewalks, driveways, curb and gutter, A. C. paving, ADA curb ramps,
and miscellaneous items of work as specified and required by the Contract
Documents.
Online
Available for viewing ONLINE ONLY!!!
414
2:00 PM
MARTINEZ
ALHAMBRA VALLEY ROAD SIDEWALK GAP
CLOSURE (C2007) AND SHELL AVENUE
PEDESTRIAN/BICYCLE IMPROVEMENT
PROJECT (C2008) - ONLINE ONLY
Available for viewing ONLINE ONLY!!!
466
2:00 PM
SANTA
CLARA
COUNTY
CALTRANS 04-272044 REHABILITATE PCC & AC Rehabilitate PCC and AC pavements, upgrade guardrails and signs in Santa Clara
PAVEMENTS, UPGRADE GUARDRAILS & SIGNS County in Cupertino and Los Altos from Tantau Avenue Overcrossing to Foothill
(ONLINE ONLY)
Expressway Undercrossing. The Contractor must have either a Class A License or
one of the following Class C Licenses: C-8, C-12.
This Project is available for viewing ONLINE ONLY!!!
Page 4 of 25
1
Online
Bid Date
Plan # Bid Time Location
10/29/2014 468
2:00 PM
GILROY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CALTRANS 04-4C2004 COLD PLANE & OVERLAY, Project includes cold plane and overlay, pedestrian ramp, replace loop detector in
PEDESTRIAN RAMP, REPLACE LOOP
Santa Clara County in and near Gilroy at various locations from Route 101/152
DETECTOR (ONLINE ONLY)
Interchange to Route 152/156 Interchange. The Contractor must have either a
Class A License or any combination of the following Class C Licenses which
constitutes a majority of the work: C-12, C-10.
Online
This Project is available for viewing ONLINE ONLY!!!
406
2:30 PM
SAN PABLO
DAVIS PARK PLAY AREA RENOVATION (ONLINE This bid shall cover the furnishing of all labor, material, equipment, mechanical
ONLY)
workmanship, transportation and services which are required for: Replacement and
installation of a new play structure and surfacing at Davis Park.
1
Online
Available for viewing ONLINE ONLY!!!
245
3:00 PM
SEBASTOPO
L
SEBASTOPOL COMMUNITY CULTURAL CENTER Div 1, 3, 6-10 & 16. Trades include cast-in-place concrete; interior architectural
OFFICE REMODEL
woodwork; joint sealants; aluminum windows; door hardware; glazing; ceramic tile;
painting; sheet vinyl; door mat; microflex structures; toilet accessories; drinking
fountain; lighting; and electrical.
Planroom &
Online
Please direct all questions regarding the project Plans and specifications in writing
to the Architect, Alexis Persinger, with Persinger Architects and Associates, 5875
Ross Branch Road, Sebastopol, CA 95472, (707) 887-0700.
Questions regarding other contract provisions, bonding, and insurance may be
addressed to Susan Kelly, Engineering Director, at (707) 823-2151.
10/30/2014 215
1:30 PM
SAN RAFAEL
SLUDGE THICKENING SYSTEM REPLACEMENT Div 1-3, 5, 7, 9-11, 13 & 15-16. Project consists of demolishing the existing
Dissolved Air Flotation Thickeners (DAFT's) and associated equipment and piping;
Furnish and install two (2) Rotary Drum Thickeners; Furnish and install piping,
conduits, and other structural, mechanical, electrical, seismic, and
instrumentation/control equipment systems needed to provide a complete,
functional installation; Provide control integration of new equipment into the existing
Treatment Plant process control system; and test completed system to ensure
proper operation.
Contact Brian Thomas, Engineering Manager, at (415) 459-1455, Ext. 121 with any
questions.
Page 5 of 25
2
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
10/30/2014 145
2:00 PM
DAVIS
CNPRC CAGE WASH FACILITY AT UC DAVIS
Div 1, 3, 7, 9, 22-23, 26 & 31-33. Provide all labor, materials, equipment, tools,
transportation, insurance, and services required to install approximately 100 ft of
roof mounted steam and condensate piping, 400 ft of underground steam and
condensate piping, and general tenant improvements to an unimproved bay of the
CNPRC Shop Building for the purpose of serving a future cage wash machine. Site
work shall include excavation, installation of underground piping, poured in place
insulation and patching of asphalt roadway. Tenant improvements to the 2,200 sq.
ft. open bay shall include concrete slab, concrete flatwork, plumbing, steam fitting,
electrical, HVAC and architectural sheet metal improvements. Work will be
performed within the California National Primate Center and shall require health
screenings for all workers.
244
2:00 PM
SANTA CRUZ
MORAN PUMP STATION UPGRADE
The Moran Pump Station Upgrade project will provide for removal of the existing
shaft driven pumps and installation of new 3 new pumps, concrete bases, valves
and associated piping, etc.
Planroom &
Online
1
Planroom &
Online
Contact Marcella Bailey, Project Mgr, at (831) 454-2803 with any questions.
311
2:00 PM
MARIN
COUNTY
435
2:00 PM
SAN RAMON
NEW ARV VAULT MAINTENANCE PROJECT
Div 1-3, 9 & 15. Trades include excavation and backfill, surface restoration, cast-inplace concrete, painting and pipework.
CITYWIDE SCHOOL CROSSING ENHANCEMENT The work consists, in general, of enhancement of crosswalks with pedestrian
PROJECT (ONLINE ONLY)
activated in-pavement warning lights and installation of overhead signal heads and
poles at the locations designated on the Plans. Related items of work include, but
are not limited to, construction signage; removal and installation of signs and posts;
installation of LED enhanced signs and pedestrian pushbuttons on poles;
installation of controllers; pull boxes, conduit, and wiring; removal of pole and signal
heads; installation of pedestrian barricades; removal of existing striping; placement
of new striping; and all
other work necessary for a complete project in accordance with the Plans and
Specifications.
Planroom &
Online
Online
Available for viewing ONLINE ONLY!!!
438
2:00 PM
SANTA ROSA
KING ST SEWER AND WATER IMPROVEMENTS - See Specifications for complete Scope of Work. Project is available for viewing
PHASE 2 (ONLINE ONLY)
ONLINE ONLY!!!
Page 6 of 25
Online
Bid Date
Plan # Bid Time Location
10/30/2014 439
2:00 PM
CUPERTINO
Plan Name
CSI Divisions / Job Description
HYDE MIDDLE SCHOOL INTERIM HOUSING
PROJECT (ONLINE ONLY)
The Project consists of providing all material, labor, equipment, and apparatus,
whether specifically mentioned or not, necessary to relocate storage sheds and
fence post and fabric, provide and install a new transformer and distribution panel,
install all low voltage wiring for Power, Fire Alarm, Clock\Bell Paging, Intercom
Phone, Data, and install new fence posts and fabric for the New Interim Housing
Portables at Hyde Middle School.
