PROJECTS BY LOCATION - Golden State Builders Exchanges

THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363
PROJECTS BY LOCATION - Tuesday, February 10, 2015
(All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com
Bid Date
2/10/2015
Plan # Bid Time Location
149
5:00 PM
ALAMEDA
Plan Name
CSI Divisions / Job Description
SPIN PIZZA RESTAURANT
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
# of
Addenda Plans
Planroom &
Online
This is a Spin Pizza restaurant about 3,191 sq. ft. Scope includes, but is not limited
to: demolition, concrete, concrete cutting, concrete countertops, insulation, interior
finishes, millwork installation, drywall/framing, doors & frames, HVAC, electrical and
plumbing. Please refer to the plans to determine the full Scope of Work. Look at
the responsibility schedule on sheet G002 and the K-sheets more notes and details
are in these sheets. This is Parkway Construction Project.
If you have any questions, please Malone Bullock at (469) 322-3783, ext. 3083 or
by email at: [email protected]
2/19/2015
426
2:00 PM
ALAMEDA
COUNTY
CALTRANS 04-4A4804 REPLACE GUARDRAIL, Replace guardrail, restore portal building, install CCTV in Alameda County in
RESTORE PORTAL BUILDING & INSTALL CCTV Alameda and Oakland at Posey Tube and Webster Street Tube. The Contractor
(ONLINE ONLY)
must have either a Class A License or one of the following Class C licenses: C-10,
C-29.
4
Online
Project is available for viewing ONLINE ONLY!!!
2/24/2015
121
11:00 AM
ALBANY
PIERCE STREET PARK CONSTRUCTION
PROJECT
2/17/2015
450
3:30 PM
ANDERSON
ANDERSON MIDDLE SCHOOL ADMINISTRATION Div 1-3, 5-10, 12, 22-23, 26, 28 & 32. Work consists of the reconstruction and
AND LIBRARY CONSTRUCTION (ONLINE ONLY) modernization of the Anderson Middle School Administration and Library. The
following divisions are included: existing conditions, concrete, metals, wood,
plastics and composites, thermal and moisture protection, openings, finishes,
specialties, furnishings, plumbing, HVAC, electrical, electronic safety and security
and exterior improvements.
Div 1-3, 9-12, 22, 26 & 31-33. The Project is located at the intersection of Pierce
Street and Calhoun Street in the City of Albany, Alameda County California. The
Project is more specifically defined in the Contract Documents, but generally it
includes site work consisting of site grading, installation of utilities, construction of
new playground, parking, and public facilities, installation of play equipment and
landscaping. The Project includes a base bid and a bid alternate.
Project is available for viewing ONLINE ONLY!!!
Page 1 of 30
Planroom &
Online
4
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2/12/2015
473
2:00 PM
ANTIOCH
SWIM LAGOON RESURFACING AND
MISCELLANEOUS REPAIRS (ONLINE ONLY)
See Specifications for complete Scope of Work. Project is available for viewing
ONLINE ONLY!!!
Online
2/17/2015
469
2:00 PM
ANTIOCH
PAVEMENT PLUGS AND BASE REPAIRS AT
VARIOUS LOCATIONS (ONLINE ONLY)
This Project consists, in general, of traffic control, pavement grind and base repair, 3
asphalt concrete plugs as marked in the field, storm water pollution control,
pavement marking removal, pavement marking installation and all other work shown
on the Plans and specified in the Project Special Provisions and Standard
Specifications. The Work is more fully described in the Description of Project and
other Contract Documents.
Online
Project is available for viewing ONLINE ONLY!!!
2/19/2015
401
2:00 PM
ANTIOCH
NEW BUCHANAN CROSSINGS PROJECT (ONLINE
ONLY)
Please provide your Proposal for the Work described in the Bid Documents for the
Buchannan Crossings project located at 3300 Buchanan Road in Antioch, CA.
Online
Bid Package # 5 Major ‘D’ Shell, Major ‘C’ Shell and Major ‘C’ Tenant Improvement
(T.I.).
Project is available for viewing ONLINE ONLY!!!
2/23/2015
483
2:00 PM
APTOS
SOLAR WATER HEATER SWIMMING POOL
(ONLINE ONLY)
Project consists of Adding Solar panels; Regrade panel Area; Adding Retaining wall
and fence; Adding pumps and controlers in pump room; and Adding piping between
panel area and pump room.
Online
Project is available for viewing ONLINE ONLY!!!
3/3/2015
303
2:00 PM
BURLINGAME NEW NEIGHBORHOOD STORM DRAIN PROJECT #7
The Work consists of construction and/or replacement of approximately 370 linear
feet of storm drain mains by open trench construction, approximately 200 linear feet
of cured-in-place pipe, approximately 1,500 linear feet of curb and gutter
replacement, storm drain manhole installations, installation of 100 linear feet of
concrete swales, concrete work on driveways/sidewalks and the replacement of
existing and/or construction of new curb inlets.
2/13/2015
470
11:00 AM
CONCORD
The Work to be done in general consists of fabrication and installation of two tubular 1
steel archways and construction of supporting concrete columns and cast in drilled
hole (CIDH) pier foundations, furnishing and installing cultured stone veneer on
column faces, furnishing and installing bronze plaques, coordinating the work of
sign fabricator (letters and LED lighting on backing plates, fabricated by others)
assembly of signage in archway and providing electrical connection to existing
service and all other work as shown on the Plans and as specified in these Special
Provisions.
TODOS SANTOS PLAZA ARCHWAY (ONLINE
ONLY)
Project is available for viewing ONLINE ONLY!!!
Page 2 of 30
Planroom &
Online
Online
Bid Date
2/25/2015
Plan # Bid Time Location
412
11:00 AM
CONCORD
Plan Name
CSI Divisions / Job Description
NEW TREAT BOULEVARD/CLAYTON
ROAD/DENKINGER ROAD INTERSECTION
CAPACITY IMPROVEMENTS (ONLINE ONLY)
# of
Addenda Plans
2
Project consists of mobilization, traffic control, storm water pollution control, open
trench replacement of storm drain, valley gutter, street pavement. concrete curb,
gutter and sidewalk reconstruction, concrete ADA ramp reconstruction, tree
removal, potholing of existing utilities, traffic striping and markings, and traffic signal
and street lighting.
Online
Project is available for viewing ONLINE ONLY!!!
3/5/2015
475
3:00 PM
CUPERTINO
KIOSKS PROJECT AT DE ANZA COLLEGE
(ONLINE ONLY)
Div 1, 26 & 31-33. Trades include electrical, site preparation, demolition, paving
and surfacing, and underground electrical structures.
Online
PLEASE NOT: All questions must be faxed to the District’s Purchasing Office at
(650) 948-5194, Attention: Gina Bailey with a copy to Linda Mahi, or by
email to: [email protected] with a copy to Linda Mahi at: [email protected].
The deadline to submit questions is Noon on February 18, 2015. A question form is
included herein, see Bid Document, 00 31 07.
This Project is available for viewing ONLINE ONLY!!!
3/11/2015
409
3:00 PM
CUPERTINO NEW ATHLETIC SUPPLY BUILDINGS AT DE ANZA
COLLEGE (ONLINE ONLY)
Div 1-2, 26 & 31-32. The Project consist of the demolition of two (2) existing
storage buildings, site work and preparation for new buildings and utilities, and the
procurement and installation of two (2) new DSA-approved buildings to be used for
athletic equipment and material supply storage. Scope includes building demolition,
electrical utility installation, grading and preparation of the building pads, minor
grading and asphalt paving of the entries, concrete perimeter foundations, and the
placement and completion of the two (2) new buildings.
Online
Project is available for viewing ONLINE ONLY!!!
2/19/2015
482
2:00 PM
DIXON
WASTEWATER TREATMENT FACILITY WATER
SUPPLY WELL PROJECT (ONLINE ONLY)
Project consists of drilling an approximately 930 foot deep borehole and completing
it as a water supply well with an estimated depth of 910 feet.
1
Online
1
Planroom &
Online
Project is available for viewing ONLINE ONLY!!!
2/12/2015
44
2:00 PM
EL CERRITO
EL CERRITO VETERAN’S HALL ACCESSIBILITY The Work includes accessibility improvements including a new exterior ramp,
IMPROVEMENTS
renovation of an existing exterior stairway, and construction of an interior ramp.
PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be
open for inspection by bidders on Tuesday, January 20, 2015. Inspection tours will
be conducted on this date by a representative of the County's Capital Projects
Management Division. Tour will begin promptly at 9:00 AM, starting at the front
entrance of the Veteran's Memorial Building, 6401 Stockton Avenue, El Cerrito.
Page 3 of 30
Bid Date
2/10/2015
Plan # Bid Time Location
434
2:00 PM
ELK GROVE
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
SITE PREPARATION PROJECT (ECHO WATER
PROJECT) - ONLINE ONLY
Div 1-11, 22-23, 26-28, 31-34, 40 & 43. The Project Scope includes temporary and
permanent roadway installation; utility installation, relocation, and demolition;
extension of District 12kV electrical system for temporary power use; installation of
new construction well; installation and demolition of fencing and gates, installation
of a new security guard facility; site development for Echo Water Project contractor
areas; demolition and relocation of several existing buildings; and other site work
throughout the Sacramento Regional Wastewater Treatment Plant (SRWTP).
