THE SAN FRANCISCO BUILDERS EXCHANGE - TELEPHONE (415) 282-8220. FAX (415) 821-0363 PROJECTS BY LOCATION - Tuesday, February 10, 2015 (All project listed are available in the Planroom unless otherwise noted). To view plans online go to; www.bxofsf.com Bid Date 2/10/2015 Plan # Bid Time Location 149 5:00 PM ALAMEDA Plan Name CSI Divisions / Job Description SPIN PIZZA RESTAURANT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! # of Addenda Plans Planroom & Online This is a Spin Pizza restaurant about 3,191 sq. ft. Scope includes, but is not limited to: demolition, concrete, concrete cutting, concrete countertops, insulation, interior finishes, millwork installation, drywall/framing, doors & frames, HVAC, electrical and plumbing. Please refer to the plans to determine the full Scope of Work. Look at the responsibility schedule on sheet G002 and the K-sheets more notes and details are in these sheets. This is Parkway Construction Project. If you have any questions, please Malone Bullock at (469) 322-3783, ext. 3083 or by email at: [email protected] 2/19/2015 426 2:00 PM ALAMEDA COUNTY CALTRANS 04-4A4804 REPLACE GUARDRAIL, Replace guardrail, restore portal building, install CCTV in Alameda County in RESTORE PORTAL BUILDING & INSTALL CCTV Alameda and Oakland at Posey Tube and Webster Street Tube. The Contractor (ONLINE ONLY) must have either a Class A License or one of the following Class C licenses: C-10, C-29. 4 Online Project is available for viewing ONLINE ONLY!!! 2/24/2015 121 11:00 AM ALBANY PIERCE STREET PARK CONSTRUCTION PROJECT 2/17/2015 450 3:30 PM ANDERSON ANDERSON MIDDLE SCHOOL ADMINISTRATION Div 1-3, 5-10, 12, 22-23, 26, 28 & 32. Work consists of the reconstruction and AND LIBRARY CONSTRUCTION (ONLINE ONLY) modernization of the Anderson Middle School Administration and Library. The following divisions are included: existing conditions, concrete, metals, wood, plastics and composites, thermal and moisture protection, openings, finishes, specialties, furnishings, plumbing, HVAC, electrical, electronic safety and security and exterior improvements. Div 1-3, 9-12, 22, 26 & 31-33. The Project is located at the intersection of Pierce Street and Calhoun Street in the City of Albany, Alameda County California. The Project is more specifically defined in the Contract Documents, but generally it includes site work consisting of site grading, installation of utilities, construction of new playground, parking, and public facilities, installation of play equipment and landscaping. The Project includes a base bid and a bid alternate. Project is available for viewing ONLINE ONLY!!! Page 1 of 30 Planroom & Online 4 Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 2/12/2015 473 2:00 PM ANTIOCH SWIM LAGOON RESURFACING AND MISCELLANEOUS REPAIRS (ONLINE ONLY) See Specifications for complete Scope of Work. Project is available for viewing ONLINE ONLY!!! Online 2/17/2015 469 2:00 PM ANTIOCH PAVEMENT PLUGS AND BASE REPAIRS AT VARIOUS LOCATIONS (ONLINE ONLY) This Project consists, in general, of traffic control, pavement grind and base repair, 3 asphalt concrete plugs as marked in the field, storm water pollution control, pavement marking removal, pavement marking installation and all other work shown on the Plans and specified in the Project Special Provisions and Standard Specifications. The Work is more fully described in the Description of Project and other Contract Documents. Online Project is available for viewing ONLINE ONLY!!! 2/19/2015 401 2:00 PM ANTIOCH NEW BUCHANAN CROSSINGS PROJECT (ONLINE ONLY) Please provide your Proposal for the Work described in the Bid Documents for the Buchannan Crossings project located at 3300 Buchanan Road in Antioch, CA. Online Bid Package # 5 Major ‘D’ Shell, Major ‘C’ Shell and Major ‘C’ Tenant Improvement (T.I.). Project is available for viewing ONLINE ONLY!!! 2/23/2015 483 2:00 PM APTOS SOLAR WATER HEATER SWIMMING POOL (ONLINE ONLY) Project consists of Adding Solar panels; Regrade panel Area; Adding Retaining wall and fence; Adding pumps and controlers in pump room; and Adding piping between panel area and pump room. Online Project is available for viewing ONLINE ONLY!!! 3/3/2015 303 2:00 PM BURLINGAME NEW NEIGHBORHOOD STORM DRAIN PROJECT #7 The Work consists of construction and/or replacement of approximately 370 linear feet of storm drain mains by open trench construction, approximately 200 linear feet of cured-in-place pipe, approximately 1,500 linear feet of curb and gutter replacement, storm drain manhole installations, installation of 100 linear feet of concrete swales, concrete work on driveways/sidewalks and the replacement of existing and/or construction of new curb inlets. 2/13/2015 470 11:00 AM CONCORD The Work to be done in general consists of fabrication and installation of two tubular 1 steel archways and construction of supporting concrete columns and cast in drilled hole (CIDH) pier foundations, furnishing and installing cultured stone veneer on column faces, furnishing and installing bronze plaques, coordinating the work of sign fabricator (letters and LED lighting on backing plates, fabricated by others) assembly of signage in archway and providing electrical connection to existing service and all other work as shown on the Plans and as specified in these Special Provisions. TODOS SANTOS PLAZA ARCHWAY (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! Page 2 of 30 Planroom & Online Online Bid Date 2/25/2015 Plan # Bid Time Location 412 11:00 AM CONCORD Plan Name CSI Divisions / Job Description NEW TREAT BOULEVARD/CLAYTON ROAD/DENKINGER ROAD INTERSECTION CAPACITY IMPROVEMENTS (ONLINE ONLY) # of Addenda Plans 2 Project consists of mobilization, traffic control, storm water pollution control, open trench replacement of storm drain, valley gutter, street pavement. concrete curb, gutter and sidewalk reconstruction, concrete ADA ramp reconstruction, tree removal, potholing of existing utilities, traffic striping and markings, and traffic signal and street lighting. Online Project is available for viewing ONLINE ONLY!!! 3/5/2015 475 3:00 PM CUPERTINO KIOSKS PROJECT AT DE ANZA COLLEGE (ONLINE ONLY) Div 1, 26 & 31-33. Trades include electrical, site preparation, demolition, paving and surfacing, and underground electrical structures. Online PLEASE NOT: All questions must be faxed to the District’s Purchasing Office at (650) 948-5194, Attention: Gina Bailey with a copy to Linda Mahi, or by email to: [email protected] with a copy to Linda Mahi at: [email protected]. The deadline to submit questions is Noon on February 18, 2015. A question form is included herein, see Bid Document, 00 31 07. This Project is available for viewing ONLINE ONLY!!! 3/11/2015 409 3:00 PM CUPERTINO NEW ATHLETIC SUPPLY BUILDINGS AT DE ANZA COLLEGE (ONLINE ONLY) Div 1-2, 26 & 31-32. The Project consist of the demolition of two (2) existing storage buildings, site work and preparation for new buildings and utilities, and the procurement and installation of two (2) new DSA-approved buildings to be used for athletic equipment and material supply storage. Scope includes building demolition, electrical utility installation, grading and preparation of the building pads, minor grading and asphalt paving of the entries, concrete perimeter foundations, and the placement and completion of the two (2) new buildings. Online Project is available for viewing ONLINE ONLY!!! 2/19/2015 482 2:00 PM DIXON WASTEWATER TREATMENT FACILITY WATER SUPPLY WELL PROJECT (ONLINE ONLY) Project consists of drilling an approximately 930 foot deep borehole and completing it as a water supply well with an estimated depth of 910 feet. 1 Online 1 Planroom & Online Project is available for viewing ONLINE ONLY!!! 2/12/2015 44 2:00 PM EL CERRITO EL CERRITO VETERAN’S HALL ACCESSIBILITY The Work includes accessibility improvements including a new exterior ramp, IMPROVEMENTS renovation of an existing exterior stairway, and construction of an interior ramp. PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be open for inspection by bidders on Tuesday, January 20, 2015. Inspection tours will be conducted on this date by a representative of the County's Capital Projects Management Division. Tour will begin promptly at 9:00 AM, starting at the front entrance of the Veteran's Memorial Building, 6401 Stockton Avenue, El Cerrito. Page 3 of 30 Bid Date 2/10/2015 Plan # Bid Time Location 434 2:00 PM ELK GROVE # of Addenda Plans Plan Name CSI Divisions / Job Description SITE PREPARATION PROJECT (ECHO WATER PROJECT) - ONLINE ONLY Div 1-11, 22-23, 26-28, 31-34, 40 & 43. The Project Scope includes temporary and permanent roadway installation; utility installation, relocation, and demolition; extension of District 12kV electrical system for temporary power use; installation of new construction well; installation and demolition of fencing and gates, installation of a new security guard facility; site development for Echo Water Project contractor areas; demolition and relocation of several existing buildings; and other site work throughout the Sacramento Regional Wastewater Treatment Plant (SRWTP). 