WEEKLY PLAN LIST - Friday, November 07, 2014 www.bxofsf.com

THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363
WEEKLY PLAN LIST - Friday, November 07, 2014
(All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com
Bid Date
11/7/2014
Plan # Bid Time Location
493
2:00 PM
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW SERENITY MED SPA TENANT IMPROVEMENTS SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
SAN
FRANCISCO
(ONLINE ONLY)
R.W. Simone Company is taking bids for Demolition until Tuesday 11/4. Bids for
Plumbing; Electrical; HVAC; Fire Alarm; Fire Sprinkler; Laminate Floors; Tile Floors;
Metal Stud Framing; Sheetrock Hanging and Floating; Door Installation and
Hardware; and Cabinet Installation; and anything left out.
Online
The building can accommodate long work days and Saturday work. The Project is
scheduled for completion December 31st. The project needs to run steadily, but
safely, due to the quick completion date.
Contact Ron Simone at (415) 377-5915, or by email at: [email protected]
with any questions.
Project is available for viewing ONLINE ONLY!!!
11/10/2014 463
11:30 AM
COTATI
2014 PAVEMENT MAINTENANCE PROJECT
(ONLINE ONLY)
The Work consists of digout, crack seal and associated re-striping on local city
streets.
Online
This Project is available for viewing ONLINE ONLY!!!
449
2:00 PM
CONCORD
FARM BUREAU ROAD SAFE ROUTES TO
SCHOOL PROJECT (ONLINE ONLY)
The Work to be done, in general, consists of mobilization, traffic control, storm water 2
pollution control, open trench construction of storm drain, street pavement, concrete
curb and gutter construction, concrete sidewalk construction, concrete ADA ramp
construction, tree removal, potholing of existing utilities, traffic striping and markings,
street lighting, landscape and irrigation construction and all other work as shown on
the Plans and as specified in these Special Provisions.
Available for viewing ONLINE ONLY!!!
Page 1 of 28
Online
Bid Date
Plan # Bid Time Location
11/10/2014 496
2:00 PM
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
SAN MATEO NEW FIRE STATION 23 INTERIOR REMODEL - PHASE The Contractor shall perform all work necessary to complete the Contract in a
2 (ONLINE ONLY)
satisfactory manner. The work to be performed under this Contract shall include,
but not be limited to, Interior remodel work to create dormitory rooms (Dorm Room 1
and Dorm Room 2) from existing offices; Interior remodel work to create a new
bathroom (New Bath) from an existing dormitory room. Please note that plumbing
was installed during the construction of Fire Station 23 for this bathroom; Work by
others includes the alerting system modifications (Telecommunications Engineering
Associates) and the removal of the existing A/V equipment by AV Integrators. The
City will coordinate the work between the contractors. The new bathroom and
dormitory rooms shall have matching materials and finishes as the existing
bathroom and dormitory rooms upstairs.
Online
Any questions regarding the contract documents should be directed to Gogo
Heinrich, Project Manager, at (650) 522-7361, or in writing at:
[email protected].
Project is available for viewing ONLINE ONLY!!!
11/11/2014 110-111
10:00 AM
GREENFIELD
MAGNOLIA PLACE SENIOR APARTMENTS
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Planroom &
Online
Project consists of the construction of a 32-unit, 26,220 sq. ft. building complete with
architectural, civil, electrical, landscaping, plumbing, mechanical and structural
trades.
487
12:00 PM
ANDERSON
ARCO AM/PM - ANDERSON, CA (ONLINE ONLY) Ground-up construction of new c-store, with future tenant to be built in adjacent
tenant space.
Online
TRADES NEEDED: Survey/Staking; Erosion Control; Grading/Paving; Utilities;
Striping; Landscaping; Concrete; Concrete Sealer; CMU; Structural Steel; Rough
Carpentry; Insulation; Roofing; Flashing and Metals; Sealing and Caulking; Doors;
Storefront; Stucco, Drywall; Tile; Flooring; Paint; T-Bar; FRP/Marlite; Restrooms;
Plumbing; HVAC; and Electrical.
Project is available for viewing ONLINE ONLY!!!
11/12/2014 401
1:30 PM
UKIAH
INSTALL NEW GATE AND TRACK AT CITY OF
UKIAH CORPORATION YARD (ONLINE ONLY)
Project consists of all labor, materials and equipment for complete installation of a
chain link gate with track at City Corporation Yard, as per attached specification
#E33664.
Available for viewing ONLINE ONLY!!!
Page 2 of 28
2
Online
Bid Date
Plan # Bid Time Location
11/12/2014 243
11:00 AM
OAKLAND
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
RENOVATION OF 3824 WEST ST., OAKLAND
Div 1-3, 5-10, 12, 22-23, 26 & 32. The proposed Work consists, in general, of the
renovation of a two story single family home built in 1915 at 3824 West St. in
Oakland. Work shall include exterior painting, window replacement, dry rot repairs
at porches, interior painting, floor replacement or re-finishing and remodeling of
upstairs bathroom.
Planroom &
Online
Contact Jeff Krohn at (510) 238-2253, or by email at: [email protected] with
any questions.
454
2:00 PM
SAUSALITO
MISCELLANEOUS UPGRADES PROJECT
(ONLINE ONLY)
This project consists of 6 tasks:
2
Online
1. Exterior painting of several small buildings.
2. Structural improvements to foundation supports.
3. Replacement of 4 air relief valves on the District’s sewer force main.
4. Collector system modifications to two sewer sediment tanks.
5. One sewer pump replacement.
6. Modifications to a pump station wet well.
Available for viewing ONLINE ONLY!!!
471
2:30 PM
SAN
FRANCISCO
OCEAN AVENUE AND PERSIA AVENUE
PAVEMENT RENOVATION AND SEWER
REPLACEMENT (ONLINE ONLY)
The Work is located along Ocean Ave from San Jose Ave to Persia Ave and along
Persia Ave from Ocean Ave to Dublin St and consists of pavement renovation, TEP
bulbout and curb ramp construction, sewer replacement, water support work, traffic
signal and streetlight support work, traffic routing and all associated work.
Online
Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions.
Available for viewing ONLINE ONLY!!!
473
2:30 PM
SAN
FRANCISCO
PAVEMENT RENOVATION AND SEWER
REPLACEMENT CRESCENT AND HUDSON
AVENUES (ONLINE ONLY)
Div 1-2 & 31-33. The Work is located on Crescent Ave from Mission St to Murphy
located on Crescent Ave from Mission St to Murphy St and from Porter St to Putnam
St , and on Hudson Ave from Phelps St to Ingalls St, and includes pavement
renovation, sewer and drainage work, traffic routing and all associated work.
Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions.
Available for viewing ONLINE ONLY!!!
Page 3 of 28
Online
Bid Date
Plan # Bid Time Location
11/12/2014 205
3:00 PM
PETALUMA
Plan Name
CSI Divisions / Job Description
VICTORIA LIFT STATION UPGRADES
Div 1, 9, 11, 13 & 15-16. The Work includes modifications to the existing pump
station including, but not limited to, forcemain tie-in, dry pit valve replacement,
removal and replacement of submersible pumps, wet well top replacements,
electrical equipment, controls and instrumentation, bypass pumping during
construction,
site work, and related work as shown in the Contract Documents. Work also
includes
electrical improvements at the La Cresta Water Tanks for SCADA upgrades.
# of
Addenda Plans
2
Planroom &
Online
1
Planroom &
Online
SITE OF WORK: The site of the WORK is located at City of Petaluma Victoria Lift
Station, Intersection of Windsor and West Haven, 1001 Windsor Dr. Petaluma CA
and
La Cresta Water Tanks at the end of Hayes Lane, Petaluma CA.
247
3:00 PM
LOS ALTOS
SMITHWICK THEATER HARDWARE
IMPROVEMENTS AT FOOTHILL COLLEGE
Div 1 & 8-9. Trades include wood doors, FRP doors, door hardware and painting.
All questions must be sent to the District’s Purchasing Office, Attention: Annette
Perez with a copy to Linda Mahi by email to: [email protected] with a copy to
Linda Mahi at: [email protected], or by fax to (650) 948-5194. The deadline to
submit questions is Noon on October 28, 2014. A question form is included herein,
see Bid
Document, 00 31 07. If you do not use the question form, you must still include the
same details in your question that are requested by the form. The District will issue
written response(s) to the bid questions as Amendments to the bid documents. Do
not direct questions to any other person associated with this Project. Such action
will only slow the District’s ability to respond to your inquiry.