5
Online
EAST BAYSHORE RECYCLED WATER PIPELINE - Div 1-3, 5, 9, 26, 31-33 & 40. Work includes furnishing and installing approximately 1
PHASE 1A - EBMUD (ONLINE ONLY)
2,305 ft of 12-inch diameter PVC pipe, 115 ft of 12-in painted MLS and 85 ft of 12-in
ML&PCS pipe that crosses Temescal Creek, and installing 2,695 ft of Districtfurnished 12-in ML&PCS pipe from IKEA continuing onto Shellmound Street,
Shellmound Way to tie-in with Christie Avenue; then continuing on Christie towards
65th in the City of Emeryville.
Online
Project is available for viewing ONLINE ONLY!!!
2/11/2015
413
1:30 PM
EMERYVILLE
Project is available for viewing ONLINE ONLY!!!
3/18/2015
214-215
1:30 PM
EMERYVILLE NEW 82ND AVENUE & HOLLIS RATE CONTROL
STATIONS REHABILITATION - EBMUD
Div 1-3, 5, 8-9, 22-23, 26-28, 31-33, 40 & 43. Work includes complete electrical
replacement and partial mechanical and civil/structural rehabilitation of the 82nd
Avenue and Hollis rate control stations located in Alameda County. This Project will
require multiple trades and types of work; for example hazardous materials
handling, concrete, mechanical, electrical, pipeline, plumbing, paving and other
required work and trades. For additional description and information, see Sections
00 14 02 Bid Form, 01 11 00 Summary of Work, and the remaining Contract
Documents.
Planroom &
Online
2/18/2015
491
2:00 PM
FAIRFAX
The Work, in general, consists of paving approximately 1,200 square yards of a
parking lot and driveway access on the west side of Bank Street and minor concrete
sidewalk improvements on the north end of the lot.
Online
BANK STREET PARKING LOT IMPROVEMENT
PROJECT (ONLINE ONLY)
Project is available for viewing ONLINE ONLY!!!
4/8/2015
498
2:00 PM
FREMONT
NEW CALTRANS 04-0J9404 INSTALL WASH RACKS
(ONLINE ONLY)
Install wash racks in Alameda County in Fremont at the Fremont Maintenance
Station at 2045 Mowry Avenue. The Contractor must have either a Class A License
or Class B License or a combination of Class C Licenses which constitutes a
majority of the work.
Project is available for viewing ONLINE ONLY!!!
Page 4 of 30
Online
Bid Date
Plan # Bid Time Location
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
NEW HIGHLAND 1530 RESERVOIR PROJECT
Div 1-3, 5, 7, 9, 11, 13 & 15-17. The Work consists, in general, of constructing a 1.2
MGD Welded Steel Tank Reservoir with valve vault and accompanying
appurtenances, site improvements including paving, site preparation, earthwork,
sheeting, shoring and bracing, concrete, anchor bolts, miscellaneous metal work
hot-dip zinc coating, mechanical zinc coating, preformed joint fillers, sealants and
caulking, coating systems, coating for steel water storage reservoir, equipment,
cathodic protection, welded steel water storage tank, mechanical, electrical,
instrumentation and controls.
2/17/2015
180
2:00 PM
HAYWARD
2/17/2015
410
2:30 PM
LIVERMORE NEW BRISA STREET SANITARY SEWER MAINLINE
BOTTLENECKS (ONLINE ONLY)
Div 1-3, 5, 9 & 31-33. The Project consists of replacing existing sanitary sewer
mains by open cut and by the pipe bursting method. Also, a new steel casing will
be installed under the UPRR tracks by the bore and jack method.
Planroom &
Online
1
Online
1
Div 1-3, 6-10 & 12-13. Trades include selective building demolition, concrete,
plastic laminate, rough carpentry, finish carpentry, wood casework, solid surface
fabrications, building insulation, concrete slab vapor emissions and alkalinity control
treatment, waterproof membrane, roofing, sealants, caulking and adhesive tape,
steel knock down drywall frame, rolling steel door, rolling door motor, glass, glazing
and window films, gypsum board, wall tile, resilient base, vinyl composition tile,
epoxy mosaic composition flooring, decorative fiberglass reinforced wall panels,
painting, toilet partitions, washroom accessories, baby changing station, fire
extinguishers, entrance floor mats and frames, and security access and surveillance.
Online
Project is available for viewing ONLINE ONLY!!!
2/12/2015
465
11:00 AM
LODI
LODI TRANSIT STATION RESTROOM VAULT
IMPROVEMENTS (ONLINE ONLY)
Project is available for viewing ONLINE ONLY!!!
2/25/2015
423
11:00 AM
LODI
NEW WHITE SLOUGH FARM IRRIGATION
IMPROVEMENTS (ONLINE ONLY)
The Work consists of removing the existing concrete irrigation ditch and slide gates
and replacing them with approximately 3,770 feet of 30” and 36” pipe, five alfalfa
valves, five concrete standpipes, 300 feet of 18” lateral, and other incidental and
related work.
Online
Project is available for viewing ONLINE ONLY!!!
422
11:00 AM
LODI
NEW HENRY GLAVES PARK PUMP STATION
IMPROVEMENTS (ONLINE ONLY)
The Work consists of furnishing and installing a submersible storm drain pump,
electrical control panel, and other incidental and related work, all shown on the
Plans and Specifications for the above Project.
Project is available for viewing ONLINE ONLY!!!
Page 5 of 30
Online
Bid Date
3/5/2015
Plan # Bid Time Location
466
2:00 PM
MARIN AND
SONOMA
COUNTIES
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
3
CALTRANS 04-264094 REALIGN HIGHWAY AND Realign highway and construct new bridge In Marin and Sonoma Counties near
CONSTRUCT NEW BRIDGE (ONLINE ONLY)
Petaluma from 0.8 mile south to 2.0 miles north of the Marin-Sonoma County Line.
The Contractor must have either a Class A License or any combination of the
following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-32.
Online
Available for viewing ONLINE ONLY!!!
2/10/2015
205
2:00 PM
MARTINEZ
3/12/2015
414
2:00 PM
MARTINEZ
TREATMENT PLANT SAFETY ENHANCEMENTS, Div 1-3, 5, 7, 9 & 14-16. The Work generally consists of safety improvements to
existing facilities in the treatment plant and ADA improvements.
PHASE 4
NEW ROOF REPLACEMENT AT 2099 ARNOLD
INDUSTRIAL WAY (ONLINE ONLY)
1
Div 1-2 & 6-9. The Work includes removal and replacement of existing roofing,
flashing, drains and skylights, at a secure facility.
Planroom &
Online
Online
PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be
open for inspection by bidders on Tuesday, February 24, 2015. Inspection tours will
be conducted on these dates by a representative of the County's Capital Projects
Management Division. Tours will begin promptly at 10 AM, starting at the main
entrance of the Sheriff Property Services office, 2099 Arnold Industrial Drive, Suite
D, Concord, California.
Project is available for viewing ONLINE ONLY!!!
2/25/2015
433
2:00 PM
MODESTO
HONOR FARM BARRACKS FOUR, GUARD
Project consists of Mobilization, Barracks 4 and Guard Shack (Modular) Demolition
BOOTH AND SHOP PAINT BOOTH DEMOLITION and Disposal, Shop Paint Booth Demolition and Disposal.
(ONLINE ONLY)
Project is available for viewing ONLINE ONLY!!!
2/17/2015
479
2:00 PM
MOUNTAIN
VIEW
RESIDENCE INN GUESTROOM ADDITION
(ONLINE ONLY)
3
Online
5
Div 1-3, 5-14, 21-23, 26-28 & 31-33. Project consists of demolition of 4 existing
buildings and construction of a new ground-up 4 story 22,612 sq. ft. Guest Tower
addition to an existing Residence Inn with site and offiste work to include:
hazardous material abatement, demolition, surveying, earthwork, erosion control,
utilities, landscaping, concrete, structural steel, rough/finish carpentry, architectural
millwork, cultured marble/solid surfaces, waterproofing, insulation, siding, roofing,
sheet metal, joint sealer, doors and hardware, storefront, windows, lath and plaster,
metal stud/drywall, ceramic tile, acoustical ceiling, wall coverings, painting, toilet
partitions/accessories, shelving, linen chutes, residential cabinetry, window
treatment, FF&E, elevator, fire protection, plumbing, HVAC, electrical, fire alarm and
low voltage.
Online
This Project is available for viewing ONLINE ONLY!!!
2/12/2015
200
2:00 PM
NAPA
LOS CARNEROS WATER DISTRICT (LCWD)
RECYCLED WATER PIPELINE
Page 6 of 30
Div 1-3, 5, 9, 13 & 15-16. See specifications for complete Scope of Work.
6
Planroom &
Online
Bid Date
3/5/2015
Plan # Bid Time Location
419
3:30 PM
NAPA
Plan Name
CSI Divisions / Job Description
NEW NAPA COUNTY ADMINISTRATION BUILDING
EXTERIOR ENVELOPE AND STRUCTURAL
EARTHQUAKE REPAIRS (ONLINE ONLY)
# of
Addenda Plans
The Work generally consists of, but is not limited to, all labor and materials for the
Earthquake Exterior Envelope and Structural repairs of the Napa County
Administration Building.