5 Online EAST BAYSHORE RECYCLED WATER PIPELINE - Div 1-3, 5, 9, 26, 31-33 & 40. Work includes furnishing and installing approximately 1 PHASE 1A - EBMUD (ONLINE ONLY) 2,305 ft of 12-inch diameter PVC pipe, 115 ft of 12-in painted MLS and 85 ft of 12-in ML&PCS pipe that crosses Temescal Creek, and installing 2,695 ft of Districtfurnished 12-in ML&PCS pipe from IKEA continuing onto Shellmound Street, Shellmound Way to tie-in with Christie Avenue; then continuing on Christie towards 65th in the City of Emeryville. Online Project is available for viewing ONLINE ONLY!!! 2/11/2015 413 1:30 PM EMERYVILLE Project is available for viewing ONLINE ONLY!!! 3/18/2015 214-215 1:30 PM EMERYVILLE NEW 82ND AVENUE & HOLLIS RATE CONTROL STATIONS REHABILITATION - EBMUD Div 1-3, 5, 8-9, 22-23, 26-28, 31-33, 40 & 43. Work includes complete electrical replacement and partial mechanical and civil/structural rehabilitation of the 82nd Avenue and Hollis rate control stations located in Alameda County. This Project will require multiple trades and types of work; for example hazardous materials handling, concrete, mechanical, electrical, pipeline, plumbing, paving and other required work and trades. For additional description and information, see Sections 00 14 02 Bid Form, 01 11 00 Summary of Work, and the remaining Contract Documents. Planroom & Online 2/18/2015 491 2:00 PM FAIRFAX The Work, in general, consists of paving approximately 1,200 square yards of a parking lot and driveway access on the west side of Bank Street and minor concrete sidewalk improvements on the north end of the lot. Online BANK STREET PARKING LOT IMPROVEMENT PROJECT (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! 4/8/2015 498 2:00 PM FREMONT NEW CALTRANS 04-0J9404 INSTALL WASH RACKS (ONLINE ONLY) Install wash racks in Alameda County in Fremont at the Fremont Maintenance Station at 2045 Mowry Avenue. The Contractor must have either a Class A License or Class B License or a combination of Class C Licenses which constitutes a majority of the work. Project is available for viewing ONLINE ONLY!!! Page 4 of 30 Online Bid Date Plan # Bid Time Location # of Addenda Plans Plan Name CSI Divisions / Job Description NEW HIGHLAND 1530 RESERVOIR PROJECT Div 1-3, 5, 7, 9, 11, 13 & 15-17. The Work consists, in general, of constructing a 1.2 MGD Welded Steel Tank Reservoir with valve vault and accompanying appurtenances, site improvements including paving, site preparation, earthwork, sheeting, shoring and bracing, concrete, anchor bolts, miscellaneous metal work hot-dip zinc coating, mechanical zinc coating, preformed joint fillers, sealants and caulking, coating systems, coating for steel water storage reservoir, equipment, cathodic protection, welded steel water storage tank, mechanical, electrical, instrumentation and controls. 2/17/2015 180 2:00 PM HAYWARD 2/17/2015 410 2:30 PM LIVERMORE NEW BRISA STREET SANITARY SEWER MAINLINE BOTTLENECKS (ONLINE ONLY) Div 1-3, 5, 9 & 31-33. The Project consists of replacing existing sanitary sewer mains by open cut and by the pipe bursting method. Also, a new steel casing will be installed under the UPRR tracks by the bore and jack method. Planroom & Online 1 Online 1 Div 1-3, 6-10 & 12-13. Trades include selective building demolition, concrete, plastic laminate, rough carpentry, finish carpentry, wood casework, solid surface fabrications, building insulation, concrete slab vapor emissions and alkalinity control treatment, waterproof membrane, roofing, sealants, caulking and adhesive tape, steel knock down drywall frame, rolling steel door, rolling door motor, glass, glazing and window films, gypsum board, wall tile, resilient base, vinyl composition tile, epoxy mosaic composition flooring, decorative fiberglass reinforced wall panels, painting, toilet partitions, washroom accessories, baby changing station, fire extinguishers, entrance floor mats and frames, and security access and surveillance. Online Project is available for viewing ONLINE ONLY!!! 2/12/2015 465 11:00 AM LODI LODI TRANSIT STATION RESTROOM VAULT IMPROVEMENTS (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! 2/25/2015 423 11:00 AM LODI NEW WHITE SLOUGH FARM IRRIGATION IMPROVEMENTS (ONLINE ONLY) The Work consists of removing the existing concrete irrigation ditch and slide gates and replacing them with approximately 3,770 feet of 30” and 36” pipe, five alfalfa valves, five concrete standpipes, 300 feet of 18” lateral, and other incidental and related work. Online Project is available for viewing ONLINE ONLY!!! 422 11:00 AM LODI NEW HENRY GLAVES PARK PUMP STATION IMPROVEMENTS (ONLINE ONLY) The Work consists of furnishing and installing a submersible storm drain pump, electrical control panel, and other incidental and related work, all shown on the Plans and Specifications for the above Project. Project is available for viewing ONLINE ONLY!!! Page 5 of 30 Online Bid Date 3/5/2015 Plan # Bid Time Location 466 2:00 PM MARIN AND SONOMA COUNTIES Plan Name CSI Divisions / Job Description # of Addenda Plans 3 CALTRANS 04-264094 REALIGN HIGHWAY AND Realign highway and construct new bridge In Marin and Sonoma Counties near CONSTRUCT NEW BRIDGE (ONLINE ONLY) Petaluma from 0.8 mile south to 2.0 miles north of the Marin-Sonoma County Line. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-12, C-32. Online Available for viewing ONLINE ONLY!!! 2/10/2015 205 2:00 PM MARTINEZ 3/12/2015 414 2:00 PM MARTINEZ TREATMENT PLANT SAFETY ENHANCEMENTS, Div 1-3, 5, 7, 9 & 14-16. The Work generally consists of safety improvements to existing facilities in the treatment plant and ADA improvements. PHASE 4 NEW ROOF REPLACEMENT AT 2099 ARNOLD INDUSTRIAL WAY (ONLINE ONLY) 1 Div 1-2 & 6-9. The Work includes removal and replacement of existing roofing, flashing, drains and skylights, at a secure facility. Planroom & Online Online PLEASE NOTE: Because of the restrictive nature of the facility, the site will only be open for inspection by bidders on Tuesday, February 24, 2015. Inspection tours will be conducted on these dates by a representative of the County's Capital Projects Management Division. Tours will begin promptly at 10 AM, starting at the main entrance of the Sheriff Property Services office, 2099 Arnold Industrial Drive, Suite D, Concord, California. Project is available for viewing ONLINE ONLY!!! 2/25/2015 433 2:00 PM MODESTO HONOR FARM BARRACKS FOUR, GUARD Project consists of Mobilization, Barracks 4 and Guard Shack (Modular) Demolition BOOTH AND SHOP PAINT BOOTH DEMOLITION and Disposal, Shop Paint Booth Demolition and Disposal. (ONLINE ONLY) Project is available for viewing ONLINE ONLY!!! 2/17/2015 479 2:00 PM MOUNTAIN VIEW RESIDENCE INN GUESTROOM ADDITION (ONLINE ONLY) 3 Online 5 Div 1-3, 5-14, 21-23, 26-28 & 31-33. Project consists of demolition of 4 existing buildings and construction of a new ground-up 4 story 22,612 sq. ft. Guest Tower addition to an existing Residence Inn with site and offiste work to include: hazardous material abatement, demolition, surveying, earthwork, erosion control, utilities, landscaping, concrete, structural steel, rough/finish carpentry, architectural millwork, cultured marble/solid surfaces, waterproofing, insulation, siding, roofing, sheet metal, joint sealer, doors and hardware, storefront, windows, lath and plaster, metal stud/drywall, ceramic tile, acoustical ceiling, wall coverings, painting, toilet partitions/accessories, shelving, linen chutes, residential cabinetry, window treatment, FF&E, elevator, fire protection, plumbing, HVAC, electrical, fire alarm and low voltage. Online This Project is available for viewing ONLINE ONLY!!! 2/12/2015 200 2:00 PM NAPA LOS CARNEROS WATER DISTRICT (LCWD) RECYCLED WATER PIPELINE Page 6 of 30 Div 1-3, 5, 9, 13 & 15-16. See specifications for complete Scope of Work. 6 Planroom & Online Bid Date 3/5/2015 Plan # Bid Time Location 419 3:30 PM NAPA Plan Name CSI Divisions / Job Description NEW NAPA COUNTY ADMINISTRATION BUILDING EXTERIOR ENVELOPE AND STRUCTURAL EARTHQUAKE REPAIRS (ONLINE ONLY) # of Addenda Plans The Work generally consists of, but is not limited to, all labor and materials for the Earthquake Exterior Envelope and Structural repairs of the Napa County Administration Building. Online Trades include selective structure demolition; roofing modifications and repair; joint sealant rehabilitation; water repellents; exterior insulation and finish system repairs; sheet metal flashing and trim; applied fireproofing; firestopping; joint sealers; wall coverings; Portland cement and plastering; and painting. Project is available for viewing ONLINE ONLY!!! 3/12/2015 472 3:30 PM NAPA NAPA COUNTY DEPARTMENT OF CORRECTIONS SUPPLY AND EXHAUST VENT REPLACEMENT (ONLINE ONLY) The Work involves all labor and materials for manufacturing of supply and exhaust vents located within the Napa County Department of Corrections. 