340
3:00 PM
SUNNYVALE
FIRE STATION ROLL UP DOOR REPLACEMENT Project consists of furnishing all labor, materials, and equipment and performing all
work necessary and incidental to the completion of the project known as "Fire
Station Roll Up Door Replacement, Project No. PR-14/02-15” consisting of replacing
11 roll up doors at three fire stations in the City of Sunnyvale, according to Plans
and Specifications prepared by the City of Sunnyvale and according to the Contract
Documents.
11/13/2014 470
1:00 PM
DALY CITY
EXTENSION OF WESTLAKE WAREHOUSE
(ONLINE ONLY)
1
The Work includes design and construction of a pre-fabricated warehouse as
detailed in the Plans and Specifications including, but not limited to, construct
warehouse foundation based on soils report recently completed, construct
warehouse, coordinate with City's Inspector to design and construct an extension of
the fire sprinklers, installation of a ramp, installation of electrical equipment and
acquire all necessary permits and any other work required for a complete and fully
functional warehouse.
Available for viewing ONLINE ONLY!!!
Page 4 of 28
Planroom &
Online
Online
Bid Date
Plan # Bid Time Location
11/13/2014 210-211
1:30 PM
CASTRO
VALLEY,
ALAMO AND
LAFAYETTE
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
EDEN RESERVOIR REPLACEMENT AND ROUND Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33, 40 & 43. Work includes the following:
HILL RESERVOIR REHABILITATION - EBMUD
1). At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million
gallon bolted steel temporary tank, foundation, related piping, and appurtenances;
demolish existing 1.6-MG welded steel Eden Reservoir including the exterior
wooden architectural screen; construct two, 0.45 million gallon welded steel
reservoirs with aluminum geodesic dome roofs, foundations, piping, valve
structures, coatings, and appurtenances; disassemble and store 0.28 million gallon
bolted steel temporary tank, restore temporary tank site, pave reservoir site, install
irrigation and landscaping, install fencing and perform related work as specified in
the Contract Documents at Eden Reservoir, located near the intersection of
Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda
County), California.
1
Planroom &
Online
2). At Round Hill Reservoir: Construct radio communication towers and related cable
and conduit; perform earthwork; provide and install 0.16 million gallon bolted steel
temporary tank, foundation, piping, and appurtenances; remove exterior wooden
architectural screen from existing Round Hill Reservoir; abrasive blast and recoat
tank interior; low-pressure water clean, prime and top coat tank exterior;
disassemble and store 0.16 million gallon bolted steel temporary tank, pave
reservoir site, install fencing; and perform related work as specified in the Contract
Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place
in Alamo (Unincorporated Contra Costa County), California.
3). At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank,
deliver to Eden Reservoir, remove and replace fencing, restore site, and perform
related work as specified in the Contract Documents at Hink No. 2 Reservoir located
at the end of Vista Bella Drive, Lafayette, California.
148
2:00 PM
HEALDSBUR
G
VILLA ANNEX RESTROOM UPGRADE
1
Trades include demolition, miscellaneous rough carpentry, interior architectural
woodwork, plastic paneling, penetration firestopping, joint sealants, flush wood
doors, door hardware, gypsum board, resilient base and accessories, resilient sheet
flooring, interior painting, panel signage, toilet compartments, toilet accessories,
plumbing and electrical.
Planroom &
Online
20
2:00 PM
SAN RAFAEL
TERRA LINDA POOL HOUSE RENOVATION
PROJECT
The existing restrooms and locker rooms are to be renovated; A new meeting room
is to be added; Mechanical, electrical and plumbing systems are to be upgraded;
and a new fire sprinkler system will be installed as a deferred submittal.
Planroom &
Online
Page 5 of 28
1
Bid Date
Plan # Bid Time Location
11/13/2014 429
2:00 PM
LAFAYETTE
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
CALTRANS 04-3G1604 CONSTRUCT MULTITIRED SLOPE STRESSING SYSTEM (ONLINE
ONLY)
Construct multi-tired slope stressing system in Contra Costa County in Lafayette 0.6
miles west of Happy Valley Road. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-8, C-12, C-27.
Online
Available for viewing ONLINE ONLY!!!
435
2:00 PM
SAN RAMON
1
CITYWIDE SCHOOL CROSSING ENHANCEMENT The work consists, in general, of enhancement of crosswalks with pedestrian
PROJECT (ONLINE ONLY)
activated in-pavement warning lights and installation of overhead signal heads and
poles at the locations designated on the Plans. Related items of work include, but
are not limited to, construction signage; removal and installation of signs and posts;
installation of LED enhanced signs and pedestrian pushbuttons on poles;
installation of controllers; pull boxes, conduit, and wiring; removal of pole and signal
heads; installation of pedestrian barricades; removal of existing striping; placement
of new striping; and all
other work necessary for a complete project in accordance with the Plans and
Specifications.
Online
Available for viewing ONLINE ONLY!!!
460
2:00 PM
SACRAMENT
O
ACCESS BARRIER REMOVAL ONLY AUTOMATIC Project comprises of labor, material and services necessary for minor demolition,
DOOR OPENER AND PUSH PLATES (ONLINE
door operator, push plates, signage, new fire rated door, electrical and related work.
ONLY)
Available for viewing ONLINE ONLY!!!
Online
467
2:00 PM
SAN
FRANCISCO
JOB ORDER CONTRACT, ELECTRICAL (C-10
A Job Order Contract is an indefinite quantity contract pursuant to which the San
LICENSE), SAN FRANCISCO, PENINSULA, AND Francisco Public Utilities Commission may accomplish a series of projects with a
EAST BAY CONTRACT NOS. JOC-52 AND JOC-53 single, competitively bid contract awarded before the projects are identified.
(ONLINE ONLY)
Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by
issuing task orders to the successful contractor during the two year term of the
contract.
Online
483
2:00 PM
SANTA
CLARA
COUNTY
CALTRANS 04-0J5804 TREAT BRIDGE DECKS
WITH METHACRYLATE AND REPLACE JOINT
SEALS (ONLINE ONLY)
Online
Treat bridge decks with methacrylate and replace joint seals in Santa Clara County
at various locations. The Contractor must have either a Class A License or any
combination of the following Class C Licenses which constitutes a majority of the
work: C-8, C-61D06.
Available for viewing ONLINE ONLY!!!
Page 6 of 28
Bid Date
Plan # Bid Time Location
11/13/2014 489
2:00 PM
FRESNO
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1
SPORTSMAN'S WAREHOUSE - FRESNO (ONLINE Div 1-11 & 15-16. New building for Sportsman’s Warehouse. Project consists of,
ONLY)
but is not limited to, earthwork, concrete work, chain link fence, CMU masonry,
stone work, structural steel, Steel Joists, Metal deck, rough carpentry, sheathing,
millwork, countertops, insulation, EIFS, membrane roofing, flashing and sheet metal,
roof accessories, steel doors and frames, wood doors, overhead doors, aluminum
storefront, automatic entrance doors, door hardware, glass and glazing, metal stud
framing, drywall, resilient flooring, FRP, carpet, painting, sealed concrete floors,
toilet compartments, toilet and bath accessories, fire suppression, HVAC, plumbing
and electrical work.
Online
Project is available for viewing ONLINE ONLY!!!
492
2:00 PM
MARINA
NEW REGIONAL TREATMENT PLANT FUELING
SYSTEM UPGRADE AND UNDERGROUND
STORAGE TANK FACILITY REMOVAL (ONLINE
ONLY)
Div 1-3, 9 & 15-16. The Work includes the construction of two separate (one
gasoline and one diesel) aboveground fuel storage tank (AST) fueling facilities and
removal of the existing Underground Storage Tank (UST) fueling facility which
includes two 6,000 gallon USTs (one gasoline and one diesel), two fuel dispensers
located in one fueling
island and related appurtenances.
1
Online
Trades include demolition and reconstruction, site preparation, earthwork, trenching,
backfilling and compacting for utilities, asphaltic concrete vehicular paving,
underground storage tank removal, concrete, coatings, flammable liquid storage and
dispensing systems using protected aboveground storage tanks and electrical.
Project is available for viewing ONLINE ONLY!!!
103
2:30 PM
SAN MATEO
COUNTY
MEMORIAL PARK WATER TREATMENT
IMPROVEMENT PROJECT LOMA MAR AREA
Page 7 of 28
The Work consists of, in general, installing 4" water main including trench and
backfill, water line connections to any water service that was impacted by the
waterline improvement, water valves, air release valves, elbows, thrust blocks,
fittings, removing two storage sheds, installing two 4" thick concrete pads, new
surface water treatment system with tanks (one source water and two baffled
contact tanks), new raw water duplex pump system, and water line connections
within the treatment system and pump house, as well as any other items and details
not mentioned above, but required by the Project Plans, Standard Specifications
and these Special Provisions, and the directions of the Engineer.