Online
Trades include selective structure demolition; roofing modifications and repair; joint
sealant rehabilitation; water repellents; exterior insulation and finish system repairs;
sheet metal flashing and trim; applied fireproofing; firestopping; joint sealers; wall
coverings; Portland cement and plastering; and painting.
Project is available for viewing ONLINE ONLY!!!
3/12/2015
472
3:30 PM
NAPA
NAPA COUNTY DEPARTMENT OF
CORRECTIONS SUPPLY AND EXHAUST VENT
REPLACEMENT (ONLINE ONLY)
The Work involves all labor and materials for manufacturing of supply and exhaust
vents located within the Napa County Department of Corrections.
1
Online
3
Online
• Supply and install all vents.
• Test and balance all vents.
• Contractor shall field verify all dimensions and all existing conditions.
• Infill walls to align with existing finishes.
• Patch, paint and texture to match existing conditions.
• All work, material, means & methods, ETC. shall conform to all governing building
codes, regulations and agencies.
Project is available for viewing ONLINE ONLY!!!
2/13/2015
476
2:00 PM
OAKLAND
FRUITVALE ELEMENTARY SCHOOL BLEACHER Div 1, 6-7, 9-10, 12, 22, 26 & 32. The Project consists of restoration of bleachers;
AND RESTROOM UPGRADES (ONLINE ONLY)
construction of a new press box; remodel of student restrooms that includes, but is
not, limited to replacement of toilet partitions, replacement of lavatories,
removal/replacement of water closets, removal and replacement of toilet
accessories, repair of wood roof deck, replacement of roofing, repair of fascia at
eave, and installation of additional door hardware. Scope includes building
components replacement and painting.
Contact David Haddad, Project Manager, at (510) 535-2726 with any questions.
This Project is available for viewing ONLINE ONLY!!!
Page 7 of 30
Bid Date
2/17/2015
Plan # Bid Time Location
300
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
INSTALL MOTORIZED ROLLING GATE,
SECURITY TURNSTILE, AND REMOVE FENCE
MAN DOOR AT OKS - BART
Div 1-3, 20, 26 & 32-33. The Work of this Contract includes, but is not limited to,
furnishing all labor, equipment, materials and services required to install one (1)
automatic, motorized, side rolling security gate and one (1) security personnel
turnstile. Existing fencing and two (2) man doors will be removed and replaced as
needed at two (2) locations, as indicated in Contract Specifications and Drawings.
# of
Addenda Plans
Planroom &
Online
SCOPE OF WORK:
A. Provide one (1) 30 ft. wide, side rolling motorized chain link gate at BART
Oakland
Shops driveway per Contract drawings, retracting into Union Pacific Railroad
easement area, including steel lower track and its concrete support piers. Easement
area is the area allotted to BARTO by Union Pacific on their property for installation
of BARTO's retracting side rolling fence and support piers.
B. Remove one (1) existing man door and surrounding fence as needed, and provide
one (1) security turnstile with three 47" long arms at employee parking lot entrance
as
indicated on Contract Drawings.
C. Remove one (1) existing man door at northwest corner of lot and replace with
chain link fencing and barbed wire to match adjacent fence.
2/19/2015
474
2:00 PM
OAKLAND
MARTIN LUTHER KING SHORELINE TIDEWATER Project consists of widening asphalt road for park entry; construction of concrete
ENTRY MODIFICATIONS (ONLINE ONLY)
sidewalk, curb and gate center Island; installation of two-rail fence, metal gates,
tiger teeth and wheel stops.
Online
Project is available for viewing ONLINE ONLY!!!
41-42
2:00 PM
OAKLAND
1110 JACKSON STREET MIXED USE PROJECT
Div 1-12, 14, 21-23, 26-28 & 31-33. This Project is a 71 unit multi-family apartment,
affordable housing project scheduled to begin construction on or about March 2015.
The street level shall be a combination of common area residential, commercial
“cold shell” and parking. The structure shall be slab on grade with thickened
footings, grade beams with the second level post-tensioned concrete and 4 levels of
type V-A wood framing above the 2nd level of concrete.
PLEASE NOTE: This is a Prevailing Wage project and Certified Payroll job with
Oakland Local Hire Requirements.
Page 8 of 30
Planroom &
Online
Bid Date
2/20/2015
Plan # Bid Time Location
460
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
UCSF BENIOFF CHILDREN'S HOSPITAL
Turner Construction has been awarded the construction of a new, 6-story, steel
OAKLAND OUTPATIENT CENTER 2 BID GROUP 3 frame, medical clinic, approximately 88,000 gsf, with associated landscaping, site
(ONLINE ONLY)
utility work and existing parking garage modifications.
BID GROUP 3 TRADES: Invited to submit a proposal at this time:
- Structrual Excavation / Site Demo / Earthwork / Paving
- CMU
- Metal Fabrications
- Roofing / Waterproofing
- Flashing / Sheet Metal / Expansion Joints
- Garage Renovations
- Deep Foundations / Drilled Piers
- Micropiles
- Site Concrete
- Landscaping
- Architectural Millwork
- Lab Casework
- Fireproofing
- Doors, Frames and Hardware
- Acoustical Ceilings / Wall Panels
- Flooring
- Ceramic Tile
- Painting and Wall Coverings
- Specialites: Signage / Toilet Partitions & Accessories / Coiling Doors / Window
Coverings
PROJECT SCHEDULE: Construction to begin in July 2015 with a 23-month
duration. Refer to construction bid schedule for more information.
PREQUALIFICATION: All subcontractors must be pre-qualified to submit a
proposal. Pre-qualification information may be requested from Sylvia Strowe by
email at:([email protected]).
PROPOSAL FORMAT: A Turner Bid Form is provided. Proposals are to be
submitted via the SmartBidNet link above or emailed to Shirley San Diego
at:([email protected]).
PROJECT LABOR AGREEMENT: This Project will have a Project Labor Agreement
in effect.
Project is available for viewing ONLINE ONLY!!!
Page 9 of 30
6
Online
Bid Date
2/20/2015
Plan # Bid Time Location
463
2:00 PM
OAKLAND
Plan Name
CSI Divisions / Job Description
ARCHITECTURAL SERVICES AT RAINBOW
RECREATION CENTER RENOVATION &
EXPANSION - RFP (ONLINE ONLY)
The Project Delivery Division of the City of Oakland, Oakland Public Works
Department (OPW) is issuing a Request for Proposals for full design and
engineering services for the renovation and expansion of the Rainbow Recreation
Center and renovation of the site. The center is located at 5800 International
Boulevard. The design team shall assist the City in conforming to its grant
obligations under the Safe Drinking Water Bond Act of 2006 (Proposition 84).
# of
Addenda Plans
Online
Services may include, but not limited to, the following: site surveys, site and building
evaluations, building programming, ADA and code analysis, facilitating stakeholder
meetings, permit applications, sustainability program implementation, certification
and conformance, schematic design, design development, construction documents,
cost estimating, construction support and construction close out support.
Contact Denise Louie, Project Manager, by email at: [email protected], or by
phone at (510) 238-3682 with any questions.
Project is available for viewing ONLINE ONLY!!!
3/5/2015
151
2:00 PM
OAKLAND
NEW TASSAFARONGA RECREATION CENTER
INTERIOR REMODEL
The Proposed Work, in general, consists of interior finish work including new
flooring/base, wall panels, cabinetry refinishes, new doors, and painting;
reconstruction of the restrooms including accessibility compliance, new
fixtures/accessories and plumbing work; replace kitchen appliance; electrical work
related to new outlets, lights, equipment and door opener; and hazardous
abatement as specified in the Contract Documents.
Planroom &
Online
Contact WooJae Kim, Project Manager, at (510) 238-3389, or by email at:
[email protected] with any questions.
3/11/2015
421
11:00 AM
OAKLAND
NEW RUNWAY 10R-28L SHOULDER REHABILITATION, The Work of this 40 calendar day project consists, in general, of furnishing all labor,
NORTH FIELD (ONLINE ONLY)
materials, appliances, tools, equipment, transportation, services and supervision
required to complete the crack sealing and placement of a seal coat on the
shoulders of Runway 10R-28L and to perform all associated work, all in accordance
with the Contract Documents.
Project is available for viewing ONLINE ONLY!!!
Page 10 of 30
Online
Bid Date
2/18/2015
Plan # Bid Time Location
93-95
2:00 PM
PACIFICA
Plan Name
CSI Divisions / Job Description
HOLIDAY INN EXPRESS
Div 1, 3-10, 14, 21-23, 26 & 31-32.
# of
Addenda Plans
1
Planroom &
Online
1
Online
SITE: Combine existing hotel site with newly acquired northerly site into one
property; Demolish existing residential structure near creek to allow new addition;
Demolish existing commercial building in northerly property to allow new addition
and landscaping. existing creek side landscaping to remain and be protected during
construction.
EXISTING HOTEL: Conversion of high ceiling space above existing breakfast room
to 1 guestroom at 2nd floor, enlarge 1 existing 3rd floor guestroom, conversion of
parking spaces to hotel space and motorcycle parking, convert 2 existing parking
spaces for new driveway into new parking garage.
CREEKSIDE ADDITION: Addition of 9 upper floor guest rooms, breakfast room,
meeting space and back-of-house renovation.
NORTHERLY SITE ADDITION: Addition of 36 upper floor guest rooms, ground floor
retail and parking garage.