# of
Addenda Plans
Online
Available for viewing ONLINE ONLY!!!
442
2:00 PM
SOUTH SAN
FRANCISCO
TURBO BLOWER #2 AT WATER QUALITY
CONTROL PLANT (ONLINE ONLY)
Project consists of fabricating, assembling, testing and delivering of a 300 to 335
horsepower high speed motor driven turbo blower system, including specified spare
parts and providing field testing and start-up services.
Online
Available for viewing ONLINE ONLY!!!
800
2:00 PM
MILPITAS
MCCARTHY BLVD. LIGHTING & LANDSCAPE
IMPROVEMENTS PHASE I
Project includes demolition, lighting, refurbish existing fence/sign, paving, planting,
irrigation, water pollution control and traffic control.
433
3:00 PM
SAN JOSE
7458 - POLICE ADMINISTRATION AND
Furnish all labor, materials, tools, equipment, supervision, storage, coordination and
COMMUNICATION BUILDINGS (PAB/C) CHILLER any other associated resources necessary to design, furnish and install (including
REPLACEMENTS - ONLINE ONLY
any required demolition of existing systems), new cooling systems and all
appurtenances necessary to meet the requirements set forth in Attachment 6:
Project Definition Manual: Basis of Design of these Specifications for the PAB/C
Chiller Replacements Project. Trades include plumbing, HVAC, testing, adjusting
and balancing and electrical work.
1
Planroom &
Online
Online
Contact Jim Wilson, Project Manager, at (408) 535-8441 with any questions.
Available for viewing ONLINE ONLY!!!
434
3:00 PM
SAN JOSE
7585 - DEMOLITION OF KELLEY HOUSE (ONLINE Trades include materials disposal, hazmat protection procedures, back fill and
ONLY)
demolition.
Online
Contact Raj Verma, Project Manager, at (408) 535-8443 with any questions.
Available for viewing ONLINE ONLY!!!
61
3:00 PM
CUPERTINO
MILLER MIDDLE SCHOOL INTERIM HOUSING
PORTABLES
Page 7 of 25
The Project consists of providing all material, labor, equipment, and apparatus,
whether specifically mentioned or not, necessary to relocate storage sheds and
fence post and fabric, install new fire suppression line and hydrant, provide and
install a new transformer and distribution panel, install all low voltage wiring for
power, fire alarm, clock/bell paging, intercom phone, data, install new fence posts
and fabric, and miscellaneous site work for the New Interim Housing Portables at
Miller Middle School.
2
Planroom &
Online
Bid Date
Plan # Bid Time Location
10/31/2014 106-107
11:00 AM
LINCOLN
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
LINCOLN CA STAKE MEETINGHOUSE NEW
CONSTRUCTION
Div 1, 3-12, 14, 21-23, 26-28 & 31-33. Ground up 24,811 sq. ft. Meeting House for 1
the LDS on a 5-acre newly developed site. The Scope will include earthwork,
utilities, paving, concrete flat work, landscaping, structural concrete, masonry,
structural steel, carpentry, casework, thermal insulation, roofing, doors, windows,
drywall, floor coverings, specialties, athletic equipment, baptismal, plumbing, HVAC
and electrical.
Planroom &
Online
PLEASE NOTE: Many of the major trades require a pre-qualification process for
Subcontractors, which will be announced by addendum prior to bid date.
11/4/2014
229
12:00 PM
MENLO PARK
INFRASTRUCTURE ENGINEERING B136 AND
BSY PUMP STATION COOLING SYSTEM
This posting is for the addition of a Cooling System at Building 136 and at the Beam
Switch Yard Pump Station.
Planroom &
Online
447
10:00 AM
MARIN
COUNTY
MMWD SOUTH PIPELINE REPLACEMENT
PROJECT (ONLINE ONLY)
Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the
installation of 6,020 feet of 12-, 8-, 6- and 4-inch welded steel and polyvinyl chloride
(PVC) pipe with valves, fittings and appurtenances. The work to be done is located
in San Anselmo, Ross, Tiburon and Belvedere within the County of Marin, California.
Online
Trades include earthwork, asphaltic concrete paving and resurfacing, cathodic
protection magnesium anodes, distribution piping system, concrete, field applied
tape coating systems and environmental protection.
Contact Jake Miller, Project Engineer, at (415) 945-1580.
Available for viewing ONLINE ONLY!!!
488
10:30 AM
SAN
FRANCISCO
PORT SECURITY FENCES PHASE 4 (ONLINE
ONLY)
The proposed Work will consist of installation of fences at: (1) Piers 94/96, (2) Piers 2
48/50, and (3) Roundhouse.
Online
For more information, contact the Project Engineer, Ken Chu, PE at 415-274-0593.
Available for viewing ONLINE ONLY!!!
464
2:00 PM
BERKELEY
NEW SANITARY SEWER REHABILITATION - PARKER The Work to be done consists, in general, of rehabilitation and construction of
STREET (BAYER HEALTHCARE EASEMENT) approximately 963 linear feet of 10-inch diameter sanitary sewer, construction of
ONLINE ONLY
manholes, manhole rehabilitation, excavation, replacement of approximately 135
linear feet of 4-inch and 6-inch diameter sewer laterals and related work.
Available for viewing ONLINE ONLY!!!
Page 8 of 25
Online
Bid Date
11/4/2014
Plan # Bid Time Location
87
2:00 PM
STOCKTON
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
ELEVATOR ALTERATIONS PROJECT AT SAN
JOAQUIN DELTA COLLEGE
1
Div 1, 5, 7-9 & 14-16. The Project was reviewed and approved by the Division of
State Architect (DSA) and it consists of: Repair and renovation of 10 elevators
including HVAC, fire alarm and hardware upgrades; maintenance of all elevators
included in this project during the construction phase and as more specifically
defined in the elevator specifications. There is also an additive alternate for an
extended (5 year) maintenance contract after the completion of this Project, but this
will not be a part of the basis of award.