1 Online 3 Online • Supply and install all vents. • Test and balance all vents. • Contractor shall field verify all dimensions and all existing conditions. • Infill walls to align with existing finishes. • Patch, paint and texture to match existing conditions. • All work, material, means & methods, ETC. shall conform to all governing building codes, regulations and agencies. Project is available for viewing ONLINE ONLY!!! 2/13/2015 476 2:00 PM OAKLAND FRUITVALE ELEMENTARY SCHOOL BLEACHER Div 1, 6-7, 9-10, 12, 22, 26 & 32. The Project consists of restoration of bleachers; AND RESTROOM UPGRADES (ONLINE ONLY) construction of a new press box; remodel of student restrooms that includes, but is not, limited to replacement of toilet partitions, replacement of lavatories, removal/replacement of water closets, removal and replacement of toilet accessories, repair of wood roof deck, replacement of roofing, repair of fascia at eave, and installation of additional door hardware. Scope includes building components replacement and painting. Contact David Haddad, Project Manager, at (510) 535-2726 with any questions. This Project is available for viewing ONLINE ONLY!!! Page 7 of 30 Bid Date 2/17/2015 Plan # Bid Time Location 300 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description INSTALL MOTORIZED ROLLING GATE, SECURITY TURNSTILE, AND REMOVE FENCE MAN DOOR AT OKS - BART Div 1-3, 20, 26 & 32-33. The Work of this Contract includes, but is not limited to, furnishing all labor, equipment, materials and services required to install one (1) automatic, motorized, side rolling security gate and one (1) security personnel turnstile. Existing fencing and two (2) man doors will be removed and replaced as needed at two (2) locations, as indicated in Contract Specifications and Drawings. # of Addenda Plans Planroom & Online SCOPE OF WORK: A. Provide one (1) 30 ft. wide, side rolling motorized chain link gate at BART Oakland Shops driveway per Contract drawings, retracting into Union Pacific Railroad easement area, including steel lower track and its concrete support piers. Easement area is the area allotted to BARTO by Union Pacific on their property for installation of BARTO's retracting side rolling fence and support piers. B. Remove one (1) existing man door and surrounding fence as needed, and provide one (1) security turnstile with three 47" long arms at employee parking lot entrance as indicated on Contract Drawings. C. Remove one (1) existing man door at northwest corner of lot and replace with chain link fencing and barbed wire to match adjacent fence. 2/19/2015 474 2:00 PM OAKLAND MARTIN LUTHER KING SHORELINE TIDEWATER Project consists of widening asphalt road for park entry; construction of concrete ENTRY MODIFICATIONS (ONLINE ONLY) sidewalk, curb and gate center Island; installation of two-rail fence, metal gates, tiger teeth and wheel stops. Online Project is available for viewing ONLINE ONLY!!! 41-42 2:00 PM OAKLAND 1110 JACKSON STREET MIXED USE PROJECT Div 1-12, 14, 21-23, 26-28 & 31-33. This Project is a 71 unit multi-family apartment, affordable housing project scheduled to begin construction on or about March 2015. The street level shall be a combination of common area residential, commercial “cold shell” and parking. The structure shall be slab on grade with thickened footings, grade beams with the second level post-tensioned concrete and 4 levels of type V-A wood framing above the 2nd level of concrete. PLEASE NOTE: This is a Prevailing Wage project and Certified Payroll job with Oakland Local Hire Requirements. Page 8 of 30 Planroom & Online Bid Date 2/20/2015 Plan # Bid Time Location 460 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description # of Addenda Plans UCSF BENIOFF CHILDREN'S HOSPITAL Turner Construction has been awarded the construction of a new, 6-story, steel OAKLAND OUTPATIENT CENTER 2 BID GROUP 3 frame, medical clinic, approximately 88,000 gsf, with associated landscaping, site (ONLINE ONLY) utility work and existing parking garage modifications. BID GROUP 3 TRADES: Invited to submit a proposal at this time: - Structrual Excavation / Site Demo / Earthwork / Paving - CMU - Metal Fabrications - Roofing / Waterproofing - Flashing / Sheet Metal / Expansion Joints - Garage Renovations - Deep Foundations / Drilled Piers - Micropiles - Site Concrete - Landscaping - Architectural Millwork - Lab Casework - Fireproofing - Doors, Frames and Hardware - Acoustical Ceilings / Wall Panels - Flooring - Ceramic Tile - Painting and Wall Coverings - Specialites: Signage / Toilet Partitions & Accessories / Coiling Doors / Window Coverings PROJECT SCHEDULE: Construction to begin in July 2015 with a 23-month duration. Refer to construction bid schedule for more information. PREQUALIFICATION: All subcontractors must be pre-qualified to submit a proposal. Pre-qualification information may be requested from Sylvia Strowe by email at:([email protected]). PROPOSAL FORMAT: A Turner Bid Form is provided. Proposals are to be submitted via the SmartBidNet link above or emailed to Shirley San Diego at:([email protected]). PROJECT LABOR AGREEMENT: This Project will have a Project Labor Agreement in effect. Project is available for viewing ONLINE ONLY!!! Page 9 of 30 6 Online Bid Date 2/20/2015 Plan # Bid Time Location 463 2:00 PM OAKLAND Plan Name CSI Divisions / Job Description ARCHITECTURAL SERVICES AT RAINBOW RECREATION CENTER RENOVATION & EXPANSION - RFP (ONLINE ONLY) The Project Delivery Division of the City of Oakland, Oakland Public Works Department (OPW) is issuing a Request for Proposals for full design and engineering services for the renovation and expansion of the Rainbow Recreation Center and renovation of the site. The center is located at 5800 International Boulevard. The design team shall assist the City in conforming to its grant obligations under the Safe Drinking Water Bond Act of 2006 (Proposition 84). # of Addenda Plans Online Services may include, but not limited to, the following: site surveys, site and building evaluations, building programming, ADA and code analysis, facilitating stakeholder meetings, permit applications, sustainability program implementation, certification and conformance, schematic design, design development, construction documents, cost estimating, construction support and construction close out support. Contact Denise Louie, Project Manager, by email at: [email protected], or by phone at (510) 238-3682 with any questions. Project is available for viewing ONLINE ONLY!!! 3/5/2015 151 2:00 PM OAKLAND NEW TASSAFARONGA RECREATION CENTER INTERIOR REMODEL The Proposed Work, in general, consists of interior finish work including new flooring/base, wall panels, cabinetry refinishes, new doors, and painting; reconstruction of the restrooms including accessibility compliance, new fixtures/accessories and plumbing work; replace kitchen appliance; electrical work related to new outlets, lights, equipment and door opener; and hazardous abatement as specified in the Contract Documents. Planroom & Online Contact WooJae Kim, Project Manager, at (510) 238-3389, or by email at: [email protected] with any questions. 3/11/2015 421 11:00 AM OAKLAND NEW RUNWAY 10R-28L SHOULDER REHABILITATION, The Work of this 40 calendar day project consists, in general, of furnishing all labor, NORTH FIELD (ONLINE ONLY) materials, appliances, tools, equipment, transportation, services and supervision required to complete the crack sealing and placement of a seal coat on the shoulders of Runway 10R-28L and to perform all associated work, all in accordance with the Contract Documents. Project is available for viewing ONLINE ONLY!!! Page 10 of 30 Online Bid Date 2/18/2015 Plan # Bid Time Location 93-95 2:00 PM PACIFICA Plan Name CSI Divisions / Job Description HOLIDAY INN EXPRESS Div 1, 3-10, 14, 21-23, 26 & 31-32. # of Addenda Plans 1 Planroom & Online 1 Online SITE: Combine existing hotel site with newly acquired northerly site into one property; Demolish existing residential structure near creek to allow new addition; Demolish existing commercial building in northerly property to allow new addition and landscaping. existing creek side landscaping to remain and be protected during construction. EXISTING HOTEL: Conversion of high ceiling space above existing breakfast room to 1 guestroom at 2nd floor, enlarge 1 existing 3rd floor guestroom, conversion of parking spaces to hotel space and motorcycle parking, convert 2 existing parking spaces for new driveway into new parking garage. CREEKSIDE ADDITION: Addition of 9 upper floor guest rooms, breakfast room, meeting space and back-of-house renovation. NORTHERLY SITE ADDITION: Addition of 36 upper floor guest rooms, ground floor retail and parking garage. 