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/14/2014 497
10:15 AM
PALO ALTO
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW RELOCATION & MODIFICATION OF MODULAR Project consists of the relocation and modification of an existing District-owned
BUILDING - CORPORATION YARD (ONLINE ONLY)modular
building. Work includes, but is not limited to, new interior walls, roofing, lighting,
data/phones, (N) wall framing, drywall, tack board, cabinets, plumbing, electrical,
modification of (E) HVAC system, lighting, alarm systems, cabinets, flooring, for a
complete and functioning building. Bidding documents contain the full scope of
work.
Online
Project is available for viewing ONLINE ONLY!!!
441
2:00 PM
RICHMOND
RICHMOND PARKWAY INTERCONNECT WIRE Project consists of removal and installation of 275 (200 Base Bid + 75 Alternate)
AND PULLBOX REPLACEMENT (ONLINE ONLY) new traffic rated boxes and construction of reinforced concrete pads around the
boxes in accordance to City Standards, removal of asphalt concrete and concrete
sidewalk as required, and the complete re-wire of the traffic signal interconnect
system along the Richmond Parkway (Base Bid) from San Pablo Avenue to I-580
and Castro Street (Alternate Bid). (See Plans Attached), and for all other work,
items or details not mentioned above that are required by the Drawings, Standard
Specifications, or these Special Provisions.
Online
Available for viewing ONLINE ONLY!!!
11/17/2014 120
2:00 PM
RICHMOND
NEW 3300 REGATTA BUILD OUT FOR MUSEUMS FOR Div 1-3, 5-11, 21-23, 26, 28 & 32. Project includes, but is not limited to, renovation
UC BERKELEY
of approximately 21,000 sq. ft. of an existing warehouse space into a collection
storage and work facility for the University’s museums. The new facility will have
two separate zones of temperature and humidity controlled rooms with tight
tolerance. Main work includes, but is not limited to, reconfiguration of spaces,
mechanical, electrical, plumbing and fire protection systems. Storage equipment
systems are not included in the project scope.
Planroom &
Online
11/18/2014 99
1:00 PM
BERKELEY
NEW CORY HALL - ELEVATOR MODERNIZATION AT
UC BERKELEY
Planroom &
Online
Page 8 of 28
Div 1-2, 5, 7-10, 14, 23 & 26. Project includes providing all labor, material,
equipment, tools, transportation, and services necessary to safely modernize and
alter one Otis Elevator Company elevator and one Montgomery Elevator Company
elevator. Work also includes associated fire curtains, fire alarm, electrical, patching
and painting, and providing selected demolition and maintenance.
Bid Date
Plan # Bid Time Location
11/18/2014 312
10:00 AM
CONCORD
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
1
BOLLMAN WTP SODIUM HYPOCHLORITE TANK Div 1 & 9. The Work includes supply, erection, and removal of scaffolding; the
T-46 REPAIR
supply, erection, operation, and removal of an environment control (ventilation)
system and lighting for activities inside the tank; the supply, erection, operation, and
removal of an abrasive and dust containment enclosure; pressure washing of
interior surfaces and removal and disposal of all wash water rinsate; removal of
existing resin lining; removal and proper disposal of debris materials; welding steel
plates as patches over pits and corroded areas on the tank interior as directed;
repair of the hole in the tank wall by welding steel plates on the tank interior and
exterior; preparation of surfaces for new coatings; application and curing of multiple
layers of new vinyl ester resin lining system; replacement of flanges, hardware, and
gaskets on the four nozzles on the bottom of the tank; furnishing emergency rescue
services while personnel are working inside the tank; reconnection of all inlet, outlet,
and drain piping; hydrostatic test of tank for leakage; and supplying tools, materials,
and appurtenant equipment as required for a complete rehabilitation of Sodium
Hypochlorite Tank T-46.
The Work also includes supply, erection and removal of scaffolding, the supply,
erection, operation, and removal of an environment control (ventilation) system and
lighting for inspection activities inside each tank, and furnishing emergency rescue
services while personnel are inside each tank to facilitate the inspection of the two
other sodium hypochlorite tanks T-44 and T-45.
Page 9 of 28
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/18/2014 196
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
BART EARTHQUAKE SAFETY PROGRAM
1-7, 9, 20 & 32. The Work in this Contract is part of the BART Earthquake Safety
SEISMIC RETROFIT AND REPAIRS AT VARIOUS Program (the Program). The Program includes construction of structural
LOCATIONS
modifications to the existing system to provide adequate resistance to forces of a
major seismic event. The result will reduce the risk to, and improve the safety of,
patrons and personnel during an earthquake. The Work included in this Contract
includes construction of structural modifications to improve seismic safety of Districtowned structures as described in the Contract Documents. Work includes, but is
not limited to the following:
Planroom &
Online
EMBARCADERO STATION: Removal of existing granite curb and fabrication and
installation of new concrete curb at radial crossover at six (6) station entrance
locations.
DALY CITY STATION and NORTH OAKLAND AERIALS including ROCKRIDGE
STATION PARKING LOT: Removal of existing fire protective coating and
installation of new fire protective coating and painting over existing fiber reinforced
polymer (FRP) wrapped casings at various locations.
SAN FRANCISCO TRANSITION STRUCTURE (SFTS): Fabricate and install
stainless steel fence panels, install tamper proof screws, install walkway markings,
replace light fixture, install pushbutton signage, and repair leak(s) at planter.
209
2:00 PM
FREMONT
WARM SPRINGS EXTENSION WETLAND
MITIGATION SITE - BART
Div 1-3, 5-7, 10 & 31-33. The Work includes furnishing all labor, equipment,
materials, except for District-Furnished plants and cuttings, and services to
construct a wetland mitigation site adjacent to the Warm Springs Extension trackway
in the City of Fremont, CA as described in Contract Specification Section 01 11 00
Summary of Work.
Planroom &
Online
Prospective Bidders are requested to make every effort to attend the one and only
scheduled pre-Bid meeting and site tour as the majority of the Jobsite is a BART
construction site. Cameras will be allowed at the job site tour. Interested
prospective Bidders are requested to confirm their intention to attend by notifying
Contract Administrator, Sunni Gunawardena, telephone (510) 464-6550 prior to the
date of the
scheduled pre-bid meeting and site tour.
225
2:00 PM
MERCED
2
WASTEWATER TREATMENT PLANT DRY SOLIDS The Work to be done consists, in general, of the construction of a 70’ x 180’ metal
STORAGE BUILDING
storage building with Granitstone wall panels, roof vents and metal roof panels. The
building will have a concrete floor with a 8’-0” high concrete wall on the inside of the
building, and solar exhaust fans. In addition, site work, including clearing and
grubbing, fill and concrete driveway approach and slab. All work shall be done at
the Merced Wastewater Treatment Plant within the City of Merced.
Page 10 of 28
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/18/2014 228
2:00 PM
Plan Name
CSI Divisions / Job Description
ELK GROVE NEW ELK GROVE MESA II PROCESSING ROOM
PROJECT
# of
Addenda Plans
Div 1-2, 7-10, 22-23 & 26. The Proposed Work shall be performed in accordance
with the Plans, Specifications and other Contract Documents and shall include, but
not be limited to, mechanical and electrical upgrades for the MESA II Processing
and Storage Rooms in an existing Elk Grove facility. Improvements consist of minor
demolition work to an existing T-bar ceiling and the installation of a new hard lid
ceiling, mechanical exhaust and cooling systems as well as additional power and
lighting. Work is limited to the two rooms shown on the Plans as well as minor work
in the building’s electrical room for new circuits. There will also be the addition of
roof mounted mechanical equipment and requisite electrical, and work to route
plumbing lines to nearest the restroom (Work).
Planroom &
Online
Please direct all questions to Alvin Wong at (916) 478-2260, or by email at:
[email protected]
403
2:00 PM
ALAMEDA
NEW STORM DRAIN VIDEO INSPECTION AND
CLEANING PHASE 1 (ONLINE ONLY)
The City of Alameda is a charter city with a population of over 75,000. This Project
is to be compliant with the City of Alameda Specifications, Special Provisions and
Plans. The project will include approximately 10 miles of CCTV inspection and
cleaning by the end of the calendar year (December 31, 2015).