Planroom &
Online
Technical and general questions must be submitted in writing no later than 3:00 PM
on Monday, October 27, 2014, to Darrin Cline by email at: [email protected],
with a courtesy copy to Maria G. Bernardino, Director of Purchasing and Contracts,
at: [email protected]
11/5/2014
448
10:00 AM
SAN
ANSELMO
2014-2015 ELDA DRIVE TANK COATING
PROJECT - MMWD (ONLINE ONLY)
Div 1, 9, 13 & 18. This Contract is for furnishing all necessary and required
materials, equipment and labor for completing tank modifications and preparing
surfaces and applying protective coatings to all interior and exterior surfaces of one
(1) 150,000 gallon, 32 ft. diameter, 28 ft. high welded steel water storage tank - Elda
Drive Tank.
Online
Contact Gary Andersen, Project Engineer, at (415) 945-1581 with any questions.
Available for viewing ONLINE ONLY!!!
19
12:00 PM
SACRAMENT NEW NEIGHBORHOOD MARKET #6530-00 TAKEOVER Div 1-11, 13 & 15-16. Project consists of tenant improvements for an existing
O
AND TENANT IMPROVEMENTS
51,879 sq. ft. building,
TRADES NEEDED: erosion control, special testing, grading, striping/signage, tactile
warning systems, demolition, concrete, concrete polishing, masonry, miscellaneous
structural steel, metal framing, carpentry, millwork, FRP, insulation, stucco/EIFS,
architectural sheet metal, caulking/sealants, doors, glazing, drywall, ceramic tile,
acoustic ceilings, flooring, painting, toilet accessories, metal canopy, seismic
protection, sub metering, fire sprinklers, plumbing, HVAC and electrical.
Page 9 of 25
2
Planroom &
Online
Bid Date
11/5/2014
Plan # Bid Time Location
431
2:00 PM
FAIRFIELD
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
UTILITY INFRASTRUCTURE UPGRADE
(ENERGY) HVAC/EMS EFFICIENCY PROJECT
ASBESTOS ABATEMENT (ONLINE ONLY)
The Work under this Contract will be in 2 phases. First Phase (Buildings 800 &
1500) will be performed during Winter break of 2014 and Second Phase (Buildings
100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which
includes, but not limited to, the removal of existing HVAC unit at Building 1600, Dry
Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2’x4’ False Ceiling
Panels. Demolition, removal, and disposal of all asbestos containing materials
detailed in the Asbestos Abatement Specifications for Solano Community College,
and as indicated on HMS front end documents, and HMS and Kleinfelder Reports.
All Work to be performed is under a single Prime Contract.
Online
Available for viewing ONLINE ONLY!!!
450
2:00 PM
SAN LUIS
OBISPO
COUNTY
CALTRANS 05-1A7004 CONSTRUCT SOLDIER
PILE RETAINING WALL (ONLINE ONLY)
Construct soldier pile retaining wall in San Luis Obispo County about 19 miles north 1
of San Simeon from 0.7 mile to 1.0 mile north of Ragged Point Viaduct. The
Contractor must have either a Class A License or any combination of the following
Class C Licenses which constitutes a majority of the work: C-12, C-61D09.
Online
This Project is available for viewing ONLINE ONLY!!!
455
2:00 PM
MILL VALLEY NEW CALTRANS 04-2G8704 CONSTRUCT SOIL NAIL
WALL, ADDITIONAL SHOULDER, AND
GUARDRAIL (ONLINE ONLY)
Construct soil nail wall, additional shoulder and guardrail in Marin County in Mill
Valley at 0.1 mile east of Maple Street. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-12, C-61D06.
Online
Available for viewing ONLINE ONLY!!!
484
2:00 PM
MOUNTAIN
VIEW
1
2012-2013 MISCELLANEOUS WATER AND
The Work to be performed under this Contract includes the replacement of water
SEWER MAIN REPLACEMENTS (ONLINE ONLY) and sanitary sewer mains. Contract work includes abandonment or removal of
existing facilities, replacement of new pipelines by both open trench and pipe
bursting methods, replacement of water service line and sewer lateral, reconnection
to existing pipelines, sidewalk, and other miscellenous work.
Online
This Project is available for viewing ONLINE ONLY!!!
444
2:30 PM
SAN
FRANCISCO
VARIOUS LOCATIONS PAVEMENT
PRESERVATION FY 2014-2015 NO. 2 (ONLINE
ONLY)
Div 1 & 32. The Work is located on various streets thoughout San Francisco and
consists of pavement preservation using Type 2 and Type 3 micro-surfacing,
traffic routing, temporary pavement markings and all associated work.
Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions.
Available for viewing ONLINE ONLY!!!
Page 10 of 25
Online
Bid Date
11/5/2014
Plan # Bid Time Location
446
2:30 PM
SAN
FRANCISCO
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
PROPOSITION K CURB RAMPS FISCAL YEAR
2013-2014 (ONLINE ONLY)
Div 1 & 31-33. The Work is located at various intersections in San Francisco,
California and consists of curb ramp construction, sewer replacement, traffic routing
and striping, and all associated work.
Online
Contact Amy Lam, Project Manager, at (415) 437-7048 with any questions.
Available for viewing ONLINE ONLY!!!
11/6/2014
248
10:00 AM
VALLEJO
BLUE ROCK SPRINGS GOLF COURSE-CART
BARN PROJECT
1
Project consists of design, plan review process, procurement, fabrication, and
construction of a metal building system including all associated ventilation,
electrical, signage, doors, and hardware as specified in the Plans and Specifications.
Planroom &
Online
Contact Roland Rojas, Asst Maint Superintendent/Facilities, at (707) 548-4557, or
by email at: [email protected] with any questions.
128
2:00 PM
BURLINGAME NEW VILLAGE PARK RESTROOM REPLACEMENT
2014-15
Project consists of the removal of existing wood-framed toilet building and
replacement with new concrete masonry unit toilet building consisting of two single
occupant toilet rooms, a storage room and utility room.
Planroom &
Online
20
2:00 PM
SAN RAFAEL NEW TERRA LINDA POOL HOUSE RENOVATION
PROJECT
The existing restrooms and locker rooms are to be renovated; A new meeting room
is to be added; Mechanical, electrical and plumbing systems are to be upgraded;
and a new fire sprinkler system will be installed as a deferred submittal.
Planroom &
Online
400
2:00 PM
OAKLAND
THIS PROJECT IS A REBID!!!
REPLACEMENT OF EMBARCADERO BRIDGE
OVER LAKE MERRITT CHANNEL - REBID
(ONLINE ONLY)
The proposed Work consists, in general, of the bridge replacement. Said work
consists of, but is not limited to, bridge removal, structural excavation and backfill,
grading, structural concrete, furnishing and driving cast-in-drilled hole concrete
piles, reinforcement steel and miscellaneous metal work, new restroom building,
environmental protection, traffic control and other work specifically shown on the
Plans or included in the Specifications and these Special Provisions.