2/10/2015 461 2:00 PM PLACERVILL E MAIN STREET REHABILITATION PROJECT PHASE 1A: WATER LINE REPLACEMENT (ONLINE ONLY) The Project is located in the City of Placerville, El Dorado County. The Work to be done is shown on the Plans described in the Special Provisions and generally consists of, but is not limited to: Replacement of aged and deteriorated existing water lines within Main Street, located in Downtown Placerville. For bonding purposes, the anticipated project cost is less than $700,000. Project is available for viewing ONLINE ONLY!!! 2/17/2015 488 2:00 PM PLEASANTO N BI-ANNUAL CONTROL VALVE IMPROVEMENTS Work shall include all the work associated with the removal and replacement of 22 water Blow Off Assemblies, associated main line pipe, and street restoration. (ONLINE ONLY) This Project is available for viewing ONLINE ONLY!!! Page 11 of 30 Online Bid Date 2/10/2015 Plan # Bid Time Location 459 4:00 PM REDWOOD CITY Plan Name CSI Divisions / Job Description # of Addenda Plans REMODEL OF A DISTRICT RESIDENCE AT 20000 The purpose of this project is for the remodel of a District residence located at SKYLINE BLVD (ONLINE ONLY) 20000 Skyline Blvd in Woodside. The furnishing of all labor, materials and services required for the following designated scope of work: Replace deck; replace sliding glass door with window at the residence located in Russian Ridge Open Space Preserve. Online Mandatory Pre-bid / Site Visit: January 30th at 10 AM. RSVP Required: [email protected] by 4 PM on January 29th. Project is available for viewing ONLINE ONLY!!! 2/12/2015 60 2:00 PM RICHMOND RICHMOND CIVIC AUDITORIUM AMERICANS WITH DISABILITIES ACT BUILDING UPGRADES PROJECT Div 1-2, 4-10 & 14-16. The City of Richmond will accept bids for the construction of 3 the Richmond Civic Auditorium Americans with Disabilities Act building upgrades project. Trades include Selective Demolition; Site Concrete; Concrete; Structural Steel; Cold Formed Metal Framing; Metal Fabrications; Handrails and Guardrails; Carpentry; Finish Carpentry; Countertops; Water Repellants; Flashing and Sheet Metal; Joint Sealers; Steel Doors and Frames; Aluminum Storefront and Sliding Doors; Hardware; Glazing; Portland Cement Plaster; Gypsum Board Assemblies; Tile; Carpet; Modular Wall System; Paints & Coatings; Plastic Laminate Toilet Compartments; Signage; Toilet Accessories; Hydraulic Elevator; Fire Protection; Plumbing; HVAC; and Electrical. Page 12 of 30 Planroom & Online Bid Date 2/12/2015 Plan # Bid Time Location 82 2:00 PM RICHMOND # of Addenda Plans Plan Name CSI Divisions / Job Description SENIOR CENTER ADA RESTROOMS IMPROVEMENTS Div 1-4, 6-11 & 15-16. Project consists of performing ADA restrooms improvements 2 and relocation of kitchen and for all other Work, items or details not mentioned above that are required by the Drawings, Standard Specifications, or these Special Provisions. Planroom & Online Trades include site concrete; concrete; CMU construction; rough carpentry; finish carpentry; architectural woodwork; building insulation; flashing and sheet metal; firestopping; joint sealers; steel doors and frames; access doors and panels; door hardware; portland cement plaster; gypsum board assemblies; tile, resinous kitchen flooring; fiberglass wall panels; paints and coatings; quartz surfacing countertops; fire extinguisher cabinets; toilet accessories; food service equipment; appliances; plumbing; HVAC; lighting; and electrical. All questions regarding bid documents, construction Plans and Specifications must be submitted by email to Yader Bermudez, Project Manager, at: [email protected] no later than 5 PM, on February 5, 2015. Questions will be answered in a written response and will be available to bidders on the City’s website at www.ci.richmond.ca.us/bids no later than three (3) working days prior to the bid opening deadline. 3/10/2015 134 2:00 PM RICHMOND 3/6/2015 442 2:00 PM ROCKLIN NEW NORTH RICHMOND PUMP STATION DIVERSION Div 1-3, 5, 7, 9, 11 & 15-17. The Work includes demolition of existing pumps and associated piping and then permanent installation of two new sump pumps and PROJECT associated mechanical, electrical, and instrumentation equipment. This Project will divert stormwater from pump station to waste water. ZONE 1 WELL UPGRADE AND EXPANSION PROJECT (ONLINE ONLY) Div 1-11, 13 & 15-17. The Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of Improvements to Sunset Well, including well liner, casing and screen, submersible pump, valves piping, appurtenances, chemical feed facilities, building site work, etc. The Project also includes improvements to the Tinker Road well including a new vertical turbine pump, valves, piping and appurtenances, well house, tank mixer, site work and all other associated work described in these documents. Additionally, due to urgent water supply needs of the Agency, the Contractor will be required to provide temporary power, pumping, disinfection, and piping facilities to provide access water from both wells. Project is available for viewing ONLINE ONLY!!! Page 13 of 30 Planroom & Online 2 Online Bid Date 3/12/2015 Plan # Bid Time Location 98 2:00 PM ROHNERT PARK Plan Name CSI Divisions / Job Description # of Addenda Plans CABERNET VILLAGE STUDENT HOUSING Div 1, 5-12, 22-23 & 26-28. Work Included in the Contract includes all construction RENOVATION AT SONOMA STATE UNIVERSITY and services required for rehabilitating 54 student housing units and common building, California Building Code (CBC) Type V-B construction, of approximately 62,888 sq. ft. floor area, including: 1 Planroom & Online 1 Online 1. New interior finishes including cabinets, counters, doors, door hardware, paint, carpet, resilient flooring, and bathroom accessories. 2. Gypsum board demolition, patch, and new skim coat and texture. 3. New plumbing supply system. 4. Heating and ventilating systems. 5. Electrical power, lighting and signal systems. 6. Coordination of work being performed by others under separate contracts with University, described in Article below titled "CONCURRENT WORK UNDER SEPARATE CONTRACTS." 7. Additional general information concerning the Project is provided on the Architectural Drawings. 2/24/2015 496 2:00 PM SALINAS NEW E. ALISAL ST AND SKYWAY BLVD ROUNDABOUT In general, the Work shall include, but is not limited to, demolition of existing road asphalt, concrete, signs and other street appurtenances; relocation of existing (ONLINE ONLY) utilities and the construction of new underground storm and sanitary sewer main pipes; construction of new asphalt road pavement, asphalt overlays, new street lights, curbs, gutter, sidewalks, LID features, and drainage features; grading and erosion control activities; signing and striping improvements; landscaping and irrigation improvements; and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions for the construction of a complete and operational roundabout intersection at E. Alisal Street and Skyway Boulevard. Project is available for viewing ONLINE ONLY!!! Page 14 of 30 Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 2/17/2015 35 3:00 PM SAN CARLOS INDUSTRIAL ROAD PARALLEL SANITARY SEWER PROJECT 2 Div 1-3, 5 & 15. Project consists of dewatering, mobilization, demolition, abandonement and removal, sewage flow control, earthwork, soil stabilization, steel casing pipe, sanitary sewer rehabilitation using CIPP method, excavation support shoring and bracing, steel sheet pile shafts, secant pile shafts, instrumentation and monitoring, asphalt concrete paving, shaft construction, microtunneling, precast concrete structures, carrier pipe installation into casing, fused PVC sewer pipe, sanitary sewer system testing and cleaning, CCTV inspection of sanitary sewer system, building sewer (lateral) construction and reinstatement, traffic stripes and pavement markings, traffic control, traffic loops, adjust incidental structures to grade, controlled low strength material, concrete reinforcement, cast-in-place concrete, concrete cylinder pipe, backfill grout, casing pipe annular backfill grouting, grout, ground pre-treatment, manhole and below grade vault rehab, manhole frames and covers, and general piping. Planroom & Online 2/25/2015 487 2:00 PM SAN DIEGO HEALTH CARE FACILITY IMPROVEMENT PROGRAM AT RICHARD J. DONOVAN CORRECTIONAL FACILITY (ONLINE ONLY) 2 Div 1-3, 5-10, 12, 22-23, 26-28 & 31-33. The Project at RJD is part of the Health Care Facility Improvement Program (HCFIP). The purpose of this Project at RJD is to remedy deficiencies in its existing health care components. Online The Project consists of two sub-projects, which includes one to two sub-phases within the sub-project. The Scope of Work includes, but is not limited to, demolition, building pad preparation, new construction, accessible paths-of-travel, and infrastructure upgrades. The Projects are located within and outside the existing secure perimeter. The new Administration Building will be slab-on-grade with exterior fully grouted structural concrete masonry unit walls, metal framed interior walls, and a single-ply type, fully adhered over rigid insulation roof assembly. Utility relocation will be necessary for the construction of the new building, including communications/signal, electrical, storm drain, water and sewer lines. This Project is available ONLINE ONLY!!! 2/10/2015 53-55 2:00 PM SAN FRANCISCO PRESIDIO MIDDLE SCHOOL MODERNIZATION Div 1-3, 5-12 & 14-16. General School Modernizations and reconstruction including 1 ADA Access and Fire/Life-Safety upgrades, interior and exterior painting, classroom retrofit, new phone system, new clock paging system, new data infrastructure, new elevator and lift, miscellaneous site work and landscaping, hazardous material/Asbestos remediation, boiler replacement, other miscellaneous interior renovation work and Interim Housing installation and removal. Page 15 of 30 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans 2/11/2015 122 2:00 PM SAN FRANCISCO AMBULATORY CARE CENTER (ACC) B1 PLAZA LEVEL ORTHOTICS & PROSTHETICS RELOCATIONS AT UCSF 4 Div 1-2, 5-10, 22-23 & 26. Relocation of the existing Prosthetics and Orthotics Clinic and Shop Fabrication space from the Clinical Sciences