2/10/2015
461
2:00 PM
PLACERVILL
E
MAIN STREET REHABILITATION PROJECT
PHASE 1A: WATER LINE REPLACEMENT
(ONLINE ONLY)
The Project is located in the City of Placerville, El Dorado County. The Work to be
done is shown on the Plans described in the Special Provisions and generally
consists of, but is not limited to:
Replacement of aged and deteriorated existing water lines within Main Street,
located in Downtown Placerville. For bonding purposes, the anticipated project cost
is less than $700,000.
Project is available for viewing ONLINE ONLY!!!
2/17/2015
488
2:00 PM
PLEASANTO
N
BI-ANNUAL CONTROL VALVE IMPROVEMENTS Work shall include all the work associated with the removal and replacement of 22
water Blow Off Assemblies, associated main line pipe, and street restoration.
(ONLINE ONLY)
This Project is available for viewing ONLINE ONLY!!!
Page 11 of 30
Online
Bid Date
2/10/2015
Plan # Bid Time Location
459
4:00 PM
REDWOOD
CITY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
REMODEL OF A DISTRICT RESIDENCE AT 20000 The purpose of this project is for the remodel of a District residence located at
SKYLINE BLVD (ONLINE ONLY)
20000 Skyline Blvd in Woodside. The furnishing of all labor, materials and services
required for the following designated scope of work: Replace deck; replace sliding
glass door with window at the residence located in Russian Ridge Open Space
Preserve.
Online
Mandatory Pre-bid / Site Visit: January 30th at 10 AM. RSVP Required:
[email protected] by 4 PM on January 29th.
Project is available for viewing ONLINE ONLY!!!
2/12/2015
60
2:00 PM
RICHMOND
RICHMOND CIVIC AUDITORIUM AMERICANS
WITH DISABILITIES ACT BUILDING UPGRADES
PROJECT
Div 1-2, 4-10 & 14-16. The City of Richmond will accept bids for the construction of 3
the Richmond Civic Auditorium Americans with Disabilities Act building upgrades
project.
Trades include Selective Demolition; Site Concrete; Concrete; Structural Steel; Cold
Formed Metal Framing; Metal Fabrications; Handrails and Guardrails; Carpentry;
Finish Carpentry; Countertops; Water Repellants; Flashing and Sheet Metal; Joint
Sealers; Steel Doors and Frames; Aluminum Storefront and Sliding Doors;
Hardware; Glazing; Portland Cement Plaster; Gypsum Board Assemblies; Tile;
Carpet; Modular Wall System; Paints & Coatings; Plastic Laminate Toilet
Compartments; Signage; Toilet Accessories; Hydraulic Elevator; Fire Protection;
Plumbing; HVAC; and Electrical.
Page 12 of 30
Planroom &
Online
Bid Date
2/12/2015
Plan # Bid Time Location
82
2:00 PM
RICHMOND
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
SENIOR CENTER ADA RESTROOMS
IMPROVEMENTS
Div 1-4, 6-11 & 15-16. Project consists of performing ADA restrooms improvements 2
and relocation of kitchen and for all other Work, items or details not mentioned
above that are required by the Drawings, Standard Specifications, or these Special
Provisions.
Planroom &
Online
Trades include site concrete; concrete; CMU construction; rough carpentry; finish
carpentry; architectural woodwork; building insulation; flashing and sheet metal;
firestopping; joint sealers; steel doors and frames; access doors and panels; door
hardware; portland cement plaster; gypsum board assemblies; tile, resinous kitchen
flooring; fiberglass wall panels; paints and coatings; quartz surfacing countertops;
fire extinguisher cabinets; toilet accessories; food service equipment; appliances;
plumbing; HVAC; lighting; and electrical.
All questions regarding bid documents, construction Plans and Specifications
must be submitted by email to Yader Bermudez, Project Manager, at:
[email protected] no later than 5 PM, on February 5, 2015.
Questions will be answered in a written response and will be available to bidders on
the City’s website at www.ci.richmond.ca.us/bids no later than three (3) working days
prior to the bid opening deadline.
3/10/2015
134
2:00 PM
RICHMOND
3/6/2015
442
2:00 PM
ROCKLIN
NEW NORTH RICHMOND PUMP STATION DIVERSION Div 1-3, 5, 7, 9, 11 & 15-17. The Work includes demolition of existing pumps and
associated piping and then permanent installation of two new sump pumps and
PROJECT
associated mechanical, electrical, and instrumentation equipment. This Project will
divert stormwater from pump station to waste water.
ZONE 1 WELL UPGRADE AND EXPANSION
PROJECT (ONLINE ONLY)
Div 1-11, 13 & 15-17. The Work includes the furnishing of all labor, materials, tax,
equipment and services for the construction and completion of Improvements to
Sunset Well, including well liner, casing and screen, submersible pump, valves
piping, appurtenances, chemical feed facilities, building site work, etc. The Project
also includes improvements to the Tinker Road well including a new vertical turbine
pump, valves, piping and appurtenances, well house, tank mixer, site work and all
other associated work described in these documents. Additionally, due to urgent
water supply needs of the Agency, the Contractor will be required to provide
temporary power, pumping, disinfection, and piping facilities to provide access
water from both wells.
Project is available for viewing ONLINE ONLY!!!
Page 13 of 30
Planroom &
Online
2
Online
Bid Date
3/12/2015
Plan # Bid Time Location
98
2:00 PM
ROHNERT
PARK
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CABERNET VILLAGE STUDENT HOUSING
Div 1, 5-12, 22-23 & 26-28. Work Included in the Contract includes all construction
RENOVATION AT SONOMA STATE UNIVERSITY and services required for rehabilitating 54 student housing units and common
building, California Building Code (CBC) Type V-B construction, of approximately
62,888 sq. ft. floor area, including:
1
Planroom &
Online
1
Online
1. New interior finishes including cabinets, counters, doors, door hardware, paint,
carpet, resilient flooring, and bathroom accessories.
2. Gypsum board demolition, patch, and new skim coat and texture.
3. New plumbing supply system.
4. Heating and ventilating systems.
5. Electrical power, lighting and signal systems.
6. Coordination of work being performed by others under separate contracts with
University, described in Article below titled "CONCURRENT WORK UNDER
SEPARATE CONTRACTS."
7. Additional general information concerning the Project is provided on the
Architectural Drawings.
2/24/2015
496
2:00 PM
SALINAS
NEW E. ALISAL ST AND SKYWAY BLVD ROUNDABOUT In general, the Work shall include, but is not limited to, demolition of existing road
asphalt, concrete, signs and other street appurtenances; relocation of existing
(ONLINE ONLY)
utilities and the construction of new underground storm and sanitary sewer main
pipes; construction of new asphalt road pavement, asphalt overlays, new street
lights, curbs, gutter, sidewalks, LID features, and drainage features; grading and
erosion control activities; signing and striping improvements; landscaping and
irrigation improvements; and all incidental and appurtenant improvements and
restorations specified on the Plans and herein these Special Provisions for the
construction of a complete and operational roundabout intersection at E. Alisal
Street and Skyway Boulevard.
Project is available for viewing ONLINE ONLY!!!
Page 14 of 30
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2/17/2015
35
3:00 PM
SAN CARLOS
INDUSTRIAL ROAD PARALLEL SANITARY
SEWER PROJECT
2
Div 1-3, 5 & 15. Project consists of dewatering, mobilization, demolition,
abandonement and removal, sewage flow control, earthwork, soil stabilization, steel
casing pipe, sanitary sewer rehabilitation using CIPP method, excavation support
shoring and bracing, steel sheet pile shafts, secant pile shafts, instrumentation and
monitoring, asphalt concrete paving, shaft construction, microtunneling, precast
concrete structures, carrier pipe installation into casing, fused PVC sewer pipe,
sanitary sewer system testing and cleaning, CCTV inspection of sanitary sewer
system, building sewer (lateral) construction and reinstatement, traffic stripes and
pavement markings, traffic control, traffic loops, adjust incidental structures to
grade, controlled low strength material, concrete reinforcement, cast-in-place
concrete, concrete cylinder pipe, backfill grout, casing pipe annular backfill grouting,
grout, ground pre-treatment, manhole and below grade vault rehab, manhole frames
and covers, and general piping.
Planroom &
Online
2/25/2015
487
2:00 PM
SAN DIEGO
HEALTH CARE FACILITY IMPROVEMENT
PROGRAM AT RICHARD J. DONOVAN
CORRECTIONAL FACILITY (ONLINE ONLY)
2
Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The Project at RJD is part of the Health
Care Facility Improvement Program (HCFIP). The purpose of this Project at RJD is
to remedy deficiencies in its existing health care components.
Online
The Project consists of two sub-projects, which includes one to two sub-phases
within the sub-project. The Scope of Work includes, but is not limited to, demolition,
building pad preparation, new construction, accessible paths-of-travel, and
infrastructure upgrades. The Projects are located within and outside the existing
secure perimeter.
The new Administration Building will be slab-on-grade with exterior fully grouted
structural concrete masonry unit walls, metal framed interior walls, and a single-ply
type, fully adhered over rigid insulation roof assembly. Utility relocation will be
necessary for the construction of the new building, including communications/signal,
electrical, storm drain, water and sewer lines.
This Project is available ONLINE ONLY!!!