For more information, contact Nader Rabahat, Project Manager, at (510) 238-6605.
Available for viewing ONLINE ONLY!!!
(Previously scheduled bid date was 5/22/14. Old Plan #494)
Page 11 of 25
1
Online
Bid Date
11/6/2014
Plan # Bid Time Location
421
2:00 PM
OAKLAND
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
THE REHABILITATION OF SANITARY SEWERS
AT LAKESIDE PARK PUMP STATION (ONLINE
ONLY)
The proposed Work consists, in general, of the removal of existing sanitary sewer
pumps, excavation, dewatering, shoring and installation of a pre-engineered and
pre-fabricated complete pump station system with associated electrical and alarm
systems, install precast holding tank, and other items of work stated in the Special
Provisions and the Project Plans or as required for a fully functional sanitary sewer
pump station.
1
Online
1
THE REHABILITATION OF SANITARY SEWERS IN The proposed Work consists, in general, of rehabilitating approximately 2,953
THE AREA BOUNDED BY PARK, BOULEVARD, linear feet of existing 6” diameter sewer pipes and approximately 13,774 linear feet
HOLLYWOOD AVE, SUNNYHILLS ROAD AND
of existing 8” diameter sewer pipes by pipe-expanding method; rehabilitating sewer
BRIGHTON AVE (SUBBASIN 54-16) - ONLINE
structures; reconnecting house connection sewers; rehabilitating house connections
ONLY
sewers, and other related works as indicated on the Plans and Specifications.
Online
Contact Gunawan Santoso, PE (Project Manager) at 510-238-7260, or by email at:
[email protected] with any questions.
Available for viewing ONLINE ONLY!!!
422
2:00 PM
OAKLAND
Contact David Ng, Project Manager, at (510) 238-7267, or by email at:
[email protected] with any questions.
Available for viewing ONLINE ONLY!!!
467
2:00 PM
NEW JOB ORDER CONTRACT, ELECTRICAL (C-10
SAN
A Job Order Contract is an indefinite quantity contract pursuant to which the San
FRANCISCO
LICENSE), SAN FRANCISCO, PENINSULA, AND Francisco Public Utilities Commission may accomplish a series of projects with a
EAST BAY CONTRACT NOS. JOC-52 AND JOC-53 single, competitively bid contract awarded before the projects are identified.
(ONLINE ONLY)
Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by
issuing task orders to the successful contractor during the two year term of the
contract.
Page 12 of 25
Online
Bid Date
11/6/2014
Plan # Bid Time Location
74-76
2:00 PM
LOS ALTOS
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
FOOTHILL COLLEGE LIBRARY AND LEARNING
CENTER RENOVATION (LEASE/LEASEBACK
PROJECT)
Div 1-3, 5-12, 14, 21-23, 25-28 & 31-33. This Project will be constructed utilizing
multiple trade contractors, each working under a separate Contract with Kitchell
CEM, who is the Lease/Lease Back Contractor for the new library modernization at
Foothill College.
1
Planroom &
Online
1
Planroom
The Following is a list of various trade bid packages:
Trade Bid Package 00 44 01:Demolition
Trade Bid Package 00 44 02:Misc Trades
Trade Bid Package 00 44 03:Roofing
Trade Bid Package 00 44 04:Doors & Hardware
Trade Bid Package 00 44 05:Glazing
Trade Bid Package 00 44 06:Painting
Trade Bid Package 00 44 07:Framing, Insulation & GWB
Trade Bid package 00 44 08: Flooring
Trade Bid Package 00 44 09:Acoustical
Trade Bid Package 00 44 10:Mechanical, Plumbing & Fire Sprinkler
Trade Bid Package 00 44 11:Electrical
Trade Bid Package 00 44 12:Landscaping
NOTE: Bidders must be prequalified to submit a bid to Kitchell. The Prequalification
Application must be submiited to Kitchell no later than September 30, 2014.
986
2:00 PM
SAN MATEO
REGIONAL GROUNDWATER STORAGE AND
RECOVERY
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
PLEASE NOTE: This Contract requires bidder pre-qualification by the SFPUC.
Div 1-3, 5-11, 13 & 15-16. The objective of this Project is to drill, install, and
construct 13 groundwater well facilities, including site preparation; clearing/grubbing
and grading; various work on existing groundwater wells; building foundations,
temporary shoring and retaining walls; new pumps, motors and related
appurtenances; ventilation system; trenching and pipeline and conduit construction;
cathodic protection system; chemical treatment equipment, tanks and pumping
systems; electrical power distribution systems, SCADA and I&C control systems;
perimeter security fence; security monitoring and control systems; final grading and
drainage; landscape and irrigation systems; sanitary and storm drain piping and
connections to municipal systems; paving and various other site improvements;
construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water
transmission pipeline. The Work is to be performed in San Mateo, California. The
Engineer's Estimate is approximately between $47 to $50 million. The Contract will
be awarded to the lowest responsible and responsive bidder.
Page 13 of 25
Bid Date
Plan # Bid Time Location
11/10/2014 463
11:30 AM
COTATI
Plan Name
CSI Divisions / Job Description
NEW 2014 PAVEMENT MAINTENANCE PROJECT
(ONLINE ONLY)
# of
Addenda Plans
The Work consists of digout, crack seal and associated re-striping on local city
streets.
Online
This Project is available for viewing ONLINE ONLY!!!
449
2:00 PM
CONCORD
FARM BUREAU ROAD SAFE ROUTES TO
SCHOOL PROJECT (ONLINE ONLY)
The Work to be done, in general, consists of mobilization, traffic control, storm water
pollution control, open trench construction of storm drain, street pavement, concrete
curb and gutter construction, concrete sidewalk construction, concrete ADA ramp
construction, tree removal, potholing of existing utilities, traffic striping and
markings, street lighting, landscape and irrigation construction and all other work as
shown on the Plans and as specified in these Special Provisions.
Online
Available for viewing ONLINE ONLY!!!
931
11/11/2014 110-111
2:00 PM
MOUNTAIN
VIEW
2
LIGHT RAIL EFFICIENCY PROJECT: MOUNTAIN Div 1-3, 10, 26 & 31-34. The Project will add a second light rail track over a
VIEW PHASE 2 - VTA
distance of approximately 3,000 feet, including closure and removal of the existing
Evelyn Light Rail Station, installation of light rail support systems, and modifications
to the municipal drain system.
10:00 AM
GREENFIELD
MAGNOLIA PLACE SENIOR APARTMENTS
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Project consists of the construction of a 32-unit, 26,220 sq. ft. building complete with
architectural, civil, electrical, landscaping, plumbing, mechanical and structural
trades.