1
Online
The City desires to obtain the services of an outside Firm to help the City by
performing CCTV Inspection and Cleaning Services to designated areas within the
City of Alameda various storm drainages. The selected Firm will provide the full
range of services including storm drain cleaning, storm drain video inspection and
manhole inspections.
Contact Laurie Kozisek, Acting Senior Engineer, at (510) 747-7930 with any
questions.
RFP is available for viewing ONLINE ONLY!!!
410
2:00 PM
BERKELEY
NEW HAAS SCHOOL OF BUSINESS S480 AV
RENOVATION FOR UC BERKELEY (ONLINE
ONLY)
Project includes, but is not limited to, renovation the educational technology
equipment and capabilities of our Executive Learning Classroom; a premier
educational space designed to accommodate the continuing educational needs of CSuite executives from across the globe. The room is a high-end existing space
requiring a complete refresh of audio visual and presentation technologies including
dual HD computer and video front-projection screens and projectors, sound system
with both presenter wireless mics and 60 student desk mics, HD video lecture
capture and live streaming capabilities, all sourced from a custom teaching lectern.
The classroom has an adjoining technical control booth with four full-sized
equipment racks and operated camera PTZ control and general room control via
Crestron.
Project is available for viewing ONLINE ONLY!!!
Page 11 of 28
Online
Bid Date
Plan # Bid Time Location
11/18/2014 416
2:00 PM
DALY CITY
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
REPLACE GLASS PANELS AT DALY CITY
STATION PLATFORM - BART (ONLINE ONLY)
Contractor shall provide all labor, equipment, materials and services required for
replacing non-tempered glass panels with tempered glass at the platform level at the
BART Daly City Station.
Online
Contact Anita Maynar at (510) 464-6543 with any questions.
Available for viewing ONLINE ONLY!!!
462
2:00 PM
SAN
FRANCISCO
AND
ALAMEDA
COUNTIES
CALTRANS 04-013524 REMOVE BRIDGE
Remove bridge (portion) and salvage bridge elements in the City and County of San 1
(PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8
ONLINE ONLY
mile west of the Toll Plaza. The Contractor must have either a Class A License or a
combination of Class C Licenses which constitutes a majority of the work.
Online
This Project is available for viewing ONLINE ONLY!!!
465
2:00 PM
SAN PABLO
PLAZA SAN PABLO ROADWAY IMPROVEMENTS The Project consists of, but is not limited to, demolition of existing concrete
PROJECT PHASES 1 & 2 (ONLINE ONLY)
sidewalk, curb and gutter, AC pavement, and select utilities; installation of new
underground utilities, storm drain piping and inlets, sanitary sewer main pipe and
sanitary sewer manhole, fine grading and placement of baserock, concrete
sidewalk, curb and gutter, AC pavement, ADA ramps, signage and striping, bioswales, landscaping and planting, and irrigation system; construction of a water
fountain; and installation of street lighting and traffic signals.
1
Online
Available ONLINE ONLY!!!
485
2:00 PM
MOUNTAIN
VIEW
INTERCEPTOR SEWER TRUNK MAIN MANHOLE Project consists of the construction of four sanitary sewer trunk main manholes with
CONSTRUCTION (ONLINE ONLY)
shoring and dewatering.
499
2:00 PM
SANTA CRUZ NEW WASTEWATER TREATMENT FACILITY
DIGESTER # 4 CLEANING (ONLINE ONLY)
Online
Project is available for viewing ONLINE ONLY!!!
Project consists of full service removal and disposal of all liquids and solids from
Digester # 4 and wash down of interior. Digester # 4 is 95' inside diameter at a
depth of 31 feet. The City will reduce the amount of material to approximately 18.5'
just above the upper draw off line. The Contractor shall break the seal. The amount
of material the Contractor shall remove is approximatley 994,000 gallons.
Project is available for viewing ONLINE ONLY!!!
Page 12 of 28
Online
Bid Date
Plan # Bid Time Location
11/18/2014 915
2:00 PM
ALAMEDA
COUNTY
404
3:00 PM
PALO ALTO
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
DRAINAGE INLET STRUCTURE REPLACEMENT The Project consists of preparing construction schedules; preparing traffic and
AT VARIOUS LOCATIONS ON FOOTHILL ROAD detour plans; installing temporary traffic control systems; providing construction area
AND MINES ROAD
signs; furnishing and implementing water pollution control plan; furnishing and
applying water;
installing and removing temporary high visibility and silt/wildlife exclusion fence and
posts at each project site; relocating roadside signs/mile markers and posts;
installing roadside signs and posts; removing existing concrete headwalls and drop
inlets; removing part of existing CMP/RCP culverts; removing and disposing of
unsuitable subgrade material, if encountered, as directed by the Engineer; removing
and disposing of excess and waste material; extending existing CMPIIlCP/box
culverts; installing reinforced concrete pipe collars; constructing new reinforced
concrete headwalls and drop inlets; clearing/removing all debris from existing
CMP/RCP/box culverts; coordinating with various utility companies; coordinating
with property owners; the cleaning of the site at the end of the job.
NEW CITY HALL TRANE CHILLER OVERHAUL
PROJECT (ONLINE ONLY)
This Project will disassemble, inspect, reassemble and test the Trane centrifugal
chiller per factory overhaul standard procedures. This Project shall also include
bearing replacements, first and third stage guide vane overhaul, and the installation
of the economizer flange retrofit kit. The Trane chiller located in the 8th floor
mechanical room in the Civic Center.
Planroom &
Online
Online
Project is available for viewing ONLINE ONLY!!!
498
4:00 PM
SAN MATEO NEW LOS PRADOS PARK SYNTHETIC TURF SOCCER Project consists of demolishing existing natural turf; export existing material; import
FIELDS - PREQUAL (ONLINE ONLY)
new base; grade; install synthetic turf; repair A/C pathway; ADA/parking
improvements; and landscaping.
Online
Alternates - Install synthetic turf at infields; and tree relocation.
Project is available for viewing ONLINE ONLY!!!
11/19/2014 129
2:00 PM
APTOS
408
2:00 PM
SANTA ROSA NEW LAGUNA TREATMENT PLANT FILTER VALVE
ACTUATORS AND VALVE REFURBISHMENT
(ONLINE ONLY)
BUILDING 1550 AND 1600 HVAC AND LIGHTING Div 2, 6, 9 & 15-17. Trades include selective demolition, rough carpentry, gypsum
board assemblies, paints and coatings, HVAC, testing and balancing, lighting and
RENOVATIONS AT CABRILLO COLLEGE
electrical.
See Specifications for complete Scope of Work. Project is available for viewing
ONLINE ONLY!!!
Page 13 of 28
Planroom &
Online
Online
Bid Date
Plan # Bid Time Location
11/19/2014 409
2:00 PM
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
SANTA ROSA NEW DELPORT AVE AND MCMINN AVE SEWER AND Project consists of dust control, traffic control, earthwork, aggregate base,
WATER IMPROVEMENTS (ONLINE ONLY)
bituminous seals, asphalt concrete, aspahlt concrete trench paving, signs, soil and
groundwater disposal, sanitary sewer system, concrete curbs and sidewalks, traffic
stripes and pavement markings, raised pavement markers, water system and
material recycling.
Online
Project is available for viewing ONLINE ONLY!!!
456
2:00 PM
SONOMA
COUNTY
CALTRANS 04-3G1204 CONSTRUCT SOLDIER Construct soldier pile wall and place culvert in Sonoma County near Cloverdale
PILE WALL AND PLACE CULVERT (ONLINE ONLY)about 3.1 miles west of north Cloverdale Boulevard. The Contractor must have
either a Class A License or a combination of Class C Licenses which constitutes a
majority of the work.
Online
Available for viewing ONLINE ONLY!!!
477
2:00 PM
WEST
SACRAMENT
O
EMERGENCY BACKUP GENERATORS FOR
STATIONS 42, 43 and 44 (ONLINE ONLY)
The Work generally consists of the installation of emergency backup generators
(City-provided) automatic transfer switches (City-provided), all natural gas piping,
electrical conduits, wires, testing of natural gas pipes and all other equipment,
materials, and labor for the complete installation at all three Fire Stations. All 3
stations must have a full test run of the units upon completion and training of the
firefighters at each station on the units. The City will be providing the generators
and automatic transfer switches which are located at the sites currently. The City
will be responsible for attending the building permits.
Online
Project is available for viewing ONLINE ONLY!!!