2/10/2015
53-55
2:00 PM
SAN
FRANCISCO
PRESIDIO MIDDLE SCHOOL MODERNIZATION
Div 1-3, 5-12 & 14-16. General School Modernizations and reconstruction including 1
ADA Access and Fire/Life-Safety upgrades, interior and exterior painting, classroom
retrofit, new phone system, new clock paging system, new data infrastructure, new
elevator and lift, miscellaneous site work and landscaping, hazardous
material/Asbestos remediation, boiler replacement, other miscellaneous interior
renovation work and Interim Housing installation and removal.
Page 15 of 30
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2/11/2015
122
2:00 PM
SAN
FRANCISCO
AMBULATORY CARE CENTER (ACC) B1 PLAZA
LEVEL ORTHOTICS & PROSTHETICS
RELOCATIONS AT UCSF
4
Div 1-2, 5-10, 22-23 & 26. Relocation of the existing Prosthetics and Orthotics
Clinic and Shop Fabrication space from the Clinical Sciences Building (CSB)
basement to the Ambulatory Care Center (ACC) Plaza location. The modular clinic
area’s remodel will consist of some wall demolition and reconstruction to create five
exam rooms; a Gait Room; two Offices; a new cross corridor hallway; and storage
room. The Shop Fabrication area includes a complete gut and remodel to provide a
shop equipment room; a plaster room; assembly area; and small storage area. In
addition to the architectural construction, mechanical and electrical upgrades to
serve the fabricating equipment space will be included in the Scope of Work. Area
is approximately 4,100 sq. ft.
Planroom &
Online
2/12/2015
484
2:00 PM
SAN
FRANCISCO
YERBA BUENA RECONFIGURE OFFICES
(ONLINE ONLY)
1
Project includes material testing, site demolition, hazmat testing, asbestos
abatement, PCB removal, rough carpentry, HM doors and frames, wood doors, door
hardware, tubular daylighting devices, gypsum wallboard, ceramic tile, resilient
flooring, carpet, painting, toilet and bath accessories, window treatments,
manufactured casework, solid surface countertops, plumbing, HVAC, electrical,
public address and fire alarm.
Online
Project is available for viewing ONLINE ONLY!!!
46
2:00 PM
SAN
FRANCISCO
STORM DRAIN PUMP STATIONS SDPS-1B AND PLANS & SPECS WILL BE POSTED ONLINE SOON!!!
SDPS-1C IMPROVEMENTS AT SFO
Div 1-2, 5, 9, 23, 26 & 31-34. This Project will replace pumps, outfall pipes, Pumps
controls, SCADA system and electrical equipment for storm drain pump stations
SDPS-1B and SDPS-1C to ensure a reliable and robust drainage system for major
airport runways.
Page 16 of 30
3
Planroom &
Online
Bid Date
2/17/2015
Plan # Bid Time Location
109-110
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
LOWELL HIGH SCHOOL NEW CLASSROOM
BUILDINGS
Div 1-3, 5-12, 21-23, 25-28 & 31-33.
# of
Addenda Plans
Planroom &
Online
NEW CLASSROOM BUILDING AND SITEWORK: Replace the existing portable
classrooms on the Lowell campus with a permanent classroom complex consisting
of a 12-classroom building and a 2-classroom building. In addition, the Project
requires associated sitework to reconfigure the existing parking lot and landscaping
including exterior lighting, improve circulation, upgrade underground utilities and
ADA access.
INTERIM HOUSING: In addition, (5) five new temporary relocatable classrooms
and (2) two new temporary relocatable toilet buildings will be provided by the District
as interim housing and will be located on the adjacent existing basketball court for
the construction duration. All utilities and sitework associated with these new
relocatables will be provided by this Contract. This Contractor will also be
responsible for the hazardous material removal and utility disconnection of for all
the existing relocatables and will be required to demolish and remove (7) seven
relocatable classrooms and (2) two portable toilet buildings.
After construction completion of the new classroom buildings, the utilities from the
interim housing relocatable buildings will be disconnected in preparation for the
District removal of these relocatables. The existing basketball court will be resurfaced and re-striped and new basketball poles and backstops will be installed to
restore the court to the original condition.
2/18/2015
152
2:00 PM
NEW FED-EX OFFICE REMODEL - FINANCIAL
SAN
FRANCISCO
DISTRICT
SPECIFICATIONS ARE ON THE FLOOR PLANS!!!
Planroom &
Online
This is an open store remodel and all work must be performed between the hours of
9 PM and 6 AM. Please provide pricing accordingly and note in all proposals that
this is included.
Please feel free to email any questions to: [email protected].
137
2:30 PM
SAN
FRANCISCO
GILMAN PLAYGROUND RENOVATION
Div 1, 3, 6, 9-12, 22, 26 & 31-33. The Work to be done under this Contract is
located at 993 Gilman Avenue, San Francisco, 94124, known as Gilman
Playground, and consists of site demolition; hazardous material abatement; new
children’s play equipment, rubber surfacing and site furnishings; minor grading;
drainage; lighting; irrigation; planting; paving; restroom renovation; and all
appurtenant work in accordance with Specifications and Drawings.
Contact Marvin Yee, Project Manager, at (415) 581-2541 with any questions.
Page 17 of 30
1
Planroom &
Online
Bid Date
2/19/2015
Plan # Bid Time Location
197
2:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
SOUTHEAST WATER POLLUTION CONTROL
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
PLANT SLUDGE THICKENING IMPROVEMENTS, JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
PHASE 1
Div 1-3, 5, 7, 9, 11, 22-23, 26, 40 & 46. The objective of the Project is to rehabilitate
Southeast Plant (SEP) 785 facility and equipment including gravity belt thickeners,
odor control unit, minor plumbing upgrades in SEP 780 basement location that
includes upsizing of polymer pipes valves and pumps. The Work is to be performed
in San Francisco, California.
Page 18 of 30
Planroom
Bid Date
2/24/2015
Plan # Bid Time Location
21-24
3:00 PM
SAN
FRANCISCO
Plan Name
CSI Divisions / Job Description
ISLAIS CREEK FACILITY PHASE II MAINTENANCE AND OPERATIONS BUILDING
(REBID)
THIS PROJECT IS A REBID!!!
# of
Addenda Plans
Div 1-3 & 5-16. The Work to be done under this Contract is located within the City
of San Francisco as shown on the Plans. The Project generally consists of the
construction of a new maintenance and operations building which will supplement
the existing fuel/wash and annex buildings previously constructed.
Work to be performed under this Project includes, but not limited to, Selective
demolition for the installation of work to be performed; Utility work in both the public
and private right of way including fire water, domestic water, fire hydrants, storm
and sanitary sewer, electrical and communication work, manholes, utility boxes, gas
service, etc.; Excavate, handle, reuse, transport, and dispose of site soils,
groundwater and storm water controls, environmental mitigation controls, and
environmental management of excavated materials; Dewatering work, including
dewatering of excavations, equipment, foundations, and utility trenches; Shoring for
excavations and open cuts as required by the governing jurisdiction(s)
requirements, and as determined by the contractor to perform the work to be
constructed; Site work including street and sidewalk, concrete paving, fencing work,
site lighting, signage and striping, site furnishings; Building construction including
piles, pile caps, framing, exterior siding, roofing, elevators, windows, interior
partitions, insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior
furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire
alarm, fire protection systems, system integration, solar panel system, access
control, security systems, etc.; Fluid systems including underground and
aboveground tanks, piping and dispensing systems; Vehicle maintenance
equipment including vehicle lifts, exhaust system, shop equipment, hoists and
cranes;Replacement of existing manhole lids; Provide pre-construction and post
construction survey, vibration and ground movement monitoring; Construction of
shoreline improvements including the installation of benches, and the removal and
replacement/re-grading of existing surfaces to align with the grade with the building
entrances; Coordinating and scheduling of work with the various utility agencies for
their service; Coordinating and scheduling of the special inspections and testing
agencies, and inspections by the governing jurisdictions; Coordinating and
scheduling of work with Muni Operations and Maintenance, and other projects
working on the site or in the immediate area; Testing, Training, and Start-Up. A
comprehensive program for testing, training, and start-up of systems and
components installed in the work of this Contract, including preparing operations
and maintenance manuals, providing training for City’s operating and maintenance
personnel, and completing start-up procedures and requirements as detailed in the
Specifications.
Contact Joon Park, Project Manager, at (415) 701-4742, or by email at:
Page 19 of 30
2
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
[email protected] with any questions.
(Previously scheduled bid date was 12/9/14. Old Plan # was the same).
2/25/2015
415
2:30 PM
NEW AS-NEEDED PAVEMENT PRESERVATION FY
SAN
FRANCISCO
2015-2016 PROJECT (ONLINE ONLY)
The Work is located on various street locations throughout San Francisco and
consists of pavement preservation using Type 2 and Type 3 micro-surfacing,
traffic routing, temporary pavement markings, and all associated work.
Online
Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions.
Project is available for viewing ONLINE ONLY!!!