Building (CSB) basement to the Ambulatory Care Center (ACC) Plaza location. The modular clinic area’s remodel will consist of some wall demolition and reconstruction to create five exam rooms; a Gait Room; two Offices; a new cross corridor hallway; and storage room. The Shop Fabrication area includes a complete gut and remodel to provide a shop equipment room; a plaster room; assembly area; and small storage area. In addition to the architectural construction, mechanical and electrical upgrades to serve the fabricating equipment space will be included in the Scope of Work. Area is approximately 4,100 sq. ft. Planroom & Online 2/12/2015 484 2:00 PM SAN FRANCISCO YERBA BUENA RECONFIGURE OFFICES (ONLINE ONLY) 1 Project includes material testing, site demolition, hazmat testing, asbestos abatement, PCB removal, rough carpentry, HM doors and frames, wood doors, door hardware, tubular daylighting devices, gypsum wallboard, ceramic tile, resilient flooring, carpet, painting, toilet and bath accessories, window treatments, manufactured casework, solid surface countertops, plumbing, HVAC, electrical, public address and fire alarm. Online Project is available for viewing ONLINE ONLY!!! 46 2:00 PM SAN FRANCISCO STORM DRAIN PUMP STATIONS SDPS-1B AND PLANS & SPECS WILL BE POSTED ONLINE SOON!!! SDPS-1C IMPROVEMENTS AT SFO Div 1-2, 5, 9, 23, 26 & 31-34. This Project will replace pumps, outfall pipes, Pumps controls, SCADA system and electrical equipment for storm drain pump stations SDPS-1B and SDPS-1C to ensure a reliable and robust drainage system for major airport runways. Page 16 of 30 3 Planroom & Online Bid Date 2/17/2015 Plan # Bid Time Location 109-110 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description LOWELL HIGH SCHOOL NEW CLASSROOM BUILDINGS Div 1-3, 5-12, 21-23, 25-28 & 31-33. # of Addenda Plans Planroom & Online NEW CLASSROOM BUILDING AND SITEWORK: Replace the existing portable classrooms on the Lowell campus with a permanent classroom complex consisting of a 12-classroom building and a 2-classroom building. In addition, the Project requires associated sitework to reconfigure the existing parking lot and landscaping including exterior lighting, improve circulation, upgrade underground utilities and ADA access. INTERIM HOUSING: In addition, (5) five new temporary relocatable classrooms and (2) two new temporary relocatable toilet buildings will be provided by the District as interim housing and will be located on the adjacent existing basketball court for the construction duration. All utilities and sitework associated with these new relocatables will be provided by this Contract. This Contractor will also be responsible for the hazardous material removal and utility disconnection of for all the existing relocatables and will be required to demolish and remove (7) seven relocatable classrooms and (2) two portable toilet buildings. After construction completion of the new classroom buildings, the utilities from the interim housing relocatable buildings will be disconnected in preparation for the District removal of these relocatables. The existing basketball court will be resurfaced and re-striped and new basketball poles and backstops will be installed to restore the court to the original condition. 2/18/2015 152 2:00 PM NEW FED-EX OFFICE REMODEL - FINANCIAL SAN FRANCISCO DISTRICT SPECIFICATIONS ARE ON THE FLOOR PLANS!!! Planroom & Online This is an open store remodel and all work must be performed between the hours of 9 PM and 6 AM. Please provide pricing accordingly and note in all proposals that this is included. Please feel free to email any questions to: [email protected]. 137 2:30 PM SAN FRANCISCO GILMAN PLAYGROUND RENOVATION Div 1, 3, 6, 9-12, 22, 26 & 31-33. The Work to be done under this Contract is located at 993 Gilman Avenue, San Francisco, 94124, known as Gilman Playground, and consists of site demolition; hazardous material abatement; new children’s play equipment, rubber surfacing and site furnishings; minor grading; drainage; lighting; irrigation; planting; paving; restroom renovation; and all appurtenant work in accordance with Specifications and Drawings. Contact Marvin Yee, Project Manager, at (415) 581-2541 with any questions. Page 17 of 30 1 Planroom & Online Bid Date 2/19/2015 Plan # Bid Time Location 197 2:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description # of Addenda Plans SOUTHEAST WATER POLLUTION CONTROL THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. PLANT SLUDGE THICKENING IMPROVEMENTS, JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! PHASE 1 Div 1-3, 5, 7, 9, 11, 22-23, 26, 40 & 46. The objective of the Project is to rehabilitate Southeast Plant (SEP) 785 facility and equipment including gravity belt thickeners, odor control unit, minor plumbing upgrades in SEP 780 basement location that includes upsizing of polymer pipes valves and pumps. The Work is to be performed in San Francisco, California. Page 18 of 30 Planroom Bid Date 2/24/2015 Plan # Bid Time Location 21-24 3:00 PM SAN FRANCISCO Plan Name CSI Divisions / Job Description ISLAIS CREEK FACILITY PHASE II MAINTENANCE AND OPERATIONS BUILDING (REBID) THIS PROJECT IS A REBID!!! # of Addenda Plans Div 1-3 & 5-16. The Work to be done under this Contract is located within the City of San Francisco as shown on the Plans. The Project generally consists of the construction of a new maintenance and operations building which will supplement the existing fuel/wash and annex buildings previously constructed. Work to be performed under this Project includes, but not limited to, Selective demolition for the installation of work to be performed; Utility work in both the public and private right of way including fire water, domestic water, fire hydrants, storm and sanitary sewer, electrical and communication work, manholes, utility boxes, gas service, etc.; Excavate, handle, reuse, transport, and dispose of site soils, groundwater and storm water controls, environmental mitigation controls, and environmental management of excavated materials; Dewatering work, including dewatering of excavations, equipment, foundations, and utility trenches; Shoring for excavations and open cuts as required by the governing jurisdiction(s) requirements, and as determined by the contractor to perform the work to be constructed; Site work including street and sidewalk, concrete paving, fencing work, site lighting, signage and striping, site furnishings; Building construction including piles, pile caps, framing, exterior siding, roofing, elevators, windows, interior partitions, insulation, fireproofing, interior finishes, doors, cabinetry, painting, interior furnishings, etc.; Mechanical, electrical, plumbing, telecom, communication, fire alarm, fire protection systems, system integration, solar panel system, access control, security systems, etc.; Fluid systems including underground and aboveground tanks, piping and dispensing systems; Vehicle maintenance equipment including vehicle lifts, exhaust system, shop equipment, hoists and cranes;Replacement of existing manhole lids; Provide pre-construction and post construction survey, vibration and ground movement monitoring; Construction of shoreline improvements including the installation of benches, and the removal and replacement/re-grading of existing surfaces to align with the grade with the building entrances; Coordinating and scheduling of work with the various utility agencies for their service; Coordinating and scheduling of the special inspections and testing agencies, and inspections by the governing jurisdictions; Coordinating and scheduling of work with Muni Operations and Maintenance, and other projects working on the site or in the immediate area; Testing, Training, and Start-Up. A comprehensive program for testing, training, and start-up of systems and components installed in the work of this Contract, including preparing operations and maintenance manuals, providing training for City’s operating and maintenance personnel, and completing start-up procedures and requirements as detailed in the Specifications. Contact Joon Park, Project Manager, at (415) 701-4742, or by email at: Page 19 of 30 2 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans [email protected] with any questions. (Previously scheduled bid date was 12/9/14. Old Plan # was the same). 2/25/2015 415 2:30 PM NEW AS-NEEDED PAVEMENT PRESERVATION FY SAN FRANCISCO 2015-2016 PROJECT (ONLINE ONLY) The Work is located on various street locations throughout San Francisco and consists of pavement preservation using Type 2 and Type 3 micro-surfacing, traffic routing, temporary pavement markings, and all associated work. Online Contact Ramon Kong, Project Manager, at (415) 554-8280 with any questions. Project is available for viewing ONLINE ONLY!!! 2/26/2015 97 10:30 AM SAN FRANCISCO PIER 49 (J1) UNDER-PIER SEWER PIPING REPLACEMENT PROJECT 306 2:00 PM NEW AS-NEEDED DUCTILE IRON WATER MAIN SAN FRANCISCO REPLACEMENT AT VARIOUS LOCATIONS Div 1, 9 & 15. The Port of San Francisco (the “Port”), a department of the City and 1 County of San Francisco (the "City") announces an Invitation for Bids (“IFB”) for construction on the PIER 49 (J1) UNDER-PIER SEWER PIPING REPLACEMENT PROJECT in San Francisco, CA. The proposed Work will consist of replacement of the existing under-pier sewer gravity main and all lateral lines, which connect to multiple tenants restaurants’ plumbing fixtures. THIS PROJECT WILL NOT BE POSTED ONLINE PER OWNER'S REQUEST. JOB SITE & BID DOCUMENTS ARE SECURITY SENSITIVE!!! Planroom & Online Planroom The objective of the Project is as-needed water main replacement required to support leak and break repairs and new development projects. It is estimated that approximately 5,280 L.F. of ductile iron water mains will be replaced annually for a two and a half year period. 