Page 14 of 25
Planroom &
Online
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/12/2014 210-211
1:30 PM
CASTRO
VALLEY,
ALAMO AND
LAFAYETTE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
EDEN RESERVOIR REPLACEMENT AND ROUND Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33, 40 & 43. Work includes the following:
HILL RESERVOIR REHABILITATION - EBMUD
1). At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million
gallon bolted steel temporary tank, foundation, related piping, and appurtenances;
demolish existing 1.6-MG welded steel Eden Reservoir including the exterior
wooden architectural screen; construct two, 0.45 million gallon welded steel
reservoirs with aluminum geodesic dome roofs, foundations, piping, valve
structures, coatings, and appurtenances; disassemble and store 0.28 million gallon
bolted steel temporary tank, restore temporary tank site, pave reservoir site, install
irrigation and landscaping, install fencing and perform related work as specified in
the Contract Documents at Eden Reservoir, located near the intersection of
Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda
County), California.
Planroom &
Online
2). At Round Hill Reservoir: Construct radio communication towers and related
cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted
steel temporary tank, foundation, piping, and appurtenances; remove exterior
wooden architectural screen from existing Round Hill Reservoir; abrasive blast and
recoat tank interior; low-pressure water clean, prime and top coat tank exterior;
disassemble and store 0.16 million gallon bolted steel temporary tank, pave
reservoir site, install fencing; and perform related work as specified in the Contract
Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place
in Alamo (Unincorporated Contra Costa County), California.
3). At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank,
deliver to Eden Reservoir, remove and replace fencing, restore site, and perform
related work as specified in the Contract Documents at Hink No. 2 Reservoir located
at the end of Vista Bella Drive, Lafayette, California.
243
11:00 AM
OAKLAND
NEW RENOVATION OF 3824 WEST ST., OAKLAND
Div 1-3, 5-10, 12, 22-23, 26 & 32. The proposed Work consists, in general, of the
renovation of a two story single family home built in 1915 at 3824 West St. in
Oakland. Work shall include exterior painting, window replacement, dry rot repairs
at porches, interior painting, floor replacement or re-finishing and remodeling of
upstairs bathroom.
Contact Jeff Krohn at (510) 238-2253, or by email at: [email protected] with
any questions.
Page 15 of 25
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/12/2014 454
2:00 PM
SAUSALITO
Plan Name
CSI Divisions / Job Description
MISCELLANEOUS UPGRADES PROJECT
(ONLINE ONLY)
This project consists of 6 tasks:
# of
Addenda Plans
Online
1. Exterior painting of several small buildings.
2. Structural improvements to foundation supports.
3. Replacement of 4 air relief valves on the District’s sewer force main.
4. Collector system modifications to two sewer sediment tanks.
5. One sewer pump replacement.
6. Modifications to a pump station wet well.
Available for viewing ONLINE ONLY!!!
471
2:30 PM
NEW OCEAN AVENUE AND PERSIA AVENUE
SAN
FRANCISCO
PAVEMENT RENOVATION AND SEWER
REPLACEMENT (ONLINE ONLY)
The Work is located along Ocean Ave from San Jose Ave to Persia Ave and along
Persia Ave from Ocean Ave to Dublin St and consists of pavement renovation, TEP
bulbout and curb ramp construction, sewer replacement, water support work, traffic
signal and streetlight support work, traffic routing and all associated work.
Online
Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions.
Available for viewing ONLINE ONLY!!!
473
2:30 PM
NEW PAVEMENT RENOVATION AND SEWER
SAN
FRANCISCO
REPLACEMENT CRESCENT AND HUDSON
AVENUES (ONLINE ONLY)
Div 1-2 & 31-33. The Work is located on Crescent Ave from Mission St to Murphy
located on Crescent Ave from Mission St to Murphy St and from Porter St to Putnam
St , and on Hudson Ave from Phelps St to Ingalls St, and includes pavement
renovation, sewer and drainage work, traffic routing and all associated work.
Online
Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions.
Available for viewing ONLINE ONLY!!!
205
3:00 PM
PETALUMA
VICTORIA LIFT STATION UPGRADES
Div 1, 9, 11, 13 & 15-16. The Work includes modifications to the existing pump
station including, but not limited to, forcemain tie-in, dry pit valve replacement,
removal and replacement of submersible pumps, wet well top replacements,
electrical equipment, controls and instrumentation, bypass pumping during
construction,
site work, and related work as shown in the Contract Documents. Work also
includes
electrical improvements at the La Cresta Water Tanks for SCADA upgrades.
SITE OF WORK: The site of the WORK is located at City of Petaluma Victoria Lift
Station, Intersection of Windsor and West Haven, 1001 Windsor Dr. Petaluma CA
and
La Cresta Water Tanks at the end of Hayes Lane, Petaluma CA.
Page 16 of 25
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/12/2014 247
3:00 PM
LOS ALTOS
Plan Name
CSI Divisions / Job Description
SMITHWICK THEATER HARDWARE
IMPROVEMENTS AT FOOTHILL COLLEGE
Div 1 & 8-9. Trades include wood doors, FRP doors, door hardware and painting.
# of
Addenda Plans
Planroom &
Online
All questions must be sent to the District’s Purchasing Office, Attention: Annette
Perez with a copy to Linda Mahi by email to: [email protected] with a copy
to Linda Mahi at: [email protected], or by fax to (650) 948-5194. The deadline
to submit questions is Noon on October 28, 2014. A question form is included
herein, see Bid
Document, 00 31 07. If you do not use the question form, you must still include the
same details in your question that are requested by the form. The District will issue
written response(s) to the bid questions as Amendments to the bid documents. Do
not direct questions to any other person associated with this Project. Such action
will only slow the District’s ability to respond to your inquiry.
340
3:00 PM
SUNNYVALE NEW FIRE STATION ROLL UP DOOR REPLACEMENT Project consists of furnishing all labor, materials, and equipment and performing all
work necessary and incidental to the completion of the project known as "Fire
Station Roll Up Door Replacement, Project No. PR-14/02-15” consisting of replacing
11 roll up doors at three fire stations in the City of Sunnyvale, according to Plans
and Specifications prepared by the City of Sunnyvale and according to the Contract
Documents.
11/13/2014 470
1:00 PM
DALY CITY
NEW EXTENSION OF WESTLAKE WAREHOUSE
(ONLINE ONLY)
The Work includes design and construction of a pre-fabricated warehouse as
detailed in the Plans and Specifications including, but not limited to, construct
warehouse foundation based on soils report recently completed, construct
warehouse, coordinate with City's Inspector to design and construct an extension of
the fire sprinklers, installation of a ramp, installation of electrical equipment and
acquire all necessary permits and any other work required for a complete and fully
functional warehouse.