2/26/2015
97
10:30 AM
SAN
FRANCISCO
PIER 49 (J1) UNDER-PIER SEWER PIPING
REPLACEMENT PROJECT
306
2:00 PM
NEW AS-NEEDED DUCTILE IRON WATER MAIN
SAN
FRANCISCO
REPLACEMENT AT VARIOUS LOCATIONS
Div 1, 9 & 15. The Port of San Francisco (the “Port”), a department of the City and 1
County of San Francisco (the "City") announces an Invitation for Bids (“IFB”) for
construction on the PIER 49 (J1) UNDER-PIER SEWER PIPING REPLACEMENT
PROJECT in San Francisco, CA. The proposed Work will consist of replacement of
the existing under-pier sewer gravity main and all lateral lines, which connect to
multiple tenants restaurants’ plumbing fixtures.
THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST.
JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!!
Planroom &
Online
Planroom
The objective of the Project is as-needed water main replacement required to
support leak and break repairs and new development projects. It is estimated that
approximately 5,280 L.F. of ductile iron water mains will be replaced annually for a
two and a half year period.
3/3/2015
489
2:00 PM
SAN
FRANCISCO
SAN FRANCISCO FERRY TERMINAL UTILITY
AND ROOF REHABILITATION (ONLINE ONLY)
This Public Works Project consists of, in general, rehabilitation of the existing utility
system, boarding ramp supports, and existing roofing at the San Francisco Ferry
Terminal. The Work includes: removing and replacing under deck sewer and water
pipelines; removing and replacing the roof system; removing, replacing, and
installing under deck pipe and conduit supports; repairing and patching concrete;
repairing and patching exterior stucco walls; painting exterior building surfaces;
rehabilitating boarding ramp cylinder supports and hinges; and all other work
items as required to complete the Project.
Online
Project is available for viewing ONLINE ONLY!!!
126-128
2:00 PM
SAN
FRANCISCO
VISITACION VALLEY ELEMENTARY SCHOOL
MODERNIZATION
Div 1-13 & 15-16. The Project is generally described as General School
Modernization and Reconstruction including, but not limited to, ADA Access and
Fire/Life-Safety Upgrades, Painting, Installation and Removal of Interim Housing,
Miscellaneous Site Work, Hazardous Material/Asbestos Remediation, Demolition of
Existing Portables and other Miscellaneous Interior Renovation Work.
Page 20 of 30
Planroom &
Online
Bid Date
3/4/2015
Plan # Bid Time Location
462
2:00 PM
SAN
FRANCISCO
AND
ALAMEDA
COUNTIES
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
CALTRANS 04-013524 REMOVE BRIDGE
Remove bridge (portion) and salvage bridge elements in the City and County of San 4
(PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8
ONLINE ONLY
mile west of the Toll Plaza. The Contractor must have either a Class A License or a
combination of Class C Licenses which constitutes a majority of the work.
Online
This Project is available for viewing ONLINE ONLY!!!
2/26/2015
416
3:00 PM
SAN JOSE
NEW COYOTE ROAD AND SCARLETT WAY SANITARY Project consists of dust control, mobilization, water pollution control, clearing and
SEWER REPLACEMENT - 7132 (ONLINE ONLY) grubbing, watering, sub-bases and bases, deep lift asphalt base, surfacing and
pavements, asphalt concrete, concrete structures, reinforcement, curbs and
sidewalks, monuments, traffic stripes and pavement markings, drainage and sewer
facilities, pipes and structures, trench excavation, bedding and backfill, pipe
installation, pipeline structures, acceptance tests for sanitary sewers, cleaning
pipelines, and sanitary sewer rehabilitation.
Online
Project is available for viewing ONLINE ONLY!!!
3/17/2015
497
2:00 PM
SAN
LEANDRO
NEW SITE IMPROVEMENTS AT SAN LEANDRO
STATION - BART (ONLINE ONLY)
Div 1-3 & 31-33. In general, the Work consists of furnishing all labor, equipment,
materials and services required for the construction of Site Improvements at San
Leandro Station, including but not limited to, mobilization; construction phasing,
demolition; excavation; site preparation; traffic control; and maintenance during
construction; removal of excess material and clean up after construction; obtain
permits required to execute the Work; replacing reinforced concrete driveway;
replacing asphalt concrete pavement; replacing concrete sidewalk, curbs, curb and
gutters; replacing ramps; accessibility work; tree and root pruning; completing all
required earthwork; replacing pavement marking and striping; and miscellaneous
and incidental Work all as Indicated.
Project is available for viewing ONLINE ONLY!!!
Page 21 of 30
Online
Bid Date
3/5/2015
Plan # Bid Time Location
116
2:00 PM
Plan Name
CSI Divisions / Job Description
SAN MATEO NEW HEATING, VENTILATION AND AIR
CONDITIONING MODIFICATIONS - RE-BID
# of
Addenda Plans
THIS PROJECT IS A REBID!!!
WORK TO BE DONE:
The Contractor shall perform all work necessary to complete the Contract in a
satisfactory manner. Unless otherwise provided, the Contractor shall furnish and
install all materials, equipment, tools, labor, and incidentals necessary to complete
the work.
1. Existing HVAC Site Conditions:
A. RTU-1 and RTU-2 are roof-mounted air handler units with DX cooling, hot water
heating coils, 0-100% outside air economizer, and supply and return fans with
variable frequency drives. Condensers of the cooling systems are water-cooled and
treated by Dolphin systems. Each unit has 75 ton nominal cooling capacity and
rated for 20,000 CFM.
B. Units serve both floors of the building with RTU-1 serving the south side and
RTU-2 serving the north side.
C. The majority of the zones are served by duct mounted reheat coils with a duct
mounted static pressure sensors and motorized dampers upstream of the coil. A
few zones are served by variable air volume boxes with reheat coils. Zones are
made up of multiple rooms with the temperature control in one room. Systems are
plenum return. The building occupied 24-hours per day, 365 days per year.
Dispatch office units are independent from the main RTU units.
SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING:
1. Replace RTU-1 and RTU-2 with two new Trane Intellipak Air cooled units. Units
shall be replaced one at a time in order to keep the station operational. Provide a
detailed schedule of the work so that the relocation of personnel can be coordinated
accordingly.
2. Install condensate pipe per routing and sizes on the plan drawings. Provide
submittals on pipe sizes and materials.
3. Disconnect and reconnect the main power feed for the RTU-units. Disconnect
and reconnect fire alarm system devices to existing Fire Alarm System.
4. Coordinate unit replacement construction schedule with the City. City will
relocate personnel to other parts of the building in order to accommodate the work.
5. Add VAV (variable air volume boxes) and modify ductwork to rezone Rooms 106
Training, 113 Break Room, 116 Briefing Room, 258 Detectives area, and 269 PAL
offices.
6. Install supply fans for Locker Rooms: Provide air from return plenum space as
make-up air since these spaces are 100% exhausted to the outside. System shall
be controlled to run by the building management system or by override switch in
Page 22 of 30
Planroom &
Online
Bid Date
Plan # Bid Time Location
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
space.
7. Install ceiling transfer fan with wall timer switch in 219 Office.
8. Install ceiling transfer fan with wall timer switch in 262 Conference.
9. Balance the main equipment and the areas with VAV box additions.
10. Replace thermo-fusers with regular register in the VAV zones (in open areas).
11. Install new Alerton building management system. Replace controllers with new
Alerton controls, existing wiring can be reused.
12. The majority of the existing ductwork will be used for the work. Ceiling tiles at
the modified ductwork connections will be opened and investigated in order to
minimize the off-time of the system in the building.
13. Modify fire sprinkler piping as required to accommodate the work. Field verify.
14. Patch roofing material, install new ceiling tiles if damaged, repair any ceiling
openings that were required to perform work, and touch-up paint.
15. Train the City personnel for each mode of operation on all equipment, and for
planned maintenance work.
16. Replace two existing boilers with two high-efficiency boilers with internal
controls. Modify the hot water piping inside the boiler enclosure. Incorporate boiler
controls with the new Building Management System.
17. Provide an extended warranty for the compressors.
18. Allowance of $25,000 for unforeseen conditions. Items under the allowance
require written approval from the City and the City shall have full authority and
discretion to determine the decrease or increase in quantities under the allowance.
(Previously scheduled bid date was 1/8/15. Old Plan #78)
2/12/2015
425
2:00 PM
SAN MATEO
AND
ALAMEDA
COUNTIES
CALTRANS 04-1J5204 INSTALL SIDEWALK, SITE Install sidewalk, site furnishings, signs, native planting, irrigation in San Mateo and
FURNISHINGS, SIGNS, NATIVE PLANTING &
Alameda Counties in Menlo Park and Fremont at PM 29.3 and PM 0.5. The
IRRIGATION (ONLINE ONLY)
Contractor must have either a Class A License or one of the following Class C
Licenses: C-27, C-13.
1
Online
Project is available for viewing ONLINE ONLY!!!
2/18/2015
199
11:00 AM
SAN RAFAEL NEW PLANT IMPROVEMENTS 2015 PHASE 1
Div 1-3, 5, 7, 9-11, 15-16, 26 & 40. The Project is generally described as:
• Marinwood Pump Station Panel Installation and Pump Upgrades.
• Digester Mixing Pump Installation.
• Plant Lighting Installation.
• Grit Washer Installation with Hydro Cyclones and Yard Piping.
Page 23 of 30
Planroom &
Online
Bid Date
2/25/2015
Plan # Bid Time Location
104-105
2:00 PM
SAN RAMON
Plan Name
CSI Divisions / Job Description
DOUGHERTY VALLEY HIGH SCHOOL
CLASSROOM BUILDING ADDITION (REBID)
THIS PROJECT IS A REBID!!!