3/3/2015 489 2:00 PM SAN FRANCISCO SAN FRANCISCO FERRY TERMINAL UTILITY AND ROOF REHABILITATION (ONLINE ONLY) This Public Works Project consists of, in general, rehabilitation of the existing utility system, boarding ramp supports, and existing roofing at the San Francisco Ferry Terminal. The Work includes: removing and replacing under deck sewer and water pipelines; removing and replacing the roof system; removing, replacing, and installing under deck pipe and conduit supports; repairing and patching concrete; repairing and patching exterior stucco walls; painting exterior building surfaces; rehabilitating boarding ramp cylinder supports and hinges; and all other work items as required to complete the Project. Online Project is available for viewing ONLINE ONLY!!! 126-128 2:00 PM SAN FRANCISCO VISITACION VALLEY ELEMENTARY SCHOOL MODERNIZATION Div 1-13 & 15-16. The Project is generally described as General School Modernization and Reconstruction including, but not limited to, ADA Access and Fire/Life-Safety Upgrades, Painting, Installation and Removal of Interim Housing, Miscellaneous Site Work, Hazardous Material/Asbestos Remediation, Demolition of Existing Portables and other Miscellaneous Interior Renovation Work. Page 20 of 30 Planroom & Online Bid Date 3/4/2015 Plan # Bid Time Location 462 2:00 PM SAN FRANCISCO AND ALAMEDA COUNTIES Plan Name CSI Divisions / Job Description # of Addenda Plans CALTRANS 04-013524 REMOVE BRIDGE Remove bridge (portion) and salvage bridge elements in the City and County of San 4 (PORTION) AND SALVAGE BRIDGE ELEMENTS - Francisco and Alameda County from 0.8 mile east of the Yerba Buena Tunnel to 0.8 ONLINE ONLY mile west of the Toll Plaza. The Contractor must have either a Class A License or a combination of Class C Licenses which constitutes a majority of the work. Online This Project is available for viewing ONLINE ONLY!!! 2/26/2015 416 3:00 PM SAN JOSE NEW COYOTE ROAD AND SCARLETT WAY SANITARY Project consists of dust control, mobilization, water pollution control, clearing and SEWER REPLACEMENT - 7132 (ONLINE ONLY) grubbing, watering, sub-bases and bases, deep lift asphalt base, surfacing and pavements, asphalt concrete, concrete structures, reinforcement, curbs and sidewalks, monuments, traffic stripes and pavement markings, drainage and sewer facilities, pipes and structures, trench excavation, bedding and backfill, pipe installation, pipeline structures, acceptance tests for sanitary sewers, cleaning pipelines, and sanitary sewer rehabilitation. Online Project is available for viewing ONLINE ONLY!!! 3/17/2015 497 2:00 PM SAN LEANDRO NEW SITE IMPROVEMENTS AT SAN LEANDRO STATION - BART (ONLINE ONLY) Div 1-3 & 31-33. In general, the Work consists of furnishing all labor, equipment, materials and services required for the construction of Site Improvements at San Leandro Station, including but not limited to, mobilization; construction phasing, demolition; excavation; site preparation; traffic control; and maintenance during construction; removal of excess material and clean up after construction; obtain permits required to execute the Work; replacing reinforced concrete driveway; replacing asphalt concrete pavement; replacing concrete sidewalk, curbs, curb and gutters; replacing ramps; accessibility work; tree and root pruning; completing all required earthwork; replacing pavement marking and striping; and miscellaneous and incidental Work all as Indicated. Project is available for viewing ONLINE ONLY!!! Page 21 of 30 Online Bid Date 3/5/2015 Plan # Bid Time Location 116 2:00 PM Plan Name CSI Divisions / Job Description SAN MATEO NEW HEATING, VENTILATION AND AIR CONDITIONING MODIFICATIONS - RE-BID # of Addenda Plans THIS PROJECT IS A REBID!!! WORK TO BE DONE: The Contractor shall perform all work necessary to complete the Contract in a satisfactory manner. Unless otherwise provided, the Contractor shall furnish and install all materials, equipment, tools, labor, and incidentals necessary to complete the work. 1. Existing HVAC Site Conditions: A. RTU-1 and RTU-2 are roof-mounted air handler units with DX cooling, hot water heating coils, 0-100% outside air economizer, and supply and return fans with variable frequency drives. Condensers of the cooling systems are water-cooled and treated by Dolphin systems. Each unit has 75 ton nominal cooling capacity and rated for 20,000 CFM. B. Units serve both floors of the building with RTU-1 serving the south side and RTU-2 serving the north side. C. The majority of the zones are served by duct mounted reheat coils with a duct mounted static pressure sensors and motorized dampers upstream of the coil. A few zones are served by variable air volume boxes with reheat coils. Zones are made up of multiple rooms with the temperature control in one room. Systems are plenum return. The building occupied 24-hours per day, 365 days per year. Dispatch office units are independent from the main RTU units. SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING: 1. Replace RTU-1 and RTU-2 with two new Trane Intellipak Air cooled units. Units shall be replaced one at a time in order to keep the station operational. Provide a detailed schedule of the work so that the relocation of personnel can be coordinated accordingly. 2. Install condensate pipe per routing and sizes on the plan drawings. Provide submittals on pipe sizes and materials. 3. Disconnect and reconnect the main power feed for the RTU-units. Disconnect and reconnect fire alarm system devices to existing Fire Alarm System. 4. Coordinate unit replacement construction schedule with the City. City will relocate personnel to other parts of the building in order to accommodate the work. 5. Add VAV (variable air volume boxes) and modify ductwork to rezone Rooms 106 Training, 113 Break Room, 116 Briefing Room, 258 Detectives area, and 269 PAL offices. 6. Install supply fans for Locker Rooms: Provide air from return plenum space as make-up air since these spaces are 100% exhausted to the outside. System shall be controlled to run by the building management system or by override switch in Page 22 of 30 Planroom & Online Bid Date Plan # Bid Time Location Plan Name CSI Divisions / Job Description # of Addenda Plans space. 7. Install ceiling transfer fan with wall timer switch in 219 Office. 8. Install ceiling transfer fan with wall timer switch in 262 Conference. 9. Balance the main equipment and the areas with VAV box additions. 10. Replace thermo-fusers with regular register in the VAV zones (in open areas). 11. Install new Alerton building management system. Replace controllers with new Alerton controls, existing wiring can be reused. 12. The majority of the existing ductwork will be used for the work. Ceiling tiles at the modified ductwork connections will be opened and investigated in order to minimize the off-time of the system in the building. 13. Modify fire sprinkler piping as required to accommodate the work. Field verify. 14. Patch roofing material, install new ceiling tiles if damaged, repair any ceiling openings that were required to perform work, and touch-up paint. 15. Train the City personnel for each mode of operation on all equipment, and for planned maintenance work. 16. Replace two existing boilers with two high-efficiency boilers with internal controls. Modify the hot water piping inside the boiler enclosure. Incorporate boiler controls with the new Building Management System. 17. Provide an extended warranty for the compressors. 18. Allowance of $25,000 for unforeseen conditions. Items under the allowance require written approval from the City and the City shall have full authority and discretion to determine the decrease or increase in quantities under the allowance. (Previously scheduled bid date was 1/8/15. Old Plan #78) 2/12/2015 425 2:00 PM SAN MATEO AND ALAMEDA COUNTIES CALTRANS 04-1J5204 INSTALL SIDEWALK, SITE Install sidewalk, site furnishings, signs, native planting, irrigation in San Mateo and FURNISHINGS, SIGNS, NATIVE PLANTING & Alameda Counties in Menlo Park and Fremont at PM 29.3 and PM 0.5. The IRRIGATION (ONLINE ONLY) Contractor must have either a Class A License or one of the following Class C Licenses: C-27, C-13. 1 Online Project is available for viewing ONLINE ONLY!!! 2/18/2015 199 11:00 AM SAN RAFAEL NEW PLANT IMPROVEMENTS 2015 PHASE 1 Div 1-3, 5, 7, 9-11, 15-16, 26 & 40. The Project is generally described as: • Marinwood Pump Station Panel Installation and Pump Upgrades. • Digester Mixing Pump Installation. • Plant Lighting Installation. • Grit Washer Installation with Hydro Cyclones and Yard Piping. Page 23 of 30 Planroom & Online Bid Date 2/25/2015 Plan # Bid Time Location 104-105 2:00 PM SAN RAMON Plan Name CSI Divisions / Job Description DOUGHERTY VALLEY HIGH SCHOOL CLASSROOM BUILDING ADDITION (REBID) THIS PROJECT IS A REBID!!! # of Addenda Plans 3 Planroom & Online 1 Online Div 1-12, 21-23, 25-28 & 31-33. 