11/20/2014 10
2:00 PM
LOS ALTOS
1
REHABILITATION OF LOYOLA OVERCROSSING Project consists of bridge removal (portions); adding additional traffic lanes and
AT FOOTHILL EXPRESSWAY
bicycle lanes in each direction; reconstruct bridge railing; placing CIDH piles behind
existing abutment walls, columns to the pier; protecting in place a retaining wall as
well as associated roadway work for the structure briefly described as: Loyola
Overcrossing at Foothill Expressway.
Planroom &
Online
Contact Amir Douraghy, Project Engineer, at (408) 573-2496 with any questions.
100
2:00 PM
SAN JOSE
NEW CAPRIOTTI'S SANDWICH SHOP
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Tenant Improvement. Trades to include: sawcut, demolition, post tension slab
coring, concrete (topping slab), masonry (brick veneer), finish carpentry, cabinets &
countertops, frp, insulation, doors/frames/hardware, storefront/glazing, drywall/metal
framing, ceramic tile, acoustical ceiling, painting, toilet accessories, fire sprinklers,
plumbing, HVAC and electrical.
Page 14 of 28
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/20/2014 39-41
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2:00 PM
SAN
FRANCISCO
IDA B. WELLS HIGH SCHOOL MODERNIZATION Div 1-12 & 14-17. Project consists of general school modernization and
reconstruction including hazardous material/asbestos remediation, building
demolition, ADA Access and Fire/Life/Structural Safety upgrades, including but not
limited to, shotcrete work, shear wall installation, masonry repair work, framing and
drywall installation, installation of fire sprinkler and fire alarm systems, clock & P.A.
system, bathroom remodeling, exterior repair work, miscellaneous site work, interior
and exterior painting and other miscellaneous renovation work.
407
2:00 PM
NEW FIRST FLOOR WINDOW REPLACEMENT AT
SAN
The Project is generally described as First Floor Window Replacement at Children
FRANCISCO
CHILDREN ADMINISTRATION CENTER (ONLINE Administration Center, 20 Cook Street, PROJECT NO: 11726.
ONLY)
Project is available for viewing ONLINE ONLY!!!
411
2:00 PM
VALLEJO
NEW BAFFLE REPLACEMENT PROJECT (ONLINE
ONLY)
Planroom &
Online
Online
In general, the Work consists of the replacement of all, or part, of the existing baffle
wall attached to the existing CMA Small Boat Harbor Pier. The entirety of the Work
is anticipated to take place in multiple phases with each phase comprising one or
more wall sections. Each phase consists of a single mobilization and the demolition
and replacement of one, or more, existing 3/8 in. z-shaped sheet pile wall section(s)
with new ½ in. z-shaped steel PZ40 sheet pile, connected to each other by walers.
Each section consists of ten pairs (20 sheets). Replacement will consist of steel
sheet pile in alternating pairs of 50 ft. length and pairs of shorter, sediment window,
lengths. The basic Scope of Work includes one phase of work in 2014, addressing
a single section of baffle wall. Unit pricing is required for including additional
sections in a given phase and for additional phases.
Online
Project is available for viewing ONLINE ONLY!!!
430
2:00 PM
SAN
FRANCISCO
SCHWERIN STREET SEWER SYSTEM
IMPROVEMENT (ONLINE ONLY)
Div 1-3, 5 & 9. The objective of the Project Installation of new auxiliary wet weather
sewer by means of microtunneling and replacement of existing local sewers. The
Work is to be performed in San Francisco, California.
457
2:00 PM
GILROY
EIGLEBERRY STREET RESURFACING PROJECT Project consists of the construction of asphalt concrete pavement, cold mill of
(ONLINE ONLY)
asphalt concrete and portland concrete, removal and replacement of concrete,
adjustment of utilities to grade, concrete construction, and striping including
incidental and appurtenant work necessary for the completion of construction of the
resurfacing Eigleberry Street from 1st to 10th street in the City of Gilroy, CA.
Online
Available for viewing ONLINE ONLY!!!
Available for viewing ONLINE ONLY!!!
Page 15 of 28
1
Online
Bid Date
Plan # Bid Time Location
11/20/2014 490
2:00 PM
SANTA ROSA
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
BRIGHAM AVE AND GORDON LN SEWER AND
WATER IMPROVEMENTS - VALLEJO ST TO
JEFFREY ST (ONLINE ONLY)
Project consists of dust control, traffic control, earthwork, aggregate base, asphalt
concrete, asphalt concrete trench paving, soil and groundwater disposal, reinforced
concrete pipe, sanitary sewer system, concrete curbs and sidewalks, monuments,
traffic stripes and pavement markings, pavement markers, portland cement and
sand slurry mixture, cell concrete, water system, asphalt concrete dike, tree surgery
(sidewalk maintenance) and material recycling.
Online
Project is available for viewing ONLINE ONLY!!!
495
2:00 PM
SOUTH SAN NEW FOUR PARKS PLAYGROUND RENOVATION
FRANCISCO
PROJECT (ONLINE ONLY)
Div 1, 3, 5, 9, 11-12 & 31-32. The Project includes the renovation of four
playgrounds located at Buri Buri Park, Clay Avenue Park, Francisco Terrace Park
and Winston Manor Park per Plans and Specifications. The Work consists of, but is
not limited to, protection of existing trees; demolition of specified existing play
equipment and site furnishings; demolition of concrete curbs and asphalt paving;
demolition of plantings; removal and stockpiling of existing wood fiber safety
surfacing; furnishing and installation of new concrete curbs, synthetic and wood fiber
safety surfacing, subsurface drainlines, concrete and asphalt paving, decomposed
granite surfacing, boulders, concrete seat wall, site furnishings, new fence and gate,
new accessible parking area with curb ramps, of ramp and stairs with handrails and
new signage; resurfacing existing asphalt paths to conform with ADA standards; site
grading; adjustment of existing drainage and site utilities; installation of new play
structures supplied by Owner and available for Contractor pick-up within the City
Limits; and coordination of the refurbishing of specified play structures.
Online
Project is available for viewing ONLINE ONLY!!!
71-73
2:00 PM
SAN
FRANCISCO
BOOKER T. WASHINGTON COMMUNITY
SERVICE CENTER
Div 1-12, 14, 21-23, 26, 28 & 31-33. Trade scopes include, but are not limited to,
demolition, concrete and rebar, shotcrete, gypsum underlayment, stone countertops,
structural steel and metal fabrications, rough carpentry, casework, waterproofing,
insulation, roofing, cement siding, sheet metal flashing, expansion joints,
doors/frames/hardware, sectional doors, storefronts and windows, plaster, gypsum
board assemblies, tile, acoustical ceilings, wood athletic flooring, carpet and
resilient, painting, signage, toilet partitions and accessories, wire mesh partitions,
operable partitions, lockers, appliances, projection screens, athletic equipment, play
structures, window shades, entry grilles, bleachers, site furnishings, bike racks,
elevators, trash chutes, fire suppression, plumbing, HVAC, electrical, fire alarm,
earthwork, A/C paving, site concrete, playground surfacing, metal and wood fences
and gates, planting and irrigation and underground utilities.
Page 16 of 28
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/20/2014 986
2:00 PM
SAN MATEO
Plan Name
CSI Divisions / Job Description
REGIONAL GROUNDWATER STORAGE AND
RECOVERY
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
# of
Addenda Plans
2
Planroom
PLEASE NOTE: This Contract requires bidder pre-qualification by the SFPUC.
Div 1-3, 5-11, 13 & 15-16. The objective of this Project is to drill, install, and
construct 13 groundwater well facilities, including site preparation; clearing/grubbing
and grading; various work on existing groundwater wells; building foundations,
temporary shoring and retaining walls; new pumps, motors and related
appurtenances; ventilation system; trenching and pipeline and conduit construction;
cathodic protection system; chemical treatment equipment, tanks and pumping
systems; electrical power distribution systems, SCADA and I&C control systems;
perimeter security fence; security monitoring and control systems; final grading and
drainage; landscape and irrigation systems; sanitary and storm drain piping and
connections to municipal systems; paving and various other site improvements;
construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water
transmission pipeline. The Work is to be performed in San Mateo, California. The
Engineer's Estimate is approximately between $47 to $50 million. The Contract will
be awarded to the lowest responsible and responsive bidder.
38
2:30 PM
LIVERMORE
LIVERMORE-PLEASANTON FIRE STATION NO. 9 Div 1-12, 21-23, 26-28 & 31-34. Project consists of the demolition and disposal of
the existing 3,350 sq. ft. Fire Station No. 9 and construction of a new 6,920 sq. ft.
Fire Station on the same site in the City of Livermore.
