7 April 2015 UPDATED: WEEKEND CLOSURE 13 March 2015 Roe Highway between Tonkin Hwy and Great Eastern Hwy Bypass 7pm, Friday 17 until 5am, Monday 20 April 2015 The Roe Highway / Berkshire Road intersection is being upgraded to a grade separated interchange, interchange where Roe Highway traffic will travel over the top of Berkshire Road, allowing a free-flow free flow movement. To continue to progress the upgrade of this intersection, the existing intersection and sections of Roe Highway must be temporarily realigned to the north (towards the industrial area), opening up more work area to allow the bridge construction to start. In order to allow the safe completion of the construction and realignment of traffic onto the new temporary Roe Highway / Berkshire Road intersection, the full closure of Roe Highway is required. This closure has been rescheduled due to wet weather. Roe Highway between Tonkin Highway and Great Eastern Highway Bypass will be closed to all traffic from 7pm, Friday 17 April until 5am, Monday 20 April 2015. During this closure, access to / from Roe Highway to / from the adjoining roads along this section will also be closed. Enclosed are maps showing the location of this closure and detour routes. Signage will be in place to guide road users through detour routes to complete their journey during this closure. Road users are strongly encouraged to plan their journey to avoid the area if possible or allow extra travel time. The work is subject to weather and site conditions, which may result in changes to this schedule. In the event of changes, updated information will be available on the project website. Location of closure Reference: GWA-WZ-COR-0510
© Copyright 2024