2-Story addition of approximately 18,850 sq. ft. to general classroom building “A”. Addition is approximately 9,200 sq. ft. per floor, E Occupancy, Type V-B (sprinklered) construction. There are 3 labs, one general education classroom and a CTE facility on the lower level; 4 labs and 2 two general education classrooms on upper level. Also lab prep rooms on both levels, a janitor closet on lower level and book storage room at upper level. There is an enclosed outdoor area attached to the CTE facility and associated site work. Trades include demolition; concrete; thin brick veneer; structural steel; metal fabrications; steel stairs; rough carpentry; finish carpentry; interior architectural woodwork; site-applied water repellent; thermal building insulation; below-grade vapor retarder; water vapor emission control; aluminum plate wall panels; preformed metal roofing; flat seam metal wall panels; modified bitumen roofing; re-roofing; flashing and sheet metal work; penetration firestop systems and sealants; joint sealants; movement joint cover assemblies; steel doors and frames; flush wood doors; integrated door assemblies; flush FRP doors; access doors and panels; aluminum windows; door hardware; glass and glazing; louvers and vents; gypsum board shaftwall systems; ceiling and soffit suspension systems; lath and portland cement plaster; foam shapes in plaster surfaces; gypsum board; acosutical ceilings; resilient flooring; static dissipative tile flooring; carpeting; tackable wall surfaces; acoustic insulation and sealants; painting; markerboards; signage; HDPE toilet compartments and screens; accordion folding partitions; corner guards, toilet and bath accessories; fire protection specialties; steel lockers; projection screens; horizontal louver blinds; lab casework; fire protection; plumbing; HVAC; integrated automation; lighting; electrical; data networking; intrusion alarm; fire alarm; clearing and grubbing; trenching and backfilling; cement and concrete for exterior improvements; base courses; flexible paving; concrete curbs and gutters; fences and gates; irrigation; planting; and utilities. (Previously scheduled bid date was 1/14/15. Old Plan # was the same) 2/11/2015 456 3:00 PM SANTA CLARA SCOTT BOULEVARD AND PARK AVENUE SANITARY SEWER IMPROVEMENTS (ONLINE ONLY) The Work shall consist of replacing approximately 800+/- feet of 8-inch sanitary sewer with 10-inch sanitary sewer at Scott Boulevard (between Homestead Road and Serra Avenue), and replacing approximately 672+/- feet of 10-inch sanitary sewer with 10-inch and 12-inch sanitary sewer at Park Avenue (between Bellomy Street and Poplar Street), replacement of approximately 22 existing sanitary sewer laterals and cleanouts, including sanitary sewer manholes, impacted traffic signal detector loops, and all other appurtenances required to make the work complete. Project is available for viewing ONLINE ONLY!!! Page 24 of 30 Bid Date 2/18/2015 Plan # Bid Time Location 453 3:00 PM SANTA CLARA # of Addenda Plans Plan Name CSI Divisions / Job Description TRIMBLE ROAD TRUNK SANITARY SEWER IMPROVEMENTS (ONLINE ONLY) Div 1-3, 5, 9 & 15. Trades include controlled low strength material, shaft excavation 1 and support, settlement monitoring, erosion control (vegetative), pilot tube guided auger boring, pilot tube guided pipe ramming, pipe jacking using tunnel boring machine, sheeting, shoring and bracing, asphalt concrete pavement and base, slurry seal, high density polyethelene pressure pipe, large PVC non-pressure pip, steel casing pipe, casing spacers, sewer crack and joint grouting, cured-in-place pipe liner, cured-in-place manhole rehabilitation, calcium aluminate manhole rehabilitation, CCTV inspection of sanitary sewer mains, concrete, miscellaneous metals, PVC liner and stop gates. Online Project is available for viewing ONLINE ONLY!!! 3/18/2015 499 2:00 PM NEW CALTRANS 04-235624 REPLACE BRIDGE, HMA SANTA PAVING, DRAINAGE & CONCRETE BARRIER CLARA AND (ONLINE ONLY) SAN MATEO COUNTIES Replace bridge, HMA paving, drainage and concrete barrier in Santa Clara and San Mateo Counties in Palo Alto and East Palo Alto from Oregon Expressway Overcrossing to 0.3 mile south of University Avenue Overcrossing. The Contractor must have either a Class A License or any combination of the following Class C Licenses which constitutes a majority of the work: C-8, C-10, C-12. Online Please see link for INFORMATION HANDOUT http://dot.ca.gov/hq/esc/oe/project_ads_addenda/04/04-235624/supplemental_info/ Project is available for viewing ONLINE ONLY!!! 2/12/2015 301 1:30 PM SANTA CLARA COUNTY INSTALLATION OF COOLING UNITS IN SIGNAL BUNGALOWS Work consists of furnishing all labor, material, and equipment necessary for the addition of 15 HVAC units and control thermostats to designated signal huts along the VTA Light Rail Corridor. All Work must conform to this document and all insurance, bonding, California Public Untilites Commission, and VTA Rail Safety requirements to work within the Light Rail right of Way. See Appendix 'A' for VTA Specified location of Signal Huts. 2/18/2015 485 2:00 PM SANTA ROSA AUSTIN WAY AREA WATER AND SEWER IMPROVEMENTS (ONLINE ONLY) See Specifications for complete Scope of Work. Project is available for viewing ONLINE ONLY!!! 245 2:00 PM SANTA ROSA FORSYTH HALL HVAC UNIT 1 & 2 REPLACEMENT AT SANTA ROSA JR COLLEGE See Specifications for complete Scope of Work. Technical Specifications are on the 3 floor plans. Planroom & Online 61 2:00 PM SARATOGA WEST VALLEY COLLEGE MAIN TELECOMMUNICATIONS ROOM RENOVATION Div 1-3, 5-10, 21-23 & 26-28. Project consists of Renovation of an existing building to house the new telecommunications infrastructure and fiber backbone for the campus; Development of a service yard on the west side of the existing building.; Structural modifications to facilitate architectural, mechanical, and electrical remodel; and New fire suppression system to serve the telecommunications room. Planroom & Online 2/12/2015 Page 25 of 30 1 Planroom & Online Online 3 Bid Date 2/24/2015 Plan # Bid Time Location 458 2:00 PM SAUSALITO # of Addenda Plans Plan Name CSI Divisions / Job Description BEACH FORCE MAIN AND GRAVITY SEWER INSPECTION PROJECT (ONLINE ONLY) Div 1-2 & 9. The Work includes, but is not limited to; 1) the installation of four access wyes along the Beach Force Main (FM); 2) cleaning and CCTV inspection of the SMCSD Beach FM from the Main Street Pump Station to the SMCSD Treatment Facility; 3) cleaning and CCTV inspection of the City of Sausalito gravity sewer from City manhole 110000 to City manholes 110201 and 110202, and additional work as needed to construct and inspect a complete and operational project as specified in these Contract Documents. Online Questions concerning this project or the bid package must be submitted by fax to (415) 332-0453, or email to: [email protected] to Kevin Rahman, Associate Engineer, at least five (5) working days before the time specified for bid opening. Where appropriate, the District may respond to such questions by addenda transmitted to all bid package recipients. Project is available for viewing ONLINE ONLY!!! 2/24/2015 150 2:00 PM SOUTH SAN NEW MUNICIPAL SERVICES BUILDING ATRIUM FRANCISCO RESTROOM MODERNIZATION Div 1-2, 6-10, 12, 22-23 & 26. The Project will demolish existing partitions, light fixtures, equipment, plumbing fixtures, and finishes; patching of ceiling as required; installation of new tile flooring and walls, new partitions, new lighting fixtures and new plumbing fixtures. Planroom & Online Contact Sam Bautista, SSF Engineering Dept. at (650) 829-6668, or by email at: [email protected] 2/12/2015 452 3:00 PM STOCKTON 700 YARD TRACK IMPROVEMENTS PROJECT (ONLINE ONLY) Div 1-2 & 31-34. The Project consists of approximately 24,700 track feet of new track and turnouts, grading, storm drainage facilities, access roads and associated demolition to support the new tracks The new construction will consist of modifications to existing tracks as well as the addition of two lead tracks, A and D, and 9 new yard tracks. All of the work will be located to the north of the existing 700 Yard tracks. A gravel access road will encompass the perimeter of the yard, at-grade crossings will consist of precast concrete panels and paved asphalt approaches. Existing utilities will be encased. Grading and drainage will consist of a network of solid storm drain lines and perforated underdrain piping. The piping will channel the water to a number of new storm drain structures that will drain into several existing storm drain trunk lines and outfall to an existing drainage canal. Several sections of these existing trunk lines will be replaced to accommodate the new track construction. This project will conform to the latest version of City of Stockton, Caltrans, UPRR, and AREMA Standards and Specifications. Project is available for viewing ONLINE ONLY!!! Page 26 of 30 3 Online Bid Date 2/20/2015 