Trades include building demolition, hazmant abatement, concrete, masonry mortar,
unit masonry, adhered masonry veneer, structural steel framing, metal fabrications,
metal ladders, rough carpentry, shop-fabricated wood trusses, glue-laminated
construction, finish carpentry, wood-veneer-faced architectural cabinets, water
repellents, blanket insulation, nailable insulated sheathing, TPR, sheet metal
roofing, sheet metal flashing and trim, manufactured guttes and downspouts, roof
hatches, firestopping, joint sealants, hollow metal doors and frames, wood doors,
access doors and frames, overhead coiling doors, aluminum windows, tubular
skylights, door hardware, glazing, gypsum board assemblies, cement plastering,
acoustical panel ceiling, resilient flooring, tile carpeting, fiber reinforced plastic
panel, painting, utility protective systems, graffiti resistant coating, markerboards
and tackboards, signage, toilet accessories, fire protection specialties, flagpoles,
grilles and screens, vehicle exhaust removal system, miscellaneous equipment,
vertical louver blinds, fire suppression sprinkler system, plumbing, HVAC, testing,
adjusting and balancing for HVAC generator, electrical, TV signal distribution
system, sound system, fire alarm system, rough grading, finish grading, excavation,
backfilling, trenching, asphalt paving, concrete paving, chain link fences and gates,
automatic gates, landscaping, irrigation system and utilities.
Page 17 of 28
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
11/21/2014 230
2:00 PM
SANTA ROSA NEW FORSYTH HALL AIR HANDLING UNITS UPGRADE Air handling units upgrade.
AT SANTA ROSA JR COLLEGE
If a subcontractor wants to be included on the plan holder’s list for any potential
addenda, they must complete the Plan Receipt Form which is posted online in the
Specs Folder and fax it to (707) 527-4870.
475
4:00 PM
SAN
FRANCISCO
REQUEST FOR QUALIFICATIONS FOR A
CONSTRUCTION MANAGER / GENERAL
CONTRACTOR FOR A NEW ESER 2010 BOND
FIRE STATION 5 (ONLINE ONLY)
# of
Addenda Plans
Planroom &
Online
The Department of Public Works (DPW) announces a Request for Qualifications
(RFQ) for a Construction Manager/General Contractor (CM/GC) to provide General
Contracting and Construction Services for the ESER 2010 Bond Fire Station 5
Facility located 1301 Turk St, San Francisco, CA. The Fire Station 5 project will
include the demolition of an existing fire station and replacement with a new two
story fire station with mezzanine storage, a second story terrace, and development
of an outdoor parking area and landscaping design as outlined by the approved
conceptual plans. Mechanical and electrical equipment serving the building,
including the emergency generator, will be located on the roof. Fuel tank and oil
separator will be located underground. SFPUC Storm Water Management approved
design. There is no basement included with this Project.
Online
Work shall identify and comply with all current code requirements including
requirements for an Essential Facility, Accessibility and Sustainability. Scope of
Work will include analysis and coordination to develop a strategy and check-list to
achieve USGBC LEED Gold certification for the project.
RFQ Packet is available for viewing ONLINE ONLY!!!
11/25/2014 406
2:00 PM
CUPERTINO NEW QUINLAN COMMUNITY CENTER INTERIOR
UPGRADES (ONLINE ONLY)
Work generally consists of interior finishes upgrades to the existing Quinlan
Community Center building.
Project is available for viewing ONLINE ONLY!!!
Page 18 of 28
1
Online
Bid Date
Plan # Bid Time Location
11/25/2014 58-59
2:00 PM
BURLINGAME
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
BURLINGAME INTERMEDIATE SCHOOL
CLASSROOM BUILDING
Div 1-12, 21-23, 25-28 & 31-33. Project consists of the construction of a new
classroom building on an existing middle school site. Removal of existing toilet
room building, clear existing site, perform selective demo of existing structures and
elements as indicated and construct new building, site work and utility infrastructure,
including associated. architectural, civil, structural, mechanical, plumbing, fire
protection, electrical and landscaping. Project will involve barricading of work as
indicated.
Prevailing Wage and CMU Requirements / 10% Retention / OCIP Required / 396
Day Duration Project / $2,000 Per Day Liquidated Damages / 1 Year Warranty
Required Unless Otherwise Specified.
TRADES NEEDED (but not limited to): Structure and Selective Demolition;
Earthwork; Erosion and Termite Control; Water Distribution; Sanitary Sewer; Storm
Drainage; Asphalt Paving; Planting and Irrigation; Import Topsoil; Gypsum Concrete
underlayment; CMU; Site Concrete; Rebar; Building Concrete; Structural and
Miscellaneous Steel; Metal Fabrication; Metal Stairs; Pipe and Tube Railings;
Rough and Finish Carpentry; Cabinets; Waterproofing; Insulation; Weather Barriers;
Metal Roof Panels; SBS Mod. Bit. Membrane Roofing; Sheet Metal Flashing and
Trim; Roof Expansion Joints; Fire Stopping; Joint Sealants; Expansion Control;
Doors, Frames and Hardware; Access Doors; Entrances and Storefronts; Glazed
Aluminum Curtain Walls; Aluminum Windows; Unit Skylights; Glazing; Fixed
Louvers; Non-Structural Metal Framing; Cement Plastering; Gypsum Board; Tiling;
Acoustical Panel Ceilings; Epoxy Resinous Flooring; Sheet Carpeting; Tackable
Wall Surface; Exterior and Interior Painting; Staining and Finishing; Vapor Emission
Treatment; Visual Display Units; Display Cases; Dimensional Letter Signage; Signs;
Toilet/Bath Accessories and Compartments; Folding Glass-Panel Partitions; Wall
and Door Protection; Fire Extinguishers and Cabinets; Assisted Listening System.;
Projection Screens; Vertical Louver Blinds; Roller Window Shades; Miscellaneous
Countertops; Elevators; Fire Sprinklers: Plumbing; HVAC; Automation Facility
Controls; Electrical; Communications; and Fire Alarm System.
Page 19 of 28
Planroom &
Online
Bid Date
Plan # Bid Time Location
11/26/2014 171
2:00 PM
PITTSBURG
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
AMBROSE AQUATIC CENTER RENOVATION
PROJECT
Div 1-4, 6-10, 12-13, 22-23, 26 & 31-33. Project consists of the rehabilitation of
existing pool and pool facilities. The scope includes restoration of the existing pool,
portions of the deck area and bathroom building; new fencing; accessible parking
stalls; chemical storage building; landscaping; and expansion of the pump house.
Trades include selective structure demolition; oncrete; masonry grout and mortar,
masonry reinforcement, concrete masonry units and masonry assemblies; rough
carpentry and interior finish carpentry; asphalt shingles, built-up asphalt roofing,
sheet metal flashing and trim, roof specialties and joint sealer; hollow metal doors
and frames, overhead coiling doors, aluminum windows, door hardware, glazing and
mirrors; gypsum board, tile setting materials and accessories, tiling, resilient base
and accessories, epoxy floor topping, ant-graffiti coatings, paints and concrete
sealers; architectural louvers, plastic toilet compartments and toilet accessories; site
furnishings; swimming pool; plumbing; HVAC; lighting and electrical; site clearing,
earth moving, finish grading, excavation, trenching and backfilling and termite
control; aggregate base courses, asphalt paving, sitework cast-in-place concrete,
pavement markings, planting irrigation, planting and landscape installation; and
utilities.
Page 20 of 28
Planroom &
Online
Bid Date
12/1/2014
Plan # Bid Time Location
21-24
3:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
ISLAIS CREEK FACILITY PHASE II MAINTENANCE AND OPERATIONS BUILDING
Div 1-3 & 5-16. The Work to be done under this Contract is located within the City
of San Francisco as shown on the Plans. The Project generally consists of the
construction of a new maintenance and operations building which will supplement
the existing fuel/wash and annex buildings previously constructed.