Planroom &
Online
Online
Available for viewing ONLINE ONLY!!!
429
2:00 PM
LAFAYETTE
CALTRANS 04-3G1604 CONSTRUCT MULTITIRED SLOPE STRESSING SYSTEM (ONLINE
ONLY)
Construct multi-tired slope stressing system in Contra Costa County in Lafayette 0.6
miles west of Happy Valley Road. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-8, C-12, C-27.
Online
Available for viewing ONLINE ONLY!!!
460
2:00 PM
SACRAMENT NEW ACCESS BARRIER REMOVAL ONLY AUTOMATIC Project comprises of labor, material and services necessary for minor demolition,
O
DOOR OPENER AND PUSH PLATES (ONLINE
door operator, push plates, signage, new fire rated door, electrical and related work.
ONLY)
Available for viewing ONLINE ONLY!!!
Page 17 of 25
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
11/13/2014 467
2:00 PM
NEW JOB ORDER CONTRACT, ELECTRICAL (C-10
SAN
A Job Order Contract is an indefinite quantity contract pursuant to which the San
FRANCISCO
LICENSE), SAN FRANCISCO, PENINSULA, AND Francisco Public Utilities Commission may accomplish a series of projects with a
EAST BAY CONTRACT NOS. JOC-52 AND JOC-53 single, competitively bid contract awarded before the projects are identified.
(ONLINE ONLY)
Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by
issuing task orders to the successful contractor during the two year term of the
contract.
103
2:30 PM
SAN MATEO NEW MEMORIAL PARK WATER TREATMENT
COUNTY
IMPROVEMENT PROJECT LOMA MAR AREA
11/14/2014 441
2:00 PM
RICHMOND
The Work consists of, in general, installing 4" water main including trench and
backfill, water line connections to any water service that was impacted by the
waterline improvement, water valves, air release valves, elbows, thrust blocks,
fittings, removing two storage sheds, installing two 4" thick concrete pads, new
surface water treatment system with tanks (one source water and two baffled
contact tanks), new raw water duplex pump system, and water line connections
within the treatment system and pump house, as well as any other items and details
not mentioned above, but required by the Project Plans, Standard Specifications
and these Special Provisions, and the directions of the Engineer.
RICHMOND PARKWAY INTERCONNECT WIRE Project consists of removal and installation of 275 (200 Base Bid + 75 Alternate)
AND PULLBOX REPLACEMENT (ONLINE ONLY) new traffic rated boxes and construction of reinforced concrete pads around the
boxes in accordance to City Standards, removal of asphalt concrete and concrete
sidewalk as required, and the complete re-wire of the traffic signal interconnect
system along the Richmond Parkway (Base Bid) from San Pablo Avenue to I-580
and Castro Street (Alternate Bid). (See Plans Attached), and for all other work,
items or details not mentioned above that are required by the Drawings, Standard
Specifications, or these Special Provisions.
Available for viewing ONLINE ONLY!!!
Page 18 of 25
Online
Planroom &
Online
Online
Bid Date
Plan # Bid Time Location
11/18/2014 312
10:00 AM
CONCORD
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW BOLLMAN WTP SODIUM HYPOCHLORITE TANK Div 1 & 9. The Work includes supply, erection, and removal of scaffolding; the
T-46 REPAIR
supply, erection, operation, and removal of an environment control (ventilation)
system and lighting for activities inside the tank; the supply, erection, operation, and
removal of an abrasive and dust containment enclosure; pressure washing of
interior surfaces and removal and disposal of all wash water rinsate; removal of
existing resin lining; removal and proper disposal of debris materials; welding steel
plates as patches over pits and corroded areas on the tank interior as directed;
repair of the hole in the tank wall by welding steel plates on the tank interior and
exterior; preparation of surfaces for new coatings; application and curing of multiple
layers of new vinyl ester resin lining system; replacement of flanges, hardware, and
gaskets on the four nozzles on the bottom of the tank; furnishing emergency rescue
services while personnel are working inside the tank; reconnection of all inlet, outlet,
and drain piping; hydrostatic test of tank for leakage; and supplying tools, materials,
and appurtenant equipment as required for a complete rehabilitation of Sodium
Hypochlorite Tank T-46.
The Work also includes supply, erection and removal of scaffolding, the supply,
erection, operation, and removal of an environment control (ventilation) system and
lighting for inspection activities inside each tank, and furnishing emergency rescue
services while personnel are inside each tank to facilitate the inspection of the two
other sodium hypochlorite tanks T-44 and T-45.
Page 19 of 25
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/18/2014 196
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
BART EARTHQUAKE SAFETY PROGRAM
1-7, 9, 20 & 32. The Work in this Contract is part of the BART Earthquake Safety
SEISMIC RETROFIT AND REPAIRS AT VARIOUS Program (the Program). The Program includes construction of structural
LOCATIONS
modifications to the existing system to provide adequate resistance to forces of a
major seismic event. The result will reduce the risk to, and improve the safety of,
patrons and personnel during an earthquake. The Work included in this Contract
includes construction of structural modifications to improve seismic safety of Districtowned structures as described in the Contract Documents. Work includes, but is
not limited to the following:
Planroom &
Online
EMBARCADERO STATION: Removal of existing granite curb and fabrication and
installation of new concrete curb at radial crossover at six (6) station entrance
locations.
DALY CITY STATION and NORTH OAKLAND AERIALS including ROCKRIDGE
STATION PARKING LOT: Removal of existing fire protective coating and
installation of new fire protective coating and painting over existing fiber reinforced
polymer (FRP) wrapped casings at various locations.
SAN FRANCISCO TRANSITION STRUCTURE (SFTS): Fabricate and install
stainless steel fence panels, install tamper proof screws, install walkway markings,
replace light fixture, install pushbutton signage, and repair leak(s) at planter.
209
2:00 PM
FREMONT
WARM SPRINGS EXTENSION WETLAND
MITIGATION SITE - BART
Div 1-3, 5-7, 10 & 31-33. The Work includes furnishing all labor, equipment,
materials, except for District-Furnished plants and cuttings, and services to
construct a wetland mitigation site adjacent to the Warm Springs Extension
trackway in the City of Fremont, CA as described in Contract Specification Section
01 11 00 Summary of Work.