Plan # Bid Time Location 405 2:00 PM STOCKTON Plan Name CSI Divisions / Job Description NEW FENCE REPLACEMENT PROJECT AT SAN JOAQUIN DELTA COLLEGE - REBID (ONLINE ONLY) # of Addenda Plans THIS PROJECT IS A REBID!!! Online The Project was reviewed and approved by the Division of State Architect (DSA) and it consists of removal and disposal of old fencing and replacing with new fencing, gates and gate hardware at various locations on the San Joaquin Delta Community College campus, Stockton, CA. The Project shall include incidental vegetation trimming/removal. Project is available for viewing ONLINE ONLY!!! 2/24/2015 406 11:00 AM STOCKTON NEW BLANCHARD AND MARCOPULOS GYM FLOOR REFINISHING AT SAN JOAQUIN DELTA COLLEGE (ONLINE ONLY) The Project generally consists of refinishing of Blanchard and Marcopulos gymnasium hardwood floors including, but not limited to, sanding, sealing, graphics/striping, final finish coating, removal of existing floor boxes and sleeves and adjusted to be flush with new finish floor, removal of existing vented wood base at both gymnasiums, installation of new molded, vented rubber base at both gymnasiums, and the replacement of bottom 6” of gypsum wallboard if found damaged during existing wood base removal and touch-up wall paint as needed. Online Project is available for viewing ONLINE ONLY!!! 2/26/2015 402 2:00 PM STOCKTON NEW SMART CLASSROOMS - PHASE II AT SAN JOAQUIN DELTA COLLEGE (ONLINE ONLY) The Project has been reviewed and approved by the Division of State Architect and generally consists of installation of new audio / visual equipment and associated work in multiple rooms at San Joaquin Delta College, Stockton, CA per Specifications prepared by Angus Hamer, Inc. (DSA approved 01/27/15). Online Project is available for viewing ONLINE ONLY!!! 2/13/2015 408 2:00 PM SUNNYVALE NEW CUPERTINO MIDDLE SCHOOL - PEDESTRIAN CANOPIES (ONLINE ONLY) Div 1-3, 5, 7, 9 & 31-32. Project consists of installation of pedestrian canopies at the new Quad, iincludng selective demolition, concrete, structural steel, steel decking, metal fabrications, metal roof panels, sheet metal flashing and trim, painting, cast-in-place concrete piers and site concrete. 1 Online 1 Online Project is available for viewing ONLINE ONLY!!! 407 3:00 PM SUNNYVALE NEW CUPERTINO MIDDLE SCHOOL - SOUTH PARKING LOT (ONLINE ONLY) New parking lot installation project. This Project is available for viewing ONLINE ONLY!!! Page 27 of 30 Bid Date 3/3/2015 Plan # Bid Time Location 471 3:00 PM TIBURON # of Addenda Plans Plan Name CSI Divisions / Job Description DAIRY KNOLLS STAIR AND PATH IMPROVEMENTS (ONLINE ONLY) The Work to be performed under this Contract consists of constructing two concrete 1 stair cases. Stair cases include concrete steps and landings, metal rails and wood headers with stakes. An aggregate base path shall connect the two stair cases to provide a clear route of travel. Concrete sidewalk shall be constructed to connect the top of the upper stairs to an existing curb ramp adjacent to the existing recreation center building. Clearing and grubbing shall be completed, including removal of a tree. Earthwork and grading shall be completed. The Work will require minor traffic control, coordination with local utility companies, and other miscellaneous items not mentioned above that are required by the Plans, the Standard Specifications or these Special Provisions to be performed, placed, constructed or installed. Online Project is available for viewing ONLINE ONLY!!! 2/18/2015 492 2:00 PM TRACY NEW CORRAL HOLLOW/KAVANAGH STORM DRAIN LIFT STATION REHAB (ONLINE ONLY) The Project is more specifically defined in the Plans and Specifications, but generally includes the following work to be done: Replacement of two approximately 450 gpm and two 1850 gpm submersible pumps in existing storm drain lift station. Online Project is available for viewing ONLINE ONLY!!! 3/3/2015 495 2:00 PM TRACY NEW 11TH STREET EAST TRACY OVERHEAD BRIDGE The Project is more specifically defined in the Contract Documents, but generally includes the following work to be done: Replacement of the existing 11th Street OH REPLACEMENT (ONLINE ONLY) Bridge with a shorter bridge in combination with retaining walls and embankment fill at the approaches. Construction of a temporary on-site detour bridge to allow the existing bridge to be removed and the new bridge to be constructed in one stage on a similar horizontal alignment as the existing structure. Reconstruction and widening of 11th Street and MacArthur Drive, including the installation of curb and gutter, sidewalk, pavement section, sewer main, sewer manholes, storm drain lines and drainage inlets, non-potable water lines, new traffic signal and traffic signal modifications, decorative street lighting system, improvement of open drainage channel, landscaping and irrigation, and signing and striping. The Engineer’s estimate will not be released until the bids are publicly opened. Project is available for viewing ONLINE ONLY!!! Page 28 of 30 Online Bid Date 2/26/2015 Plan # Bid Time Location 457 2:00 PM UNION CITY Plan Name CSI Divisions / Job Description # of Addenda Plans 2014-15 WHEELCHAIR RAMP PROJECT (ONLINE Project consists of hauling, mobilization, water and dust control, maintaining traffic, ONLY) traffic control system for lane closure, construction area signs, barricades, clearing, grubbing, grading and soil off-haul, relocate irrigation lines and heads, curb ramp construction, concrete, sidewalk, curb and gutter, concrete retaining curb and concrete work at traffic signals. Online Questions concerning this Project, based on the bid package, must be submitted by fax to (510) 489-9468 or by email to: [email protected] to Murray Chang or phone (510) 675-5311 at least five (5) working days before the time specified for bid opening. Project is available for viewing ONLINE ONLY!!! 3/5/2015 420 2:00 PM UNION CITY NEW MISSION BOULEVARD UNDERGROUNDING PROJECT-DECOTO ROAD TO 7TH STREET (ONLINE ONLY) Project consists of temporary traffic control, grading, clearing and grubbing, earthwork, landscape, hot mix asphalt, concrete curbs and sidewalks, electrical systems, and concrete. Online Questions concerning this Project, based on the Bid Package, must be submitted by fax to (510) 489-9468, or by email to: [email protected] to Farooq Azim or phone (510) 675-5368 at least five (5) working days before the time specified for bid opening. Project is available for viewing ONLINE ONLY!!! 2/19/2015 445 2:00 PM VALLEJO MARE ISLAND WESTERN APPROACH BRIDGE REPLACEMENT (ONLINE ONLY) The Work to be done includes providing traffic control, remove and replace existing timber bridge with concrete simple span structure constructed of piles, bent cap and precast concrete voided slabs. The approach road on west side will be replaced with new AC pavement. and removing and replacing Portland cement concrete sidewalk and handicap curb ramps. The bidder shall include in his/her bid and provide all labor, tools and materials for a complete and working Project in conformance with the intent shown on the Drawings and specified herein. Contact Srinivas Mulktevi, Project Manager, at (707) 651-7107 with any questions. Project is available for viewing ONLINE ONLY!!! Page 29 of 30 Online Bid Date 2/25/2015 Plan # Bid Time Location 196 2:00 PM VARIOUS Plan Name CSI Divisions / Job Description # of Addenda Plans INSTALL SAFETY BARRIERS IN RIGHT-OF-WAY Div 1-6, 9, 20, 26 & 31-34. The Work, in general, consists of providing all labor, SYSTEM - BART materials, equipment and other services necessary for the performance of all operations to construct permanent physical barriers consisting of any combination of chain link fences and gates, Caltrans K-rail topped with chain link fence, and poles and chains, in various locations as indicated. The Work includes drilling and bonding dowels in concrete; drilling and bonding dowels with chemical adhesives; cast-in-place concrete; precast concrete; clearing and grubbing; locating existing utilities; protection of existing utilities; earthwork; and grounding and bonding of new barriers. Planroom & Online The Work includes: Mobilization, construction phasing, construction barriers, demolition, excavation, traffic control, site preparation and maintenance during construction, removal of excess material and clean up after construction. In addition, the Contractor shall be responsible for obtaining all required permits from authorities other than BART as needed for the execution of the Work. A permit from Union Pacific Railroad (UPRR or Railroad) is required for site for AYJ, which is located at E. 8th Street in Oakland, CA AYJ is more than 50 feet away from the center line of UPRR. See Contract Drawings. 2/27/2015 411 2:00 PM NEW TOUCHSTONE PARK ADA PROJECT (ONLINE WEST ONLY) SACRAMENT O 1 Project consists of the installation of concrete ADA sidewalk and ADA compliant picnic pad, two picnic tables and a drinking fountain, including replacement of any pavement, sidewalk, curb and gutter or public and private improvements removed or damaged as a consequence of the execution of this contract. Project is available for viewing ONLINE ONLY!!! Page 30 of 30 Online
© Copyright 2024