# of
Addenda Plans
Work to be performed under this Project includes, but not limited to, Selective
demolition for the installation of work to be performed; Utility work in both the public
and private right of way including fire water, domestic water, fire hydrants, storm and
sanitary sewer, electrical and communication work, manholes, utility boxes, gas
service, etc.; Excavate, handle, reuse, transport, and dispose of site soils,
groundwater and storm water controls, environmental mitigation controls, and
environmental management of excavated materials; Dewatering work, including
dewatering of excavations, equipment, foundations, and utility trenches; Shoring for
excavations and open cuts as required by the governing jurisdiction(s) requirements,
and as determined by the contractor to perform the work to be constructed; Site
work including street and sidewalk, concrete paving, fencing work, site lighting,
signage and striping, site furnishings; Building construction including piles, pile
caps, framing, exterior siding, roofing, elevators, windows, interior partitions,
insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior
furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire
alarm, fire protection systems, system integration, solar panel system, access
control, security systems, etc.; Fluid systems including underground and
aboveground tanks, piping and dispensing systems; Vehicle maintenance
equipment including vehicle lifts, exhaust system, shop equipment, hoists and
cranes;Replacement of existing manhole lids; Provide pre-construction and post
construction survey, vibration and ground movement monitoring; Construction of
shoreline improvements including the installation of benches, and the removal and
replacement/re-grading of existing surfaces to align with the grade with the building
entrances; Coordinating and scheduling of work with the various utility agencies for
their service; Coordinating and scheduling of the special inspections and testing
agencies, and inspections by the governing jurisdictions; Coordinating and
scheduling of work with Muni Operations and Maintenance, and other projects
working on the site or in the immediate area; Testing, Training, and Start-Up. A
comprehensive program for testing, training, and start-up of systems and
components installed in the work of this Contract, including preparing operations
and maintenance manuals, providing training for City’s operating and maintenance
personnel, and completing start-up procedures and requirements as detailed in the
Specifications.
Contact Joon Park, Project Manager, at (415) 701-4742, or by email at:
[email protected] with any questions.
Page 21 of 28
Planroom &
Online
Bid Date
12/1/2014
Plan # Bid Time Location
402
5:00 PM
RICHMOND
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW RICHMOND TRANSIT VILLAGE PHASE 2 NEVIN The Successor Agency to the Richmond Community Redevelopment Agenc
AVE IMPROVEMENTS: BART TO 19TH ST - RFP (“Agency”) is seeking qualified consultants to provide Construction Management
(ONLINE ONLY)
Services for the RichmondTransit Village Phase II Nevin Avenue Improvements:
BART - 19th Project (“Project”) a total reconstruction of the east entrance to the
Richmond BART station to remove the existing non-ADA compliant walkway and
replace with an at-grade extension of Nevin Avenue, terminating at a “kiss-and-ride”
cul-de-sac-a full complement of pedestrian and bicycle-oriented street design
features and amenities along the above-referenced extension of Nevin Avenue
including wide sidewalks, bulb outs, curb ramps, enhanced crosswalks, bicycle
sharrows, pedestrian scaled lighting, wayfinding signage, landscaping and street
trees, a new BART station access stairway, elevator and pedestrian plaza to provide
direct access to the station, similar to the work already completed for the west
entrance to the station as part of Phase I of the Richmond Transit Village. The
Project also includes the installation of a new, ADA-compliant access ramp.
Online
RFP is available for viewing ONLINE ONLY!!!
12/2/2014
242
2:00 PM
PACIFICA
CHRISTEN HILL RESERVOIR REPLACEMENT
Div 1-3, 9, 11, 13 & 16. The Scope of Work shall include the furnishing of all labor,
materials, equipment, tools, and services required to perform all appurtenant work
necessary to construct a three-million, seven hundred and fifty-thousand gallon tank
(3.75 MG) at the Christen Hill Tank Site including, but not limitied to, mobilization
and demobilization, site grading, excavating and backfilling/compacting as
necessary for the installation of reinforced concrete ring-walls and asphalt concrete
base for the tank floor, the fabrication and erection of the welded steel tank with
appurtenant connections, the application of interior and exterior coatings, the
installation of galvanic anode cathodic protection systems, and the installation of
appurtenant electrical work as specified in the Contract Drawings and Specifications.
Planroom &
Online
486
2:00 PM
DANVILLE
CENTRALIZED IRRIGATION CONTROLLER
REPLACEMENT PROJECT (ONLINE ONLY)
These bids shall cover all the furnishing of all labor, material, equipment,
mechanical workmanship, transportation and services which are required for
Centralized Irrigation Controller Replacement Project Phase II, Contract No. A-492.
In general, the project involves removing/salvaging existing irrigation controllers
from roadside landscape sites in Danville, and installing replacement irrigation
controllers and related components that will integrate with the Town's Centralized
Irrigation System.
Online
Project is available for viewing ONLINE ONLY!!!
12/4/2014
86
10:30 AM
SAN
FRANCISCO
BELTLINE BUILDING PROJECT - PHASE I
The Project Scope of Work includes installation of public Men's and Women's
restrooms in the historic Beltline Building's 1944 addition. Work includes selective
demolition and hazardous material removal; installation of walls, doors, tile, flooring
and toilet partitions; installation and repairs of plumbing, mechanical, electrical,
fixtures and systems.
Page 22 of 28
5
Planroom &
Online
Bid Date
12/4/2014
Plan # Bid Time Location
105
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
JOB CANCELED - ELIHU HARRIS STATE
BUILDING 602 - ACCESS BARRIER REMOVAL
PROJECT
THIS PROJECT WAS CANCELED PER ADD #1 RECV'D ON 11/6/14!!!
# of
Addenda Plans
Div 1-2, 5-10, 12, 26-28 & 31-32. The Access Barrier Removal Project at the Elihu
Harris State Building is limited to and includes only the removal of architectural
barriers related to the path of travel in common areas within the building and the
site. The following items have been identified as non-compliant with the 2013 CBC
or the 2010 Americans with Disabilities Standards.
The Scope of Work includes constructing new accessible parking stalls (including restriping and wheel stops), correcting slopes of driveways, passenger loading,
walkways, on-site sidewalks, and ramps, installation of truncated domes, lowering
control panels and correcting threshold gaps in 17 passenger elevators, replacement
of two building entrance doors, replacement of battery powered door openers with
door openers hard wired to power generators, replacement of signage
(approximately 500 total); demolition of existing concrete pavement, parking lot
striping, and exterior doors. Scope of Work will bring these areas into compliance.
Contact Pamela Mendoza, Associate Construction Analyst, at (916) 376-1731 with
any questions.
Page 23 of 28
1
Planroom &
Online
Bid Date
12/4/2014
Plan # Bid Time Location
482
2:00 PM
RICHMOND
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2
VALLEY VIEW ELEMENTARY SCHOOL INTERIM Div 1-12, 22-23, 26-28 & 31-33. Project consists of the construction of temporary
HOUSING PROJECT (ONLINE ONLY)
interim housing for Valley View Elementary School. Work includes rough and finish
grading, connection of portables to new and existing utilities, site improvements,
landscaping, striping, provision and installation of playground equipment, play
structures and site furnishings. Work also includes, but is not limited to,
demolition/excavation as required to construct new paving, sewer domestic water,
mechanical/plumbing, electrical/ fire alarm connection to portables, installation of
site lighting and intrusion alarms.
Online
Trades include selective demolition; precast concrete specialties; concrete unit
masonry; structural steel framing, steel decking, cold-formed metal framing, metal
fabrications; exterior finish carpentry, plastic-laminate-clad architectural cabinets;
self-adhering sheet underlayment, roof and deck insulation, standing seam metal
roof panels, flashing and sheet metal, joint sealants; painting and coating; visual
display surfaces, signage, toilet accessories, miscellaneous specialties; food service
equipment, projection screens, playground equipment; site furnishings; plumbing;
HVAC, testing, adjusting and balancing for HVAC; lighting, electrical;
communications; fire alarm system, security intrusion alarm system; clearing and
grubbing, site preparation and plant protection, excavation & fill, trenching and
backfilling, geosythetic soil stabilization and layer separation; concrete for exterior
improvements, base courses, asphalt concrete pavement, parking bumpers,
pavement markings, landscape pavement marking, tactile warning surfacing, chain
link fences and gates, ornamental fences and gates; and utilities.
Project is available for viewing ONLINE ONLY!!!
12/9/2014
478
2:00 PM
CUPERTINO
MOT RESTROOM REMODEL AT OPERATION
CENTER (ONLINE ONLY)
The Project consists of all materials, labor, equipment, and apparatus, whether
specifically mentioned or not, necessary to remodel MOT Department’s women’s
and men’s restrooms per McKim Architect’s Plans and Specifications. The
restrooms are located in CUSD’s facilities building at Operations Center.
2
Online
This Project is available for viewing ONLINE ONLY!!!
931
2:00 PM
MOUNTAIN
VIEW
3
LIGHT RAIL EFFICIENCY PROJECT: MOUNTAIN Div 1-3, 10, 26 & 31-34. The Project will add a second light rail track over a
VIEW PHASE 2 - VTA
distance of approximately 3,000 feet, including closure and removal of the existing
Evelyn Light Rail Station, installation of light rail support systems, and modifications
to the municipal drain system.