Prospective Bidders are requested to make every effort to attend the one and only
scheduled pre-Bid meeting and site tour as the majority of the Jobsite is a BART
construction site. Cameras will be allowed at the job site tour. Interested
prospective Bidders are requested to confirm their intention to attend by notifying
Contract Administrator, Sunni Gunawardena, telephone (510) 464-6550 prior to the
date of the
scheduled pre-bid meeting and site tour.
Page 20 of 25
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/18/2014 416
2:00 PM
DALY CITY
Plan Name
CSI Divisions / Job Description
REPLACE GLASS PANELS AT DALY CITY
STATION PLATFORM - BART (ONLINE ONLY)
Contractor shall provide all labor, equipment, materials and services required for
replacing non-tempered glass panels with tempered glass at the platform level at
the BART Daly City Station.
# of
Addenda Plans
Online
Contact Anita Maynar at (510) 464-6543 with any questions.
Available for viewing ONLINE ONLY!!!
462
2:00 PM
SAN
FRANCISCO
AND
ALAMEDA
COUNTIES
CALTRANS 04-013524 REMOVE BRIDGE
Remove bridge (portion) and salvage bridge elements in the City and County of San
(PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8
ONLINE ONLY
mile west of the Toll Plaza. The Contractor must have either a Class A License or a
combination of Class C Licenses which constitutes a majority of the work.
Online
This Project is available for viewing ONLINE ONLY!!!
465
2:00 PM
SAN PABLO
NEW PLAZA SAN PABLO ROADWAY IMPROVEMENTS The Project consists of, but is not limited to, demolition of existing concrete
PROJECT PHASES 1 & 2 (ONLINE ONLY)
sidewalk, curb and gutter, AC pavement, and select utilities; installation of new
underground utilities, storm drain piping and inlets, sanitary sewer main pipe and
sanitary sewer manhole, fine grading and placement of baserock, concrete
sidewalk, curb and gutter, AC pavement, ADA ramps, signage and striping, bioswales, landscaping and planting, and irrigation system; construction of a water
fountain; and installation of street lighting and traffic signals.
Online
Available ONLINE ONLY!!!
478
2:00 PM
CUPERTINO
MOT RESTROOM REMODEL AT OPERATION
CENTER (ONLINE ONLY)
The Project consists of all materials, labor, equipment, and apparatus, whether
specifically mentioned or not, necessary to remodel MOT Department’s women’s
and men’s restrooms per McKim Architect’s Plans and Specifications. The
restrooms are located in CUSD’s facilities building at Operations Center.
This Project is available for viewing ONLINE ONLY!!!
Page 21 of 25
1
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
11/18/2014 915
2:00 PM
ALAMEDA
COUNTY
NEW DRAINAGE INLET STRUCTURE REPLACEMENT The Project consists of preparing construction schedules; preparing traffic and
AT VARIOUS LOCATIONS ON FOOTHILL ROAD detour plans; installing temporary traffic control systems; providing construction
AND MINES ROAD
area signs; furnishing and implementing water pollution control plan; furnishing and
applying water;
installing and removing temporary high visibility and silt/wildlife exclusion fence and
posts at each project site; relocating roadside signs/mile markers and posts;
installing roadside signs and posts; removing existing concrete headwalls and drop
inlets; removing part of existing CMP/RCP culverts; removing and disposing of
unsuitable subgrade material, if encountered, as directed by the Engineer; removing
and disposing of excess and waste material; extending existing CMPIIlCP/box
culverts; installing reinforced concrete pipe collars; constructing new reinforced
concrete headwalls and drop inlets; clearing/removing all debris from existing
CMP/RCP/box culverts; coordinating with various utility companies; coordinating
with property owners; the cleaning of the site at the end of the job.
Planroom &
Online
11/19/2014 129
2:00 PM
APTOS
NEW BUILDING 1550 AND 1600 HVAC AND LIGHTING Div 2, 6, 9 & 15-17. Trades include selective demolition, rough carpentry, gypsum
RENOVATIONS AT CABRILLO COLLEGE
board assemblies, paints and coatings, HVAC, testing and balancing, lighting and
electrical.
Planroom &
Online
456
2:00 PM
SONOMA
COUNTY
NEW CALTRANS 04-3G1204 CONSTRUCT SOLDIER Construct soldier pile wall and place culvert in Sonoma County near Cloverdale
PILE WALL AND PLACE CULVERT (ONLINE ONLY)about 3.1 miles west of north Cloverdale Boulevard. The Contractor must have
either a Class A License or a combination of Class C Licenses which constitutes a
majority of the work.
Online
Available for viewing ONLINE ONLY!!!
11/20/2014 10
2:00 PM
LOS ALTOS
NEW REHABILITATION OF LOYOLA OVERCROSSING Project consists of bridge removal (portions); adding additional traffic lanes and
AT FOOTHILL EXPRESSWAY
bicycle lanes in each direction; reconstruct bridge railing; placing CIDH piles behind
existing abutment walls, columns to the pier; protecting in place a retaining wall as
well as associated roadway work for the structure briefly described as: Loyola
Overcrossing at Foothill Expressway.
Planroom &
Online
Contact Amir Douraghy, Project Engineer, at (408) 573-2496 with any questions.
430
2:00 PM
SAN
FRANCISCO
SCHWERIN STREET SEWER SYSTEM
IMPROVEMENT (ONLINE ONLY)
Div 1-3, 5 & 9. The objective of the Project Installation of new auxiliary wet weather
sewer by means of microtunneling and replacement of existing local sewers. The
Work is to be performed in San Francisco, California.
Available for viewing ONLINE ONLY!!!
Page 22 of 25
Online
Bid Date
Plan # Bid Time Location
11/20/2014 457
2:00 PM
GILROY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW EIGLEBERRY STREET RESURFACING PROJECT Project consists of the construction of asphalt concrete pavement, cold mill of
(ONLINE ONLY)
asphalt concrete and portland concrete, removal and replacement of concrete,
adjustment of utilities to grade, concrete construction, and striping including
incidental and appurtenant work necessary for the completion of construction of the
resurfacing Eigleberry Street from 1st to 10th street in the City of Gilroy, CA.
Online
Available for viewing ONLINE ONLY!!!
71-73
2:00 PM
NEW BOOKER T. WASHINGTON COMMUNITY
SAN
FRANCISCO
SERVICE CENTER
38
2:30 PM
LIVERMORE NEW LIVERMORE-PLEASANTON FIRE STATION NO. 9 Div 1-12, 21-23, 26-28 & 31-34. Project consists of the demolition and disposal of
the existing 3,350 sq. ft. Fire Station No. 9 and construction of a new 6,920 sq. ft.
Fire Station on the same site in the City of Livermore.