# of
Addenda Plans
3
Planroom &
Online
1
Online
Div 1-12, 21-23, 25-28 & 31-33. 2-Story addition of approximately 18,850 sq. ft. to
general classroom building “A”. Addition is approximately 9,200 sq. ft. per floor, E
Occupancy, Type V-B (sprinklered) construction. There are 3 labs, one general
education classroom and a CTE facility on the lower level; 4 labs and 2 two general
education classrooms on upper level. Also lab prep rooms on both levels, a janitor
closet on lower level and book storage room at upper level. There is an enclosed
outdoor area attached to the CTE facility and associated site work.
Trades include demolition; concrete; thin brick veneer; structural steel; metal
fabrications; steel stairs; rough carpentry; finish carpentry; interior architectural
woodwork; site-applied water repellent; thermal building insulation; below-grade
vapor retarder; water vapor emission control; aluminum plate wall panels; preformed
metal roofing; flat seam metal wall panels; modified bitumen roofing; re-roofing;
flashing and sheet metal work; penetration firestop systems and sealants; joint
sealants; movement joint cover assemblies; steel doors and frames; flush wood
doors; integrated door assemblies; flush FRP doors; access doors and panels;
aluminum windows; door hardware; glass and glazing; louvers and vents; gypsum
board shaftwall systems; ceiling and soffit suspension systems; lath and portland
cement plaster; foam shapes in plaster surfaces; gypsum board; acosutical
ceilings; resilient flooring; static dissipative tile flooring; carpeting; tackable wall
surfaces; acoustic insulation and sealants; painting; markerboards; signage; HDPE
toilet compartments and screens; accordion folding partitions; corner guards, toilet
and bath accessories; fire protection specialties; steel lockers; projection screens;
horizontal louver blinds; lab casework; fire protection; plumbing; HVAC; integrated
automation; lighting; electrical; data networking; intrusion alarm; fire alarm; clearing
and grubbing; trenching and backfilling; cement and concrete for exterior
improvements; base courses; flexible paving; concrete curbs and gutters; fences
and gates; irrigation; planting; and utilities.
(Previously scheduled bid date was 1/14/15. Old Plan # was the same)
2/11/2015
456
3:00 PM
SANTA
CLARA
SCOTT BOULEVARD AND PARK AVENUE
SANITARY SEWER IMPROVEMENTS (ONLINE
ONLY)
The Work shall consist of replacing approximately 800+/- feet of 8-inch sanitary
sewer with 10-inch sanitary sewer at Scott Boulevard (between Homestead Road
and Serra Avenue), and replacing approximately 672+/- feet of 10-inch sanitary
sewer with 10-inch and 12-inch sanitary sewer at Park Avenue (between Bellomy
Street and Poplar Street), replacement of approximately 22 existing sanitary sewer
laterals and cleanouts, including sanitary sewer manholes, impacted traffic signal
detector loops, and all other appurtenances required to make the work complete.
Project is available for viewing ONLINE ONLY!!!
Page 24 of 30
Bid Date
2/18/2015
Plan # Bid Time Location
453
3:00 PM
SANTA
CLARA
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
TRIMBLE ROAD TRUNK SANITARY SEWER
IMPROVEMENTS (ONLINE ONLY)
Div 1-3, 5, 9 & 15. Trades include controlled low strength material, shaft excavation 1
and support, settlement monitoring, erosion control (vegetative), pilot tube guided
auger boring, pilot tube guided pipe ramming, pipe jacking using tunnel boring
machine, sheeting, shoring and bracing, asphalt concrete pavement and base,
slurry seal, high density polyethelene pressure pipe, large PVC non-pressure pip,
steel casing pipe, casing spacers, sewer crack and joint grouting, cured-in-place
pipe liner, cured-in-place manhole rehabilitation, calcium aluminate manhole
rehabilitation, CCTV inspection of sanitary sewer mains, concrete, miscellaneous
metals, PVC liner and stop gates.
Online
Project is available for viewing ONLINE ONLY!!!
3/18/2015
499
2:00 PM
NEW CALTRANS 04-235624 REPLACE BRIDGE, HMA
SANTA
PAVING, DRAINAGE & CONCRETE BARRIER
CLARA AND
(ONLINE ONLY)
SAN MATEO
COUNTIES
Replace bridge, HMA paving, drainage and concrete barrier in Santa Clara and San
Mateo Counties in Palo Alto and East Palo Alto from Oregon Expressway
Overcrossing to 0.3 mile south of University Avenue Overcrossing. The Contractor
must have either a Class A License or any combination of the following Class C
Licenses which constitutes a majority of the work: C-8, C-10, C-12.
Online
Please see link for INFORMATION HANDOUT
http://dot.ca.gov/hq/esc/oe/project_ads_addenda/04/04-235624/supplemental_info/
Project is available for viewing ONLINE ONLY!!!
2/12/2015
301
1:30 PM
SANTA
CLARA
COUNTY
INSTALLATION OF COOLING UNITS IN SIGNAL
BUNGALOWS
Work consists of furnishing all labor, material, and equipment necessary for the
addition of 15 HVAC units and control thermostats to designated signal huts along
the VTA Light Rail Corridor. All Work must conform to this document and all
insurance, bonding, California Public Untilites Commission, and VTA Rail Safety
requirements to work within the Light Rail right of Way. See Appendix 'A' for VTA
Specified location of Signal Huts.
2/18/2015
485
2:00 PM
SANTA ROSA
AUSTIN WAY AREA WATER AND SEWER
IMPROVEMENTS (ONLINE ONLY)
See Specifications for complete Scope of Work. Project is available for viewing
ONLINE ONLY!!!
245
2:00 PM
SANTA ROSA
FORSYTH HALL HVAC UNIT 1 & 2
REPLACEMENT AT SANTA ROSA JR COLLEGE
See Specifications for complete Scope of Work. Technical Specifications are on the 3
floor plans.
Planroom &
Online
61
2:00 PM
SARATOGA
WEST VALLEY COLLEGE MAIN
TELECOMMUNICATIONS ROOM RENOVATION
Div 1-3, 5-10, 21-23 & 26-28. Project consists of Renovation of an existing building
to house the new telecommunications infrastructure and fiber backbone for the
campus; Development of a service yard on the west side of the existing building.;
Structural modifications to facilitate architectural, mechanical, and electrical
remodel; and New fire suppression system to serve the telecommunications room.
Planroom &
Online
2/12/2015
Page 25 of 30
1
Planroom &
Online
Online
3
Bid Date
2/24/2015
Plan # Bid Time Location
458
2:00 PM
SAUSALITO
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
BEACH FORCE MAIN AND GRAVITY SEWER
INSPECTION PROJECT (ONLINE ONLY)
Div 1-2 & 9. The Work includes, but is not limited to; 1) the installation of four
access wyes along the Beach Force Main (FM); 2) cleaning and CCTV inspection of
the SMCSD Beach FM from the Main Street Pump Station to the SMCSD Treatment
Facility; 3) cleaning and CCTV inspection of the City of Sausalito gravity sewer from
City manhole 110000 to City manholes 110201 and 110202, and additional work as
needed to construct and inspect a complete and operational project as specified in
these Contract Documents.
Online
Questions concerning this project or the bid package must be submitted by fax to
(415) 332-0453, or email to: [email protected] to Kevin Rahman, Associate
Engineer, at least five (5) working days before the time specified for bid opening.
Where appropriate, the District may respond to such questions by addenda
transmitted to all bid package recipients.
Project is available for viewing ONLINE ONLY!!!
2/24/2015
150
2:00 PM
SOUTH SAN NEW MUNICIPAL SERVICES BUILDING ATRIUM
FRANCISCO
RESTROOM MODERNIZATION
Div 1-2, 6-10, 12, 22-23 & 26. The Project will demolish existing partitions, light
fixtures, equipment, plumbing fixtures, and finishes; patching of ceiling as required;
installation of new tile flooring and walls, new partitions, new lighting fixtures and
new plumbing fixtures.
Planroom &
Online
Contact Sam Bautista, SSF Engineering Dept. at (650) 829-6668, or by email at:
[email protected]
2/12/2015
452
3:00 PM
STOCKTON
700 YARD TRACK IMPROVEMENTS PROJECT
(ONLINE ONLY)
Div 1-2 & 31-34. The Project consists of approximately 24,700 track feet of new
track and turnouts, grading, storm drainage facilities, access roads and associated
demolition to support the new tracks
The new construction will consist of modifications to existing tracks as well as the
addition of two lead tracks, A and D, and 9 new yard tracks. All of the work will be
located to the north of the existing 700 Yard tracks. A gravel access road will
encompass the perimeter of the yard, at-grade crossings will consist of precast
concrete panels and paved asphalt approaches. Existing utilities will be encased.
Grading and drainage will consist of a network of solid storm drain lines and
perforated underdrain piping. The piping will channel the water to a number of new
storm drain structures that will drain into several existing storm drain trunk lines and
outfall to an existing drainage canal. Several sections of these existing trunk lines
will be replaced to accommodate the new track construction. This project will
conform to the latest version of City of Stockton, Caltrans, UPRR, and AREMA
Standards and Specifications.
Project is available for viewing ONLINE ONLY!!!