Page 24 of 28
Planroom &
Online
Bid Date
12/9/2014
Plan # Bid Time Location
78-82
3:00 PM
SAN JOSE
Plan Name
CSI Divisions / Job Description
OLD MAIN HOSPITAL SEISMIC SAFETY
PROJECT, ANCILLARY BUILDING: CHANGE
ORDER 4 (MEP), CHANGE ORDER 5 (LINK &
STAIRWELL) & TENANT IMPROVEMENTS
(BASEMENT & 2ND FL)
Project Description:
# of
Addenda Plans
2
Planroom &
Online
A. The Project comprises construction of multiple related projects located at the
Ancillary Building of the Old Main Hospital in San Jose, California. The Project
consists of (1) changes to the MEP systems (Change Order 4), (2) new link and
stairwell (Change Order 5), and (3) ancillary basement and second floor tenant
improvements, all with a $20M construction budget. This target Scope and cost is
preliminary and subject to adjustment during design.
B. The pre-construction phase portion of the Work (Phase I) shall be completed
within ninety (90) calendar Days from the date when pre-construction phase
Contract Time commences to run, and the construction phase portion of the Work
(Phase II) shall be completed within four hundred eighty six (486) calendar Days
from the date when construction phase Contract Time commences to run, all as
provided in Contract Documents.
12/10/2014 106
2:00 PM
CUPERTINO NEW HYDE MIDDLE SCHOOL MODERNIZATION
Div 1-3, 5-12, 14, 22-23, 26-28 & 31-33. The Project consists of the Modernization
of Buildings 100 (Administration); 200 (Library); 300 (Classrooms); 400 (MultiPurpose); 500 (Staff); 600 (Classrooms); 700 (Classrooms); 800 (Locker &
Showers); 900 (Classrooms); 1000 (Classrooms); 1100 (Classrooms); 1200
(Gymnasium); and Portables 1, 2, 3 (Classrooms), to include but not limited to,
Code, Health and Safety, Building Envelope, Site Work and Support Facility
upgrades at Hyde Middle School.
Planroom &
Online
12/11/2014 112
2:00 PM
SAN
FRANCISCO
Div 1-2, 23 & 26-27. The Project consists of the replacement of remaining HVAC
pneumatic system components, including valve and damper operations, VAV box
controllers, pneumatic supply piping, pneumatic system compressor and air
filter/dryer with electric operators and DOC control components. Project includes
complete air balancing of each VAV box and associated air outlets.
Planroom &
Online
CPUC REPLACE VAV CONTROLLERS
Page 25 of 28
Bid Date
Plan # Bid Time Location
12/11/2014 192-193
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
SAN FRANCISCO GROUNDWATER SUPPLY
WELL STATIONS - REBID
THIS PROJECT IS A REBID!!!
# of
Addenda Plans
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE.
Div 1-3, 5, 7-11, 13 & 15-16. The objective of the Project consists of constructing
four new groundwater well stations including ground improvements; site preparation
including clearing & grubbing and grading; various work on existing groundwater
wells; building foundations, drilled piers & piles, temporary shoring & retaining walls;
new pumps, motors & related appurtenances; ventilation system; trenching &
pipeline & conduit construction; cathodic protection system; surge tanks &
compressed air systems; chemical tanks & pumping systems; electrical power
distribution systems, SCADA & I&C control systems; perimeter security fence;
security monitoring & control systems; final grading & drainage; landscape &
irrigation systems, paving & various other site improvements. The Work is to be
performed in San Francisco, California.
Page 26 of 28
5
Planroom
Bid Date
Plan # Bid Time Location
12/16/2014 194-195
2:00 PM
HAYWARD
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW CONSTRUCTION OF HAYWARD MAINTENANCE Div 1-5, 9, 20, 26 & 31-34. The Project consists of site preparation work, utility
COMPLEX PROJECT SITE, TRACK AND
work, 8" waterline extension, structural work and special trackwork, electrical,
SYSTEMS - BART
traction power work and train control system work.
The Work includes construction of modifications to the BART Hayward Maintenance
Complex Site, Track, and Systems, including the following:
I. SITE WORK: Includes demolition, grading, backfill, concrete work, asphalt
concrete paving, fencing, lighting and associated work.
2. UTILITY WORK: Includes utilities, utility structures, support and protection of
utilities, trenching and backfilling for utilities, water utility distribution piping, sanitary
utility sewerage piping, subdrainage and associated work.
3. 8" WATERLINE EXTENSION: Includes utilities, utility structures, support and
protection of utilities, trenching and backfilling for utilities, pipe boring and jacking,
water utility distribution piping and associated work.
4. STRUCTURAL WORK: Includes sound walls and retaining walls.
5. TRACKWORK AND SPECIAL TRACKWORK: Includes grading, subballast,
ballast, tire derived aggregate, ties, rail, special trackwork and associated items.
6. ELECTRICAL AND TRACTION POWER WORK: Includes underground ductwork
and structures for facilities services, contact rail system, traction power cables,
auxiliary power distribution; indoor cabinets, frames and racks, transformers,
electrical cabinets and enclosures, circuit breakers and panel boards, testing and
associated work.
7. TRAIN CONTROL SYSTEM WORK: Includes train control room equipment, train
control wayside equipment including foundations, conduits, relocation of equipment,
switches, signals and track circuits, wayside signs and graphics, testing and all
associated work.
Page 27 of 28
Planroom &
Online
Bid Date
Plan # Bid Time Location
12/16/2014 55
2:00 PM
ELMIRA
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
NEW EASTERLY WASTEWATER TREATMENT PLANT Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The general description of work includes:
TERTIARY PROJECT - LAB EXPANSION
Construction of a new laboratory at the City’s Easterly Wastewater Treatment Plant
located at 6040 Vaca Station Road in Elmira, California. The Project consists of
construction of a one-story, 4,900 sq. ft. building, and associated site work
immediately south of the existing administration building. The existing plant will be
in operation during construction of the building.
Planroom &
Online
Trades include control of groundwater; surface water and excavation drainage;
concrete; structural steel framing; steel decking; cold-formed metal framing; metal
fabrications; decorative metal; miscellaneous rough carpentry; architectural
woodwork; laboratory casework and furnishings; water repellent; thermal insulation;
below-grade vapor retarder; building envelope underlayment; manufactured
standing seam roofing; metal roof screen; elastomeric membrane roofing; flashing
and sheet metal; joint sealants; hollow metal doors and frames; flush wood doors;
access doors and panels; glazed window wall assemblies; door hardware, glazing,
louvers; gypsum board assemblies; acrylic coated cement plaster; tiling; acoustical
ceilings; linear wood ceilings; resilient base, resilient tile flooring; tile carpeting;
painting and coating; signage; toilet accessories; fire extinguisher cabinets; metal
storage shelving; window shades; plumbing; HVAC; lighting; electrical;
communications; access control; fire alarm system; site clearing; earth moving;
asphalt paving; site concrete; planting irrigation; planting; facility water distribution
piping; sanitary utility sewerage piping; and storm utility drainage piping.
12/18/2014 108
2:00 PM
IONE
NEW WASTEWATER TREATMENT PLANT
IMPROVEMENTS AT MULE CREEK STATE
PRISON
Div 1-3, 5-13, 21-23, 25-28, 31-33, 35, 40 & 43-44. In general, the Scope of the
project is the construction of new infrastructure elements and the implementation of
equipment upgrades to the existing Wastewater Treatment Plant at Mule Creek
State Prison. The infrastructure upgrades include the addition of a secondary
clarifier, a mixed liquor splitter box, a chlorine contact basin, a disinfected secondary
effluent pump station, motor speed controls for return activated sludge pumps,
chemical feed
equipment, power supply, electrical equipment, instrumentation and controls, piping,
valves, site work and a new staff office building.
1/15/2015
2:00 PM
OAKLAND
NEW CALTRANS 04-4H2214 COLD PLANE AND
HMA/RHMA OVERLAY, PCC SLAB AND GUARD
RAIL REPLACE (ONLINE ONLY)
Project consists of cold plane and HMA/RHMA overlay, PCC slab and guard rail
replacement In Alameda County in Oakland from 0.1 mile east of Boston Ave
Overcrossing to 0.2 mile west of the Route 80/580/880 Separation and at 0.2 mile
West of Route 80/580/880 Separation. The Contractor must have either a Class A
License or any combination of the following Class C Licenses which constitutes a
majority of the work: C-12, C-32.
405
Project is available for viewing ONLINE ONLY!!!
Page 28 of 28
Planroom &
Online
Online