Div 1-12, 14, 21-23, 26, 28 & 31-33. Trade scopes include, but are not limited to,
demolition, concrete and rebar, shotcrete, gypsum underlayment, stone
countertops, structural steel and metal fabrications, rough carpentry, casework,
waterproofing, insulation, roofing, cement siding, sheet metal flashing, expansion
joints, doors/frames/hardware, sectional doors, storefronts and windows, plaster,
gypsum board assemblies, tile, acoustical ceilings, wood athletic flooring, carpet
and resilient, painting, signage, toilet partitions and accessories, wire mesh
partitions, operable partitions, lockers, appliances, projection screens, athletic
equipment, play structures, window shades, entry grilles, bleachers, site furnishings,
bike racks, elevators, trash chutes, fire suppression, plumbing, HVAC, electrical, fire
alarm, earthwork, A/C paving, site concrete, playground surfacing, metal and wood
fences and gates, planting and irrigation and underground utilities.
Trades include building demolition, hazmant abatement, concrete, masonry mortar,
unit masonry, adhered masonry veneer, structural steel framing, metal fabrications,
metal ladders, rough carpentry, shop-fabricated wood trusses, glue-laminated
construction, finish carpentry, wood-veneer-faced architectural cabinets, water
repellents, blanket insulation, nailable insulated sheathing, TPR, sheet metal
roofing, sheet metal flashing and trim, manufactured guttes and downspouts, roof
hatches, firestopping, joint sealants, hollow metal doors and frames, wood doors,
access doors and frames, overhead coiling doors, aluminum windows, tubular
skylights, door hardware, glazing, gypsum board assemblies, cement plastering,
acoustical panel ceiling, resilient flooring, tile carpeting, fiber reinforced plastic
panel, painting, utility protective systems, graffiti resistant coating, markerboards
and tackboards, signage, toilet accessories, fire protection specialties, flagpoles,
grilles and screens, vehicle exhaust removal system, miscellaneous equipment,
vertical louver blinds, fire suppression sprinkler system, plumbing, HVAC, testing,
adjusting and balancing for HVAC generator, electrical, TV signal distribution
system, sound system, fire alarm system, rough grading, finish grading, excavation,
backfilling, trenching, asphalt paving, concrete paving, chain link fences and gates,
automatic gates, landscaping, irrigation system and utilities.
Page 23 of 25
Planroom &
Online
Planroom &
Online
Bid Date
12/1/2014
Plan # Bid Time Location
21-24
3:00 PM
Plan Name
CSI Divisions / Job Description
NEW ISLAIS CREEK FACILITY PHASE II SAN
FRANCISCO
MAINTENANCE AND OPERATIONS BUILDING
# of
Addenda Plans
Div 1-3 & 5-16. The Work to be done under this Contract is located within the City
of San Francisco as shown on the Plans. The Project generally consists of the
construction of a new maintenance and operations building which will supplement
the existing fuel/wash and annex buildings previously constructed.
Work to be performed under this Project includes, but not limited to, Selective
demolition for the installation of work to be performed; Utility work in both the public
and private right of way including fire water, domestic water, fire hydrants, storm
and sanitary sewer, electrical and communication work, manholes, utility boxes, gas
service, etc.; Excavate, handle, reuse, transport, and dispose of site soils,
groundwater and storm water controls, environmental mitigation controls, and
environmental management of excavated materials; Dewatering work, including
dewatering of excavations, equipment, foundations, and utility trenches; Shoring for
excavations and open cuts as required by the governing jurisdiction(s)
requirements, and as determined by the contractor to perform the work to be
constructed; Site work including street and sidewalk, concrete paving, fencing work,
site lighting, signage and striping, site furnishings; Building construction including
piles, pile caps, framing, exterior siding, roofing, elevators, windows, interior
partitions, insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior
furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire
alarm, fire protection systems, system integration, solar panel system, access
control, security systems, etc.; Fluid systems including underground and
aboveground tanks, piping and dispensing systems; Vehicle maintenance
equipment including vehicle lifts, exhaust system, shop equipment, hoists and
cranes;Replacement of existing manhole lids; Provide pre-construction and post
construction survey, vibration and ground movement monitoring; Construction of
shoreline improvements including the installation of benches, and the removal and
replacement/re-grading of existing surfaces to align with the grade with the building
entrances; Coordinating and scheduling of work with the various utility agencies for
their service; Coordinating and scheduling of the special inspections and testing
agencies, and inspections by the governing jurisdictions; Coordinating and
scheduling of work with Muni Operations and Maintenance, and other projects
working on the site or in the immediate area; Testing, Training, and Start-Up. A
comprehensive program for testing, training, and start-up of systems and
components installed in the work of this Contract, including preparing operations
and maintenance manuals, providing training for City’s operating and maintenance
personnel, and completing start-up procedures and requirements as detailed in the
Specifications.
Contact Joon Park, Project Manager, at (415) 701-4742, or by email at:
[email protected] with any questions.
Page 24 of 25
Planroom &
Online
Bid Date
12/4/2014
Plan # Bid Time Location
86
10:30 AM
SAN
FRANCISCO
105
2:00 PM
OAKLAND
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
BELTLINE BUILDING PROJECT - PHASE I
The Project Scope of Work includes installation of public Men's and Women's
restrooms in the historic Beltline Building's 1944 addition. Work includes selective
demolition and hazardous material removal; installation of walls, doors, tile, flooring
and toilet partitions; installation and repairs of plumbing, mechanical, electrical,
fixtures and systems.
NEW ELIHU HARRIS STATE BUILDING 602 - ACCESS Div 1-2, 5-10, 12, 26-28 & 31-32. The Access Barrier Removal Project at the Elihu
BARRIER REMOVAL PROJECT
Harris State Building is limited to and includes only the removal of architectural
barriers related to the path of travel in common areas within the building and the
site. The following items have been identified as non-compliant with the 2013 CBC
or the 2010 Americans with Disabilities Standards.
The Scope of Work includes constructing new accessible parking stalls (including restriping and wheel stops), correcting slopes of driveways, passenger loading,
walkways, on-site sidewalks, and ramps, installation of truncated domes, lowering
control panels and correcting threshold gaps in 17 passenger elevators, replacement
of two building entrance doors, replacement of battery powered door openers with
door openers hard wired to power generators, replacement of signage
(approximately 500 total); demolition of existing concrete pavement, parking lot
striping, and exterior doors. Scope of Work will bring these areas into compliance.
Contact Pamela Mendoza, Associate Construction Analyst, at (916) 376-1731 with
any questions.
Page 25 of 25
4
Planroom &
Online
Planroom &
Online