Page 26 of 30
3
Online
Bid Date
2/20/2015
Plan # Bid Time Location
405
2:00 PM
STOCKTON
Plan Name
CSI Divisions / Job Description
NEW FENCE REPLACEMENT PROJECT AT SAN
JOAQUIN DELTA COLLEGE - REBID (ONLINE
ONLY)
# of
Addenda Plans
THIS PROJECT IS A REBID!!!
Online
The Project was reviewed and approved by the Division of State Architect (DSA)
and it consists of removal and disposal of old fencing and replacing with new
fencing, gates and gate hardware at various locations on the San Joaquin Delta
Community College campus, Stockton, CA. The Project shall include incidental
vegetation trimming/removal.
Project is available for viewing ONLINE ONLY!!!
2/24/2015
406
11:00 AM
STOCKTON
NEW BLANCHARD AND MARCOPULOS GYM FLOOR
REFINISHING AT SAN JOAQUIN DELTA
COLLEGE (ONLINE ONLY)
The Project generally consists of refinishing of Blanchard and Marcopulos
gymnasium hardwood floors including, but not limited to, sanding, sealing,
graphics/striping, final finish coating, removal of existing floor boxes and sleeves
and adjusted to be flush with new finish floor, removal of existing vented wood base
at both gymnasiums, installation of new molded, vented rubber base at both
gymnasiums, and the replacement of bottom 6” of gypsum wallboard if found
damaged during existing wood base removal and touch-up wall paint as needed.
Online
Project is available for viewing ONLINE ONLY!!!
2/26/2015
402
2:00 PM
STOCKTON
NEW SMART CLASSROOMS - PHASE II AT SAN
JOAQUIN DELTA COLLEGE (ONLINE ONLY)
The Project has been reviewed and approved by the Division of State Architect and
generally consists of installation of new audio / visual equipment and associated
work in multiple rooms at San Joaquin Delta College, Stockton, CA per
Specifications prepared by Angus Hamer, Inc. (DSA approved 01/27/15).
Online
Project is available for viewing ONLINE ONLY!!!
2/13/2015
408
2:00 PM
SUNNYVALE NEW CUPERTINO MIDDLE SCHOOL - PEDESTRIAN
CANOPIES (ONLINE ONLY)
Div 1-3, 5, 7, 9 & 31-32. Project consists of installation of pedestrian canopies at
the new Quad, iincludng selective demolition, concrete, structural steel, steel
decking, metal fabrications, metal roof panels, sheet metal flashing and trim,
painting, cast-in-place concrete piers and site concrete.
1
Online
1
Online
Project is available for viewing ONLINE ONLY!!!
407
3:00 PM
SUNNYVALE NEW CUPERTINO MIDDLE SCHOOL - SOUTH
PARKING LOT (ONLINE ONLY)
New parking lot installation project. This Project is available for viewing ONLINE
ONLY!!!
Page 27 of 30
Bid Date
3/3/2015
Plan # Bid Time Location
471
3:00 PM
TIBURON
# of
Addenda Plans
Plan Name
CSI Divisions / Job Description
DAIRY KNOLLS STAIR AND PATH
IMPROVEMENTS (ONLINE ONLY)
The Work to be performed under this Contract consists of constructing two concrete 1
stair cases. Stair cases include concrete steps and landings, metal rails and wood
headers with stakes. An aggregate base path shall connect the two stair cases to
provide a clear route of travel. Concrete sidewalk shall be constructed to connect
the top of the upper stairs to an existing curb ramp adjacent to the existing
recreation center building. Clearing and grubbing shall be completed, including
removal of a tree. Earthwork and grading shall be completed. The Work will require
minor traffic control, coordination with local utility companies, and other
miscellaneous items not mentioned above that are required by the Plans, the
Standard Specifications or these Special Provisions to be performed, placed,
constructed or installed.
Online
Project is available for viewing ONLINE ONLY!!!
2/18/2015
492
2:00 PM
TRACY
NEW CORRAL HOLLOW/KAVANAGH STORM DRAIN
LIFT STATION REHAB (ONLINE ONLY)
The Project is more specifically defined in the Plans and Specifications, but
generally includes the following work to be done: Replacement of two approximately
450 gpm and two 1850 gpm submersible pumps in existing storm drain lift station.
Online
Project is available for viewing ONLINE ONLY!!!
3/3/2015
495
2:00 PM
TRACY
NEW 11TH STREET EAST TRACY OVERHEAD BRIDGE The Project is more specifically defined in the Contract Documents, but generally
includes the following work to be done: Replacement of the existing 11th Street OH
REPLACEMENT (ONLINE ONLY)
Bridge with a shorter bridge in combination with retaining walls and embankment fill
at the approaches. Construction of a temporary on-site detour bridge to allow the
existing bridge to be removed and the new bridge to be constructed in one stage on
a similar horizontal alignment as the existing structure. Reconstruction and
widening of 11th Street and MacArthur Drive, including the installation of curb and
gutter, sidewalk, pavement section, sewer main, sewer manholes, storm drain lines
and drainage inlets, non-potable water lines, new traffic signal and traffic signal
modifications, decorative street lighting system, improvement of open drainage
channel, landscaping and irrigation, and signing and striping. The Engineer’s
estimate will not be released until the bids are publicly opened.
Project is available for viewing ONLINE ONLY!!!
Page 28 of 30
Online
Bid Date
2/26/2015
Plan # Bid Time Location
457
2:00 PM
UNION CITY
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
2014-15 WHEELCHAIR RAMP PROJECT (ONLINE Project consists of hauling, mobilization, water and dust control, maintaining traffic,
ONLY)
traffic control system for lane closure, construction area signs, barricades, clearing,
grubbing, grading and soil off-haul, relocate irrigation lines and heads, curb ramp
construction, concrete, sidewalk, curb and gutter, concrete retaining curb and
concrete work at traffic signals.
Online
Questions concerning this Project, based on the bid package, must be submitted by
fax to (510) 489-9468 or by email to: [email protected] to Murray Chang or
phone (510) 675-5311 at least five (5) working days before the time specified for bid
opening.
Project is available for viewing ONLINE ONLY!!!
3/5/2015
420
2:00 PM
UNION CITY NEW MISSION BOULEVARD UNDERGROUNDING
PROJECT-DECOTO ROAD TO 7TH STREET
(ONLINE ONLY)
Project consists of temporary traffic control, grading, clearing and grubbing,
earthwork, landscape, hot mix asphalt, concrete curbs and sidewalks, electrical
systems, and concrete.
Online
Questions concerning this Project, based on the Bid Package, must be submitted by
fax to (510) 489-9468, or by email to: [email protected] to Farooq Azim or phone
(510) 675-5368 at least five (5) working days before the time specified for bid
opening.
Project is available for viewing ONLINE ONLY!!!
2/19/2015
445
2:00 PM
VALLEJO
MARE ISLAND WESTERN APPROACH BRIDGE
REPLACEMENT (ONLINE ONLY)
The Work to be done includes providing traffic control, remove and replace existing
timber bridge with concrete simple span structure constructed of piles, bent cap and
precast concrete voided slabs. The approach road on west side will be replaced
with new AC pavement. and removing and replacing Portland cement concrete
sidewalk and handicap curb ramps. The bidder shall include in his/her bid and
provide all labor, tools and materials for a complete and working Project in
conformance with the intent shown on the Drawings and specified herein.
Contact Srinivas Mulktevi, Project Manager, at (707) 651-7107 with any questions.
Project is available for viewing ONLINE ONLY!!!
Page 29 of 30
Online
Bid Date
2/25/2015
Plan # Bid Time Location
196
2:00 PM
VARIOUS
Plan Name
CSI Divisions / Job Description
# of
Addenda Plans
INSTALL SAFETY BARRIERS IN RIGHT-OF-WAY Div 1-6, 9, 20, 26 & 31-34. The Work, in general, consists of providing all labor,
SYSTEM - BART
materials, equipment and other services necessary for the performance of all
operations to construct permanent physical barriers consisting of any combination
of chain link fences and gates, Caltrans K-rail topped with chain link fence, and
poles and chains, in various locations as indicated. The Work includes drilling and
bonding dowels in concrete; drilling and bonding dowels with chemical adhesives;
cast-in-place concrete; precast concrete; clearing and grubbing; locating existing
utilities; protection of existing utilities; earthwork; and grounding and bonding of new
barriers.
Planroom &
Online
The Work includes: Mobilization, construction phasing, construction barriers,
demolition, excavation, traffic control, site preparation and maintenance during
construction, removal of excess material and clean up after construction. In
addition, the Contractor shall be responsible for obtaining all required permits from
authorities other than BART as needed for the execution of the Work. A permit from
Union Pacific Railroad (UPRR or Railroad) is required for site for AYJ, which is
located at E. 8th Street in Oakland, CA AYJ is more than 50 feet away from the
center line of UPRR. See Contract Drawings.
2/27/2015
411
2:00 PM
NEW TOUCHSTONE PARK ADA PROJECT (ONLINE
WEST
ONLY)
SACRAMENT
O
1
Project consists of the installation of concrete ADA sidewalk and ADA compliant
picnic pad, two picnic tables and a drinking fountain, including replacement of any
pavement, sidewalk, curb and gutter or public and private improvements removed or
damaged as a consequence of the execution of this contract.
Project is available for viewing ONLINE ONLY!!!
Page 30 of 30
Online